Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pathways Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,002 records · Page 56

Treatment of Problematic Reactive Metal Wastes Using the GeoMelt{sup R} In-Container Vitrification (ICV{sup TM}) Process - 20326

Decommissioning of sodium-cooled reactors and fast reactor technologies has generated a number of reactive metal waste configurations that are problematic to treat and typically lack cost effective treatment methods and disposition options. As a result, Veolia Nuclear Solutions, under contract with Idaho National Laboratory (owned by the U.S. Department of Energy and managed and operated by Battelle Energy Alliance, LLC) demonstrated its GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} technology to safely convert sodium metal to a non-reactive vitrified oxide form. The demonstration project, supported by glass formulation and crucible testing, consisted of a series of ICV{sup TM} melts that processed elemental sodium into stable non-reactive glass. INL is currently implementing GeoMelt{sup R} technology as a means to safely and reliably convert radioactive reactive metal residues that contaminate sodium cooled reactor components into waste forms that comply with existing disposition pathways. Reactive metal wastes require treatment in order to remove the Resource Conservation and Recovery Act (RCRA) reactivity and ignitability characteristics to comply with land disposal restrictions. GeoMelt{sup R}, which is an alternative to other potential treatment approaches, provides a robust approach that chemically converts the reactive metals to an inert oxide while also immobilizing radionuclides in a vitrified waste form with durability equal to or better than vitrified nuclear fuel reprocessing wastes (very robust and inert waste forms). Most other treatment approaches generate hydrogen gas which is problematic. In 2016, Veolia Nuclear Solutions first demonstrated the effectiveness of the GeoMelt{sup R} ICV{sup TM} process in deactivating reactive sodium metal. Crucible, bench-scale, and engineering-scale demonstrations were conducted on several surrogate waste configurations with various ratios of sodium metal and glass formers. Each ratio and configuration demonstrated complete deactivation of the surrogate sodium metal. Follow-on work in 2017 demonstrated the deactivation of reactive sodium by GeoMelt{sup R} ICV{sup TM} at a higher waste loading relative to previously demonstrated work performed in 2016; the higher waste loading optimized glass chemistry while enhancing the economical full-scale treatment of reactive metals. Additionally, follow-on demonstration testing in 2018 and 2019 focused on more complex shapes and other reactive-metals (mocked up Experimental Breeder Reactor II [EBR-II] subassembly, sodium filled heat exchanger, and a can containing sodium potassium alloy) which were all performed at engineering scale. Veolia Nuclear Solutions designed, installed, and commissioned in September 2018, at Perma-Fix Northwest in Richland Washington, a 10-metric ton full-scale GeoMelt unit (GeoMelt{sup R} Richland) for the treatment of reactive metal wastes. As of September 2019, over 900 55-gallon drums containing a total of around 3,500 lb of sodium with low levels of radioactivity have been treated at GeoMelt{sup R} Richland, with resulting glass monoliths disposed at the Nevada National Security Site (NNSS). A full-scale radiological demonstration melt on an actual EBR-II subassembly has also been performed using the full-scale melter in 2019. The GeoMelt{sup R} technology is a proven radioactive waste treatment technology capable of immobilizing radioactive wastes, including bulk rubble such as drums and other steel vessels usually without pretreatment. Utilizing the GeoMelt{sup R} technology to treat reactive metals eliminates pretreatment steps resulting from having to separate the reactive metal from steel containers or jackets as GeoMelt{sup R} can easily operate at temperatures sufficient to melt the steel and expose the reactive metal for treatment. Eliminating handling steps of reactive metals is a significant safety advantage since reactive metals are pyrophoric. The results generated as a part of the 2018-2019 demonstration program are presented in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pathway To Low-Carbon Lignite Utilization; U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) Cooperative Agreement No. DE-FE0024233

