Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “River”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Hazard Assessment from Storm Tides and Rainfall on a Tidal River Estuary

Here, we report on methods and results for a model-based flood hazard assessment we have conducted for the Hudson River from New York City to Troy/Albany at the head of tide. Our recent work showed that neglecting freshwater flows leads to underestimation of peak water levels at up-river sites and neglecting stratification (typical with two-dimensional modeling) leads to underestimation all along the Hudson. As a result, we use a three-dimensional hydrodynamic model and merge streamflows and storm tides from tropical and extratropical cyclones (TCs, ETCs), as well as wet extratropical cyclone (WETC) floods (e.g. freshets, rain-on-snow events). We validate the modeled flood levels and quantify error with comparisons to 76 historical events. A Bayesian statistical method is developed for tropical cyclone streamflows using historical data and consisting in the evaluation of (1) the peak discharge and its pdf as a function of TC characteristics, and (2) the temporal trend of the hydrograph as a function of temporal evolution of the cyclone track, its intensity and the response characteristics of the specific basin. A k-nearest-neighbors method is employed to determine the hydrograph shape. Out of sample validation tests demonstrate the effectiveness of the method. Thus, the combined effects of storm surge and runoff produced by tropical cyclones hitting the New York area can be included in flood hazard assessment. Results for the upper Hudson (Albany) suggest a dominance of WETCs, for the lower Hudson (at New York Harbor) a case where ETCs are dominant for shorter return periods and TCs are more important for longer return periods (over 150 years), and for the middle-Hudson (Poughkeepsie) a mix of all three flood events types is important. However, a possible low-bias for TC flood levels is inferred from a lower importance in the assessment results, versus historical event top-20 lists, and this will be further evaluated as these preliminary methods and results are finalized. Future funded work will quantify the influences of sea level rise and flood adaptation plans (e.g. surge barriers). It would also be valuable to examine how streamflows from tropical cyclones and wet cool-season storms will change, as this factor will dominate at upriver locations.

Hazard assessment↗

Cross - Scale Intercomparison of Climate Change Impacts Simulated by Regional and Global Hydrological Models in Eleven Large River Basins

Ideally, the results from models operating at different scales should agree in trend direction and magnitude of impacts under climate change. However, this implies that the sensitivity to climate variability and climate change is comparable for impact models designed for either scale. In this study, we compare hydrological changes simulated by 9 global and 9 regional hydrological models (HM) for 11 large river basins in all continents under reference and scenario conditions. The foci are on model validation runs, sensitivity of annual discharge to climate variability in the reference period, and sensitivity of the long-term average monthly seasonal dynamics to climate change. One major result is that the global models, mostly not calibrated against observations, often show a considerable bias in mean monthly discharge, whereas regional models show a better reproduction of reference conditions. However, the sensitivity of the two HM ensembles to climate variability is in general similar. The simulated climate change impacts in terms of long-term average monthly dynamics evaluated for HM ensemble medians and spreads show that the medians are to a certain extent comparable in some cases, but have distinct differences in other cases, and the spreads related to global models are mostly notably larger. Summarizing, this implies that global HMs are useful tools when looking at large-scale impacts of climate change and variability. Whenever impacts for a specific river basin or region are of interest, e.g. for complex water management applications, the regional-scale models calibrated and validated against observed discharge should be used.

Hydrological models↗

Ground and Satellite Based Observation Datasets for the Lower Mekong River Basin

In ‘Satellite observations and modeling to understand the Lower Mekong River Basin streamflow variability’ [1] hydrological fluxes, meteorological variables, land cover land use maps, and soil characteristics and parameters data were compiled and processed for the Lower Mekong River Basin. In this work, daily streamflow time series data at nine gauges located at five different countries in the Mekong region (Thailand, Laos People׳s Democratic Republic (PDR), Myanmar, Cambodia, and Viet Nam) is presented. Satellite-based daily precipitation and air temperature (minimum & maximum) data is processed and provided over the entire basin as part of the dataset provided in this work. Moreover, land cover land use raster data that contains 18 classes that cover agriculture, urban, range and forests land cover land use classes for the basin is offered. In addition, a soil data that contains physical and chemical characteristics needed by physically based hydrological models to simulate the cycling of water and air is also provided.

