Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Specimen Size Artifacts Associated with a Glovebox Deployable Laser Flash Diffusivity Measurement System

To accelerate nuclear fuel qualification and deployment efforts, Oak Ridge National Laboratory has led the world in developing vehicles for accelerating burnup accumulation in nuclear fuel by testing miniature samples in the High Flux Isotope Reactor. However, a challenge remains to establish parity between post irradiation characterization methods for miniature fuel specimens in comparison to conventional fuel elements. This work aims to identify artifacts associated with the thermal analysis of miniature disk specimens in comparison to samples of standardized dimensions through a combination of experimental and computational tools. Using a newly procured Netzsch 427 laser flash diffusivity system, preliminary data on mild steel specimens were collected, and finite element techniques were used to model heat transfer using 1D conditions to assess issues associated with pulse width and data collection frequency effects. These preliminary investigations found that significant variability in measured thermal diffusivity exist within datasets. These variations are not necessarily attributed to limitations with respect to data collection rate; nor are they associated with limitations on pulse width. Instead, these artifacts may be a result of limitations in detector intensity. Future work aims to design a focusing lens to better measure the smaller surface area of miniature specimens analyzed using the laser flash analysis system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Office of Nuclear Verification FY 2023 Quarterly Report TSVT Q1

This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.

42 ENGINEERING↗

Redefining Resource Adequacy for Modern Power Systems: A Report of the Redefining Resource Adequacy Task Force

Today's rapidly increasing levels of wind, solar, storage, and load flexibility require the industry to rethink reliability planning and resource adequacy methods for modern power systems. Periods with a risk of shortfall often no longer coincide with peak demand - reliability risks are less about peak load and more about the daily setting of the sun, extended cloud cover, wind speeds, cold snaps, and heat waves. In addition, demand is increasingly flexible. Key resources are time-sensitive, as batteries need time to recharge and electricity customers can only be asked to provide demand response for just so long. And reliability failures are often correlated - with one another and with the weather. Two driving factors require the industry to reconsider its analytical approach for resource adequacy: (1) Chronological grid operations: The increasing importance of variable renewable resources (such as wind and solar) and of energy-limited resources (storage and demand response) make it essential to understand the full year of chronological operation of the grid. Specific attention must be paid to hourly, seasonal, and inter-annual resource variability. The sequence of the variability is key, as energy-limited resources such as batteries or demand response require either a preceding period or subsequent period of high production to be useful for grid reliability. (2) Correlated events: Historically, resource adequacy analysis focused on shortfalls caused by random, discrete mechanical failures of large generating units. In contrast, shortfalls today are often caused by multiple, correlated events caused by common weather patterns. Resource adequacy analysis must increasingly shift its focus to these correlated events. The redesign of resource adequacy methods will benefit from a set of guiding principles to better allow for sharing of insights and best practices, interregional resource coordination, and a smoother regulatory process for resource procurement. The objective of this report is to move this redesign forward. It provides an overview of key drivers changing the way resource adequacy needs to be evaluated, identifies shortcomings of conventional approaches, and outlines first principles for practitioners to consider as they adapt their approaches. The central message is: what got us here won't get us there.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hardware Implementation and Market Impacts of Grid-Supportive Functions in End-Use Loads

Grid-supportive loads (GSLs) are power electronics-based end-use loads that can provide frequency response and other grid services by autonomously adjusting their output power using local grid measurements. This report provides details on GSL hardware design options and their associated costs and benefits for multiple devices, including EV chargers, refrigerators, and heat pumps. We consider mechanisms to incentivize adoption of GSLs at scale and estimate the quantity of frequency response that can be procured with GSLs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of FERC Order 2222 on DER Participation Rules in US Electricity Markets

Electricity markets in the bulk grid are beginning to implement market mechanisms that support the procurement of flexible capabilities from wide range of technologies, including distributed energy resources (DERs). The flexibility of these resources will help counterbalance supply uncertainties from large-scale integration of variable renewable generation. To encourage development of distributed and aggregated market participants, FERC Order 2222 was issued in September 2020 to require each Independent System Operator (ISO) in the US to implement rules that enable broader participation from aggregations of DERs in the bulk market. The following paper first describes the generic design of ISO markets before introducing the new market participation rules that ISOs have proposed for compliance with Order 2222. The paper then describes how software performance issues may continue to affect the eligibility requirements and offer structures for DER aggregations participating in ISOs, noting that continued research on computational methods may help reduce burdens for DER integration. The prospects for transmission and distribution system coordination is second major issue discussed, which will require minor changes to existing processes in the short term. In the longer term, there is more opportunity for more wide-ranging reforms, such as the development of a Distribution System Operator (DSO) framework. Newly proposed market rules may affect how Transactive Energy Systems (TES) will help facilitate efficient formation of DER aggregations and operation of the individual DERs within an aggregation. Within the TES context, the challenge is to fully understand how resource eligibility and operational and planning coordination methods will affect the design and implementation of TES.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spot Robot Staffing Augmentation in Process Modeling and Analysis (E-2) [Slides]