Utilities continue to investigate ways to decrease their carbon footprint. Carbon capture and storage (CCS) can enable existing power generation facilities to maintain operations and address carbon reduction. Subtask 2.1 – Pathway to Low-Carbon Lignite Utilization focused on several research areas in an effort to find ways to decrease the cost of capture across both precombustion and postcombustion platforms. Two postcombustion capture solvents were tested, one from CO 2 Solutions Inc. and one from ARCTECH, Inc. The CO 2 Solutions solvent had been evaluated previously, and the company had incorporated the concept of a rotating packed bed (RPB) to replace the traditional packed columns typically used. In the limited testing performed at the Energy & Environmental Research Center (EERC), no CO 2 reduction benefit was seen from the RPB; however, if the technology could be scaled up, it may introduce some savings in capital expense and overall system footprint. Rudimentary tests were conducted with the ARCTECH solvent to evaluate if it could be utilized in a spray tower configuration contactor and capture CO 2 , SO 2 , and NO x . This solvent after loading can be processed to make an additional product to filter wastewater, providing a second-tier usable product. Modeling of the RPB process for scaling to a 550-MW power system was also conducted. The reduced cost of RPB systems combined with a smaller footprint highlight the potential for reducing the cost of capturing CO 2 ; however, more extensive testing is needed to truly evaluate their potential for use at full scale. Hydrogen separation membranes from Commonwealth Scientific and Industrial Research Organisation (CSIRO) were evaluated through precombustion testing. These had also been previously tested and were improved by CSIRO for this test campaign. They are composed of vanadium alloy, which is less expensive than the palladium alloys that are typically used. Their performance was good, and they may be good candidates for medium-pressure gasifiers, but much more scale-up work is needed. Next-generation power cycles are currently being developed and show promise for high efficiency, and the utilization of supercritical CO 2 to drive a turbine could significantly increase cycle efficiency over traditional steam cycles. The EERC evaluated pressurized oxy-combustion technology from the standpoint of CO 2 purification. If impurities can be removed, the costs for CO 2 capture can be lowered significantly over postcombustion capture systems. Impurity removal consisted of a simple water scrubber referred to as the DeSNO x process. The process worked well, but corrosion management is crucial to its success. A model of this process was constructed. Finally, an integrated gasification combined-cycle (IGCC) system model, developed by the Massachusetts Institute of Technology (MIT), was modified to allow for the modeling of membrane systems in the IGCC process. This modified model was used to provide an assessment of the costs of membrane use at full scale. An economic estimation indicated a 14% reduction in cost for CO 2 separation over the SELEXOL™ process. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal sponsors for this project were the North Dakota Industrial Commission, Basin Electric Power Cooperative, and Allete, Inc. (including BNI Coal and Minnesota Power).

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Plan to Qualify New Fuel for the High Flux Isotope Reactor for Material Minimization

The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is one of five high power research reactors the Office of Material Management and Minimization (M3) Program, Office of Conversion is working to convert from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. This effort stems from the primary objective within the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) to achieve permanent threat reduction by minimizing, and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project is pursuing fuel qualification and licensing of the high-performance reactors to operate with LEU fuels. All high-performance reactors except HFIR will be converted to LEU monolithic uranium-molybdenum alloy fuel. HFIR will be evaluated for conversion to LEU using a uranium silicide fuel, namely, U3Si2-Al dispersion fuel.The mission of the USHPRR Project is to develop the technology needed to reduce, and eventually eliminate, worldwide use of HEU in civilian applications. The goal is to develop the technical means needed to use low enriched uranium (LEU) instead of HEU fuel in research and test reactors without significant penalties in performance, economics, or safety of the reactors. The USHPRR Project has four major elements, called Pillars: Fuel Qualification (FQ) managed at Idaho National Laboratory (INL), Fuel Fabrication (FF) managed at Pacific Northwest National Laboratory (PNNL), Reactor Conversion (RC) managed at Argonne National Laboratory (Argonne), and Cross-Cutting (CC) managed at Savannah River National Laboratory (SRNL). FQ is responsible for the qualification of the fuel type. RC is responsible for supporting reactor conversion analysis and overseeing licensing submittals leading to conversions of domestic reactors to LEU fuel. For the FQ effort, FQ (INL) worked in collaboration with RC (Argonne) and ORNL to develop the plan for the uranium silicide fuel qualification for HFIR.The resulting HFIR Fuel Qualification Plan provides the general approach for the USHPRR team to move the selected uranium silicide fuel design for HFIR conversion through qualification. Authorization and use in HFIR will be approved through the DOE’s Office of Science. Uranium silicide fuel was previously qualified in NUREG-1313 at an approximate maximum heat flux of 1.4 MW/m2 and a maximum fuel section temperature of about 130°C. In addition to the different regulator process utilized by DOE, these upper limits will be exceeded in HFIR; therefore, further testing will be necessary to ensure the fuel can meet HFIR qualification requirements. The HFIR fuel loading may exceed 4.8 gU/cm3 which was determined in the NUREG-1313 safety evaluation to be acceptable for use in non-power NRC-regulated reactors provided there exist no other safety considerations. In addition, the uranium silicide fuel will need to be qualified in a HFIR-specific design. This plan includes the currently available information from the USHPRR Project Functions and Requirements document and expands these requirements to ensure that planned tests have traceable results providing evidence that the requirements have been met. Data collection methods are discussed as well as the process to show that the requirements have been met. This document is designed to provide a pathway for researchers to obtain data necessary and at the appropriate quality level for HFIR fuel qualification.

