Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Launch Vehicle Assessment for Space Solar Power

A recently completed study at Georgia Tech examined various launch vehicle options for deploying a future constellation of Space Solar Power satellites of the Suntower configuration. One of the motivations of the study was to determine whether the aggressive $400/kg launch price goal established for SSP package delivery would result in an attractive economic scenario for a future RLV developer. That is, would the potential revenue and traffic to be derived from a large scale SSP project be enough of an economic "carrot" to attract an RLV company into developing a new, low cost launch vehicle to address this market. Preliminary results presented in the attached charts show that there is enough economic reward for RLV developers, specifically in the case of the latest large GEO-based Suntower constellations (over 15,500 MT per year delivery for 30 years). For that SSP model, internal rates of return for the 30 year economic scenario exceed 22%. However, up-front government assistance to the RLV developer in terms of ground facilities, operations technologies, guaranteed low-interest rate loans, and partial offsets of some vehicle development expenses is necessary to achieve these positive results. This white paper is meant to serve as a companion to the data supplied in the accompanying charts. It's purpose is to provide more detail on the vehicles and design processes used, to highlight key decisions and issues, and to emphasize key results from each phase of the Georgia Tech study.

Olds, John R.↗

NASA Historical Data Book: NASA Launch Systems, Space Transportation, Human Spaceflight and Space Science, 1979-1988 - Volume 5

In 1973, NASA published the first volume of the NASA Historical Data Book, a hefty tome containing mostly tabular data on the resources of the space agency between 1958 and 1968. There, broken into detailed tables, were the facts and figures associated with the budget, facilities, procurement, installations, and personnel of NASA during that formative decade. In 1988, NASA reissued that first volume of the data book and added two additional volumes on the agency's programs and projects, one each for 1958-1968 and 1969-1978. NASA published a fourth volume in 1994 that addressed NASA resources for the period between 1969 and 1978. This fifth volume of the NASA Historical Data Book is a continuation of those earlier efforts. This fundamental reference tool presents information, much of it statistical, documenting the development of four critical areas of NASA responsibility for the period between 1979 and 1988. This volume includes detailed information on the development and operation of launch systems, space transportation, human spaceflight, and space science during this era. As such, it contains in-depth statistical information about the early Space Shuttle program through the return to flight in 1988, the early efforts to build a space station, the development of new launch systems, and the launching of seventeen space science missions. A companion volume will appear late in 1999, documenting the space applications, support operations, aeronautics, and resources aspects of NASA during the period between 1979 and 1988. NASA began its operations as the nation's civilian space agency in 1958 following the passage of the National Aeronautics and Space Act. It succeeded the National Advisory Committee for Aeronautics (NACA). The new organization was charged with preserving the role of the United States "as a leader in aeronautical and space science and technology" and in its application, with expanding our knowledge of the Earth's atmosphere and space, and with exploring flight both within and outside the atmosphere. By the 1980s, NASA had established itself as an agency with considerable achievements on record. The decade was marked by the inauguration of the Space Shuttle flights and haunted by the 1986 Challenger accident that temporarily halted the program. The agency also enjoyed the strong support of President Ronald Reagan, who enthusiastically announced the start of both the Space Station program and the National Aerospace Plane program.

Rumerman, Judy A.↗

Tracking the Relative Motion of Four Space Payloads Launched from a Sub-Orbital NASA Rocket

One problem, which is comparatively new in the field of GPS applications, is the determination of the relative trajectories of space vehicles. Applications include the docking of spacecraft, collision avoidance in the area of space stations, and trajectory reconstruction of multiple payloads. The required precision in any of these applications will vary, according to the requirements of the task and abilities of GPS to cope with the environment and the dynamics. This paper describes the post-mission reconstruction of the relative trajectories of four GPS receivers attached to four payloads jettisoned from a Black Brant XII rocket. This vehicle was launched by the National Aeronautics and Space Administration (NASA) in January 1999 from the Poker Flats Research Range near Fairbanks, Alaska. The Black Brant XII is a sub-orbital rocket designed to carry payloads of 100 to 500 kg into the upper atmosphere. Flight time is generally in the order of 10-20 minutes. In this experiment, a GPS receiver and antenna was attached to each of the four payloads. One of the GPS receivers was assigned as the "base station", while the other 3 receivers were designated as remotes. GPS time, code and phase measurements were telemetered to a ground station for real-time processing and storage. The object of the mission was to re-compute the position and velocity of the remote units with respect to the base station during the launch phase and after the payloads separated. During the launch segment the 3 baseling distances between the 4 antennas are known from plans and are constant values until each payload is released. On the fly ambiguity determination was used to establish local coordinates from the base antenna to each of the other 3 GPS units during flight. Distance computations were made from the GPS-derived coordinates and compared to plan distances. Using this methodology an error analysis of the relative GPS accuracies has been presented and in addition a description given of the respective payload behaviour following separation from the vehicle.