Streamflow↗

A Strong Atmospheric River Responsible for the 2019 Record Floods in the Middle East

Atmospheric rivers (ARs) cause some of the weather-related disasters around the world. While many studies have shown the contribution of ARs to precipitation in the coastal regions such as western Europe and the U.S. West Coast, little is known about their mechanisms and impacts on flooding in the Middle East. This study shows that an AR was responsible for the record floods during March 2019 across the Middle East. Iran in particular was hit hardest with the floods that left a death toll of at least 76 and an early estimate of $2.5 billion (U.S. dollars) damage to its infrastructures. The heavy precipitation produced by this AR made the 2018/19 rainy season the wettest in the past four decades. By contrast, the prior year (2017/18) was the driest over the same period. This is a compelling example of rapid dry-to-wet transitions that may enhance the chance of landslides and impose challenges to water resources management. The AR originated in the Atlantic Ocean and propagated across North Africa and the Arabian Peninsula before its final landfall over the Zagros Mountains. On its nearly 9000 km journey, the AR received additional moisture from the Mediterranean, Red, and Arabian Seas, and the Persian Gulf. Moisture transport by this AR during 24-25 March 2019 is estimated at more than 150times the aggregated discharge of the four major rivers in the region, that is, the Tigris, Euphrates, Karun, and Karkheh. Anomalously warm sea surface temperatures in all surrounding basins and coincidence of a midlatitude system and a subtropical jet provided the necessary ingredients for formation of this strong AR. This work underlines the fact that the impacts of rain-producing ARs are not limited to the coastal regions. Such ARs can travel very long distances away from the oceans and affect remote arid and semi-arid regions like the Middle East. This study examined an individual AR, though one associated with record floods. However, it attempts to draw attention to the need for more AR-related research over the Middle East.

Atmospheric Rivers↗

Implications of seagrass changes on manatee distributions in the Indian River Lagoon waters surrounding NASA’s Kennedy Space Center

The presentation will discuss Kennedy Space Center’s (KSC) long term monitoring of seagrass and manatees in the Banana River (BR) prior to 2010, the remarkable decline in seagrass habitat that occurred thereafter, and the notable shift in manatee distribution. For Banana River, from 2010 to 2015, seagrass declined while manatee presence increased, with an average of 525 manatees per flight in 2015. After 2016, both seagrasses and manatee presence declined. Concurrently, increasing manatee numbers were reported for Mosquito Lagoon (ML), where historical manatee occurrence was relatively low. In 2016, aerial surveys were expanded to include the southern half of ML to document this significant distribution shift. By 2022, ML had become the hub of manatee occurrence on KSC, with an average of 946 manatees per flight and only 48 per flight in BR. These data enhance information for IRL stakeholders regarding seagrass habitat and manatee protection in the northern IRL.

Seagrass↗

High Latitude Atmospheric Rivers: Teleconnections and Impacts

Atmospheric rivers (ARs) are long, narrow synoptic scale features that act as moisture transport vehicles by moving water vapor poleward. They are typically found in storm tracks and often have profound implications for regional hydroclimate. For high latitude locales such as Antarctica and the Arctic, ARs are fewer in number but often have an outsized impact by either producing significant snow accumulation events, or, depending on their thermal characteristics, initiating melt events on ice sheets, ice shelves, and sea ice. In this study, we apply both reanalysis and climate model data to evaluate high latitude ARs for both the Arctic and Antarctic in the context of teleconnections and modes of variability. Specifically, we fold in both MERRA-2 and ERA5 reanalysis as well as historical and climate change simulations from the CESM2 (Community Earth System Model, Version 2) and E3SMv2 (Energy Exascale Earth System Model, v2) with multiple ensemble members to better understand natural variability versus climate change signals. An overview of AR climatology and impacts will be presented, including a baseline uncertainty quantification analysis using data from ARTMIP (the Atmospheric River Tracking Method Intercomparison Project). AR impacts during specific modes of variability will be characterized by diagnosing precipitation and boundary layer temperature associated with Ars influencing the cryosphere. Modes of variability investigated include the SAM (Southern Annular Mode), PDO (Pacific Decadal Oscillation), PSA2 (Pacific South American Mode 2), the IOD (Indian Ocean Dipole), and the AO (Arctic Oscillation).

