Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Development of the Space Debris Sensor

The Space Debris Sensor (SDS) is a NASA experiment scheduled to fly aboard the International Space Station (ISS) starting in 2017. The SDS is the first flight demonstration of the Debris Resistive/Acoustic Grid Orbital NASA-Navy Sensor (DRAGONS) developed and matured by the NASA Orbital Debris Program Office. The DRAGONS concept combines several technologies to characterize the size, speed, direction, and density of small impacting objects. With a minimum two-year operational lifetime, SDS is anticipated to collect statistically significant information on orbital debris ranging from 50 micron to 500 micron in size. This paper describes the SDS features and how data from the ISS mission may be used to update debris environment models. Results of hypervelocity impact testing during the development of SDS and the potential for improvement on future sensors at higher altitudes will be reviewed.

Hamilton, J.↗

A bilevel multistage stochastic self-scheduling model with indivisibilities for trading in the continuous intraday electricity market

In this paper, we study the profit maximization problem of a virtual power plant trading in the continuous intraday electricity market. Our virtual power plant model is compatible with renewable, and thermal assets, covering a range of virtual power plants currently participating in energy markets. We model the trading problem as a bilevel multistage stochastic program. The upper level of the problem accounts for the profit maximization of the virtual power plant with explicit modeling of the technical constraints of the operational status of the thermal power plant including minimum start-up and shut-down times, ramp-up and ramp-down rates, and minimum generation level. The upper level also decides which continuous and indivisible (fill-or-kill) orders are submitted to the market. The lower-level problem accounts for the clearing of the continuous intraday market, i.e., matching of buy and sell orders. Because of the presence of fill-or-kill orders, the lower-level problem is mixed-integer, which prevents its direct conversion to a single-level problem using duality. In order to solve this challenging problem, we develop a convex-hull extended formulation for the lower-level problem, apply duality theory to obtain a single-level stochastic equivalent formulation, and employ McCormick envelopes to turn the problem into a multistage stochastic mixed-integer linear problem, which we solve using the stochastic dual dynamic integer programming algorithm. We conduct numerical experiments and analyze the optimal trading behavior of a virtual power plant trading in an ideal continuous market without arbitrage.

Bilevel multistage stochastic programming problem↗

GTO Multi-Year Program Plan FY 2022-2026

The GTO Multi-Year Program Plan (MYPP), building on the findings of the GeoVision analysis, outlines a 5-year plan of activities GTO will pursue to support the growth and long-term contribution of geothermal energy to the U.S. electricity grid and American homes and buildings. The MYPP outlines GTO’s vision and mission and presents a high-level technology plan for key areas of GTO research starting in Fiscal Year (FY) 2022 and running through the end of FY 2026.

15 GEOTHERMAL ENERGY↗

Conference Summary

Celebrations and special events were in order this year as the Minority University-Space Interdisciplinary Network (MU-SPIN) Program and NASA's Minority University Research and Education Division (MURED) both reached their 10th anniversaries. In honor of this occasion, the 2000 Annual Users' Conference held at Morris Brown College (MBC) in Atlanta, Georgia, September 11-15, 2000, was the first to be jointly hosted by MU-SPIN and MURED. It was particularly fitting that this anniversary should fall in the year 2000. The start of the new millennium propelled us to push bold new ideas and renew our commitment to minority university participation in all areas of NASA. With the theme 'Celebrating Our Tenth Year With Our Eyes on the Prize,' the conference provided a national forum for showcasing successful MU-SPIN and MURED Program (MUREP) experiences to enhance faculty/student development in areas of scientific and technical research and education. Our NASA-relevant conference agenda resulted in a record-breaking 220 registered attendees. Using feedback from past participants, we designed a track of student activities closely tailored to their interests. The resulting showcase of technical assistance and best practices set a new standard for our conferences in the years to come. This year's poster session was our largest ever, with over 50 presentations from students, faculty, and teachers. Posters covered a broad range of NASA activities from 'A Study of the Spiral Galaxy M101' to 'Network Cabling Characteristics.'

