Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Applicability of HBU Fuel Cask R and D Project to Al Clad Fuel Storage - 18558

Aluminum clad spent nuclear fuel (SNF) not destined to be reprocessed at Savannah River's H Canyon will eventually be moved from existing wet and dry storage facilities into standardized dry storage systems (e.g., Universal Canisters), ideally suited for disposal. With the current lack of disposal capacity in the U.S., placement of this SNF into dry storage requires plans for demonstrating to the regulator the safety of both the extended storage and the subsequent transportation to a future disposal facility of this SNF. For commercial SNF, concerns related to extended dry storage and subsequent transportation have been, and continue to be, addressed through several demonstration projects including, but not limited to, one for the lower burnup SNF at Idaho National Laboratory (INL) and one for the higher burnup SNF at Dominion's North Anna Power Station. Lessons learned from the more recent Orano led higher burnup demonstration project (HBU Demo Project) provides relevant information for advancing the concept of a 'smart cask' system for dry interim storage, which will allow for collection of data to support the safety demonstration for extended dry storage and subsequent transportation of the aluminum clad SNF. This 'smart cask' would eliminate the need for multiple demonstration projects that may have to be performed for different types of aluminum clad SNF designs and/or for potentially age distinguishing parameters, such as burnup or initial enrichment. This 'smart cask' would be developed and deployed by leveraging the HBU Demo Project's experience associated with modifying and deploying a TN-32B bolted carbon steel vertical storage cask system to monitor key parameters related to the criticality, structural, confinement, and thermal safety of the SNF and the canister system containing this SNF. This paper will focus on how the extensive design, licensing, and fabrication experience accumulated by the HBU Demo Project's cask system can be leveraged to support the design, licensing, and fabrication of a 'smart cask' system intended to support/confirm the interim dry storage, potential extended storage, and subsequent transportation of aluminum clad SNF, such as the Advanced Test Reactor (ATR) SNF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Information Template for Evaluating the Relative Priority of Remediation Projects that Pose a Risk to Receptors - 18674

The U.S. Department of Energy (DOE) has one of the largest remediation tasks in the world, in terms of the number of sites, the complexity of individual sites, the number of remediation projects at individual sites, and the full range of stakeholders involved. The question of how to decide what projects to initiate, at any point of time and how to prioritize the deployment of resources for these tasks, occurs both within and among sites. The Consortium for Risk Evaluation developed a Risk-informed Prioritization Framework for Oak Ridge Reservation. Our goal was to develop a risk-informed methodology for prioritizing remediation projects for the Department of Energy's Oak Ridge Reservation that can be adapted to other remediation projects elsewhere. The heart of the framework is a template that includes information about each site necessary to make prioritization decisions. The information in the template describes the environment (hazard, pathway, consequences), the receptors (workers, public, ecological) and the risk management considerations (cost, risk reduction effectiveness, capacity, efficiency and sequencing). The questions in the template provide a wide range of information that managers and regulators need to make decisions, and that Tribes and the public need to evaluate the efficacy of remediation decisions. Completing the template will also help identify data gaps, model parameters needed, and the agencies or individuals responsible for obtaining the information. The information presented in the Template will be useful for regulators (DOE, Environmental Protection Agency, states, Tribes), managers and workers at the sites, trustees of natural resources, site neighbors, and the general public, but more importantly, provides an example of information needed to rate the priority of remediation projects. DOE, other federal and state trustees, and regulators were included in all phases of the development, including the scope, overseeing its development, and evaluation of projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Development of a Small-Scale Project Model for Waste Management at the Port Hope Conversion Facility - 19126

