Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Telemetry”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

ATS-6 - Satellite-to-satellite tracking and data relay experiments

The paper describes the utilization of ATS-6 to relay tracking and telemetry data from Geos-5 and then from Nimbus-6. The experiment configuration consists of a ground station which receives data from ATS-6 through C-band links; ATS-6, in turn, transmits command data and receives telemetry data from the low-orbit satellites through S-band links. The ground and satellite equipment are described along with results of ground tests.

Schmid, P. E.↗

The SAS-3 delayed command system

To meet the requirements arising from the increased complexity of the power, attitude control and telemetry systems, a full redundant high-performance control section with delayed command capability was designed for the Small Astronomy Satellite-3 (SAS-3). The relay command system of SAS-3 is characterized by 56 bystate relay commands, with capability for handling up to 64 commands in future versions. The 'short' data command service of SAS-1 and SAS-2 consisting of shifting 24-bit words to two users was expanded to five users and augmented with a 'long load' data command service (up to 4080 bits) used to program the telemetry system and the delayed command subsystem. The inclusion of a delayed command service ensures a program of up to 30 relay or short data commands to be loaded for execution at designated times. The design and system operation of the SAS-3 command section are analyzed, with special attention given to the delayed command subsystem.

Hoffman, E. J.↗

Viking mission support

The relatively quiet Viking On Board Science & Telemetry period from November 15, 1976, through December 31, 1976, is discussed, when Mars and the Viking spacecraft were in the Solar conjunction period. The period therefore presented the Viking Radio Science Team with a unique opportunity to utilize the DSN and Viking spacecraft to exercise their experiments with nonstandard station configurations, without the usual command and telemetry constraints.

Johnston, D. W. H.↗

Experiment support system

The Experiment Support System is a switchboard system with displays and controls. It routes electrical power to experiments M092, M093, and M171 equipment; gaseous nitrogen to the Blood Pressure Measurement System; receives biomedical data from all related equipment; routes the conditioned data signals to the Airlock Module Telemetry System and also displays (in digital or analog from) portions of that data which the crewmen must see to complete the experiment successfully. The Experiment Support System is interfaced to the M131 control panel to transfer conditioned data to the Airlock Module Telemetry System.

Shannon, A. V.↗

Space environmental effects on the SKYNET 2B spacecraft

References are made to environmentally induced electrical anomalies which are known to occur on geosynchronous spacecraft, and in particular to those which have occurred on the SKYNET 2B communications spacecraft. Details are given of the investigation made into anomalous telemetry data received from SKYNET 2B during its first 23 months of operation. The frequency and timing of these anomalous events appear to differ from those described in earlier reports of such phenomena. Attempts are made to correlate the anomalous telemetry data with data describing the spacecraft environment. Some details are given of the spacecraft configuration and comments made on its susceptibility to anomalies of this type.

Robbins, A.↗

The Plasma Interaction Experiment (PIX) description and test program

The plasma interaction experiment (PIX) is a battery powered preprogrammed auxiliary payload on the LANDSAT-C launch. This experiment is part of a larger program to investigate space plasma interactions with spacecraft surfaces and components. The varying plasma densities encountered during available telemetry coverage periods are deemed sufficient to determine first order interactions between the space plasma environment and the biased experimental surfaces. The specific objectives of the PIX flight experiment are to measure the plasma coupling current and the negative voltage breakdown characteristics of a solar array segment and a gold plated steel disk. Measurements will be made over a range of surface voltages up to plus or minus kilovolt. The orbital environment will provide a range of plasma densities. The experimental surfaces will be voltage biased in a preprogrammed step sequence to optimize the data returned for each plasma region and for the available telemetry coverage.

Ignaczak, L. R.↗

LANDSAT-1 and LANDSAT-2 flight evaluation report, 23 January - 23 April 1977

The LANDSAT operations from launch through orbital instrument observations are reviewed. Orbital parameters, power subsystem, attitude control subsystem, and command/clock subsystem are discussed. Other subsystems are also considered, such as telemetry, orbit adjust, electrical interface, thermal, wideband telemetry, multispectral scanner, and data collection.

Source record↗

Propulsion/flight control integration technology (PROFIT) software system definition

The Propulsion Flight Control Integration Technology (PROFIT) program is designed to develop a flying testbed dedicated to controls research. The control software for PROFIT is defined. Maximum flexibility, needed for long term use of the flight facility, is achieved through a modular design. The Host program, processes inputs from the telemetry uplink, aircraft central computer, cockpit computer control and plant sensors to form an input data base for use by the control algorithms. The control algorithms, programmed as application modules, process the input data to generate an output data base. The Host program formats the data for output to the telemetry downlink, the cockpit computer control, and the control effectors. Two applications modules are defined - the bill of materials F-100 engine control and the bill of materials F-15 inlet control.

Carlin, C. M.↗

ATS-6 flight accelerometers

Five accelerometers mounted near the adapter base of the Titan 3-C launch vehicle and three on the hub of the ATS-F spacecraft provided (1) data for verifying basic spacecraft mode shapes and frequencies during powered flight while attached to the launch vehicle; (2) failure mode detection and diagnostic information on in-flight anomalies; and (3) data to be used in the design of future spacecraft to be flown on the Titan 3-C. Because data from the instruments mounted on the spacecraft hub passed through an in-flight disconnect at the separation plane between the transtage and ATS-F, the moment this connector was broken, the signal to the telemetry system showed a step function change. By monitoring these telemetry traces on the ground at appropriate times during flight sequences, a positive indication of spacecraft separation was obtained. Flight data showing dynamic response at spacecraft launch vehicle interface and at the top of ATS spacecraft during significant launch events are presented in tables.