Harrington, James L., Jr.↗

History and Status of ALSEP and the Apollo Lunar Data Project

A suite of automated scientific instruments (the Apollo Lunar Surface Experiment Package, or ALSEP) was installed at each of the landing sites of Apollo 12, 14, 15, 16, and 17 from 1969 to 1972. They operated from deployment until decommissioning on 30 September 1977. These data were continuously transmitted to Earth and saved on the Range Tapes, which were recorded at the Manned Space Flight Network stations. These data were also broken out by experiment and sent to the experiment Principal Investigators on what were called the P.I. Tapes. Starting in April 1973 the Range Tape data were stored in digital format on 7-track magnetic tapes, the ARCSAV Tapes. In February 1976, the handling of the Range Tapes was transferred to UT Galveston. They produced 9-track tapes referred to as the Work Tapes. Following the Apollo program the Range and ARCSAV tapes, which were never archived, were lost. The Work Tapes were archived at the National Space Science Data Center (NSSDC). Some investigators archived their individual experiment data with NSSDC as well, but much of the data had minimal documentation, were not in digital form, or were stored in difficult to translate formats. Data from many experiments were never delivered to the NSSDC. The Lunar Data Project was started to address the problem of both missing and not readily usable data. Our effort has resulted in recovery of some of the ARCSAV tapes, recovery and digitization of a large volume of Apollo scientific and technical documentation, and restoration of many ALSEP and other Apollo data collections. Restoration involves deciphering formats, assembling necessary ancillary data (metadata), and packaging data in digital format to be archived with the Planetary Data System (PDS). Recovery of the data from the ARCSAV tapes involved having the tapes read on special equipment and extracting the individual experiment data out of the integrated data stream. We will report on the history and status of the various recovery efforts.

Work Tapes↗

Expected tracking performance of the ATLAS Inner Tracker at the High-Luminosity LHC

The high-luminosity phase of LHC operations (HL-LHC), will feature a large increase in simultaneous proton-proton interactions per bunch crossing up to 200, compared with a typical leveling target of 64 in Run 3. Such an increase will create a very challenging environment in which to perform charged particle trajectory reconstruction, a task crucial for the success of the ATLAS physics program, and will exceed the capabilities of the current ATLAS Inner Detector (ID). A new all-silicon Inner Tracker (ITk) will replace the current ID in time for the start of the HL-LHC. To ensure successful use of the ITk capabilities in Run 4 and beyond, the ATLAS tracking software has been successfully adapted to achieve state-of-the-art track reconstruction in challenging high-luminosity conditions with the ITk detector. This paper presents the expected tracking performance of the ATLAS ITk based on the latest available developments since the ITk technical design reports.

47 OTHER INSTRUMENTATION↗

EnergyPlus™ v.23.2.0 2023 [SWR-17-23]

EnergyPlus™ is a whole building energy simulation program that engineers, architects, and researchers use to model both energy consumption and water use in buildings. This is the EnergyPlus Development Repository. The Department of Energy maintains a public website for EnergyPlus where you can find much more information about the program. https://energyplus.net/ For detailed developer information, consult the wiki. https://github.com/NREL/EnergyPlus/wiki Many users (and developers) of EnergyPlus are active on Unmet Hours, so that's a great place to start if you have a question about EnergyPlus or building simulation. https://unmethours.com/questions/ For more in-depth, developer-driven support, please utilize the EnergyPlus Helpdesk. https://energyplushelp.freshdesk.com/support/home