In September 2021 E-2 obtained its first Spot robot from Boston Dynamics to evaluate their suitability for work in and around laboratory facilities. Spot is a highly mobile quadruped robot capable of up to 90 minutes of operation. They can be outfitted with payloads up to 30 pounds and support Boston Dynamics-developed equipment, third party payloads, or custom-developed payloads. The platform showed immediate promise resulting in the procurement of a total of four units by the end of FY22 (Trinity, Gadget, Crossroads, and Sandstone).

42 ENGINEERING↗

Real Time and Forecasted DLR: Use Cases

This document contains two use cases for the utilization of dynamic line ratings in operational practices. These use cases were developed in support of the Transmission Optimization and Grid Enhancing Technology (TOGETS) task force aimed at facilitating the deployment of dynamic line rating and power flow technologies across the United States. The project included a demonstration of the technology on the Idaho National Laboratory system. The procurement documents, tests scripts, and field-validated results from multiple vendors will be published to improve industry’s familiarity with the products. Because of the urgency in performing this work and INL’s unique test setup, the Task Force identified a need for additional public information on the information exchanges required for operationalizing DLR (i.e. integrating DLR’s within actual system operations). As such, this use case document and an accompanying interoperability profile have been developed with input from the Task Force and various vendors whose systems would ultimately support the functionality described. The use case and interoperability profile support two distinct functionalities with different purposes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Direct Air Capture of CO 2 and Delivery to Photobioreactors for Algal Biofuel Production (Final Report)

A mobile DAC system was designed and constructed to pair with photobioreactors growing algae for biofuel production. The DAC system was designed as a versatile research system, rather than a compact production unit. The system was constructed and mounted on a mobile skid to facilitate transportation to the algae production site. Within the DAC system, CO 2 was captured using amine-loaded monoliths that allow for high CO 2 uptake with low pressure drop. The CO 2 is collected using a Global Thermostat patented temperature/vacuum swing adsorption (TVSA) process. Amine sorbents and process conditions were optimized to produce 10 to >20 g CO 2 .h-1. The stability of the amine sorbents was also studied, with sorbent modifications made to improve stability to degradation by oxidation. An Algenol-developed Spirulina strain (Arthrospira platensis AB2293) was selected as the production cyanobacterial strain. AB2293 cultured was inoculum for outdoor production following PBR installation by Algenol. The PBR system was composed of three independent PBRs, with each PBR composed of four hanging bags internally recirculated by a liquid turnover pump. The PBRs were operated outdoors in Atlanta, GA, and integrated with the DAC system. Algae were grown with similar productivity using DAC-CO 2 as algae grown using pure CO 2 obtained commercially (Airgas). Throughout the experimental duration, no discoloration was observed, and cellular morphology was consistent between the two experimental treatments. An LCA including lifecycle greenhouse gas emissions, full life cycle inventory of the Algenol system and the DAC system and integrated DAC+PBR system was developed. Lifecycle greenhouse gas emissions were calculated for capture of carbon dioxide using input from Global Thermostat and the National Renewable Energy Laboratory. Three scenarios for energy provision were evaluated: a natural gas combined heat and power system sized to meet the electricity requirement, a natural gas combined heat and power system sized to meet the process heat requirements, and a system without on-site power that procures the electricity from the grid. In all three cases, as expected, the major contributor to the emissions is the energy consumption associated with the desorption step of the DAC process. The LCA quantified the reduced potential energy and greenhouse gas emissions of heat and mass integration of DAC and Algenol compared to unintegrated DAC and Algenol systems. A life cycle assessment of the role of sorbent productivity and lifetime was also developed. The development of more robust, oxidation resistant DAC sorbents may enable small reductions in energy requirements and in lifecycle greenhouse gas emissions and other environmental impacts. NREL performed techno-economic analysis (TEA) to identify the integration scenario most likely to achieve a 15% cost reduction target versus the baseline. Heat and mass integration of DAC and the PBR is critical to minimizing the MFSP. The baseline case utilizes no heat and mass integration, and the DAC system provides 100% of the CO 2 required by the photobioreactors (20 tonnes/hr), operating for 12 hours/day capturing 40 tonnes CO 2 /operating hour. The minimum fuel selling price (MFSP) of ethanol calculated from the baseline case was $10.68/gal ethanol. This corresponds with a targeted MFSP of $9.07/gal ethanol (or 15% reduction). This target was achieved by integration Option 2a with the greatest cost reduction of 17.8% (or $8.78/gal) and integration Option 2b with a cost reduction of 16.4% (or $8.93/gal). Reductions in MFSP are attributed to two primary process considerations: (a) CO 2 storage at night reduces the capital expenses associated with DAC (i.e., increasing on-stream time); and (b) distributed DAC scenarios (DAC-PBR integration Options 2a and 2b) make use of boiler and DAC CHP flue gas CO 2 (free). Direct air capture on-stream time was one of the largest contributors to MFSP reduction.