Martell, Hugh↗

Lightning Launch Commit Criteria for America's Space Program

The danger of natural and triggered lightning significantly impacts space launch operations supported by the USAF. The lightning Launch Commit Criteria (LCC) are used by the USAF to avoid these lightning threats to space launches. This paper presents a brief overview of the LCC.

Roeder, W. P.↗

[STS-51C Launch and Landing]

This NASA KSC video release is comprised of live shots covering the day launch and landing of STS-51C/Discovery. The flight crew members were: Thomas K. Mattingly II, Commander; Loren J. Shriver, Pilot; Ellison S. Onizuka, Mission Specialist; James F. Buchli, Mission Specialist; and Gary E. Payton, Payload Specialist. The launch video is presented from several different vantage points and covers the countdown from the launch pad, main engine ignition, liftoff, and solid rocket booster separation. The landing footage contains final descent and approach, landing gear deployment, and touchdown, which was also captured from different locations including a helicopter. STS-51C carried the DoD 85-1 payload and was the first mission dedicated to the Department of Defense.

Source record↗

STS-103 Discovery Launch Scrub Press Conference

A press conference held on December 16, 1999, to explain the reason behind NASA's decision to delay the Discovery's launching by a period of 24 hrs is presented. According to Ron Dittemore, Space Shuttle Program Manager, the STS-103 team delayed the launch because they need extra time to check one vendor's manufacturing processes, after an x-ray inspection revealed that an improper weld rod was used to weld one of the pressuring lines (called NPS lines) in the ET (external tank). Mr. Dittemore explained that since it is in the ET (not a major load carrying structure and rebuild after each flight), it did not pose any danger to the STS-103 flight. However, the same vendor also manufactured some parts of the orbiter and the team wanted to make sure that the quality of the vendor's manufacturing processes is robust before launching the orbiter to space. He also answered some reporters' questions.

Source record↗

President Clinton's Arrival at CCAS and Visit to KSC for Launch of STS-95

Live footage shows President Bill Clinton and First Lady Hillary Rodham Clinton arriving in Airforce 1 on the Skid Strip, viewing the launch, and tracking the plume of Space Shuttle Discovery, on mission STS-95. The viewing takes place on the roof of the Launch Control Center (LCC). Also present on the roof to watch this event are Astronaut Robert Cabana and Eileen Collins (both in flight suit), and the NASA Administrator Daniel Goldin. The President is shown giving a speech to the Launch Team and shaking hands with employees in the LCC.

Source record↗

STS-99 Post-Launch Press Conference

Live footage shows the participants in the Post-Launch Press Conference disclosing the status of the STS-99 flight. The panelists consist of Bill Gerstenmaier, Acting Manager of Launch Integration and Dave King, Director of Shuttle Operations at KSC (Kennedy Space Center). Joel Wells, of NASA's Public Affairs Office, introduces each panelist as they discuss the mapping to the Earth, and improve safety of the shuttle. The panelists also answer questions from the audience about the countdown. Also shown are various shots of the Shuttle on the launch pad.

Source record↗

Development of Response Surface Models for Rapid Analysis & Multidisciplinary Optimization of Launch Vehicle Design Concepts

Multdisciplinary design optimization (MDO) is an important step in the design and evaluation of launch vehicles, since it has a significant impact on performance and lifecycle cost. The objective in MDO is to search the design space to determine the values of design parameters that optimize the performance characteristics subject to system constraints. Vehicle Analysis Branch (VAB) at NASA Langley Research Center has computerized analysis tools in many of the disciplines required for the design and analysis of launch vehicles. Vehicle performance characteristics can be determined by the use of these computerized analysis tools. The next step is to optimize the system performance characteristics subject to multidisciplinary constraints. However, most of the complex sizing and performance evaluation codes used for launch vehicle design are stand-alone tools, operated by disciplinary experts. They are, in general, difficult to integrate and use directly for MDO. An alternative has been to utilize response surface methodology (RSM) to obtain polynomial models that approximate the functional relationships between performance characteristics and design variables. These approximation models, called response surface models, are then used to integrate the disciplines using mathematical programming methods for efficient system level design analysis, MDO and fast sensitivity simulations. A second-order response surface model of the form given has been commonly used in RSM since in many cases it can provide an adequate approximation especially if the region of interest is sufficiently limited.

