Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task Force”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,002 records · Page 56

Orion Handling Qualities During ISS Rendezvous and Docking

The Orion spacecraft was designed to rendezvous with multiple vehicles in low earth orbit (LEO) and beyond. To perform the required rendezvous and docking task, Orion must provide enough control authority to perform coarse translational maneuvers while maintaining precision to perform the delicate docking corrections. While Orion has autonomous docking capabilities, it is expected that final approach and docking operations with the International Space Station (ISS) will initially be performed in a manual mode. A series of evaluations was conducted by NASA and Lockheed Martin at the Johnson Space Center to determine the handling qualities (HQ) of the Orion spacecraft during different docking and rendezvous conditions using the Cooper-Harper scale. This paper will address the specifics of the handling qualities methodology, vehicle configuration, scenarios flown, data collection tools, and subject ratings and comments. The initial Orion HQ assessment examined Orion docking to the ISS. This scenario demonstrates the Translational Hand Controller (THC) handling qualities of Orion. During this initial assessment, two different scenarios were evaluated. The first was a nominal docking approach to a stable ISS, with Orion initializing with relative position dispersions and a closing rate of approximately 0.1 ft/sec. The second docking scenario was identical to the first, except the attitude motion of the ISS was modeled to simulate a stress case ( 1 degree deadband per axis and 0.01 deg/sec rate deadband per axis). For both scenarios, subjects started each run on final approach at a docking port-to-port range of 20 ft. Subjects used the THC in pulse mode with cues from the docking camera image, window views, and range and range rate data displayed on the Orion display units. As in the actual design, the attitude of the Orion vehicle was held by the automated flight control system at 0.5 degree deadband per axis. Several error sources were modeled including Reaction Control System (RCS) jet angular and position misalignment, RCS thrust magnitude uncertainty, RCS jet force direction uncertainty due to self plume impingement, and Orion center of mass uncertainty.

Hart, Jeremy J.↗

Range-Specific High-Resolution Mesoscale Model Setup: Data Assimilation

Mesoscale weather conditions can have an adverse effect on space launch, landing, and ground processing at the Eastern Range (ER) in Florida and Wallops Flight Facility (WFF) in Virginia. During summer, land-sea interactions across Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) lead to sea breeze front formation, which can spawn deep convection that can hinder operations and endanger personnel and resources. Many other weak locally driven low-level boundaries and their interactions with the sea breeze front and each other can also initiate deep convection in the KSC/CCAFS area. Some of these other boundaries include the Indian River breeze front, Banana River breeze front, outflows from previous convection, horizontal convective rolls, convergence lines from other inland bodies of water such as Lake Okeechobee, the trailing convergence line from convergence of sea breeze fronts due to the shape of Cape Canaveral, frictional convergence lines from the islands in the Bahamas, convergence lines from soil moisture differences, convergence lines from cloud shading, and others. All these subtle weak boundary interactions often make forecasting of operationally important weather very difficult at KSC/CCAFS during the convective season (May-Oct). These convective processes often build quickly, last a short time (60 minutes or less), and occur over small distances, all of which also poses a significant challenge to the local forecasters who are responsible for issuing weather advisories, watches, and warnings. Surface winds during the transition seasons of spring and fall pose the most difficulties for the forecasters at WFF. They also encounter problems forecasting convective activity and temperature during those seasons. Therefore, accurate mesoscale model forecasts are needed to aid in their decision making. Both the ER and WFF would benefit greatly from high-resolution mesoscale model output to better forecast a variety of unique weather phenomena. Global and national scale models cannot properly resolve important local-scale weather features at each location due to their horizontal resolutions being much too coarse. Therefore, a properly tuned model at a high resolution is needed to provide improved capability. This task is a multi-year effort in which the Applied Meteorology Unit (AMU) will tune the Weather Research and Forecasting (WRF) model individually for each range. The goal of the first year, the results of which are in this report, was to tune the WRF model based on the best model resolution and run time while using reasonable computing capabilities. To accomplish this, the ER and WFF supported the tasking of the AMU to perform a number of sensitivity tests in order to determine the best model configuration for operational use at each of the ranges to best predict winds, precipitation, and temperature (Watson 2013). This task is a continuation of that work and will provide a recommended local data assimilation (DA) and numerical forecast model design optimized for the ER and WFF to support space launch activities. The model will be optimized for local weather challenges at both ranges.