Shokes, Tamara↗

A Plan to Qualify New Fuel for the High Flux Isotope Reactor for Material Minimization

The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is one of five high power research reactors the Office of Material Management and Minimization (M3) Program, Office of Conversion is working to convert from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. This effort stems from the primary objective within the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) to achieve permanent threat reduction by minimizing, and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project is pursuing fuel qualification and licensing of LEU fuels to support the high-performance reactors. All high-performance reactors except HFIR will be converted to LEU monolithic uranium-molybdenum alloy fuel. HFIR will be evaluated for conversion to LEU using a uranium silicide fuel, namely, U3Si2-Al dispersion fuel. The mission of the USHPRR Project is to develop the technology needed to reduce, and eventually eliminate, worldwide use of HEU in civilian applications. The goal is to develop the technical means needed to use low enriched uranium (LEU) instead of HEU fuel in research and test reactors without significant penalties in performance, economics, or safety of the reactors. The USHPRR Project has four major elements, called Pillars: Fuel Qualification (FQ) managed at Idaho National Laboratory (INL), Fuel Fabrication (FF) managed at Pacific Northwest National Laboratory (PNNL), Reactor Conversion (RC) managed at Argonne National Laboratory (Argonne), and Cross-Cutting (CC) managed at Savannah River National Laboratory (SRNL). FQ is responsible for the qualification of the fuel type. RC is responsible for supporting reactor conversion analysis and overseeing licensing submittals leading to conversions of domestic reactors to LEU fuel. For the FQ effort, FQ (INL) worked in collaboration with RC (Argonne) and ORNL to develop the plan for the uranium silicide fuel qualification for HFIR. The resulting HFIR Fuel Qualification Plan provides the general approach for the USHPRR team to move the selected uranium silicide fuel design for HFIR conversion through qualification. Authorization and use in HFIR will be approved through the DOE’s Office of Science. Uranium silicide fuel was previously qualified in NUREG-1313 at an approximate maximum heat flux of 1.4 MW/m2 and a maximum fuel section temperature of about 130°C. In addition to the different regulator process utilized by DOE, these upper limits will be exceeded in HFIR; therefore, further testing will be necessary to ensure the fuel can meet HFIR qualification requirements. The HFIR fuel loading may exceed 4.8 gU/cm3 which was determined in the NUREG-1313 safety evaluation to be acceptable for use in non-power NRC-licensed reactors provided there exist no other safety considerations. In addition, the uranium silicide fuel will need to be qualified in a HFIR-specific design. This plan includes the currently available information from the USHPRR Project Functions and Requirements document and expands these requirements to ensure that planned tests have traceable results providing evidence that the requirements have been met. Data collection methods are discussed as well as the process to show that the requirements have been met. This document is designed to provide a pathway for researchers to obtain data necessary and at the appropriate quality level for HFIR fuel qualification

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL Radiological Response Training Range

