Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Flight Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Scientific experiments on the flight of the 1979 biological satellite, draft plan

The various physiological, biological, radiobiological, and radiation physics experiments to be conducted onboard the 1979 biological satellite are described. These experiments deal with the effects of space flight on living organisms, measurement of radiation, and possible methods of shielding spacecraft against such radiation.

Source record↗

Shuttle operational expectations

The results of orbital flight tests (OFT) of the Space Shuttle are reviewed, and modifications planned for upcoming operational flights are discussed. The performance of the solid rocket boosters, external tank, main engines, structural system, propulsion system, reaction control system, electric power system, heat rejection system, hydraulic system, avionics, and other systems is described and evaluated as generally highly satisfactory. Payload servicing and deployment were also successfully demonstrated by OFT. Additional facilities planned for the operational flights are briefly described, and improvements that will make the Challenger spacecraft lighter than Columbia, provide it with more thrust, and give it a larger payload are summarized. Some software modifications being introduced are also mentioned.

Abrahamson, J. A.↗

In-flight testing of onboard UHF equipment

This paper proposes a plan to allow future flight projects to accomplish in-flight testing of on-board UHF equipment which the spacecraft carries for local relay link use at planet Mars only. This plan relies on onboard self-testing to verify receiver functional capabilities at various data rates, and on RF testing with narrow band CW signals transmitted at selected frequencies from an Earth station, non-interfering to existing UHF users, to verify the RF performance of antenna and microwave equipment. The Mars mission planners at JPL have accepted this concept as reasonable. The plan will be practical to implement with a frequency agile local link transceiver, like the next generation UHF transceiver being developed at JPL. The user can test it at one frequency and operate it at a different frequency within the operating range. Possible frequencies for uplink testing are identified. Further effort is needed to select specific test frequencies that will be agreeable to the users to which these bands are allocated.

UHF in-flight testing↗

Navigation, guidance, and control systems for V/STOL aircraft.

The development of digital autopilots and integrated avionics systems, applicable to many classes of vehicles and missions, was undertaken by Sperry Flight Systems in the mid-sixties. The first application of the system was planned for automatic flight control in the U.S. supersonic transport; the termination of that program, however, thwarted any flight experience. The second application, which has additional navigation and energy management functions, is an airborne simulator of the space shuttle vehicle. The latter system underwent a series of successful flight tests in a CV-990 aircraft under contract with NASA. The third application, which has new electronic displays, air data computation, and time-constrained guidance (i.e., specified position and altitude at a specified time), is in the DOT/NASA STOLAND test program. The STOLAND system is described specifically in this paper.

Osder, S. S.↗

High altitude aircraft direction using real-time scientific analysis of telemetered data

Microscale and some mesoscale scientific targets are often too small and fast moving in a dynamic atmosphere. In this environment the ER-2 may spend only a small time sampling the phenomena of interest. The ER-2 scientists currently rely on post-flight analysis to determine the success of the mission and to provide input for planning the next flight. Real time analysis, combined with realistic modeling, can provide important clues to significantly enhance the probability of success in the investigation of specific scientific targets.

Wegener, Steven↗

The Cassini spacecraft: Object oriented flight control software

The Cassini Attitude and Articulation Control Subsystem (AACS) is responsible for determining and controlling the spacecraft attitude including instrument pointing, antenna pointing, and thrust vector pointing during velocity change maneuvers. The 12 year mission life, long round-trip light time, and extended periods of coast without continuous ground control drive the AACS flight software design in the directions of autonomy, fault tolerance, and modularity to accommodate planned upgrades in flight. The Cassini AACS Flight Software is depicted in increasing levels of detail using a Context Diagram, Architecture Diagrams (i.e., Dependency Diagrams), an Object Diagram for each object, and a Statechart (i.e., State Transition Diagram) for each object. The detail contained in the diagrams is enhanced and refined during the Requirements and Design Phases of both Subsystem and Software Development. Examples of all the diagrams as well as the criteria for object selection, the advantages of statecharts, and the ease of modifying the design to accommodate changes in scope are described.

Hackney, John C.↗

UAS-NAS NASA 870 Ikhana UAS No Chase COA (NCC) Flights, Flight Test Report

This document is a flight test report from the operational perspective for the No Chase Certificate of Waiver or Authorization (COA) flights, or NCC flights, a major milestone of the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) project. Discussions of a demonstration event began as early as 2014 and the actual flight of the Ikhana UAS into the NAS without a safety chase vehicle in Class A, E, and D airspace was accomplished on 12 June, 2018. The major goal of this flight was to demonstrate an alternate means of compliance to the see and avoid regulations for a UAS using Detect and Avoid (DAA) technology. Participants in this flight activity and planning included the National Aeronautics and Space Administration (NASA) Ames Research Center, NASA Armstrong Flight Research Center, General Atomics Aeronautical Systems, Inc. (GA-ASI), Honeywell International, Inc., and the Federal Aviation Administration (FAA).

