Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “GROUNDWATER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

2020 Postclosure Groundwater Monitoring and Inspection Report, Central Nevada Test Area, Subsurface Corrective Action Unit 443

This report presents the groundwater monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) from the Central Nevada Test Area (CNTA), Nevada, Site, Subsurface Corrective Action Unit (CAU) 443 in Nye County, Nevada (Figure 1). The CNTA is the site of an underground nuclear test in 1968 that resulted in residual contamination near the detonation depth of 3200 feet (ft); the contamination requires long-term monitoring. Responsibility for the environmental restoration and long-term monitoring was transferred from DOE’s National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The environmental restoration and site closure process were completed in 2015 in accordance with the amended 1996 Nevada Federal Facility Agreement and Consent Order (FFACO) (State of Nevada et al. 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. The Closure Report, Central Nevada Test Area, Subsurface Corrective Action, Unit 443 (DOE 2018), also called the Closure Report, originally was completed in January 2016 and revised in October 2018; it describes LM’s plan for long-term postclosure monitoring. This includes monitoring of the radioisotopes of interest and water elevations, inspecting the site and maintaining the institutional controls (ICs), evaluating and reporting data, and documenting the site’s records and data management processes (DOE 2018).

54 ENVIRONMENTAL SCIENCES↗

2010 Groundwater Monitoring Report Central Nevada Test Area, Corrective Action Unit 443

This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) for the Central Nevada Test Area (CNTA) Subsurface Corrective Action Unit (CAU) 443. Responsibility for the environmental site restoration of CNTA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof-of-concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 443 that were conducted at the site from December 2009 through December 2010. It also represents the second year of the enhanced monitoring network and the 5-year proof-of-concept monitoring period that is intended to validate the compliance boundary.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Calculation of Groundwater Pathway Radiological Dose for the Hanford Site Composite Analysis Base Case

The purpose of this environmental calculation file (ECF) is to present the results of the exposure route-specific and total radiological dose assessments for the groundwater exposure pathway as a part of the updated Hanford Site Composite Analysis (CA). The purpose of these radiological dose assessments is to provide an estimate of the cumulative radiological impacts from all screened sources of ionizing radiation and exposure routes that could potentially contribute to the projected dose to a hypothetical member of the public from both existing or future disposal facilities and other sources including past-practice discharge sites.

61 RADIATION PROTECTION AND DOSIMETRY↗

Impact to Groundwater All-Pathways Dose Estimates for the Remote-Handled Low-Level Waste Disposal Facility Performance Assessment Using Updated Dose Coefficients from DOE-STD-1196-2022

The Performance Assessment (PA) for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility at Idaho National Laboratory (INL) was completed in 2018 (DOE-ID 2018) using dose coefficients from U.S. Department of Energy (DOE) Standard DOE-STD-1196-2011 (DOE 2011). Internal and external dosimetry was updated in 2021 and a new technical standard was published in 2022 (DOE-STD-1196-2022) (DOE 2022). This technical memorandum provides a comparison of the ingestion dose coefficients between those published in DOE (2011) and those published in DOE (2022). The dose coefficients in DOE (2022) were then used to calculate the all-pathways dose for the groundwater pathway and the results between the doses published in the 2018 PA and those calculated using the updated dose coefficients in DOE (2022) were compared. Several other issues in the 2018 RHLLW Disposal Facility PA were also addressed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PCAST: Report to the President on Improving Groundwater Security in the United States

The President’s Council of Advisors on Science and Technology (PCAST) is the sole body of advisors from outside the federal government charged with making science, technology, and innovation policy recommendations to the President and the White House. Established by Executive Order, it is an independent Federal Advisory Committee comprised of distinguished individuals from industry, academia, and non-profit organizations with a range of perspectives and expertise. On December 14, 2024, PCAST sent a report to the President with recommendations to enhance groundwater stewardship and resilience.