This assessment uses screening-level models to calculate potential environmental impacts from proposed tests at the Idaho National Laboratory (INL) Radiological Response Training Range (RRTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K2O, LaBr3, KBr, Cu, Zr, F, Ga, Ga2O3, NaNO2, Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface-soil impacts were calculated with the computer program mixing-cell model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated assuming 12 tests are conducted annually using all 11 material types for a period of 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer-code input, output, executable files, batch files, scripts, and spreadsheet files are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS). It is highly unlikely the test scenarios evaluated in this ECAR will adversely impact human health based on comparisons of calculated dose and concentration against regulatory standards and risk-based screening levels. Conservative estimates of dose to workers and the public from atmospheric transport of possible radionuclide releases are far below federal radiation protection standards. Conservative estimates of potential contaminant concentrations in groundwater are less than federal drinking water standards or screening levels. Predicted radionuclide concentrations in surface soils are below risk-based screening levels, except for Ge-68 (material Ga-68) for the worker. The Ge-68 soil concentration can be made less than the worker PRG, if the number of annual tests using Ga-68 is reduced from 12 to 6. However, the sum of ratios still exceeds one because of the high K-40 ratio. If the EF of the worker (number of days the worker is in the contaminated testing area) is reduced from 225 days/yr (default value for full time worker) to 112 days/yr, the Ge-68 ratio is less than one and the sum of ratios is less than one. Actual radiation doses and groundwater and surface-soil concentrations are likely to be much less than those calculated because of the conservative assumptions and parameters employed in the modeling. For example, atmospheric-transport calculations assume the entire inventory of each material type is readily released to the atmosphere and no plume deposition, depletion, or radioactive decay occurs during transport. The calculations also assume the same meteorological conditions (e.g., wind velocity, wind direction, stability class) that produce the maximum 95th percentile concentration (i.e., concentration representing the 95th percentile of a distribution of concentrations derived from 3 years of hourly meteorological data) at each receptor location are the same for all 12 tests during the year, and each receptor is assumed to be present during all 12 tests. The surface-soil assessment assumes the entire inventory of each test is deposited in the top 5 cm of soil. No atmospheric dispersal is assumed, and the radionuclides are subject only to leaching and radioactive decay. The groundwater-pathway modeling is conservative in that it is one-dimensional in the unsaturated zone (no lateral spreading/dilution) and assumes the entire inventory of contaminants infiltrates into the ground at the same location for every test. This is especially conservative for particulate radionuclides because they would have to dissolve or corrode first and some would be dispersed into the atmosphere. The groundwater receptor is also assumed to consume water directly from a hypothetical well positioned in the location of maximum concentration. In addition, conservative degradation rates were used, and volatilization was not considered for the nonradioactive chemical

54 ENVIRONMENTAL SCIENCES↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL National Security Test Range

This assessment uses screening-level models to calculate potential environmental impacts from proposed tests at two locations at the Idaho National Laboratory (INL) National Security Test Range (NSTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K 2 O, LaBr 3 , KBr, Cu, Zr, F, Ga, Ga 2 O 3 , NaNO 2 , Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface-soil impacts were calculated with the computer program mixing-cell model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated based on the assumption that 12 tests are conducted annually using all 11 material types for 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer-code input, output, executable files, batch files, scripts, and spreadsheet files, are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS). It is highly unlikely the test scenarios evaluated in this ECAR will adversely impact human health based on comparisons of calculated dose and concentration against regulatory standards and risk-based screening levels. Conservative estimates of dose to workers and the public from atmospheric transport of possible radionuclide releases are far below federal radiation protection standards. Conservative estimates of potential contaminant concentrations in groundwater are less than federal drinking water standards or screening levels. Predicted radionuclide concentrations in surface soils are below risk-based screening levels, except for Ge-68 (material Ga-68) for the worker. The Ge-68 soil concentration can be made less than the worker PRG, if the number of annual tests using Ga-68 is reduced from 12 to 6. However, the sum of ratios still exceeds one because of the high K-40 ratio. If the EF of the worker (number of days the worker is in the contaminated testing area) is reduced from 225 days/yr (default value for full time worker) to 112 days/yr, the Ge-68 ratio is less than one and the sum of ratios is less than one. Actual radiation doses and groundwater and surface-soil concentrations are likely to be much less than those calculated because of the conservative assumptions and parameters employed in the modeling. For example, atmospheric-transport calculations assume the entire inventory of each material type is readily released to the atmosphere and no plume deposition, depletion, or radioactive decay occurs during transport. The calculations also assume the same meteorological conditions (e.g., wind velocity, wind direction, stability class) that produce the maximum 95th percentile concentration (i.e., concentration representing the 95th percentile of a distribution of concentrations derived from 3 years of hourly meteorological data) at each receptor location are the same for all 12 tests during the year, and each receptor is assumed to be present during all 12 tests. The surface-soil assessment assumes the entire inventory of each test is deposited in the top 5 cm of soil. No atmospheric dispersal is assumed, and the radionuclides are subject only to leaching and radioactive decay. The groundwater-pathway modeling is conservative in that it is one-dimensional in the unsaturated zone (no lateral spreading/dilution) and assumes the entire inventory of contaminants infiltrates into the ground at the same location for every test. This is especially conservative for particulate radionuclides because they would have to dissolve or corrode first and some would be dispersed into the atmosphere. The groundwater receptor is also assumed to consume water directly from a hypothetical well positioned in the location of maximum concentration. In addition, conservative degradation rates were used, and volatilization was not considered for the nonradradioactive chemicals modeled. And finally, the calculations assume all 12 tests will be performed at the same place at both locations, and all 11 radioactive material types will be used for each test. This is conservative because it is anticipated that no more than two material types will be used per test.