Atmospheric Rivers↗

Implications of Seagrass Changes on Manatee Distributions in the Indian River Lagoon Waters Surrounding NASA's Kennedy Space Center

The presentation will discuss Kennedy Space Center’s (KSC) long term monitoring of seagrass and manatees in the Banana River (BR) prior to 2010, the remarkable decline in seagrass habitat that occurred thereafter, and the notable shift in manatee distribution. For Banana River, from 2010 to 2015, seagrass declined while manatee presence increased, with an average of 525 manatees per flight in 2015. After 2016, both seagrasses and manatee presence declined. Concurrently, increasing manatee numbers were reported for Mosquito Lagoon (ML), where historical manatee occurrence was relatively low. In 2016, aerial surveys were expanded to include the southern half of ML to document this significant distribution shift. By 2022, ML had become the hub of manatee occurrence on KSC, with an average of 946 manatees per flight and only 48 per flight in BR. These data enhance information for IRL stakeholders regarding seagrass habitat and manatee protection in the northern IRL.

Indian River Lagoon↗

STATISTICAL SAMPLING FOR IN-SERVICE INSPECTION OF LIQUID WASTE TANKS AT THE SAVANNAH RIVER SITE

Savannah River Remediation, LLC (SRR) is implementing a statistical sampling strategy for In-Service Inspection (ISI) of Liquid Waste (LW) Tanks at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. As a component of SRS's corrosion control program, the ISI program assesses tank wall structural integrity through the use of ultrasonic testing (UT). The statistical strategy for ISI is based on the random sampling of a number of vertically oriented unit areas, called strips, within each tank. The number of strips to inspect was determined so as to attain, over time, a high probability of observing at least one of the worst 5% in terms of pitting and corrosion across all tanks. The probability estimation to determine the number of strips to inspect was performed using the hypergeometric distribution. Statistical tolerance limits for pit depth and corrosion rates were calculated by fitting the lognormal distribution to the data. In addition to the strip sampling strategy, a single strip within each tank was identified to serve as the baseline for a longitudinal assessment of the tank safe operational life. The statistical sampling strategy enables the ISI program to develop individual profiles of LW tank wall structural integrity that collectively provide a high confidence in their safety and integrity over operational lifetimes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ELECTRONICS UPGRADE TO THE SAVANNAH RIVER NATIONAL LABORATORY COULOMETER FOR PLUTONIUM AND NEPTUNIUM ASSAY

The Savannah River Site (SRS) has the analytical measurement capability to perform high-precision plutonium concentration measurements by controlled-potential coulometry. State-of-the-art controlled-potential coulometers were designed and fabricated by the Savannah River National Laboratory and installed in the Analytical Laboratories process control laboratory. The Analytical Laboratories uses coulometry for routine accountability measurements of and for verification of standard preparations used to calibrate other plutonium measurement systems routinely applied to process control, nuclear safety, and other accountability applications. The SRNL Coulometer has a demonstrated measurement reliability of {approx}0.05% for 10 mg samples. The system has also been applied to the characterization of neptunium standard solutions with a comparable reliability. The SRNL coulometer features: a patented current integration system; continuous electrical calibration versus Faraday's Constants and Ohm's Law; the control-potential adjustment technique for enhanced application of the Nernst Equation; a wide operating room temperature range; and a fully automated instrument control and data acquisition capability. Systems have been supplied to the International Atomic Energy Agency (IAEA), Russia, Japanese Atomic Energy Agency (JAEA) and the New Brunswick Laboratory (NBL). The most recent vintage of electronics was based on early 1990's integrated circuits. Many of the components are no longer available. At the request of the IAEA and the Department of State, SRNL has completed an electronics upgrade of their controlled-potential coulometer design. Three systems have built with the new design, one for the IAEA which was installed at SAL in May 2011, one system for Los Alamos National Laboratory, (LANL) and one for the SRS Analytical Laboratory. The LANL and SRS systems are undergoing startup testing with installation scheduled for this summer.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