Global and national scale models↗

ELaNa - Educational Launch of Nanosatellite Enhance Education Through Space Flight

One of NASA's missions is to attract and retain students in the science, technology, engineering and mathematics (STEM) disciplines. Creating missions or programs to achieve this important goal helps strengthen NASA and the nation's future work force as well as engage and inspire Americans and the rest of the world. During the last three years, in an attempt to revitalize educational space flight, NASA generated a new and exciting initiative. This initiative, NASA's Educational Launch of Nanosatellite (ELaNa), is now fully operational and producing exciting results. Nanosatellites are small secondary satellite payloads called CubeSats. One of the challenges that the CubeSat community faced over the past few years was the lack of rides into space. Students were building CubeSats but they just sat on the shelf until an opportunity arose. In some cases, these opportunities never developed and so the CubeSat never made it to orbit. The ELaNa initiative is changing this by providing sustainable launch opportunities for educational CubeSats. Across America, these CubeSats are currently being built by students in high school all the way through graduate school. Now students know that if they build their CubeSat, submit their proposal and are selected for an ELaNa mission, they will have the opportunity to fly their satellite. ELaNa missions are the first educational cargo to be carried on expendable launch vehicles (ELY) for NASA's Launch Services Program (LSP). The first ELaNa CubeSats were slated to begin their journey to orbit in February 2011 with NASA's Glory mission. Due to an anomaly with the launch vehicle, ELaNa II and Glory failed to reach orbit. This first ELaNa mission was comprised of three IU CubeSats built by students at Montana State University (Explorer Prime Flight 1), the University of Colorado (HERMES), and Kentucky Space, a consortium of state universities (KySat). The interface between the launch vehicle and the CubeSat, the Poly-Picosatellite Orbital Deployer (P-POD), was developed and built by students at California Polytechnic State University (Cal Poly). Integrating a P-POD on a NASA ELV was not an easy task. The creation of new processes and requirements as well as numerous reviews and approvals were necessary within NASA before the first ELaNa mission could be attached to a NASA launch vehicle (LV). One of the key objectives placed on an ELaNa mission is that the CubeSat and PPOD does not increase the baseline risk to the primary mission and launch vehicle. The ELaNa missions achieve this objective by placing a rigorous management and engineering process on both the LV and CubeSat teams. So, what is the future of ELaNa? Currently there are 16 P-POD missions manifested across four launch vehicles to support educational CubeSats selected under the NASA CubeSat Initiative. From this initiative, a rigorous selection process produced 22-student CubeSat missions that are scheduled to fly before the end of 2012. For the initiative to continue, organizations need to submit proposals to the annual CubeSat initiative call so they have the opportunity to be manifested and launched.

Skrobot, Garrett Lee↗

Investigation of a Helicopter Individual Blade Control (IBC) System in Two Full-Scale Wind Tunnel Tests: Volume I