Woods, Jason↗

The Multiphysics on Advanced Platforms Project

In 2015, the Lawrence Livermore National Laboratory started development of next-generation multiphysics simulation capabilities for the National Nuclear Security Administration under the Advanced Technologies Development and Mitigation (ATDM) element of the Advanced Simulation and Computing program in collaboration with the Exascale Computing Project (ECP). A key driver for this effort across the NNSA tri-lab was the emergence of advanced high performance computing (HPC) architectures based on heterogeneous compute capabilities, including GPU based systems, as part of the national drive toward exascale computing platforms at multiple Department of Energy (DOE) facilities. Developing a multiphysics code capable of meeting the various simulation needs of the NNSA as defined by the current generation of integrated codes (or ICs), initially developed as part of the Accelerated Strategic Computing Initiative (ASCI) program beginning in 1996, and able to scale to the current 100 petaflop class pre-exascale systems, as well the forthcoming exaflop class computers, is a daunting challenge. To accomplish this ambitious goal, LLNL has embraced two key themes: use of high-order numerical methods and a modular approach to code development. The LLNL next generation effort is organized under the Multi-Physics on Advanced Platforms Project (MAPP). A foundational component of MAPP is the Axom computer science (CS) toolkit which provides infrastructure for the development of modular, performance portable, multi-physics application codes. MARBL is a next-generation application code built on the Axom base to address the modeling needs of the high energy density physics (HEDP) community for simulating high-explosive, magnetic or laser driven experiments such as inertial confinement fusion (ICF), pulsed-power magneto-hydrodynamics (MHD), equation of state (EOS) and material strength studies as part of the NNSA’s stockpile stewardship program (SSP).

97 MATHEMATICS AND COMPUTING↗

CABLE Big Idea RDD&D Workshop (Workshop Summary Report)

The U.S. Department of Energy’s (DOE’s) Advanced Manufacturing Office (AMO) held the CABLE Big Idea RDD&D Workshop April 7–9, 2021. The virtual workshop brought together approximately 250 leading scientific and technical experts to gather information on the state of the art in conductivity-enhanced materials and their applications. These stakeholders included scientists, engineers, manufacturers, materials experts, utility companies, and other entities within the conductor material and electrical product manufacturing supply chains. The two main goals of the workshop were to 1) start building and strengthening a research ecosystem around conductivity-enhanced materials and 2) inform AMO’s future portfolio of research, development, demonstration, and deployment (RDD&D) investments and other program activities in the area of conductivity-enhanced materials. CABLE—or Conductivity-enhanced materials for Affordable, Breakthrough Leapfrog Electric and thermal applications—was was established as an Office of Energy Efficiency and Renewable Energy initiative as a result of a competitive internal process to identify and prioritize potentially high-impact research topics. Since then, conductivity-enhanced materials have been identified as an important element of the shift to an electrified and decarbonized industry sector, and CABLE remains a Big Idea. The CABLE effort is led by AMO and supported by eight other offices within DOE. The first major effort under CABLE was the development of several subtopics for DOE’s Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) programs in 2020. Another major activity was the launch of the CABLE Conductor Manufacturing Prize in March 2021.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Voltage profile program for the Kennedy Space Center electric power distribution system

The Kennedy Space Center voltage profile program computes voltages at all busses greater than 1 Kv in the network under various conditions of load. The computation is based upon power flow principles and utilizes a Newton-Raphson iterative load flow algorithm. Power flow conditions throughout the network are also provided. The computer program is designed for both steady state and transient operation. In the steady state mode, automatic tap changing of primary distribution transformers is incorporated. Under transient conditions, such as motor starts etc., it is assumed that tap changing is not accomplished so that transformer secondary voltage is allowed to sag.

Source record↗

Superfluid Helium Tanker Study (SFHT)

The Superfluid Helium Tanker (SFHT) design is examined for minimum up front cost, a low life cycle cost, and the maximum flexibility/adaptability consistent with the above objectives. The logic flow started with the collection and analysis of user requirements. A configuration trade-off was made to determine the baseline concept for SFHT that most nearly met all of the program objectives. The next task was to develop the baseline concept for the fluid subsystem. With this accomplished the baseline tanker was designed. The commonality task was completed and the program plan and cost estimate will be completed.