One of U.S. Department of Energy's (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents - approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes - are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC's ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates - WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Deskbook. The TRA consists of three parts: (1) Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. (2) Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. (3) Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flicker Mitigation for a Grid-Connected Tidal and River Power Generator Using the BESS

In the grid-connected tidal and river power generation, the water turbulence and the grid condition can induce the fluctuating output power. This power fluctuation may cause a power quality issue such as flicker, or voltage fluctuations, during the continuous operation. Hence, it is important to assess flicker emission and to mitigate flicker in order to solve this power quality issue. This paper proposes a Battery Energy Storage System (BESS)installed between the power converters of the tidal and river power system in order to mitigate flickers in different grid conditions. The BESS smooths the active power fluctuations and reduces flicker even from the weak grid with the low impedance angle in the distribution network. The feasibility of the proposed BESS system has been tested using a simplified simulation model with interconnected inverters developed in the validated simulation tool of PSCAD/EMTDC, and the obtained results from the case studies are presented.

16 TIDAL AND WAVE POWER↗

Thermal Stimulation and Injectivity Testing at Raft River, ID EGS Site

The Raft River geothermal field is the site of an innovative Department of Energy Enhanced Geothermal System (EGS) project to determine the viability of using combined thermal and hydraulic stimulation techniques to improve energy production. Well RRG-9 is currently undergoing a stimulation program using injectate from the US Geothermal Raft River Power Plant and cold water from a cooling tower make-up water well. The stimulation began on 13 June 2013 with injection from the power plant at a temperature of about 39 °C and a pressure of 275 psig. Next, two positive displacement plunger type pumps were used to increase the injection pressure and flow rate for about one month. The highest rate achieved was 258 gpm at a pressure of 741 psig. During this time, fluid from the cooler water well was injected for about 2 weeks at various pressures. Then, the pumps were removed and plant injection resumed on 25 September. Plant injection will continue until the spring of 2014, when a high pressure hydraulic stimulation will be conducted. A series of seismic monitoring stations deployed around the well are providing data on seismic events occurring at the site. Over the past year, 51 microseismic events have been recorded, all less than Magnitude 1. During injection, several diagnostic tests were conducted to gain a better understanding of the well and reservoir. A step-rate test was performed on 22 August to measure the in-situ stress and aid in modeling in-situ fractures. A tracer was injected into the well on 9 September. No tracer was detected in adjacent production wells after several months. A second borehole televiewer survey was conducted for comparison to pre-stimulation images. Here, a third borehole televiewer survey is planned after the high pressure stimulation. Injection test data is evaluated in real time. A modified Hall plot analysis indicates the effective permeability is increasing. The injectivity index supports the results of the modified Hall plot analysis. As the thermal stimulation has continued, the injectivity index has consistently followed an upward trend from 0.1 gpm/psi to 0.53 gpm/psi.

enhanced geothermal systems↗

The Cold and Dark Process at the Savannah River Site

The deactivation and decommissioning (D and D) of a facility exposes D and D workers to numerous hazards. One of the more serious hazards is coming into contact to hazardous energy sources (e.g. electrical, pressurized steam). At the Savannah River Site (SRS) a formal process for identifying and eliminating sources of hazardous energy was developed and is called 'Cold and Dark'. Several 'near miss' events involving cutting of energized conductors during D and D work in buildings thought to be isolated identified the need to have a formal process to identify and isolate these potentially hazardous systems. This process was developed using lessons learned from D and D activities at the Rocky Flats Environmental Technology Site (Rocky Flats) in Colorado. The Cold and Dark process defines an isolation boundary (usually a building perimeter) and then systematically identifies all of the penetrations through this boundary. All penetrations that involve hazardous energy sources are then physically air-gapped. The final product is a documented declaration of isolation performed by a team involving operations, engineering, and project management. Once the Cold and Dark declaration is made for a building work can proceed without the usual controls used in an operational facility (e.g. lockout/tag-out, arc flash PPE). It is important to note that the Cold and Dark process does not remove all hazards from a facility. Work planning and controls still need to address hazards that can be present from such things as chemicals, radiological contamination, residual liquids, etc., as well as standard industrial hazards. Savannah River Site experienced 6 electrical events prior to declaring a facility 'cold and dark' and has had zero electrical events after 'cold and dark' declaration (263 facilities to date). The formal Cold and Dark process developed at SRS has eliminated D and D worker exposures to hazardous energy sources. Since the implementation of the process there have been no incidents involving energized conductors or pressurized liquids/gases. During this time SRS has demolished over 200 facilities. The ability to perform intrusive D and D activities without the normal controls such as lock outs results in shorter schedule durations and lower overall costs for a facility D and D.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Unusual Decommissioning of Contaminated Facilities at the Savannah River Site - The Demolition of Cooling Towers 285-H and 285-F