This report presents the data acquired during the testing of an individual blade control (IBC) system on a full-scale helicopter rotor in two test entries in the NASA Ames 40- by 80-Foot Wind Tunnel. The objective of these investigations was to evaluate the potential benefits of using IBC to improve rotor performance, reduce blade vortex interaction (BVI) noise, and alleviate helicopter vibrations. The wind tunnel tests were an international, collaborative effort between NASA, the U.S. Army Aeroflightdynamics Directorate, ZF Luftfahrttechnik GmbH, Eurocopter Deutschland GmbH, and the German Aerospace Laboratory (DLR). They were conducted as a task of the U.S./German Memorandum of Understanding (MOU) on Helicopter Aeromechanics. The IBC tests were performed using a full-scale BO-105 helicopter rotor mounted to the NASA/U.S. Army Rotor Test Apparatus (RTA). The first test, performed in 1993, was the first full-scale wind tunnel test to explore the effects of an IBC system on rotor vibration, noise, and performance. In this test, the pitch links of the rotor were replaced by servo-actuators. The servo-actuators and IBC control system were designed and manufactured by ZF Luftfahrttechnik GmbH. This control system allowed the pitch of each rotor blade to be changed independently of the other blades. The IBC inputs had large effects on the hub vibrations and BVI noise. However, the rotor hub moments were not retrimmed with each new IBC input. This resulted in an out-of-trim rotor configuration. The same IBC system was used in the second IBC test performed in 1994. This test more carefully investigated the potential of IBC to simultaneously reduce noise and vibration and also investigated the effect of IBC on rotor performance in high-speed-cruise flight. In the 1994 test, the hub moment and rotor thrust were readjusted to maintain rotor trim as the IBC inputs were applied. For this reason, the data taken from the second test are considered to be more accurate, except for some unique IBC input combinations not repeated in the second test. IBC controls that were evaluated were single-frequency inputs from 2/rev to 6/rev and multi-harmonic combinations of these frequencies to form pulses, wavelets, and doublets. Extensive data were acquired for each IBC data point. These data included rotor performance, average and time-varying hub loads, rotor blade bending loads, control system loads, inboard and outboard blade pitch motions, and BVI noise data. The rotor balance hub force and moment data included the mean values, half-peak-to-peak values, and sine/cosine harmonics up to the 20th rotor harmonic. The time history and averaged Fourier spectrum for each measurement are available electronically from NASA Ames Research Center. The data indicate that significant reduction in both BVI noise and hub vibration can be obtained using IBC. The 2/rev input produced the best single-frequency results. At a typical descent flight condition, 2/rev IBC combined with other IBC harmonics reduced the BVI noise up to 12 dB (85 percent) at some microphone locations. At the same time, this input could also reduce the dominant 4/rev vibratory hub loads by up to 75 percent. The data also show that performance improvements of up to 7 percent were obtained using 2/rev IBC at high-speed forward flight conditions. An analysis of the hydraulic power requirements for BVI noise suppression, vibration reduction, and rotor performance improvement is included in this report. This analysis shows that the power required by the IBC system is negligible at low-speed flight conditions, and that a net gain of 3 percent of rotor horsepower can be achieved at high-speed flight conditions.

Investigation↗

Summary of the key features of seven biomathematical models of human fatigue and performance

BACKGROUND: Biomathematical models that quantify the effects of circadian and sleep/wake processes on the regulation of alertness and performance have been developed in an effort to predict the magnitude and timing of fatigue-related responses in a variety of contexts (e.g., transmeridian travel, sustained operations, shift work). This paper summarizes key features of seven biomathematical models reviewed as part of the Fatigue and Performance Modeling Workshop held in Seattle, WA, on June 13-14, 2002. The Workshop was jointly sponsored by the National Aeronautics and Space Administration, U.S. Department of Defense, U.S. Army Medical Research and Materiel Command, Office of Naval Research, Air Force Office of Scientific Research, and U.S. Department of Transportation. METHODS: An invitation was sent to developers of seven biomathematical models that were commonly cited in scientific literature and/or supported by government funding. On acceptance of the invitation to attend the Workshop, developers were asked to complete a survey of the goals, capabilities, inputs, and outputs of their biomathematical models of alertness and performance. Data from the completed surveys were summarized and juxtaposed to provide a framework for comparing features of the seven models. RESULTS: Survey responses revealed that models varied greatly relative to their reported goals and capabilities. While all modelers reported that circadian factors were key components of their capabilities, they differed markedly with regard to the roles of sleep and work times as input factors for prediction: four of the seven models had work time as their sole input variable(s), while the other three models relied on various aspects of sleep timing for model input. Models also differed relative to outputs: five sought to predict results from laboratory experiments, field, and operational data, while two models were developed without regard to predicting laboratory experimental results. All modelers provided published papers describing their models, with three of the models being proprietary. CONCLUSIONS: Although all models appear to have been fundamentally influenced by the two-process model of sleep regulation by Borbely, there is considerable diversity among them in the number and type of input and output variables, and their stated goals and capabilities.