99 GENERAL AND MISCELLANEOUS↗

Preliminary Long-term Safety Assessment for the Planned LLW Disposal Facility at Al-Tuwaitha, Iraq - 18142

Before 1991, Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest nuclear site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were concentrated. During the first Gulf War in 1991, all sites suffered significant damage from bombing and subsequent looting. Currently, the Ministry of Science and Technology is responsible for the ten heavily damaged nuclear sites and for the management of radioactive waste in Iraq in general. The task of decommissioning the damaged nuclear facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Commission (EC), and the United States (US). In the framework of its Instrument for Nuclear Safety Cooperation (INSC), the EC has launched a cooperation project to support the planned construction of an engineered repository for short-lived low- and intermediate level waste for the safe disposal of radioactive waste resulting from the decommissioning activities, as well as for waste from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The main objectives of this project, which was awarded to a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany and JAVYS a.s. of Slovakia, are the development of an initial conceptual level basic design and preliminary safety assessment report (PSAR) and the subsequent detailed engineering design and supporting pre-construction safety assessment report (PCSAR). The current paper focuses on the development of the PSAR. Special focus is given to the long-term calculations and difficulties associated with the limited data base in regard to site characterization as well as the expected inventory for the future repository. Because of the ongoing security concerns in Iraq, the Ministry of Science and Technology had already selected the Al-Tuwaitha Site as the best suited location for the planned surface repository at the start of the project. Although some site characterization work had already been carried out prior to the start of the project, certain data for modelling the geology and hydrology of the site are still lacking. Missing data have been compensated by conservative assumptions and the assessment of alternative scenarios. Consequently, for the development of the simplified GoldSim{sup R} computer model used to carry out the long-term calculations supporting the PSAR, existing site information was used and, as appropriate, amended or replaced by conservative assumptions. Due to the nature of the waste, data on the expected inventory are associated with large uncertainties. Although certain estimates related to the future volume of the waste exist, little to no information is available on the expected radionuclide vector and respective activities. Therefore, the long-term calculations were carried out for a generic inventory including a broad range of radionuclides that are to be expected as being important considering the kind of waste to be disposed of in the facility. Based on the results of these calculations, the maximum total capacity of the facility was estimated and converted into activity limits for individual radionuclides that will be integrated into the existing general WAC for the facility. Compliance with these WAC will then guarantee the safety of the repository in regard to potential radionuclide releases via the groundwater pathway. In parallel to the determination of activity limits for the WAC, long-term calculations were carried using different estimates for the expected total activity to determine the general suitability of the proposed technical solution of the repository for receiving the total amount of Iraqi radioactive waste principally acceptable for surface disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development for Dry Storage of Aluminum-Clad Spent Nuclear Fuel - 20490