09 BIOMASS FUELS↗

Benchmarking the AirSquared All-Metal Scroll Pump Against the Normetex 15 - Preliminary report

Tritium operations require specialized equipment for material compatibility, safety, and waste considerations. Non-metallic pump materials (polymer, oil, or grease) on a tritium-wetted surface can absorb tritium and/or undergo isotope exchange between tritium and more common protium, creating tritiated compounds that can result in material property modification via beta-radiolysis, inventory loss, reduced performance and special waste considerations, all of which increase the operating cost for a facility. Vacuum pumps move gas via a pressure differential between volumes of an operation. Several types of all-metal vacuum pumps exist for this application including metal bellows, diaphragm and scroll pumps. A metal bellows pump incorporates only metal components at the wetted surfaces. The common metal bellows pump employed in tritium facilities, the MB601 (Senior Metal Bellows, Sharon, PA, USA) creates a gas-motive force with a vacuum pressure between 30-40 torr. These pumps can efficiently move gas from one process step to another, as long as sub-30 torr pressures are not required. However, for higher vacuum demand, an all-metal scroll pump can be used with the bellows pump serving as a “backing” pump. This configuration typically provides an achievable vacuum of less than 20 mTorr. All-metal scroll pumps are a technology uniquely applicable to tritium gas handling. The industry standard all-metal scroll pump for glovebox-scale tritium operations is the Normetex 15 m 3 /hr, typically referred to as the Normetex 15 (Normetex Pompes, Pont Audemer, France). However, the final Normetex pumps were manufactured in 2012, rendering them no longer available. Eumeca SaRL (formerly Normetex) has developed and is marketing a scroll pump based on the design of the Normetex 15. A US company, AirSquared (Broomfield, Colorado), has developed and is marketing a potential alternative to the Normetex 15. The Gas Transfer Systems group (Q-7) of the Los Alamos National Laboratory (LANL) procured serial number 0001 of the AirSquared All Metal Vacuum Scroll pump model number V16H034A-C01 in 2019. The LANL Hydrogen Processing Laboratory (HPL) has been evaluating the performance of the pump compared to a Normetex pump as a potential replacement in tritium and fusion facilities requiring this type of pump.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Early Intervention Program Los Alamos National Laboratory [Slides]

Objectives of the Program: Identify employees with symptoms/discomfort and provide early intervention/rapid response before discomfort becomes an injury; Demonstrate to employees that the Laboratory cares about them using a personalized approach; Improve worker productivity and workplace satisfaction; Spread the word so that employees report discomfort early and rapid intervention can be executed to prevent injuries; facilitate procurement of necessary equipment as quickly as possible given risk of progression to injury.

99 GENERAL AND MISCELLANEOUS↗

Mechanofusion for Improved Control of Cermet TPBAR Pellet Microstructure

Mechanofusion is an alternative fabrication technique that has the potential to advance cermet TPBAR pellets by producing LiAlO 2 -Zr core-shell powders that will provide tighter control of targeted microstructural characteristics such as the presence and thickness of Zr surrounding every LiAlO 2 particle in the cermet. Significantly enhanced microstructural control will translate to improved control of material properties and characteristics that affect the in-reactor performance of cermet TPBAR pellets. It was the intention of this work to demonstrate the efficacy of mechanofusion for producing precursor powders for TPBAR pellets, however materials procurement issues prevented this objective from being fully realized. In spite of these issues, in the short amount of time during which appropriate materials were available, it was demonstrated that mechanofusion does indeed have promise for producing the desired structures although the process yet requires optimization.