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. Over time, Cameco's ongoing operations contributed to an increase in the volume of low-level radioactive waste managed onsite. Since 2011, Cameco has completed annual waste management campaigns with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations. With disposal options for low-level radioactively contaminated wastes in Canada limited due to cost considerations and no commercially accessible landfills licensed for radioactive material. In recent years, Cameco has started to ship marginally contaminated wastes (<500 ppm uranium) to the United States for disposal in an appropriate landfill owned by US Ecology in Idaho. Numerous successful campaigns totaling over 1,000 successful shipments, have been completed to transport drummed and/or bagged material by rail in gondola cars to the disposal facility in Idaho since 2011. All shipments have been completed in compliance with all environmental regulations, with a perfect compliance record maintained to date. To achieve this excellent compliance record, the campaigns require careful planning by both organizations, as well as deployment of personnel from the Idaho facility during the campaign for project management, characterization and/or radiation monitoring support. As the accumulated waste inventory has been reduced through these projects, the scope and duration of each campaign has also decreased. In the last few years, road transport directly to the Idaho facility has also been utilized. This option allows for the deployment of small projects that may be completed for a smaller inventory of a specific waste type and to manage newly-generated low-level radioactive wastes on an ongoing basis. These projects have ranged from a single standard van shipment to multiple trucks running continuous loops between the Ontario and Idaho or Ontario and an intermediary site and have been utilized for marginally contaminated wastes (<500 ppm uranium) as well as marginally contaminated wastes with additional hazard classification. Cameco and US Ecology personnel have collaborated to develop characterization and shipment procedures that enable these projects to be executed in full compliance with all Canadian and US regulations, without deployment of personnel from the Idaho facility, while maintaining adequate oversight by both organizations to ensure that the waste is safely and compliantly managed. These protocols have been implemented and optimized for the Port Hope Conversion Facility and will be rolled out to other Cameco facilities in Ontario through 2019. Cameco expects to utilize the small project model for the long term to ensure that eligible marginally contaminated wastes (<500 ppm uranium) are managed appropriately to ensure that once the legacy material is eliminated, it remains so. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 12: Featured Country Canada - Engaging the Public and Indigenous Groups in Canadian Waste and D and D Projects

This panel will share insights from those directly involved in the dialogue among members of the Canadian public, elected officials of host communities, indigenous groups, project proponents, and the Canadian regulator. History has shown time and again that the early and meaningful engagement of stakeholders must go hand-in-hand with technical solutions in order to assure the successful start and finish of waste management and decommissioning projects. In this panel discussion, the requirements for consultation and communication, the tools and strategies used, the results of efforts to date, and plans will be addressed by those at the center of some of Canada's biggest and most controversial radioactive waste projects. Presentations proposed include: 1 - Engaging the Public and Indigenous Groups in Canadian Waste and D and D Projects (Candida Cianci, Canadian Nuclear Safety Commission (Canada)); 2 - Indigenous Engagement (Bob Watts, Nuclear Waste Management Organization (Canada)); 3 - Engaging the Public and Indigenous Groups Related to Canadian Waste and D and D Projects (Patrick Quinn, Canadian Nuclear Laboratories (Canada)); 4 - Engaging the Public and Indigenous Groups in Canadian Waste and D and D Projects Canadian Association of Nuclear Host Communities Point of View (Blair Skinner, Local Government District of Pinawa, Manitoba (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project X: A Flexible High Power Proton Facility

Project X is a high intensity proton facility that will support a world-leading Intensity Frontier research program over the next several decades at Fermilab. When compared to other facilities in the planning stages elsewhere in the world Project X is completely unique in its ability to deliver, simultaneously, up to 6 MW of site-wide beam power to multiple experiments, at multiple energies, and with flexible beam formats. Project X will support a wide range of experiments based on neutrinos, muons, kaons, nucleons, and nuclei. In addition, Project X will lay the foundation for the long-term development of a Neutrino Factory and/or Muon Collider. A complete concept for Project X has been developed and is documented in the Project X Reference Design Report.

43 PARTICLE ACCELERATORS↗

ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

42 ENGINEERING↗

The status of the LANSCE refurbishment project (LANSCE-R)

The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

43 PARTICLE ACCELERATORS↗

Project X and a muon facility at Fermilab

An integrated program is described, starting with muon experiments in the Booster era, continuing with a 2 MW target station, a 4 GeV Neutrino Factory and a 3 TeV Muon Collider, all driven by Project X. This idea provides an integrated approach to the Intensity and Energy Frontiers at Fermilab. Project X is a proposed high intensity proton facility intended to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab while also providing an upgrade path to drive a neutrino factory and/or a muon collider. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report of August 2007 and of the Intensity Frontier science program described in the P5 report of May 2008. The primary elements of that research program to be supported by Project X include: (1) A neutrino beam for long baseline neutrino oscillation experiments. A new 2 megawatt proton source with proton energies between 50 and 120 GeV would produce intense neutrino beams, directed toward a large detector located in a distant underground laboratory. (2) Kaon and muon based precision experiments running simultaneously with the neutrino program. These could include a world leading muon-to-electron conversion experiment and world leading rare kaon decay experiments. (3) A path toward a muon source for a possible future neutrino factory and, potentially, a muon collider at the Energy Frontier. This path requires that the new proton source have significant upgrade potential beyond the initial uses. This paper suggests that an implementation of Project X based on a CW linac can be part of a continuous synergistic transition from a muon physics program in the 'Booster era' to the Neutrino Factory and Muon Collider. It then describes a possible staging of the planned muon experiments and of Project X to provide a graceful transition from the Intensity Frontier to the Energy Frontier.