54 ENVIRONMENTAL SCIENCES↗

Batch Test Analysis of Potential Treatment Technologies for Cyanide Groundwater Remediation

In addressing groundwater contamination, several remediation technologies are widely employed, including ion exchange (IX) resins and other adsorbents in pump-and-treat (P&T) facilities. However, many sites do not have the complex nature of the Hanford Site – a legacy production site that is part of the U.S. Department of Energy nuclear weapons complex. The Hanford Site covers an area of nearly 1,500 km 2 and has various inorganic and organic contaminants. One contaminant of concern in the Hanford Site’s Central Plateau is cyanide, particularly in the recalcitrant form of ferrocyanide. While ferrocyanide is often considered a stable complex, it can release free cyanide under certain conditions and presents challenges when testing for cyanide as a total cyanide analysis cannot differentiate between complexed and free cyanide.

54 ENVIRONMENTAL SCIENCES↗

DETAILED ANALYSIS OF THE MOST PROMISING ALTERNATIVES TO USING GRANULAR ACTIVATED CARBON TO TREAT 200-ZP-1 GROUNDWATER AND 200-PW-1 SOIL VAPOR

This document presents a detailed evaluation of selected alternative treatment options to granular activated carbon (GAC) for removing carbon tetrachloride generated from the groundwater pump-and-treat system at the 200-ZP-I Operable Unit (OU) in the 200 West Area of the Hanford Site. This evaluation of alternative treatment options to GAC is also applicable to the vadose zone soil vapor extraction (SVE) system at the 200-PW-l OU, which is also located in the Hanford Site's 200 West Area.

54 ENVIRONMENTAL SCIENCES↗

Phase I Hydrologic Data for the Groundwater Flow and Contaminant Transport Model of Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Nevada Test Site, Nye County, Nevada, Revision 1

This document presents a summary and framework of the available hydrologic data and other information directly relevant to the development of the Rainier Mesa/Shoshone Mountain (RMSM) Corrective Action Unit (CAU) 99 groundwater flow models. Where appropriate, data and information documented elsewhere are briefly summarized with reference to the complete documentation.

54 ENVIRONMENTAL SCIENCES↗

Phase I Contaminant Transport Parameters for the Groundwater Flow and Contaminant Transport Model of Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Nevada Test Site, Nye County, Nevada, Revision 1

This document presents a summary and framework of available transport data and other information directly relevant to the development of the Rainier Mesa/Shoshone Mountain (RMSM) Corrective Action Unit (CAU) 99 groundwater transport model. Where appropriate, data and information documented elsewhere are briefly summarized with reference to the complete documentation.

54 ENVIRONMENTAL SCIENCES↗

RESULTS OF GROUNDWATER MONITORING FOR THE 183-H SOLAR EVAPORATION BASINS AND 300 AREA PROCESS TRENCHES JANUARY THRU JUNE 2008

This is one of a series of reports on Resource Conservation and Recovery Act of 1976 (RCRA) monitoring at the 183-H solar evaporation basins and the 300 Area process trenches. It fulfills the requirement of Washington Administrative Code (WAC) 173-303-645(11)(g), 'Release from Regulated Units', to report twice each year on the effectiveness of the corrective action program. This report covers the period from January through June 2008. The current objective of corrective action monitoring the 183-H basins is simply to track trends. Although there is short-term variability in contaminant concentrations, trends over the past 10 years are downward. The current Hanford Facility RCRA Permit (Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste [Permit No. WA 7890008967]) and monitoring plan remain adequate for the objective of tracking trends. The objective of groundwater monitoring at the 300 Area process trenches is to demonstrate the effectiveness of the corrective action program by examining the trend of the constituents of interest to confirm that they are attenuating naturally. The overall concentration of uranium in network wells remained above the 30 {micro}g/L drinking water standard in the three downgradient wells screened at the water table. Fluctuations of uranium concentration are caused by changes in river stage. The concentration of cis-1,2-dichloroethene remained above the 70 {micro}g/L drinking water standard in one well (399-1-16B). Concentrations are relatively steady at this well and are not affected by river stage. Trichloroethene and tetrachloroethene concentrations were below detection limits in all wells during the reporting period.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aquifer Testing Recommendations for Well 299-W15-225: Supporting Phase I of the 200-ZP-1 Groundwater Operable Unit Remedial Design