Unal, Resit↗

STS-30 Launch Highlights and Continuous Record from T-9 Mins.

The primary objective of the STS-30 mission was to deploy the Magellan/Venus radar mapper spacecraft and attached Inertial Upper Stage (IUS). The commander of the mission was David M. Walker. The crew was pilot, Ronald J. Grabe, and mission specialists, Norman E. Thagard, Mary L. Cleave, and Mark C. Lee. The mission was launched on May 4, 1989, after the April 28 launch attempt was scrubbed due to a problem with a liquid hydrogen recirculation pump on the number one main engine and a vapor leak in the four-inch liquid hydrogen recirculation line between the orbiter and the external tank. This videotape shows the crew breakfast on April 28, and the final preparations for launch. It also shows the crew boarding the shuttle. After the countdown is halted at T-31 seconds the crew leaves the orbiter.

Source record↗

STS-99 / Endeavour: Launch Postponement Press Conference

Live footage shows Ron Dittemore, the Shuttle Program Manager from Johnson Space Center (JSC), participating in a Launch Postponement Press Conference disclosing the status of the STS-99 flight. He addresses the weather condition which caused the postponement and the erroneous response from one of the Master Events Controllers (MEC). The moderator of this conference is Bruce Buckingham from NASA's Public Affairs Office. Ron answers questions from the audience about the MEC responsible for sending commands for launch, and the implications that it might have on the launch schedule.

Source record↗

STS-29: Pre-Launch Preparations/Launch and Landing

Live footage shows the crewmembers of STS-29, Commander Michael L. Coats, Pilot John E. Blaha, and Mission Specialists James P. Bagian, James F. Buchli, and Robert C. Springer, seated in the White Room with the traditional cake. The crew is seen performing various pre-launch activities including suit-up, and walk out to the Astro-van. This early morning launch shows countdown, main engine start, liftoff, booster separation, and various isolated footage of the launch from different cameras. Also presented are footage of the approach, gear touchdown, rollout at Edwards Air Force Base, and various isolated views of the landing.

Source record↗

Contributions of the NASA Langley Transonic Dynamics Tunnel to Launch Vehicle and Spacecraft Development

The NASA Langley Transonic Dynamics Tunnel (TDT) has provided wind-tunnel experimental validation and research data for numerous launch vehicles and spacecraft throughout its forty year history. Most of these tests have dealt with some aspect of aeroelastic or unsteady-response testing, which is the primary purpose of the TDT facility. However, some space-related test programs that have not involved aeroelasticity have used the TDT to take advantage of specific characteristics of the wind-tunnel facility. In general. the heavy gas test medium, variable pressure, relatively high Reynolds number and large size of the TDT test section have made it the preferred facility for these tests. The space-related tests conducted in the TDT have been divided into five categories. These categories are ground wind loads, launch vehicle dynamics, atmospheric flight of space vehicles, atmospheric reentry. and planetary-probe testing. All known TDT tests of launch vehicles and spacecraft are discussed in this report. An attempt has been made to succinctly summarize each wind-tunnel test, or in the case of multiple. related tests, each wind-tunnel program. Most summaries include model program discussion, description of the physical wind-tunnel model, and some typical or significant test results. When available, references are presented to assist the reader in further pursuing information on the tests.

Cole, Stanley R.↗

Establishing Hazardous Gas Launch Commit Criteria for the Space Shuttle External Tank Intertank Compartment

Until recently, the simultaneous detection and evaluation of multiple Space Transportation System (STS) element compartments for propellant leakage was not possible during the External Tank (ET) pre-pressurization (pre-press) phase of propellant loading; late in the loading sequence (T-3 min to T-0). There exist launch commit criteria (LCCS) designed to protect against leaks resulting in flammable mixtures in the intertank during the functional life of the ET; start of propellant loading through ET-Orbiter separation. However thus far, leak protection had relied on the premise that if a propellant supply system leak were to exist, it would be a leak of fixed area present at the start of propellant loading (dumb leak mode) and such a leak could be detected earlier in the loading sequence than the pre-press phase. No measures had ever been implemented which would protect against leaks potentially developing late in the loading sequence (smart leak mode), The STS community had baselined this situation as an accepted risk their decision supported by exhaustive hardware acceptance criteria and a history of many successful launches. With the recent development of improvements to the hazardous gas detection system (HGDS), an opportunity arose to monitor the intertank compartment for hazardous gas concentrations beyond the T-3 minute mark. In this timeframe the propellant supply system is pressurized for flight and protection was sought against potential leaks generated by this pressurization process. The challenge at hand was to develop LCCs in this timeframe that were not too conservative to unnecessarily prohibit a launch, yet not too liberal to endanger crew safety and mission success. Since essentially no measurement history existed in this timeframe, the LCCs would have to rely on analysis alone. At NASA's direction, Lockheed Martin Michoud Space Systems (LMMSS) developed requirements that would protect against a smart leak during pre-press. A smart leak protection strategy is noteworthy from an STS main propulsion system (NWS) community perspective. This paper presents the resultant requirements as well as the technical and program issues involved with establishing hazardous gas LCCs for the ET intertank compartment.