Fatigue/physiopathology↗

Robotic End Effectors for Hard-Rock Climbing

Special-purpose robot hands (end effectors) now under development are intended to enable robots to traverse cliffs much as human climbers do. Potential applications for robots having this capability include scientific exploration (both on Earth and other rocky bodies in space), military reconnaissance, and outdoor search and rescue operations. Until now, enabling robots to traverse cliffs has been considered too difficult a task because of the perceived need of prohibitively sophisticated planning algorithms as well as end effectors as dexterous as human hands. The present end effectors are being designed to enable robots to attach themselves to typical rock-face features with less planning and simpler end effectors. This advance is based on the emulation of the equipment used by human climbers rather than the emulation of the human hand. Climbing-aid equipment, specifically cams, aid hooks, and cam hooks, are used by sport climbers when a quick ascent of a cliff is desired (see Figure 1). Currently two different end-effector designs have been created. The first, denoted the simple hook emulator, consists of three "fingers" arranged around a central "palm." Each finger emulates the function of a particular type of climbing hook (aid hook, wide cam hook, and a narrow cam hook). These fingers are connected to the palm via a mechanical linkage actuated with a leadscrew/nut. This mechanism allows the fingers to be extended or retracted. The second design, denoted the advanced hook emulator (see Figure 2), shares these features, but it incorporates an aid hook and a cam hook into each finger. The spring-loading of the aid hook allows the passive selection of the type of hook used. The end effectors can be used in several different modes. In the aid-hook mode, the aid hook on one of the fingers locks onto a horizontal ledge while the other two fingers act to stabilize the end effector against the cliff face. In the cam-hook mode, the broad, flat tip of the cam hook is inserted into a non-horizontal crack in the cliff face. A subsequent transfer of weight onto the end effector causes the tip to rotate within the crack, creating a passive, self-locking action of the hook relative to the crack. In the advanced hook emulator, the aid hook is pushed into its retracted position by contact with the cliff face as the cam hook tip is inserted into the crack. When a cliff face contains relatively large pockets or cracks, another type of passive self-locking can be used. Emulating the function of the piece of climbing equipment called a "cam" (note: not the same as a "cam hook"; see Figure 1), the fingers can be fully retracted and the entire end effector inserted into the feature. The fingers are then extended as far as the feature allows. Any weight then transferred to the end effector will tend to extend the fingers further due to frictional force, passively increasing the grip on the feature. In addition to the climbing modes, these end effectors can be used to walk on (either on the palm or the fingertips) and to grasp objects by fully extending the fingers.

Kennedy, Brett↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the intern’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight mid deck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned for dual-use medical scrub and galley handwash facility. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Habitat↗

Configuration and Projected Capabilities of the Common Habitat Medical Care Facility

