Potential impacts of alternative waste forms on long-term performance of geological repositories for radioactive waste.
No abstract prepared.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract prepared.
No abstract prepared.
No abstract prepared.
In countries with long historical tradition in thermal water therapy and with several mineral-medicinal thermal sources, workplaces within thermal centers may be a source of radon exposure which may be intensified if these are located in regions of high level of natural radiation. According to the EU Directive 96/29/Euratom (repealed by the Directive 2013/59/EURATOM) each Member State shall identify, by means of survey or any other adequate mean, the work activities where a significant increase in the exposure from natural radiation sources may occur, including thermal centers where the exposure to thoron/radon daughters or gamma radiation may occur. The purpose of this work was to perform a radiological characterization of selected thermal centers based on indoor dosimetry. The effective doses received by workers due to radon inhalation were estimated and gamma dose rates were measured through continuous periods. The radon risk for indoor exposure was assessed on a probabilistic basis both on thermal centers and workers' dwellings. Radon levels within the thermal centers ranged from 73 to 4335 Bq/m{sup 3} and the values within the workers dwellings are of the same order of magnitude, 68-4051 Bq/m{sup 3}. Approximately 66 % of indoor radon concentration values are above the maximum EU reference (300 Bq/m{sup 3}) and 94 % of the effective dose is higher than 1 mSv/year. In some situations, radon levels at residential environments are much higher than at workplaces and effective doses are higher than 6 mSv/year, both at residential and work environments. (authors)
No abstract prepared.
Traditional Resource Adequacy (RA) frameworks in the U.S. undervalue the contributions of inter-regional transmission to resource adequacy during stress periods, focusing on the availability of nameplate capacity instead. However, availability of nameplate capacity does not always translate into electricity delivery, especially during tail events. Moreover, the rapid deployment of energy-limited resources and increasing electricity demand challenge existing resource adequacy frameworks and couple regional electricity demand and availability of supply via transmission. We propose a two-stage framework that goes beyond the existing capacity-centered approaches to reveal the RA contributions of transmission. In the first stage we introduce a multi-objective optimization framework to quantify the merits of transmission expansion via Pareto Frontiers under alternative futures of no transmission investment, primary energy resources availability and demand growth. The second stage focuses on tail events and leverages the results of the first stage to characterize the risk profile of regional consumers across the U.S. under the alternative energy futures. We find that no new transmission can lead to a more expensive and less reliable national grid across scenarios, however, the impact on regional RA can vary. The probabilistic analysis reveals that transmission investments can alleviate the tail risk of consumers, however, the availability of fuel resources does not always alleviate regional tail risks. Our findings inform policymakers and utilities on the prioritization of transmission investments to mitigate the risk of widespread outages, also for tail events, and ensure reliable and affordable electricity delivery to all.
Since the Shuttle Challenger accident in 1986, communities across NASA have been developing and extensively using quantitative reliability and risk assessment methods in their decision making process. This paper discusses several reliability engineering applications that NASA has used over the year to support the design, development, and operation of critical space flight hardware. Specifically, the paper discusses several reliability engineering applications used by NASA in areas such as risk management, inspection policies, components upgrades, reliability growth, integrated failure analysis, and physics based probabilistic engineering analysis. In each of these areas, the paper provides a brief discussion of a case study to demonstrate the value added and the criticality of reliability engineering in supporting NASA project and program decisions to fly safely. Examples of these case studies discussed are reliability based life limit extension of Shuttle Space Main Engine (SSME) hardware, Reliability based inspection policies for Auxiliary Power Unit (APU) turbine disc, probabilistic structural engineering analysis for reliability prediction of the SSME alternate turbo-pump development, impact of ET foam reliability on the Space Shuttle System risk, and reliability based Space Shuttle upgrade for safety. Special attention is given in this paper to the physics based probabilistic engineering analysis applications and their critical role in evaluating the reliability of NASA development hardware including their potential use in a research and technology development environment.
As compact and light weight power sources with reliable, long lives, Radioisotope Power Systems (RPSs) have made space missions to explore the solar system possible. Due to the hazardous material that can be released during a launch accident, the potential health risk of an accident must be quantified, so that appropriate launch approval decisions can be made. One part of the risk estimation involves modeling the response of the RPS to potential accident environments. Due to the complexity of modeling the full RPS response deterministically on dynamic variables, the evaluation is performed in a stochastic manner with a Monte Carlo simulation. The potential consequences can be determined by modeling the transport of the hazardous material in the environment and in human biological pathways. The consequence analysis results are summed and weighted by appropriate likelihood values to give a collection of probabilistic results for the estimation of the potential health risk. This information is used to guide RPS designs, spacecraft designs, mission architecture, or launch procedures to potentially reduce the risk, as well as to inform decision makers of the potential health risks resulting from the use of RPSs for space missions.