Savannah River Site is an 800-square kilometer (310-square mile) U.S. Department of Energy (DOE) industrial facility located in Aiken, Allendale, and Barnwell Counties in South Carolina. The site is dedicated to environmental cleanup, developing and deploying technologies to support the cleanup mission, processing and storing nuclear materials, and supporting national security missions. The current focus in environmental management is on the cleanup of legacy materials, facilities and wastes left from the Cold War. In 2002 the DOE initiated actions to expedite cleanup focusing on significant risk reduction coupled with reducing costs. SRS published the Savannah River Site Environmental Management Integrated Deactivation and Decommissioning Plan in 2003 which addressed the final disposition and physical end state of all 1,013 Environmental Management facilities on site by the year 2025. Included in this list of facilities are reactors, fabrication facilities, process facilities and the support facilities that were required during the past 50 years. By the end of FY06, over 200 facilities had been decommissioned. This paper describes the demolition of two facilities, cooling towers 285-H and 285-F that were associated with the operation of the process canyons. Because of the circumstances surrounding these decommissions, unique and unusual techniques were safely employed to demolish and remove the cooling towers. Both 285-H and 285-F were safely felled by pulling the columns remotely to weaken the internal portion of the structure so it would collapse inwards into the basin. Cooling tower 285-H fell in less than 1 second after approximately two-thirds of the columns had been broken. See Figure 3 for a photo of 285-H after its collapse. 285-F, which was larger than 285-H, fell in three sections, two cells at a time. Once the towers were felled conventional demolition equipment was used to segregate and remove the debris. All protective measures used to protect surrounding equipment and structures were successful and the basins were cleaned out and returned to service in less than two weeks. The demolition of both cooling towers 285- H and 285-F was completed safely and timely using unconventional means to fell the towers due to structural degradation, height, limited access, radiological and asbestos hazards, and a requirement to protect equipment on all sides of the facility as well as preservation of the basins. During felling operations personnel were required to stay outside the fall zone equivalent to a distance of 150% of the height of the towers. Remote operations outside the fall zone required a tracked vehicle to pull cables attached to the columns in a predetermined sequence so as to fell the tower straight down into the basin. Once the towers fell traditional demolition equipment segregated and removed the waste. Wooden cooling towers of this vintage present a difficult challenge to traditional demolition techniques. Because of the height and potential instability of these types of facilities, considerable effort is placed on reducing the potential energy to a point where heavy equipment can reach safely without endangering the operators. The column-pulling technique chosen for both 285-H and 285-F cooling towers proved to be a safe and efficient method for demolition of these types of facilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Savannah River Site Public and Regulatory Involvement in the Inadvertent Disposal of TRU Waste in the E-Area Low-Level Waste (LLW) Trenches