A candidate disposition pathway for the > 13 MTHM of aluminum-clad spent nuclear fuel (ASNF), owned and managed by the U.S. Department of Energy, is the drying and placement of the SNF into sealed-canister dry storage, with the ASNF-in- canisters 'road-ready' for transportation to and final direct disposal in a repository waste package. Technical information gaps in fuel drying, and fuel dry storage behavior, have previously challenged the declaration of technology readiness for drying and placement of this fuel into the DOE Standard Canister design for > 50 years of safe dry storage. The principal technical information gaps included: i) characterization and thermal dehydration behavior of aluminum (oxy)hydroxide films attendant on the cladding due to film formation during reactor operation and during post-discharge up to long-term wet storage histories; and ii) G-value data to enable estimation of the radiolytic gas generation from the cladding with its (oxy)hydroxide films. Thus, the oxide films on the ASNF challenged the safety of a sealed storage canister with thermal and radiolytic decomposition of the waters on the films that can lead to corrosion, pressurization, and flammability issues. These gaps in the technical information base have largely been closed. This paper discusses the investigations at the Idaho National Laboratory (INL) and the Savannah River National laboratory (SRNL), and outlines the pending technology development work for input to an engineering design to enable a road-ready dry storage system for ASNF. The ASNF inventory considered for road-ready dry storage is stored at the Savannah River Site (SRS) and at the Idaho Nuclear Technology and Engineering Center (INTEC) at the INL. The ASNF inventory in the SRS L Basin is from foreign and domestic research reactors (FRR and DRR), and is diverse in terms of design, irradiation, and post-reactor-discharge storage conditions; these factors yield a range of characteristics of cladding oxide films on ASNF. Mixed aluminum (oxy)hydroxide (boehmite and bayerite/gibbsite) films, non-uniform in thicknesses up to a maximum local thickness bounded by 25 μm, were observed on ASNF materials removed from wet storage in the L Basin and in non-sealed dry storage at the SRS following reactor service and a long-term (up to 40+ years) interim storage history. The ASNF inventory at INTEC, in both wet and vented dry storage, is predominantly from the Advanced Test Reactor (ATR), but it also includes DRR and FRR fuel. To address a profound behavior of these films, radiolysis testing of aluminum specimens with mixed type boehmite/bayerite oxide films was performed to develop basic data on G-values for production of radiolytic hydrogen under dry storage conditions with nominal relative humidity, temperature, and cover gas. Modeling and simulation of canister internal environments with postulated inventories of oxide films provides estimation of the evolution of the conditions of the canister loaded with ASNF. Simultaneous Thermal Analysis (TGA/DSC) of hydrated oxide powders, and laboratory-scale aluminum specimens with a bayerite film (∼10 μm) using TGA methods, inform drying time/temperature conditions to be used for the ASNF. A demonstration project is recommended for Verification and Validation of the drying and storage of the ASNF. Remaining major tasks leading up to the hot demonstration include scale-up radiolysis testing and scale-up drying testing. Engineering design with the information from the technology program will establish the safety basis and enable long-term (> 50 years) dry storage compatibility with ASNF in the DOE Standard Canister pending its transportation to and disposal in a repository. This full capability would show the ASNF-in-canister storage system to be road-ready. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2011 Mound Site Groundwater Plume Rebound Exercise and Follow-Up - 13440