Source record↗

The comet rendezvous asteroid flyby mission

The Comet Rendezvous Asteroid Flyby (CRAF) mission was approved for a New Start by the United States Congress in 1989. CRAF will be developed in parallel with the Cassini (Saturn orbiter/Titan probe) mission. The two missions have been combined into a joint program because of the substantial cost savings (approximately $500 M, or greater than 25 percent) which can be realized by using a common spacecraft design, several identical science instruments, a single management team, and a joint ground operations and data handling system for the two missions. CRAF and Cassini will be the first users of the new Mariner Mark 2 spacecraft which has been designed to carry out the next generation of planetary missions to the outer planets and to small bodies. CRAF is a joint mission between the United States, Germany, and Italy. Each partner will provide both engineering hardware and science experiments. Cassini is a joint mission between the United States, Germany, Italy, and the European Space Agency (ESA), with ESA providing the Titan atmospheric entry probe, called Huygens.

Weissman, Paul↗

Sounds Clear Enough

I'm a vice president at Line6, where we produce electronics for musical instruments. My company recently developed a guitar that can be programmed to sound like twenty-five different classic guitars - everything from a 1928 National 'Tricone' to a 1970 Martin. It is quite an amazing piece of technology. The guitar started as a research project because we needed to know if the technology was going to be viable and if the guitar design was going to be practical. I've been in this business for about twenty years now, and I still enjoy starting up projects whenever the opportunity presents itself. During the research phase, I headed up the project myself. Once we completed our preliminary research and made the decision to move into development, that's when I handed the project off - and that's where this story really begins.

Zak, Alan↗

The Biotechnology Facility for International Space Station

The primary mission of the Cellular Biotechnology Program is to advance microgravity as a tool in basic and applied cell biology. The microgravity environment can be used to study fundamental principles of cell biology and to achieve specific applications such as tissue engineering. The Biotechnology Facility (BTF) will provide a state-of-the-art facility to perform cellular biotechnology research onboard the International Space Station (ISS). The BTF will support continuous operation, which will allow performance of long-duration experiments and will significantly increase the on-orbit science throughput. With the BTF, dedicated ground support, and a community of investigators, the goals of the Cellular Biotechnology Program at Johnson Space Center are to: Support approximately 400 typical investigator experiments during the nominal design life of BTF (10 years). Support a steady increase in investigations per year, starting with stationary bioreactor experiments and adding rotating bioreactor experiments at a later date. Support at least 80% of all new cellular biotechnology investigations selected through the NASA Research Announcement (NRA) process. Modular components - to allow sequential and continuous experiment operations without cross-contamination Increased cold storage capability (+4 C, -80 C, -180 C). Storage of frozen cell culture inoculum - to allow sequential investigations. Storage of post-experiment samples - for return of high quality samples. Increased number of cell cultures per investigation, with replicates - to provide sufficient number of samples for data analysis and publication of results in peer-reviewed scientific journals.

Goodwin, Thomas↗

Rocketdyne - J-2 Saturn V 2nd and 3rd Stage Engine

The J-2 engine was unique in many respects. Technology was not nearly as well-developed in oxygen/hydrogen engines at the start of the J-2 project. As a result, it experienced a number of "teething" problems. It was used in two stages on the Saturn V vehicle in the Apollo Program, as well as on the later Skylab and Apollo/Soyuz programs. In the Apollo Program, it was used on the S-II stage, which was the second stage of the Saturn V vehicle. There were five J-2 engines at the back end of the S-II Stage. In the S-IV-B stage, it was a single engine, but that single engine had to restart. The Apollo mission called for the entire vehicle to reach orbital velocity in low Earth orbit after the first firing of the Saturn-IV-B stage and, subsequently, to fire a second time to go on to the moon. The engine had to be man-rated (worthy of transporting humans). It had to have a high thrust rate and performance associated with oxygen/hydrogen engines, although there were some compromises there. It had to gimbal for thrust vector control. It was an open-cycle gas generator engine delivering up to 230,000 pounds of thrust.