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage Liquid Oxygen (LOX) tank as its primary structure. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. Additional work outside the scope of this paper is developing a vertical translation system, a crew mobility aids system based on wearable gecko-derived grippers, and a crew seating/restraint system. These systems are all assumed for use in conjunction with the Medical Care Facility, which is needed to maintain crew well-being during these missions, where distance from Earth precludes the possibility of evacuation to Earth. This paper describes recent improvements in the Common Habitat Medical Care Facility and associated benefits for crew survivability in long duration missions beyond Earth orbit. These improvements were made with the assistance of a NASA Pathways intern whose experience includes a tour of duty in Afghanistan as an Army combat medic with the 691st GHOST-T, attached to the 1st and 7th US Special Forces Groups as part of Operation Freedom’s Sentinel, where he helped provide far-forward surgical capabilities in austere combat environments. The initial baseline Medical Care Facility was developed working in conjunction with University of Houston Space Architecture graduate students. The facility was placed on the upper deck of the Common Habitat in a location that provided privacy, operational volume, and was close to the vertical translation pathway. The notional outfitting repurposed component CAD models from unrelated studies and notionally indicated a level of care roughly equivalent to that aboard the International Space Station. The CAD modeling provided notional stowage volumes, a deployable surface, some fixed equipment, an ultrasound, and a potentially reconfigurable treatment table. While this facility is clearly a competent arrangement, it was desired to leverage available expertise and upgrade the station given the vast distances from Earth to be experienced by the Common Habitat. Key driving requirements applied to the upgrade included to provide NASA’s Medical Level of Care V, offer enhanced telemedicine capabilities, provide patient physical accommodation, provide caregiver access to the patient from all sides, include sliding pocket doors for access to hygiene and to the Vertical Translation System, and to add any additional capability possible for the best achievable medical care. The first step in the facility upgrade was to quantify the current medical inventory on the International Space Station and ensure that sufficient stowage volume was present for this purpose. To that end, the ISS medical kits were reviewed, and eight full size mid deck lockers were placed in the facility. A number of additional devices were also added, based on the co-author’s combat medic experience. Also, two fixed shelves and one horizontal work surface were added to the Medical Care Facility, with the shelves providing storage space for the additional devices and the work surface providing a location for the caregiver to work or stage equipment. Four display monitors were added to the wall above the horizontal work surface, supporting data display, telemedicine, conferencing, or other needs. The existing treatment table was replaced with a mobile surgical stretcher-chair. Two additional doors were added to the Medical Care Facility. One leads directly to the hygiene compartment, allowing it to support medical operations in addition to providing galley/wardroom support. The other door leads directly into the Vertical Translation System. The wall adjacent to the subsystems bay was moved, adding additional volume to the Medical Care Facility. This improved caregiver access to the patient and allowed for a larger number of caregivers to be present. It also provided options for relocation of support equipment relative to the patient as needed. In the upgraded Medical Care Facility, the Surgical Stretcher-Chair and the Vertical Translation System can work together to provide incapacitated crew member transport from a site of injury on any deck of the Common Habitat to the Medical Care Facility. It can also support patient treatment in a variety of positions including a variety of sitting postures and a supine posture at a variety of pitch angles. The facility can also support caregiver office work for review of examination results, private consultation, inventory and maintenance, and a variety of other purposes. A forward activity will be to conduct evaluations of the Medical Care Facility with different medical scenarios. Additionally, ambient and task lighting selections remain as forward work. The eight middeck lockers can be augmented to use as portable equipment carts, similar to a manner in which maintenance facility stowage was used as portable carts during the NASA Desert Research and Technology Studies in the Constellation Program. Trash accommodation will also need forward work to assess, including provision for wet trash, dry trash, and biological waste. It will be important to assess a redesign of the surgical stretcher-chair. The commercial version used in the upgrade can only enable vertical translation in the seated configuration, requiring the patient to bend both hips and knees. A possible redesign of the chair will allow for vertical translation without requiring any bending at the hip or knees. Also, the commercial version is wheeled, making it mobile in gravity but unanchored in microgravity. Work will be needed to adapt the chair for gravity-independent performance. The hygiene compartment can be redesigned to serve both as a medical scrub facility and for galley hand washing. Pending sufficient volume, it may also be possible to place sanitation equipment in this location to clean medical tools. Finally, most space architectures have never allowed for more than one incapacitated crew member, but several scenarios could potentially injure two or more crew in the same incident. This facility could be assessed to determine its present ability to address two or more injured crew in parallel and determine the potential upper limit for number of treatable crew in a multi-crew injury scenario, or to treat polytrauma of a single patient.