The framework for Proliferation Resistance and Physical Protection (PR & PP) evaluation is to define a set of challenges, to obtain the system responses, and to assess the outcomes. The assessment of outcomes heavily relies on pathways, defined as sequences of events or actions that could potentially be followed by a State or a group of individuals in order to achieve a proliferation objective, with the defined threats as initiating events. There may be large number of segments connecting pathway stages (e.g. acquisition, processing, and fabrication for PR) which can lead to even larger number of pathways or scenarios through possible different combinations of segment connections, each with associated probabilities contributing to the overall risk. Clustering of these scenarios in specified stage attribute intervals is important for their tractable analysis and outcome assessment. A software tool for scenario generation and clustering (OSUPR) is developed that utilizes the PRCALC code developed at the Brookhaven National Laboratory for scenario generation and the K- means, mean shift and adaptive mean shift algorithms as possible clustering schemes. The results of the study using the Example Sodium Fast Breeder as an example system show that clustering facilitates the probabilistic or deterministic analysis of scenarios to identify system vulnerabilities and communication of the major risk contributors to stakeholders. The results of the study also show that the mean shift algorithm has the most potential for assisting the analysis of the scenarios generated by PRCALC.
This is a presentation to be made at the University of Tokyo. The Idaho National Laboratory is creating the next-generation reliability- and risk-assessment methods and tools that support risk-informed decision-making by combining physics-based models with probabilistic quantification approaches. Integrating these two worlds of physics and probability using a simulation framework leads us to predictions based upon an approach called “computational risk assessment” which will serve as the technical basis for the future of reliability and risk approaches. The driving factors for this new approach includes: temporal (timing issues), spatial (location issues), mechanistic (physics issues), and topological (complexity issues). By combining phenomenology directly with stochastic quantification, we are able to perform advanced uncertainty analysis directly on both parameters and models. In addition, new tools allow for the creation of reduced order models that mimic high-fidelity engineering models while still permitting the realization of thousands of simulation iterations in short run-times on current workstation-class computers. While these advanced methods and tools can provide increased realism in our engineering safety and risk approaches, their greater benefit is to provide a risk-informed engineering framework for design and operation. This talk will briefly review the history of risk assessment and risk-informed applications, describe some of the current research and development found at the Idaho National Laboratory, and discuss potential future applications and approaches for advanced methods and tools.
This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)
HyRAM is a software toolkit for conducting quantitative risk assessment (QRA) and consequence modeling for hydrogen infrastructure and transportation systems. HyRAM contains validated, simplified hydrogen behavior models, a standardized QRA approach, and engineering models and generic data relevant to hydrogen installations. HyRAM 1.0 was developed by Sandia National Laboratories for the U. S. Department of Energy to increase access to technical data about hydrogen and to enable the use of that data to support development and revision of national and international codes and standards with risk assessment and consequence modeling. The HyRAM toolkit integrates analytical and probabilistic models for quantifying accident scenarios, predicting physical effects, and characterizing the impact of hydrogen hazards (including thermal effects from jet fires and overpressure effects from deflagrations in confined areas) on people and structures. HyRAM incorporates generic probabilities for equipment failures for nine types of components, and probabilistic models for the impact of heat flux on humans and structures, with computationally and experimentally validated analytical first order models of hydrogen release and flame physics. Version 1 can be used to quantify the risk and consequences associated with gaseous hydrogen releases from user-defined hydrogen installations.
In order to estimate the potential risks due to carbon fibers (CF) released from aircraft accidents, it was necessary to quantify the probability of an accident or incident at a major hub airport. This probability was contingent upon various conditions surrounding the incident including the phase of operation, aircraft type, and the weather conditions. The type of accident predicted was categorized according to its location relative to the runway and the severity of damage sustained. The methodology utilized to estimate the probability of a specific type of accident is outlined and the various models that were developed in the course of this work are described.
