Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

A model-based executive for commanding robot teams

The paper presents a way to robustly command a system of systems as a single entity. Instead of modeling each component system in isolation and then manually crafting interaction protocols, this approach starts with a model of the collective population as a single system. By compiling the model into separate elements for each component system and utilizing a teamwork model for coordination, it circumvents the complexities of manually crafting robust interaction protocols. The resulting systems are both globally responsive by virtue of a team oriented interaction model and locally responsive by virtue of a distributed approach to model-based fault detection, isolation, and recovery.

domain compilations↗

Development of In Situ Instruments for Planetary Exploration - Unique Challenges in Design, Development, and Execution

A viewgraph presentation describing in situ instruments for NASA missions is shown. The topics include: 1) In Situ Instrumentation; 2) Planetary Extremes; 3) Mars Surface Environment; 4) Lunar Precursor Mission Environment; 5) Europa Surface Analogue; 6) Other Parameters; 7) Space In Situ Instrumentation still in its Infancy; 8) Needed Capabilities For In Situ Science; 9) Framework For Putting The Pieces Together; 10) The Wild World of Astrobiology; 11) Timeline; 12) Example: MOD; 13) In Situ Sample Analysis Laboratories are more complex; 14) technologies In Situ Sample Analysis Requires Integration of Many Emerging Advanced Concepts; 15) Supporting technologies for In Situ Laboratories; 16) Micro-laboratory example; 17) In Situ Instrument Classes; and 18) Key for Analytical Instrument:Sample Preparation.

In Situ Instrumentation↗

Software Development Cost Estimation Executive Summary

Identify simple fully validated cost models that provide estimation uncertainty with cost estimate. Based on COCOMO variable set. Use machine learning techniques to determine: a) Minimum number of cost drivers required for NASA domain based cost models; b) Minimum number of data records required and c) Estimation Uncertainty. Build a repository of software cost estimation information. Coordinating tool development and data collection with: a) Tasks funded by PA&E Cost Analysis; b) IV&V Effort Estimation Task and c) NASA SEPG activities.

data mining↗

Interoperable Solution for Test Execution in Various I&T Environments

When there is spacecraft collaboration between several industry partners, there is an inherent difference in integration and test (I&T) methodologies, which creates a challenge for verifying flight systems during the development phase. To converge the differing I&T methodologies, considerations were required for multiple project areas such as Flight System Testbed (FST), Assembly, Test, and Launch Operations (ATLO), and Spacecraft Simulator environments. This paper details the challenges and approaches of the JPL's effort in engineering a solution to testing the flight system with the Mission Operations Ground System while maintaining the comparability with testing methods of the industry partners.

integration↗

Mars Design Reference Architecture 5.0 Study: Executive Summary

The NASA Mars Design Reference Architecture 5.0 Study seeks to update its long term goals and objective for human exploration missions; flight and surface systems for human missions and supporting infrastructure; operational concept for human and robotic exploration of Mars; key challenges including risk and cost drivers; and, its development schedule options. It additionally seeks to assess strategic linkages between lunar and Mars strategies and develop and understanding of methods for reducing the cost/risk of human Mars missions through investment in research, technology development, and synergy with other exploration plans. Recommendations are made regarding conjunction class (long-stay) missions which are seen as providing the best balance of cost, risk, and performance. Additionally, this study reviews entry, descent, and landing challenges; in-space transportation systems; launch vehicle and Orion assessments; risk and risk mitigation; key driving requirements and challenges; and, lunar linkages.

Drake, Bret G.↗

Visualization of Concurrent Program Executions

Various program analysis techniques are efficient at discovering failures and properties. However, it is often difficult to evaluate results, such as program traces. This calls for abstraction and visualization tools. We propose an approach based on UML sequence diagrams, addressing shortcomings of such diagrams for concurrency. The resulting visualization is expressive and provides all the necessary information at a glance.

concurrent programs↗

Automation Interfaces of the Orion GNC Executive Architecture

This viewgraph presentation describes Orion mission's automation Guidance, Navigation and Control (GNC) architecture and interfaces. The contents include: 1) Orion Background; 2) Shuttle/Orion Automation Comparison; 3) Orion Mission Sequencing; 4) Orion Mission Sequencing Display Concept; and 5) Status and Forward Plans.