Common Habitat↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

High Performance EVA Glove Collaboration: Glove Injury Data Mining Effort

Human hands play a significant role during Extravehicular Activity (EVA) missions and Neutral Buoyancy Lab (NBL) training events, as they are needed for translating and performing tasks in the weightless environment. Because of this high frequency usage, hand and arm related injuries are known to occur during EVA and EVA training in the NBL. The primary objectives of this investigation were to: 1) document all known EVA glove related injuries and circumstances of these incidents, 2) determine likely risk factors, and 3) recommend interventions where possible that could be implemented in the current and future glove designs. METHODS: The investigation focused on the discomforts and injuries of U.S. crewmembers who had worn the pressurized Extravehicular Mobility Unit (EMU) spacesuit and experienced 4000 Series or Phase VI glove related incidents during 1981 to 2010 for either EVA ground training or in-orbit flight. We conducted an observational retrospective case-control investigation using 1) a literature review of known injuries, 2) data mining of crew injury, glove sizing, and hand anthropometry databases, 3) descriptive statistical analyses, and finally 4) statistical risk correlation and predictor analyses to better understand injury prevalence and potential causation. Specific predictor statistical analyses included use of principal component analyses (PCA), multiple logistic regression, and survival analyses (Cox proportional hazards regression). Results of these analyses were computed risk variables in the forms of odds ratios (likelihood of an injury occurring given the magnitude of a risk variable) and hazard ratios (likelihood of time to injury occurrence). Due to the exploratory nature of this investigation, we selected predictor variables significant at p≤0.15. RESULTS: Through 2010, there have been a total of 330 NASA crewmembers, from which 96 crewmembers performed 322 EVAs during 1981-2010, resulting in 50 crewmembers being injured inflight and 44 injured during 11,704 ground EVA training events. Of the 196 glove related injury incidents, 106 related to EVA and 90 to EVA training. Over these 196 incidents, 277 total injuries (126 flight; 151 training) were reported and were then grouped into 23 types of injuries. Of EVA flight injuries, 65% were commonly reported to the hand (in general), metacarpophalangeal (MCP) joint, and finger (not including thumb) with fatigue, abrasion, and paresthesia being the most common injury types (44% of total flight injuries). Training injuries totaled to more than 70% being distributed to the fingernail, MCP joint, and finger crotch with 88% of the specific injuries listed as pain, erythema, and onycholysis. Of these training injuries, when reporting pain or erythema, the most common location was the index finger, but when reporting onycholysis, it was the middle finger. Predictor variables specific to increased risk of onycholysis included: female sex (OR=2.622), older age (OR=1.065), increased duration in hours of the flight or training event (OR=1.570), middle finger length differences in inches between the finger and the EVA glove (OR=7.709), and use of the Phase VI glove (OR=8.535). Differentiation between training and flight and injury reporting during 2002-2004 were significant control variables. For likelihood of time to first onycholysis injury, there was a 24% reduction in rate of reporting for each year increase in age. Also, more experienced crewmembers, based on number of EVA flight or training events completed, were less likely to report an onycholysis injury (3% less for every event). Longer duration events also found reporting rates to occur 2.37 times faster for every hour of length. Crewmembers with larger hand size reported onycholysis 23% faster than those with smaller hand size. Finally, for every 1/10th of an inch increase in difference between the middle finger length and the glove, the rate of reporting increased by 60%. DISCUSSION: One key finding was that the Series 4000 glove had a lower injury risk than the Phase VI, which provides a platform for further evaluation. General interventions that reduce hand overexertion and repetitive use exposure through tool development, procedural changes and shorter exposures may be one mitigation path, but due to the way the training event times were reported, we cannot provide a guideline for a specific event duration change. When the finger length was different from the glove length, the risk of injury increased indicating that the use of larger finger take-ups could be contributing to injury and therefore may not be recommended. Prior to this investigation, there was one previous investigation indicating hand anthropometry may be related to onycholysis. We found different hand anthropometry variables indicated by this investigation as compared to the prior, specifically differences in middle finger length compared to glove finger length, which point more towards a sizing issue than a specific anthropometry issue. Additionally, although this investigation has identified sizing as an issue, the force and environmental-related variables of the EVA glove that could also cause injury were not accounted for.

Reid, C. R.↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