43 PARTICLE ACCELERATORS↗

Projection screen having reduced ambient light scattering

An apparatus and method for improving the contrast between incident projected light and ambient light reflected from a projection screen are described. The efficiency of the projection screen for reflection of the projected light remains high, while permitting the projection screen to be utilized in a brightly lighted room. Light power requirements from the projection system utilized may be reduced.

47 OTHER INSTRUMENTATION↗

Economic Development Impacts of Community Wind Projects: A Review and Empirical Evaluation

"Community wind" refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an "absentee" project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside from salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.

17 WIND ENERGY↗

2008 Wind Energy Projects, Wind Powering America (Poster)

The Wind Powering America program produces a poster at the end of every calendar year that depicts new U.S. wind energy projects. The 2008 poster includes the following projects: Stetson Wind Farm in Maine; Dutch Hill Wind Farm in New York; Grand Ridge Wind Energy Center in Illinois; Hooper Bay, Alaska; Forestburg, South Dakota; Elbow Creek Wind Project in Texas; Glacier Wind Farm in Montana; Wray, Colorado; Smoky Hills Wind Farm in Kansas; Forbes Park Wind Project in Massachusetts; Spanish Fork, Utah; Goodland Wind Farm in Indiana; and the Tatanka Wind Energy Project on the border of North Dakota and South Dakota.

17 WIND ENERGY↗

Wetter California Projected by CMIP6 Models With Observational Constraints Under a High GHG Emission Scenario

As the world's fifth-largest economy entity, California (CA) is vulnerable to climate changes especially the magnitude of winter (wet season) precipitation that is closely linked to regional drought severity, vegetation growth, and wildfire activities. However, the fate of CA precipitation in the future remains highly uncertain, for example, the state-of-the-art Earth system models (ESMs) from the Coupled Model Intercomparison Project Phase 6 (CMIP6) projected –3% to +42% and –27% to +63% precipitation changes in northern and central-southern CA, respectively, under the high greenhouse gas (GHG) emission scenario (SSP585). In this work, we applied the Pareto optimality concept and used observed teleconnection patterns (causal relationships between ocean regions and CA precipitation) to mechanistically constrain CMIP6 projected CA precipitations. We estimated that precipitation will robustly increase by 0.4–1.3 mm d –1 (10–34%) over northern CA and increase by 0.1–0.5 mm d –1 (7–32%) over central-southern CA by the end of the 21st century compared with present-day. Up to 71% of ESM projection uncertainties were reduced mainly due to the strong and consistent causal relationship between North American west coast sea level pressure and CA precipitation in both observations and CMIP6 models. Our results suggest that teleconnection patterns are powerful mechanistic constraints that can help explain and reduce uncertainties in ESM projections.

54 ENVIRONMENTAL SCIENCES↗

On the representation of elements of a von Neumann algebra in the form of finite sums of products of projections. III. Commutators in C*-algebras

It is proved that every skew-Hermitian element of any properly infinite von Neumann algebra can be represented in the form of a finite sum of commutators of projections in this algebra. A new commutation condition for projections in terms of their upper (lower) bound in the lattice of all projections of the algebra is obtained. For the full matrix algebra the set of operators with canonical trace zero is described in terms of finite sums of commutators of projections and the domain in which the trace is positive is described in terms of finite sums of pairwise products of projections. Applications to AF-algebras are obtained. Bibliography: 33 titles.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Usage of Electric Vehicle Supply Equipment Along the Corridors between the EV Project Major Cities