Baran, Adam J.↗

STS-35/Astro-1: Launch T-20 Through Orbit with Replays (Tape 2 of 2)

Live footage shows the Launch Control Center (LCC) communicating with the STS-35 Space Shuttle. Scenes include various playback launch views of STS-35. Also shown are panoramic views of the Shuttle on the launch pad, main engine start, ignition, liftoff and booster separation and various Long Range Tracker views.

Source record↗

STS-35/ASTRO-1: Breakfast/Suit-up /Depart O & C / Ingress / Launch with Isolated Views

The primary objective of the STS-35 mission was the round-the-clock observations of the celestial sphere in ultraviolet and X ray astronomy with ASTRO-1. The mission was commanded by Vance D. Brand. The crew consisted of the pilot Guy S. Gardner, mission Specialists Jeffery Hoffman, John Lounge, and Robert Parker, and payload specialists Samuel Durrance, and Ronald Parise. This videotape opens with a view of the shuttle on the pad at night in preparation for a night launch. The astronauts are introduced as they finish their pre-launch breakfast. The next shots are those of the astronauts getting into their spacesuits, and boarding the bus to be taken to the pad. The astronauts are next shown climbing into the shuttle. The launch of the shuttle is shown from 19 different camera angles.

Source record↗

TITAN III/Mars Observer Post-Launch Press Conference

Footage shows George Diller, NASA's Public Affairs Officer, as he introduces the panel members. Speakers includes: William Piotrowski, Program Manager from NASA Headquarters; James Womack, NASA Launch Manager from Kennedy Space Center; John Gibb, TITAN Launch Vehicle Manager from Langley Research Center; Sid Saucier, Transfer Orbit Stage, Director from Marshall Space Flight Center; and David Evans, Mars Observer, Director from the Jet Propulsion Laboratory. The speakers discuss the launch procedures, activities, and some trouble that the Observer is having. The panelists are also seen answering questions from both the audience as well as other NASA Centers.

Source record↗

Mars Comm/Nav MicroSat Network Using the Multi-Mission Bus Launched Piggyback by Ariane 5

Recently, NASA's Jet Propulsion Laboratory completed a Mars Exploration Program Architecture Definition Study with strong international participation. The recommendations of this study include establishment of a low cost in-situ communications and navigation satellite network to provide enabling and enhancing support for the international exploration of Mars. This would be the first step toward establishing a "virtual presence throughout the solar system" as called for in NASA's Strategic Plan. Response to the proposed comm/nav satellite network has been very favorably received, as reflected by the inclusion of a line item in NASA's budget submittal to Congress, which provides funding for implementation of the network with first launch in the 2003 opportunity. Funding has already been provided for a phase A study being conducted this year. This paper presents the planned implementation of the comm/nav network, which will utilize microsats based on a multi-mission spacecraft bus being designed for launch by the Ariane 5 as a secondary payload. A companion paper at this conference, entitled "The Multi-Purpose Mars Micro-Mission System Design Utilizing Ariane 5 Piggyback Launch", describes the multimission bus design. This paper addresses the application of the multi-mission bus to the comm/nav microsat mission. Following an introduction, which provides the background that has led to the proposed comm/nav network, the paper discusses the projected user needs with emphasis on the various possible robotic missions (landers, rovers, ascent vehicles, balloons, aircraft, etc.) progressing toward eventual piloted missions. Next, the paper describes the concept for an evolving network of comm/nav microsats and the expected capability to satisfy the user needs. Results of communications and navigation performance analysis are summarized for attractive satellite constellation configurations. The important comm/nav microsat functional requirements on the multi-mission spacecraft bus are described with discussion of the mission-system tradeoffs for the driving requirements. The functional design of the in-situ communications / navigation package, which constitutes the payload of the microsat, is also described. The paper also includes discussion of technologies which are of specific importance to the implementation of the comm/nav microsat network.

Hastrup, R. C.↗