36 MATERIALS SCIENCE↗

Single-Photon Detector & Counter for Transduction

Over the recent years, quantum computers have procured the attention of the public, largely due to their fast factoring capabilities and potential for efficient simulation of quantum dynamics \cite{RevModPhys.79.135}. This interest, coupled with advances in quantum transduction, could lead to the realization of a quantum distributed network, effectively linking dilution fridges across vast distances. Presently, there are several qubit systems developed for encoding quantum information. They primarily fall into two categories: those exploiting optical frequencies for excitation, and those operating at microwave frequencies. Optical frequency qubit systems include trapped ions, neutral atoms, quantum dots, and solid-state defects. Microwave frequency qubit system encompass superconducting qubits (transmon) and spins in crystals. Among these, transmons are particularly intriguing due to their low-loss of photons at microwave frequencies. The Josephson effect within a superconducting circuit enables high-fidelity quantum operations \cite{Microwave-optical_quantum_frequency_conversion}. Thus, it is non-trivial to develop an apparatus for efficiently bridging microwave and optical frequency regimes.

Bautista-Cortezano, Pablo↗

SAIL Field Campaign X-Band Precipitation Radar Surface Quantitative Precipitation Estimation (SQUIRE) Value-Added Product Report

In 2010, the U.S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility procured 3- and 5-cm wavelength radars for documenting the macrophysical, microphysical, and dynamical structure of precipitating systems. In order to maximize the scientific impact, ARM supported the development of an application chain to correct for various phenomena in order to retrieve the lowest retrieved value on a Cartesian grid. This report details the motivation, science, and progress to date, as well as charting a path forward.

54 ENVIRONMENTAL SCIENCES↗

Alternate Retrieval A-105 Application Assessment Report

This report summarizes the historical development of the Confined Sluicing End Effector (CSEE) technology as well scarification technology. We also summarize the systems integration and deployment of that technology in the Gunite and Associated Tanks (GAAT) at the Oak Ridge Reservation where the retrieval system successfully removed the remaining sludge and heel in the eight tanks for tank closure and disposition. We also summarize the lessons learned from the deployment at Oak Ridge. Simulant development and testing have been key activities for any waste retrieval effort as many of the physical properties of the waste are unknown; therefore, this report discusses a bounding series of simulants that helps to reduce uncertainty for operations. These simulants have been developed for potential Hanford waste retrieval deployment. The potential key attributes for retrieval, based upon information provided by Washington River Protection Services (WRPS), of single-shell tank A-105 are discussed along with the potential application of CSEE technology to the challenges presented by the unique nature of A-105. These unique features include a major tear in the bottom of the tank, which necessitates technologies other than past practice sluicing to be deployed to prevent further intrusion of waste into the vadose zone. In addition, significant in-tank hardware makes A-105 particular challenging. However, there appear to be a number of parameters that should be investigated through additional testing or review of prior testing that may demonstrate the applicability of the CSEE technology to A-105. Testing of the Waste Retrieval End Effector (WREE), which was based on the original CSEE design, to demonstrate the ability to remove sludge and hardpan from Tank 241-C-106 will be reviewed to determine relevance to the Tank A-105 retrieval. There may be new requirements for the deployment system that accesses the tank with the CSEE because the tank bottom may not be flat, requiring the ability to maneuver the CSEE to maintain the appropriate stand-off distance from the CSEE and the tank bottom. Finally, we provide a set of recommendations, a set of task descriptions, and a range of estimated costs for a demonstration of the technology by the end of FY17. These tasks are summarized as: Complete system-level functional requirements; Procure or access the capacity to perform; Generate simulant development and simulant testing; Develop CSEE functionality; Develop demonstration plan; Perform demonstration; Analyze and document testing results; Perform project management and engineering.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

LLNL FY23 Aging and Lifetimes Exit Criteria: Milestone 8650, GC #4

Silicone rubbers are important materials within the complex and are used in various applications due to wide operating temperatures, favorable aging characteristics, and chemical inertness. However, silicone rubbers are susceptible to degradation in the presence of acid or base. The goal of the project is to design outgassing vessels to probe material degradation byproducts from additively manufactured (AM) silicones compressed against Arrhenius base under dry (sub 100 ppm moisture) environments. The overarching goal of this task is to develop a mechanistic understanding of degradation from experimental data that will be used to inform predictive lifetime and aging models. An outgassing chamber for multi-material compressive aging was designed. The chamber consists of a stainless-steel enclosure, which is hermetically sealed once AM silicone samples are compressed against Arrhenius base pellets in compression rigs (Fig. 1). Outgassing chambers, compression rigs, and accessories were procured, arrived onsite, and received surface treatments. Outgassing of degradation byproducts will be monitored over 12 weeks at 35 °C and 70 °C.

36 MATERIALS SCIENCE↗