This report represents the initial structure and content created for the ARC-100 nuclear reactor initial conceptual design Probabilistic Safety Assessment. The objective of the study is to assess the safety of the ARC-100 nuclear reactor conceptual design using a risk-informed approach. This early draft report is the first transmittal of the Probabilistic Safety Assessment approach and will be expanded over the remainder of the projects.
There has been increasing interest in using Quantitative Risk Assessment [QRA] to help improve the safety of hydrogen infrastructure and applications. Hydrogen infrastructure for transportation (e.g. fueling fuel cell vehicles) or stationary (e.g. back-up power) applications is a relatively new area for application of QRA vs. traditional industrial production and use, and as a result there are few tools designed to enable QRA for this emerging sector. There are few existing QRA tools containing models that have been developed and validated for use in small-scale hydrogen applications. However, in the past several years, there has been significant progress in developing and validating deterministic physical and engineering models for hydrogen dispersion, ignition, and flame behavior. In parallel, there has been progress in developing defensible probabilistic models for the occurrence of events such as hydrogen release and ignition. While models and data are available, using this information is difficult due to a lack of readily available tools for integrating deterministic and probabilistic components into a single analysis framework. This paper discusses the first steps in building an integrated toolkit for performing QRA on hydrogen transportation technologies and suggests directions for extending the toolkit.
Understanding the potential risk of stress corrosion cracking of spent nuclear fuel dry storage canisters has been identified as a knowledge gap for determining the safety of long-term interim storage of spent nuclear fuel. To address this, the DOE is funding a multi-lab DOE effort to understand the timing, occurrence, and consequences of potential canister SCC. Sandia National Laboratories has developed a probabilistic model for canister penetration by SCC. This model has been continuously updated at SNL since 2014. Model uncertainties are treated using a nested loop structure, where the outer loop accounts for uncertainties due to lack of data and the inner aleatoric loop accounts for uncertainties due to variation in nature. By separating uncertainties into these categories, it is possible to focus future work on reducing the most influential epistemic uncertainties. Several experimental studies have already been performed to improve the modeling approach through expanded process understanding and improved model parameterization. The resulting code is physics-based and intended to inform future work by identifying (1) important modeling assumptions, (2) experimental data needs, and (3) necessary model developments. In this document, several of the sub-models in the probabilistic SCC model have been exercised, and the intermediate results, as the model progresses from one sub-model to the next, are presented. Evaluating the sub-models in this manner provides a better understanding of sub-model outputs and has identified several unintended consequences of model assumptions or parameterizations, requiring updates to the modeling approach. The following updates have been made, and future updates have been identified.
The theoretical basis and numerical implementation of NESSUS (Numerical Evaluation of Stochastic Structures Under Stress; Cruse et al., 1988), a computer code for probabilistic structural analyses of aerospace components, are described, with an emphasis on the use of NESSUS for reliability and risk assessment. Topics addressed include the structure of NESSUS, the material-properties model, computational procedures, probabilistic models of fatigue-crack initiation, risk/cost evaluation, fatigue-fracture analyses, and fatigue-crack propagation. Numerical results from typical applications are presented in extensive graphs and briefly characterized; the usefulness of NESSUS predictions for establishing inspection and retirement schedules and for component certification is indicated.
The objective of this report is to summarize the deterministic and probabilistic structural evaluation results of two structures made with advanced ceramic composites (CMC): internally pressurized tube and uniformly loaded flange. The deterministic structural evaluation includes stress, displacement, and buckling analyses. It is carried out using the finite element code MHOST, developed for the 3-D inelastic analysis of structures that are made with advanced materials. The probabilistic evaluation is performed using the integrated probabilistic assessment of composite structures computer code IPACS. The affects of uncertainties in primitive variables related to the material, fabrication process, and loadings on the material property and structural response behavior are quantified. The primitive variables considered are: thermo-mechanical properties of fiber and matrix, fiber and void volume ratios, use temperature, and pressure. The probabilistic structural analysis and probabilistic strength results are used by IPACS to perform reliability and risk evaluation of the two structures. The results will show that the sensitivity information obtained for the two composite structures from the computational simulation can be used to alter the design process to meet desired service requirements. In addition to detailed probabilistic analysis of the two structures, the following were performed specifically on the CMC tube: (1) predicted the failure load and the buckling load, (2) performed coupled non-deterministic multi-disciplinary structural analysis, and (3) demonstrated that probabilistic sensitivities can be used to select a reduced set of design variables for optimization.