Marston, Mike↗

Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

NASA is maturing test and evaluation plans leading to flight readiness of the Ares I crew launch vehicle. Key development, qualification, and verification tests are planned . Upper stage engine sea-level and altitude testing. First stage development and qualification motors. Upper stage structural and thermal development and qualification test articles. Main Propulsion Test Article (MPTA). Upper stage green run testing. Integrated Vehicle Ground Vibration Testing (IVGVT). Aerodynamic characterization testing. Test and evaluation supports initial validation flights (Ares I-Y and Orion 1) and design certification.

Cockrell, Charles↗

Continuation of the University of Michigan Sounding Rocket Program

This interim report gives the activity on this grant through 31 October 1998, and the planned activities for the next fiscal year. A Project Initiation Conference (PIC) was held at the Wallops Flight Facility (WFF), with planning for the launch of flight 36.174 in Fall 1998. However, following the PIC, the WFF personnel decided that the experiment telemetry system had to be completely rewired, which required substantial design and wiring changes on the experiment side of the payload. These costs had not been anticipated in the FY98 budget, and used up considerable resources of the experimenters. In addition, the telemetry re-design was not completed until Fall 1998, so that there was no opportunity for a launch in 1998 (the Jupiter window closes in late November 1998 and it will reopen in late summer 1999). A Design Review was held by telecon with WFF personnel on 26 October 1998, with plans for the 36.174 launch now in late August 1999 with a launch window which extends into winter 2000. On a more positive note, we have been developing a vacuum UV calibration chamber in Michigan's Space Physics Research Lab, for future measurements of our experiment components, and this facility is now undergoing initial measurements of various calibration lamps in preparation for testing of the telescope UV reflective efficiency. This facility will greatly increase our ability to optimize our experiment for UV efficiency, which has been lacking in the past, and it will be made available for support of other NASA missions at Michigan and for visitors from other institutions. For the next flight 36.174, the following activities will be accomplished: (1) prepare the experiment, including replacement and upgrading of critical components, at University of Michigan; (2) pre-integrate the payload at the Wallops Flight Facility; (3) perform final far-UV calibration of instrument (4) perform final alignment, integration, and electrical checks at WSMR; (5) launch payload from WSMR and check condition of recovered payload; (6) perform post-flight calibration, if necessary and applicable (7) reduce and analyze flight data. The following pages contain information from the experimenter package for the Design Review for the next flight, 36.174, listing the plans, changes, and schedule for this flight.

Clarke, John↗

Autonomous Formation Flight

NASA's Strategic Plan for the Aerospace Technology Enterprise includes ambitious objectives focused on affordable air travel, reduced emissions, and expanded aviation-system capacity. NASA Dryden Flight Research Center, in cooperation with NASA Ames Research Center, the Boeing Company, and the University of California, Los Angeles, has embarked on an autonomous-formation-flight project that promises to make significant strides towards these goals. For millions of years, birds have taken advantage of the aerodynamic benefit of flying in formation. The traditional "V" formation flown by many species of birds (including gulls, pelicans, and geese) enables each of the trailing birds to fly in the upwash flow field that exists just outboard of the bird immediately ahead in the formation. The result for each trailing bird is a decrease in induced drag and thus a reduction in the energy needed to maintain a given speed. Hence, for migratory birds, formation flight extends the range of the system of birds over the range of birds flying solo. The Autonomous Formation Flight (AFF) Project is seeking to extend this symbiotic relationship to aircraft.

Schkolnik, Gerard S.↗

Creating an Atmosphere within Spacecraft

In space flight, the creation of an artificial atmosphere for those on board represents a serious challenge. New approaches produce environmentally and physiologically satisfactory conditions for prolonged human residence and optimize the heat and mass transfer in the spacecraft. That reduces the impact of space flight on human passengers and thereby minimizes health hazards. This is especially important in regard to plans for piloted flights to other planets, in the light of their duration and the demands placed on those on board.

42 ENGINEERING↗

From an automated flight-test management system to a flight-test engineer's workstation

The capabilities and evolution is described of a flight engineer's workstation (called TEST-PLAN) from an automated flight test management system. The concept and capabilities of the automated flight test management systems are explored and discussed to illustrate the value of advanced system prototyping and evolutionary software development.