Aquifer characterization needs are currently being assessed to optimize pump-and-treat remedial strategies within the 200-ZP-1 Operable Unit (OU), specifically for the immediate area of the 241-TX-TY Tank Farm. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system to remediate the existing groundwater contamination within this general area. Four of these wells (299-W15-40, 299-W15-43, 299-W15-44, and 299-W15-765) are targeted to remediate contamination within the immediate 241-TX-TY Tank Farm area. The major contaminant of concern (COC) for the 200-ZP-1 OU is carbon tetrachloride. Other COC’s include total chromium (trivalent [III] and hexavalent [VI], nitrate, trichloroethlyene, iodine-129, technetium-99, and tritium.

54 ENVIRONMENTAL SCIENCES↗

Field Test Report: Preliminary Aquifer Test Characterization Results for Well 299-W15-225: Supporting Phase I of the 200-ZP-1 Groundwater Operable Unit Remedial Design

This report examines the hydrologic test results for both local vertical profile characterization and large-scale hydrologic tests associated with a new extraction well (well 299-W15-225) that was constructed during FY2009 for inclusion within the future 200-West Area Groundwater Treatment System that is scheduled to go on-line at the end of FY2011. To facilitate the analysis of the large-scale hydrologic test performed at newly constructed extraction well 299-W15-225 (C7017; also referred to as EW-1 in some planning documents), the existing 200-ZP-1 interim pump-and-treat system was completely shut-down ~1 month before the performance of the large-scale hydrologic test. Specifically, this report 1) applies recently developed methods for removing barometric pressure fluctuations from well water-level measurements to enhance the detection of hydrologic test and pump-and-treat system effects at selected monitor wells, 2) analyzes the barometric-corrected well water-level responses for a preliminary determination of large-scale hydraulic properties, and 3) provides an assessment of the vertical distribution of hydraulic conductivity in the vicinity of newly constructed extraction well 299-W15-225. The hydrologic characterization approach presented in this report is expected to have universal application for meeting the characterization needs at other remedial action sites located within unconfined and confined aquifer systems.

54 ENVIRONMENTAL SCIENCES↗

Technical Basis for Evaluating Surface Barriers to Protect Groundwater from Deep Vadose Zone Contamination

This document presents a strategy for evaluating the effectiveness of surface barriers for site-specific deep vadose zone remediation. The strategy provides a technically defensible approach to determine the depth to which a surface barrier can effectively isolate contaminants in the vadose at a specific site as a function of subsurface properties, contaminant distribution, barrier design, and infiltration control performance. The strategy also provides an assessment of additional data and information needs with respect to surface barrier performance for deep vadose zone applications. The strategy addresses the linkage between surface barriers and deep vadose zone in situ remediation activities, monitoring issues, and emerging science, technology, and regulatory objectives. In short, the report documents the existing knowledge base, identifies knowledge needs (based on data gaps), and suggests tasks whose outcomes will address those knowledge needs. More important, the report serves as a starting point to engage the regulator and stakeholder community on the viability of deploying surface barriers for deep vadose zone contamination. As that engagement unfolds, a systematic methodology can be formalized and instituted. The strategy is focused on deep vadose zone contamination and the methods needed to determine the impact to groundwater from those deep vadose zone contaminants. Processes that affect surface barrier performance, recharge in the areas surrounding the surface barrier, and the near-surface vadose zone beneath the barrier are acknowledged but are not addressed by this strategy. In addition, the collection of site-specific data on contaminant distribution and geologic structure and properties are programmatic responsibilities and are not provided by this strategy.