Mattson, R.↗

The Plasma Interaction Experiment /PIX/ - Description and flight qualification test program

The Plasma Interaction Experiment (PIX) is a battery powered preprogrammed auxiliary payload on the Landsat-C launch. This experiment is part of a larger program to investigate space plasma interactions with spacecraft surfaces and components. The varying plasma densities encountered during available telemetry coverage periods are deemed sufficient to determine first order interactions between the space plasma environment and the biased experimental surfaces. The specific objectives of the PIX flight experiment are to measure the plasma coupling current and the negative voltage breakdown characteristics of a solar array segment and a gold plated steel disk. Measurements will be made over a range of surface voltages up to plus or minus 1 kilovolt. The orbital environment will provide a range of plasma densities. The experimental surfaces will be voltage-biased in a preprogrammed step sequence to optimize the data returned for each plasma region and for the available telemetry coverage.

Ignaczak, L. R.↗

Impact of advanced onboard processing concepts on end-to-end data system

An investigation is conducted of the impact of advanced onboard data handling concepts on the total system in general and on ground processing operations, such as those being performed in the central data processing facility of the NASA Goddard Space Flight Center. In one of these concepts, known as the instrument telemetry packet (ITP) system, telemetry data from a single instrument is encoded into a packet, along with other ancillary data, and transmitted in this form to the ground. Another concept deals with onboard temporal registration of image data from such sensors as the thematic mapper, to be carried onboard the Landsat-D spacecraft in 1981. It is found that the implementation of the considered concepts will result in substantial simplification of the ground processing element of the system. With the projected tenfold increase in the data volume expected in the next decade, the introduction of ITP should keep the cost of the ground data processing function within reasonable bounds and significantly contribute to a more timely delivery of data/information to the end user.

Sos, J. Y.↗

NASA standard communications and data handling subsystem

The paper gives a functional description and discusses hardware implementation for the Communication and Data Handling (C&DH) subsystem of the Multimission Modular Spacecraft. The C&DH subsystem: (1) provides the command and telemetry link between the spacecraft and the terrestrial system, (2) distributes commands to and collects telemetry from all spacecraft systems via a duplex serial multiplex data bus and remote interface units, and (3) contains onboard computation capability. The C&DH is a single 4 x 4 x 1-1/2 foot module; the stuffed module weighs 270 lbs including 60 lbs of mission unique weight. The hardware is versatile and cost effective, and its modular structure permits repair, refurbishment, and even modification/updating in space

Robinson, D. L.↗

Radio frequency arraying method for receivers

A method and apparatus for increasing the signal to noise ratio of a receiving facility for coherent frequency reception by arraying receiving systems using separate antennas for each, or one antenna for all systems are presented. One system is operated with a carrier tracking loop to provide a first local oscillator frequency for the first and all other systems arrayed, with individual tracking loops in all other systems operated at IF for tracking out any phase differences due to separate group delays using an adjustable phase shifter for a second reference to compensate for different group delays in the antenna and low noise amplifier of each of the other systems. The second IF output of all systems is summed into the first system. This technique may also be used when two systems are arrayed to an antenna designed for circular or linear polarization diversity reception to effectively provide the same signal to noise ratio for both polarized signal transmission channels that would result from matched polarization. An arrangement adapted to high rate telemetry reception is disclosed. With additional components, the same arrangement is adapted to provide low rate telemetry reception as well.

Brockman, M. H.↗

The RSZ BASIC programming language manual

The RSZ BASIC interactive language is described. The RSZ BASIC interpreter is resident in the Telemetry Data Processor, a system dedicated to the processing and displaying of PCM telemetry data. A series of working examples teaches the fundamentals of RSZ BASIC and shows how to construct, edit, and manage storage of programs.

Stattel, R. J.↗

Shuttle/payload communications and data systems interface analysis

The payload/orbiter functional command signal flow and telemetry signal flow are discussed. Functional descriptions of the various orbiter communication/avionic equipment involved in processing a command to a payload either from the ground through the orbiter by the payload specialist on the orbiter are included. Functional descriptions of the various orbiter communication/avionic equipment involved in processing telemetry data by the orbiter and transmitting the processed data to the ground are presented. The results of the attached payload/orbiter single processing and data handling system evaluation are described. The causes of the majority of attached payload/orbiter interface problems are delineated. A refined set of required flux density values for a detached payload to communicate with the orbiter is presented.

Huth, G. K.↗

LANDSAT-2 and LANDSAT-3 Flight evaluation report

Flight performance analysis of LANDSAT 2 and LANDSAT 3 are presented for the period July 1978 to October 1978. Spacecraft operations and orbital parameters are summarized for each spacecraft. Data are provided on the performance and operation of the following subsystems onboard the spacecraft: power; attitude control; command/clock; telemetry; orbit adjust; magnetic moment compensating assembly; unified S band/premodulation processor; electrical interface; thermal narrowband tape recorders; wideband telemetry; attitude measurement sensor; wideband video tape recorders; return beam vidicon; multispectral scanner subsystem; and data collections.

Winchester, T. W.↗

Total Hip Joint Replacement Biotelemetry System

The development of a biotelemetry system that is hermetically sealed within a total hip replacement implant is reported. The telemetry system transmits six channels of stress data to reconstruct the major forces acting on the neck of the prosthesis and uses an induction power coupling technique to eliminate the need for internal batteries. The activities associated with the telemetry microminiaturization, data recovery console, hardware fabrications, power induction systems, electrical and mechanical testing and hermetic sealing test results are discussed.

Boreham, J. F.↗