Coffman, Paul↗

From Pixels to Planets

The Kepler Mission was launched in 2009 as NASAs first mission capable of finding Earth-size planets in the habitable zone of Sun-like stars. Its telescope consists of a 1.5-m primary mirror and a 0.95-m aperture. The 42 charge-coupled devices in its focal plane are read out every half hour, compressed, and then downlinked monthly. After four years, the second of four reaction wheels failed, ending the original mission. Back on earth, the Science Operations Center developed the Science Pipeline to analyze about 200,000 target stars in Keplers field of view, looking for evidence of periodic dimming suggesting that one or more planets had crossed the face of its host star. The Pipeline comprises several steps, from pixel-level calibration, through noise and artifact removal, to detection of transit-like signals and the construction of a suite of diagnostic tests to guard against false positives. The Kepler Science Pipeline consists of a pipeline infrastructure written in the Java programming language, which marshals data input to and output from MATLAB applications that are executed as external processes. The pipeline modules, which underwent continuous development and refinement even after data started arriving, employ several analytic techniques, many developed for the Kepler Project. Because of the large number of targets, the large amount of data per target and the complexity of the pipeline algorithms, the processing demands are daunting. Some pipeline modules require days to weeks to process all of their targets, even when run on NASA's 128-node Pleiades supercomputer. The software developers are still seeking ways to increase the throughput. To date, the Kepler project has discovered more than 4000 planetary candidates, of which more than 1000 have been independently confirmed or validated to be exoplanets. Funding for this mission is provided by NASAs Science Mission Directorate.

supercomputers↗

Is Structured Agile an Oxymoron? Tales from Implementing and Executing Agile in a US Government Environment

To paraphrase a famous quote, "No plan survives contact with the reality." Software (SW) development is often a classic example of this: whatever the plan was for a particular development, it often does not survive contact with technical realities, budget realities, program realities and schedule realities. Traditionally, SW development has followed a waterfall methodology with requirements being rigorously specified before the design, which was completed before the coding and unit testing started, which were in turn finished before validation and verification started. This model of SW engineering derives much from the HW engineering of large systems, and has been the standard methodology used in US government software acquisitions and systems for decades, with highly variable results. US Government SW requirements are built around Waterfall concepts, which assume that the plan will survive contact with reality, or at least that modifications to the plan are relatively small, and relatively few.Because of the inefficiencies and difficulties inherent in Waterfall, the commercial SW world started using a different SW development methodology called Agile more than 20 years ago. Agile believes that a plan should evolve and learn rapidly in response to the realities encountered. At its core, there are a few key elements of Agile:- A small team of people which is highly flexible and adaptive. The team collaborates and interoperates through sophisticated development architectures and release environments- An iterative, incremental development and release approach which is based upon the concept that knowledge comes from experience within the team, and that the team makes decisions based upon what it knows- A team culture which prizes transparency, inspection and adaptation. These values are necessary so that the team experience and decision making is transparent and responsive to the realities encountered during development and testingSo, how to use Agile in a US Government environment? GMSEC (Goddard Mission Services Evolution Center) develops satellite ground system software for NASA and other US Government agencies. The SW developed by the team contains a large code base of many applications used within satellite mission operations centers. It spans the full gamut of SW development types: from SW which is in a classic maintenance and sustainment mode, to new developments with a fairly well understood scope and approach, to new developments whose scope and approach are quite unclear and which require significant research and prototyping. Team members move between all of these different types of SW development. Waterfall was inadequate to the programmatic and technical needs of the team, as well as the various types of SW development being done. The software plan was not surviving contact with the technical and programmatic realities experienced by the team. To address this, the team started a small pilot project in 2016 to test the use of Agile within a small subset of the team for a new web services application. In early 2018, the use of Agile was expanded to the whole team and all the software, but we had to fulfill the NASA SW development requirements. And we needed to do this while still remaining true to the key Agile elements of transparency, inspection and adaption. In order to do this, the team worked very closely with the Software Process Improvement (SPI) team at NASA Goddard, as well as NASA engineering manageme

Beech, Theresa W.↗

Modification to shock fitting program

A modified form of the Lepping - Argentiero single spacecraft, shock normal determination procedure is presented. The modified method incorporates a simple predictor-corrector algorithm which allows a faster convergence rate and the use of average values of the parameters for the starting vector.

Acuna, M. H.↗