Duke, E. L.↗

A Revised Approach to the ULDB Design

The National Aeronautics and Space Administration Balloon Program has experienced problems in the scaling up of the proposed Ultra Long Duration Balloon. Full deployment of the balloon envelope has been the issue for the larger balloons. There are a number of factors that contribute to this phenomenon. Analytical treatments of the deployment issue are currently underway. It has also been acknowledged that the current fabrication approach using foreshortening is costly, labor intensive, and requires significant handling during production thereby increasing the chances of inducing damage to the envelope. Raven Industries has proposed a new design and fabrication approach that should increase the probability of balloon deployment, does not require foreshortening, will reduce the handling, production labor, and reduce the final balloon cost. This paper will present a description of the logic and approach used to develop this innovation. This development consists of a serial set of steps with decision points that build upon the results of the previous steps. The first steps include limited material development and testing. This will be followed by load testing of bi-axial reinforced cylinders to determine the effect of eliminating the foreshortening. This series of tests have the goal of measuring the strain in the material as it is bi-axially loaded in a condition that closely replicated the application in the full-scale balloon. Constant lobe radius pumpkin shaped test structures will be designed and analyzed. This matrix of model tests, in conjunction with the deployment analyses, will help develop a curve that should clearly present the deployment relationship for this kind of design. This will allow the "design space" for this type of balloon to be initially determined. The materials used, analyses, and ground testing results of both cylinders and small pumpkin structures will be presented. Following ground testing, a series of test flights, staged in increments of increasing suspended load and balloon volume, will be conducted. The first small scale test flight has been proposed for early Spring 2004. Results of this test flight of this new design and approach will presented. Two additional domestic test flights from Ft. Sumner, New Mexico, and Palestine, Texas, and one circumglobal test flight from Australia are planned as part of this development. Future plans for both ground testing and test flights will also be presented.

Smith, Michael↗

The BESS-Polar Experiment Program

BESS-Polar, new, ultra-thin, superconducting spectrometer optimized for long-duration balloon flights, is presently under construction, with the goals of extending current BESS measurements of antiprotons to lower energies, extending the search for antinuclei to greater sensitivities and improving the ability to measure light isotopes in the cosmic radiation. A first flight from Antarctica in December 2004 is planned, with a later flight to be made at Solar minimum. The design, operating parameters and scientific prospects of BESS-Polar will be presented.

Streitmatter, R. E.↗

Physical sciences research plans for the International Space Station

The restructuring of the research capabilities of the International Space Station has forced a reassessment of the Physical Sciences research plans and a re-targeting of the major scientific thrusts. The combination of already selected peer-reviewed flight investigations with the initiation of new research and technology programs will allow the maximization of the ISS scientific and technological potential. Fundamental and applied research will use a combination of ISS-based facilities, ground-based activities, and other experimental platforms to address issues impacting fundamental knowledge, industrial and medical applications on Earth, and the technology required for human space exploration. The current flight investigation research plan shows a large number of principal investigators selected to use the remaining planned research facilities. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.

manned↗

Assessment of Nutrient Stability in Space Foods

Maintaining an intact nutrient supply in the food system flown on spacecraft is a critical issue for mission success and crew health and safety. Early polar expeditions and exploration expeditions by sailing vessels have taught us that a deficiency, or excess, of even a single vitamin in the food supply can be catastrophic. Evidence from ground-based research indicates that some vitamins are destroyed and fatty acids are oxidized (and therefore rendered dangerous or useless) by different types of radiation and by conditions of long-term storage. We hypothesize that radiation and long-term storage in the space-flight environment will affect the stability of vitamins, amino acids, and fatty acids in the space food system. The research objectives of our ongoing stability studies are to determine the stability of water- and fat-soluble vitamins, fatty acids, and amino acids in the space food supply before and after space flight on the International Space Station (ISS). Foods were analyzed after 2 weeks (a flight control), 11, 19, and 28 months of flight. Along with the space-flown foods, ground-based controls matched for time, light, and temperature are analyzed. The flight studies complement planned ground-based studies of the effects of radiation on vitamins, amino acids, and fatty acids. Flight studies are needed because a model based on ground-based data cannot predict all of the effects of the space-flight environment. Flight studies provide a more accurate test system to determine the effects on these nutrients of the temperature, and radiation conditions in the space-flight environment. Ground studies are required to evaluate longer missions and higher radiation levels expected outside low-Earth orbit. In addition to providing information about nutrient stability in space, the results of these studies will help NASA determine if a need exists to develop special packaging that can ensure stability of foods and nutrients in space, or if further studies of nutrient metabolism or nutrient requirements are needed.

Zwart, S. R.↗

ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow, archiving f data, and generating console logs. This technology called OCAMS (OCA (Orbital Communication System) Management System), is now considered TRL level 9 and is in daily use in the Mission Control Center in support of ISS operations. These solutions have not only allowed for improved efficiency on console; but since many of the previously manual data transfers are now automated, many of the human error prone steps have been removed, and the quality of the planning products has improved tremendously. This has also allowed our Planning Flight Controllers more time to focus on the abstract areas of the job, (like the complexities of planning a mission for 6 international crew members with a global planning team), instead of being burdened with the administrative tasks that took significant time each console shift to process. The resulting automation solutions have allowed the Operations and Planning organization to realize significant cost savings for the ISS program through 2020 and many of these solutions could be a viable

Hall, Timothy A.↗