The Mound Site facility near Miamisburg, Ohio, opened in 1948 to support early atomic weapons programs. It grew into a research, development, and production facility performing work in support of the U.S. Department of Energy (DOE) weapons and energy programs. The plant was in operation until 1995. During the course of operation, an onsite landfill was created. The landfill was located over a finger of a buried valley aquifer, which is a sole drinking water source for much of the Miami Valley. In the 1980's, volatile organic compounds (VOCs) were discovered in groundwater at the Mound site. The site was placed on the National Priorities List on November 21, 1989. DOE signed a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Federal Facility Agreement with the U.S. Environmental Protection Agency (EPA) and the Ohio Environmental Protection Agency. The agreement became effective in October 1990. The area that included the landfill was designated Operational Unit 1 (OU-1). In 1995, a Record of Decision was signed that called for the installation and operation of a pump and treatment (P and T) system in order to prevent the VOCs in OU-1 groundwater from being captured by the onsite water production wells. In addition to the P and T system, a soil vapor extraction (SVE) system was installed in 1997 to accelerate removal of VOCs from groundwater in the OU-1 area. The SVE system was successful in removing large amounts of VOCs and continued to operate until 2007, when the amount of VOCs removed became minimal. A rebound study was started in February 2003 to determine how the groundwater system and contaminants would respond to shutting down the P and T system. The rebound test was stopped in February 2004 because predetermined VOC threshold concentrations were exceeded down-gradient of the landfill. The P and T and SVE systems were restarted after the termination of the rebound test. In 2006, the remediation of the Mound site was completed and the site was declared to be protective of human health and the environment, as long as the institutional controls are observed. The institutional controls that apply to the OU-1 area include provisions that no soil be allowed to leave the site, no wells be installed for drinking water, and the site may be approved only for industrial use. The onsite landfill with the operating CERCLA remedy remained. However, the Mound Development Corporation lobbied Congress for funds to remediate the remaining onsite landfill to allow for property reuse. In 2007 DOE received funding from Congress to perform non-CERCLA removal actions at OU-1 to excavate the site sanitary landfill. In 2009, DOE received American Recovery and Reinvestment Act funding to complete the project. Excavation of the landfill occurred intermittently from 2006 through 2010 and the majority of the VOC source was removed; however, VOC levels near the P and T system remained greater than the EPA maximum contaminant levels (MCLs). Presently, groundwater is contained using two extraction wells to create a hydraulic barrier to prevent down-gradient migration of VOC-impacted groundwater. Since the primary contamination source has been removed, the feasibility of moving away from containment to a more passive remedy, namely monitored natural attenuation (MNA), is being considered. A second rebound study was started in June 2011. If contaminant and groundwater behavior met specific conditions during the study, MNA would be evaluated and considered as a viable alternative for the groundwater in the OU-1 area. From June through December 2011, the second rebound study evaluated the changes in VOC concentrations in groundwater when the P and T system was not in operation. As the study progressed, elevated concentrations of VOCs that exceeded predetermined trigger values were measured along the down-gradient boundary of the study area, and so the P and T system was restarted. It was determined that a discrete area with VOC concentrations greater than the MCLs was present in groundwater down-gradient of the extraction wells. The source was not identified, but the contamination was thought not to be caused by residually contaminated soil beneath the former landfill. The data collected so far supports the consideration of MNA as a viable alternative to hydraulic containment. Additional investigations are being performed to identify possible sources or pathways of VOCs in groundwater that may be contributing to the elevated VOC levels measured down-gradient of the extraction well system. Data from this additional investigation will be used to determine whether the VOCs detected down-gradient of the hydraulic boundary are the result of residual soil contamination, a previously unknown contribution of VOC-contaminated water entering the groundwater outside the capture zone of the extraction wells, or a pulse of VOC-contaminated groundwater from the OU-1 landfill that occurred during the rebound study. (authors)