58 GEOSCIENCES↗

ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2009

This Annual Report presents the data and evaluates the progress of the three-component remedy implemented for remediation of groundwater contamination at Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory Site. Overall, each component is achieving progress toward the goal of total plume remediation. In situ bioremediation operations in the hot spot continue to operate as planned. Progress toward the remedy objectives is being made, as evidenced by continued reduction in the amount of accessible residual source and decreases in downgradient contaminant flux, with the exception of TAN-28. The injection strategy is maintaining effective anaerobic reductive dechlorination conditions, as evidenced by complete degradation of trichloroethene and ethene production in the biologically active wells. In the medial zone, the New Pump and Treat Facility operated in standby mode. Trichloroethene concentrations in the medial zone wells are significantly lower than the historically defined concentration range of 1,000 to 20,000 μg/L. The trichloroethene concentrations in TAN-33, TAN-36, and TAN-44 continue to be below 200 μg/L. Monitoring in the distal zone wells outside and downgradient of the plume boundary demonstrate that some plume expansion has occurred, but less than the amount allowed in the Record of Decision Amendment. Additional data need to be collected for wells in the monitored natural attenuation part of the plume to confirm that the monitored natural attenuation part of the remedy is proceeding as predicted in the modeling.

54 ENVIRONMENTAL SCIENCES↗

Microbial Community Dynamics of Lactate Enriched Hanford Groundwaters

The Department of Energy site at Hanford, WA, has been historically impacted by U and Cr from the nuclear weapons industry. In an attempt to stimulate microbial remediation of these metals, in-situ lactate enrichment experiments are ongoing. In order to bridge the gap from the laboratory to the field, we inoculated triplicate anaerobic, continuous-flow glass reactors with groundwater collected from well Hanford 100-H in order to obtain a stable, enriched community while selecting for metal-reducing bacteria. Each reactor was fed from a single carboy containing defined media with 30 mM lactate at a rate of 0.223 ml/min under continuous nitrogen flow at 9 ml/min. Cell counts, organic acids, gDNA (for qPCR and pyrosequencing) and gases were sampled during the experiment. Cell counts remained low (less than 1x107 cells/ml) during the first two weeks of the experiment, but by day 20, had reached a density greater than 1x108 cells/ml. Metabolite analysis showed a decrease in the lactate concentrations over time. Pyruvate concentrations ranged from 20-40 uM the first week of the experiment then was undetectable after day 10. Likewise, formate appeared in the reactors during the first week with concentrations of 1.48-1.65 mM at day 7 then the concentrations decreased to 0.69-0.95 on day 10 and were undetectable on day 15. Acetate was present in low amounts on day 3 (0.15-0.33 mM) and steadily increased to 3.35-5.22 mM over time. Similarly, carbon dioxide was present in low concentrations early on and increased to 0.28-0.35 mM as the experiment progressed. We also were able to detect low amounts of methane (10-20 uM) during the first week of the experiment, but by day 10 the methane was undetectable. From these results and pyrosequencing analysis, we conclude that a shift in the microbial community dynamics occurred over time to eventually form a stable and enriched microbial community. Comprehensive investigations such as these allow for the examination of not only which nutrient source will accelerate site remediation, but also provide insight to evaluate remediation strategies through which enriched community members are important for bioremediation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Waste Isolation Pilot Plant Groundwater Protection Program Plan (Rev. 1)

This plan provides a framework inclusive of current and future groundwater protection, monitoring, and (potentially) remediation activities. Within this framework, detailed investigation plans will be prepared to provide specific scopes of work, milestones, schedules, and cost estimates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Enhanced Remedial Techniques for Petroleum Fuel and Related Contaminants in Soil and Groundwater

Western Research Institute (WRI) in conjunction with Earth Tech and the U.S. Department of Energy (DOE) was to identify proper sites with soils and/or groundwater contaminated by petroleum constituents and MTBE. Biodegradation rates would have been quantitatively assessed in both laboratory and field tests to achieve the optimal destruction of contaminants of concern. WRI and Earth Tech identified a site contaminated with high concentrations of methanol associated with petroleum hydrocarbons. The site was assessed and a remediation project plan was prepared; however, the site was soon acquired by a new company. An agreement between Earth Tech, WRI, and the new site owners could not be reached; therefore, a work was performed to identify a new project site. Task 33 was terminated and the available funding was redeployed to other Tasks after receiving approval from the U.S. DOE task manager.

02 PETROLEUM↗