Hart, Jeremy↗

Assessment, Planning, and Execution Considerations for Conjunction Risk Assessment and Mitigation Operations

An operational Conjunction Assessment Risk Analysis (CARA) concept is the real-time process of assessing risk posed by close approaches and reacting to those risks if necessary. The most effective way to completely mitigate conjunction risk is to perform an avoidance maneuver. The NASA Goddard Space Flight Center has implemented a routine CARA process since 2005. Over this period, considerable experience has been gained and many lessons have been learned. This paper identifies and presents these experiences as general concepts in the description of the Conjunction Assessment, Flight Dynamics, and Flight Operations methodologies and processes. These general concepts will be tied together and will be exemplified through a case study of an actual high risk conjunction event for the Aura mission.

Frigm, Ryan C.↗

Executive Summary of Ares V: Lunar Capabilities Concept Review Through Phase A-Cycle 3

This Technical Memorandum (TM) was generated as an overall Ares V summary from the Lunar Capabilities Concept Review (LCCR) through Phase A-Cycle 3 (PA-C3) with the intent that it may be coupled with separately published appendices for a more detailed, integrated narrative. The Ares V has evolved from the initial point of departure (POD) 51.00.48 LCCR configuration to the current candidate POD, PA-C3D, and the family of vehicles concept that contains vehicles PA-C3A through H. The logical progression from concept to POD vehicles is summarized in this TM and captures the trade space and performance of each. The family-of-vehicles concept was assessed during PA-C3 and offered flexibility in the path forward with the ability to add options deemed appropriate. A description of each trade space is given in addition to a summary of each Ares V element. The Ares V contributions to a Mars campaign are also highlighted with the goal of introducing Ares V capabilities within the trade space. The assessment of the Ares V vehicle as it pertains to Mars missions remained locked to the architecture presented in Mars Design Reference Authorization 5.0 using the PA-C3D vehicle configuration to assess Mars transfer vehicle options, in-space EDS capabilities, docking adaptor and propellant transfer assessments, and lunar and Mars synergistic potential.

Holladay, J. B.↗

Constellation Lessons Learned Executive Summary

This slide presentation reviews the lessons learned from the Constellation Program (CxP) and identified several factors that contributed to the inability of the CxP to meet the cost and schedule commitments. The review includes a significant section on the context in which the CxP operated since new programs are likely to experience the same constraints.

Thomas, L. Dale↗

Ares I-X Flight Data Evaluation: Executive Overview

NASA's Constellation Program (CxP) successfully launched the Ares I-X flight test vehicle on October 28, 2009. The Ares I-X flight was a developmental flight test to demonstrate that this very large, long, and slender vehicle could be controlled successfully. The flight offered a unique opportunity for early engineering data to influence the design and development of the Ares I crew launch vehicle. As the primary customer for flight data from the Ares I-X mission, the Ares Projects Office (APO) established a set of 33 flight evaluation tasks to correlate flight results with prospective design assumptions and models. The flight evaluation tasks used Ares I-X data to partially validate tools and methodologies in technical disciplines that will ultimately influence the design and development of Ares I and future launch vehicles. Included within these tasks were direct comparisons of flight data with preflight predictions and post-flight assessments utilizing models and processes being applied to design and develop Ares I. The benefits of early development flight testing were made evident by results from these flight evaluation tasks. This overview provides summary information from assessment of the Ares I-X flight test data and represents a small subset of the detailed technical results. The Ares Projects Office published a 1,600-plus-page detailed technical report that documents the full set of results. This detailed report is subject to the International Traffic in Arms Regulations (ITAR) and is available in the Ares Projects Office archives files.

Huebner, Lawrence D.↗

Hubble Space Telescope Servicing Mission Four (HST SM4) EVA Challenges for Safe Execution of STS-125

In May of 2009, the world-renowned Hubble Space Telescope (HST) received a suite of new instruments and a refurbished bus to enable science for many years to come. The restoration was conducted on-orbit by four space-walkers on five carefully scripted Extra-Vehicular Activity (EVA) days. Assuring the safety of the space-walkers and their crew-mates required careful attention to tool development, detailed procedures for every activity and many rehearsals with engineers and crew to ensure that everything worked together. Additionally, evolution of EVA requirements since the last servicing mission in 2002, and the broad scope of the mission demanded a much higher degree of safety participation in hardware design and risk acceptance than for previous servicing missions.

Dedalis, Robert P.↗

Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles

The NASA Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This paper provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles.

Jones, Daniel S.↗