54 ENVIRONMENTAL SCIENCES↗

TRAILS Output Files

Overview This data repository contains ZIP files that store compressed versions of the output of running the WaterPaths utility planning and management tool in the DU Re-Evaluation mode (to download the tool, please see this GitHub repository). The tool was used to simulate the six-utility North Carolina Research Triangle problem. Details on the contents of each ZIP file can be seen below. Data details Temporal range: Weekly data for 2,344 weeks from 2015 to 2060 (45 years). Spatial range: Six water utilities in the North Carolina Research Triangle region (0: Chapel Hil/OWASA, 1: Durham, 2: Cary, 3: Raleigh, 4: Pittsboro, and 5: Chatham) File types: CSV and OUT Different solutions available The solution numbers correspond to the different pathway strategies (henceforth referred to as "solutions") discussed in paper's main and supporting text (abstract and link to the paper here). They are as follows: Sol92: The Durham-focused pathway strategy Sol132: The Raleigh-focused pathway strategy Sol140: The regionally-robust pathway strategy Objectives files These files can be accessed by unzipping solXX_objectives_pathways.zip that contains 1,000 Objectives_RDMXX_solsXX_to_XX.csv files. Each CSV file will consist of a row representing all the objective values for that specific solution, while every six columns represents the reliability, restriction frequency, infrastructure net present value ($ mil), peak financial cost, worst-case cost, and unit cost ($ per MG; in that order) for each of the six utilities. There will be 1,000 such files, denoting the performance of the six utilities across the 1,000 deeply uncertain states of the world (DU SOWs). Pathway files These files can be accessed by unzipping solXX_objectives_pathways.zip that contains 1,000 Pathways_sXX_RDMXX.out file. Each OUT corresponds to the set of infrastructure being triggered in a specific DU SOW, and each file will have the name file will consist of four tab-delimited columns that are described as follows: Realization: The realization in which an infrastructure options being triggered utility: The utility currently triggering infrastructure week: The week in which a specific infrastructure option is being triggered infra.: The infrastructure option being triggered If the OUT file contains only the header line, no infrastructure was triggered for that specific DU SOW. Policies files These files can be obtained by unzipping Policies.zip. Each of the 1,000 CSV files within the unzipped folder will contain weekly water use restriction policies for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: 0rest_m: restriction multiplier for utility 0 (values between 0 and 1) 1rest_m: restriction multiplier for utility 1 (values between 0 and 1) 2rest_m: restriction multiplier for utility 2 (values between 0 and 1) 3rest_m: restriction multiplier for utility 3 (values between 0 and 1) 4rest_m: restriction multiplier for utility 4 (values between 0 and 1) 5rest_m: restriction multiplier for utility 5 (values between 0 and 1) 0transf: transfer volume for utility 0 (in MGD) 1transf: transfer volume for utility 1 (in MGD) 2transf: transfer volume for utility 2 (in MGD) 3transf: transfer volume for utility 3 (in MGD) 4transf: transfer volume for utility 4 (in MGD) 5transf: transfer volume for utility 5 (in MGD) Water Sources files These files can be obtained by unzipping WaterSources_subset.zip. Each of the 100 CSV files within the unzipped folder will contain weekly state variables at each water source for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: Xvolume: available water volume from source X (in MGD) Xs_area: surface area of source X (in ACF) Xdemand: demand drawn from a water source from source X (in MGD) Xup_spill: upstream spillage from source X (in MGD) Xww_inflow: wastewater inflow from source X (in MGD) Xcatch_inflow: upstream catchment inflow to source X (in MGD) Xevap: evaporation multiplier for source X (values between 0 and 1) Xds_spill: downstream spillage from source X (in MGD) X_Y_alloc_cap: the allocated capacity from source X to utility Y (values between 0 and 1) X_Y_alloc_dem: the allocated demand from source X to utility Y (values between 0 and 1) Xtrmt_alloc_Y: the allocated treatment capacity from source X to utility Y (values between 0 and 1) Utilities files These files can be obtained by unzipping Utilities_subset.zip. Each of the 100 CSV files within the unzipped folder will contain weekly state variables at each utility for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: Xst_vol: total available storage volume of utility X (in MG) Xcapacity: total storage capacity of utility X (in MG) Xnet_inf: : net inflow for all storage infrastructure for utility X (in MGD) Xst_rof: short term ROF for utility X (values between 0 and 1) Xst_stor_rof: short-term storage ROF for utility X (values between 0 and 1) Xst_trmt_rof: short-term treatment ROF for utility X (values between 0 and 1) Xlt_rof: long-term ROF for utility X (values between 0 and 1) Xlt_stor_rof: long-term storage ROF for utility X (values between 0 and 1) Xlt_trmt_rof: long-term treatment ROF for utility X (values between 0 and 1) Xrest_demand: restricted demand for utility X (in MGD) Xunrest_demand: unrestricted demand for utility X (in MGD) Xunfulf_demand: unfulfilled demand for utility X (in MGD) Xwastewater: wastewater return for utility X (in MGD) Xtreat_capacity: total treatment capacity for utility X (in MG) Xcont_fund: reserve (contingency) fund balance for utility X Xins_pout: insurance payout for utility X (% annual volumetric revenue) Xins_price: insurance price for utility X (% annual volumetric revenue) Xinfra_npv: infrastructure net present value for utility ($mil) Xst_vol: total available storage volume of utility X (in MG) Xdebt_serv: debt service for utility X (usually once per year if the infrastructure is triggered; % annual volumetric revenue) Xstor_vol: total stored volume (in MGD) Xobs_ann_dem: observed annual demand for utility X (in MGD) Xproj_dem: projected annual demand for utility X (in MGD) Xpv_debt_serv: present value of debt service payments for utility X (% annual volumetric revenue) Xgross_rev: gross revenue for utility X ($mil) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

Artificial Intelligence↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