The report explains how the EVSE are being used along the corridors between the EV Project cities. The EV Project consists of a nationwide collaboration between Idaho National Laboratory (INL), ECOtality North America, Nissan, General Motors, and more than 40 other city, regional and state governments, and electric utilities. The purpose of the EV Project is to demonstrate the deployment and use of approximately 14,000 Level II (208-240V) electric vehicle supply equipment (EVSE) and 300 fast chargers in 16 major cities. This research investigates the usage of all currently installed EV Project commercial EVSE along major interstate corridors. ESRI ArcMap software products are utilized to create geographic EVSE data layers for analysis and visualization of commercial EVSE usage. This research locates the crucial interstate corridors lacking sufficient commercial EVSE and targets locations for future commercial EVSE placement. The results and methods introduced in this research will be used by INL for the duration of the EV Project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Project 57 Air Monitoring Report: (Jan 1 - Dec 31 2018)

During the late 1950s, the Atomic Energy Commission (AEC) (now the U.S. Department of Energy [DOE]) conducted a series of safety experiments to determine if a nuclear device subjected to a large conventional explosives detonation would result in a nuclear yield. The AEC obtained temporary use of a large portion of western Emigrant Valley from the U.S. Department of Defense (DOD) for one of these experiments: Project 57. Following the Project 57 safety experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DOD. Emigrant Valley is part of the Nevada Test and Training Range (NTTR). For safety and security reasons, access to the NTTR is controlled using both physical (i.e., fences) and administrative (e.g., signs and postings) controls. Therefore, the public cannot access the Project 57 site and there are no known human receptors that routinely access the site. Project 57 was detonated on April 24, 1957, in Emigrant Valley approximately 13 mi (21 km) northeast of the north end of Yucca Flat. This test was undertaken to develop: (1) a means of estimating immediate distribution and long-term redistribution of plutonium dispersed during a nonnuclear detonation; (2) biomedical evaluation techniques for use in likely plutonium-laden environments; (3) methods of decontaminating ground areas, pavements, and building materials; and (4) alpha survey instruments and field monitoring procedures to promptly estimate contaminant deposition. Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the ground surface. Various radiological surveys have been performed in the area since Project 57 was conducted. The AEC delineated the area containing radioactive material based on radioactivity surveys performed shortly after the test was conducted. A designated Contamination Area (CA), marked by a fence, was established later. The distribution of americium-241 (Am-241) in the area was determined again in a 1997 flyover, which showed Am-241 ranging from as much as 70,000 counts per second (cps) at ground zero to background (<70 cps). This survey also documented Am-241 radioactivity on the ground surface beyond the east side CA fence at levels of up to 150 cps. In 2007, the DOE expanded the CA by posting “Contamination Area” signs 200 ft to 400 ft (60 m to 120 m) beyond the original fence, which formed a new CA boundary.

54 ENVIRONMENTAL SCIENCES↗

Cost Projections for Utility-Scale Battery Storage: 2023 Update

In this work we describe the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of recent publications that include utility-scale storage costs. The suite of publications demonstrates wide variation in projected cost reductions for battery storage over time. We use the recent publications to create low, mid, and high cost projections. Projected storage costs are $245/kWh, $326/kWh, and $403/kWh in 2030 and $159/kWh, $226/kWh, and $348/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

25 ENERGY STORAGE↗

Evaluating the Implications of Climate Projections on Heat Hardiness Zones for Green Infrastructure Planning

Background: Green Infrastructure (GI) is widely being promoted as an adaptation strategy for urban flooding. Like urban flooding, tree species could be impacted by future climatic conditions. However, there have been limited studies on the implications of future climate on GI planning, mostly due to the lack of climate data at higher spatial resolutions. Objective: Here in this paper, we analyze the implications of climate projections on heat hardiness zones since this could impact the GI landscape in the coming years. This is an extension of our earlier work on evaluating impacts of climate projections on plant hardiness zones. Method: Using downscaled daily temperature data from ten Coupled Model Intercomparison Project Phase 5 (CMIP5) climate models for the historical (1980-2005) and projected (2025-2050) periods, we analyzed future heat hardiness zones in the watershed bounding Knox County, TN. We analyzed the implications of these outputs for the current list of suggested native and non-native tree species selected for GI in the study area. Results: All the models suggest that a considerable part of the study area will move into the next warmer heat zone. While most trees remain suitable for GI, several are at the limit of their ideal heat zones. Conclusion: The insights from this study will help to guide the selection and placement of GI across the study area. Specifically, it should help green infrastructure planners design better mitigation and adaptation strategies to achieve higher returns on investments as more cities are now investing in GI projects.

54 ENVIRONMENTAL SCIENCES↗