The key to successful public involvement at the Savannah River Site (SRS) has been and continues to be vigorous, up-front involvement of the public, federal and state regulators with technical experts. The SRS Waste Management Program includes all forms of radioactive waste. All of the decisions associated with the management of these wastes are of interest to the public and successful program implementation would be impossible without including the public up-front in the program formulation. Serious problems can result if program decisions are made without public involvement, and if the public is informed after key decisions are made. This paper will describe the regulatory and public involvement program and their effects on the decisions concerning the inadvertent disposal at the Savannah River Site (SRS) of TRU waste in the E-area LLW Facility Trenches. SRS engineers discovered that a small amount of TRU waste was disposed in the E-area LLW trenches in 2003. This discovery was obviously of considerable interest to the State and Federal Regulators, and to the public. In addition to notifications to all interested parties, the first order of business was to ensure that operations continued to be protective of the public and the environment. This paper will describe the interactions with the Department of Energy (DOE), the South Carolina Department of Health and Environmental Control (SCDHEC), the Environmental Protection Agency (EPA), and the public. In addition the technical details of the inadvertent disposal will be discussed along with the analysis of long term performance of the waste form in the E-Area LLW Trenches and how this information was communicated with all parties. As can be imagined, a decision to dispose of TRU waste onsite versus shipment to the Waste Isolation Pilot Plant (WIPP) in New Mexico for disposal is of considerable interest to the stakeholders in South Carolina. The events that lead to the inadvertent disposal will be reviewed as well as the new systems put into place to ensure that this event will not happen again in the future. In order to determine alternatives to properly deposition this TRU waste, an evaluation of retrieval of the waste from the trench disposal was performed as well as an options risk analysis to determine the regulatory path forward should the decision be made to dispose of the TRU waste in place. An evaluation of the risks to the workers associated with retrieval was then compared to the risks of continued disposal in the E-Area Trenches. Cost and schedule for each alternative was also compared. This paper will describe the successful results of this technical, regulatory, and public involvement program, explore the challenges, how the accomplishments occurred, and describe the future challenges along with the road map for the future. A comparison with other similar events at other DOE sites will be discussed as well. In doing this, the SRS TRU and LLW programs must be described to give the readers an understanding of the technical complexities that must be communicated successfully to achieve constructive stakeholder participation and regulatory approval. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Public and Regulatory Involvement in the Cercla Low-Level Waste (LLW) Program and Their Effect on Decisions to Dispose of LLW Generated by Cercla

The key to successful public involvement at the Savannah River Site (SRS) has been and continues to be vigorous, up-front involvement of the public, federal and state regulators with technical experts. The SRS Waste Management Program includes all forms of radioactive waste. All of the decisions associated with the management of these wastes are of interest to the public and successful program implementation would be impossible without including the public up-front in the program formulation. Serious problems can result if program decisions are made without public involvement, and if the public is informed after key decisions are made. This paper will describe the regulatory and public involvement program and their effects on the decisions concerning the disposal at the Savannah River Site (SRS) of LLW generated from CERCLA Removal and Remedial Actions. At SRS the Deactivation and Decommissioning (D and D) project has generated large amounts of LLW from the removal of buildings and processing facilities. The D and D project is expected to generate even larger amounts of LLW in the future. The most cost effective disposal alternated is to use the onsite LLW disposal facility in E-Area. The E-Area LLW Facility is owned and operated by the Department of Energy (DOE) under its authority granted by the Atomic Energy Act of 1954, as amended. Since the disposal of CERCLA generated waste is also governed by the Environmental Protection Agency (EPA) CERCLA regulations, it is important that EPA, DOE, and the South Carolina Department of Health and Environmental Control (SCDHEC) work together to resolve any conflicts in implementation of the D and D project so that all regulations are followed and the project can be continued successfully. An issue of particular significance will be described in this paper that, were it not resolved successfully, would have jeopardized the completion of one project and resulted in higher overall project costs. The EPA determined in review of the E-Area LLW Facility groundwater monitoring that a 'release' under CERCLA had occurred. As a result, EPA determined that it was necessary to issue a 'Notice of Unacceptability' to SRS revoking the CERCLA Off-Site Rule approval for the E-Area LLW Facility, thus, no longer allowing the E-Area LLW Facility Slit trenches to receive CERCLA waste for disposal. It became critical to the success of the D and D project to reestablish CERCLA Off-Site Rule approval. The discussions and negotiations Comment [HB1]: with the South Carolina regulators and EPA were conducted in full view of the public and as such, an informed decision as to resolution included the public interactions. This paper will describe the successful results of this technical, regulatory, and public involvement program, explore the challenges, how the accomplishments occurred, and describe the future challenges along with the road map for the future. In doing this, the SRS D and D project must be described to give the readers an understanding of the technical complexities that must be communicated successfully to achieve constructive stakeholder participation and regulatory approval. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