Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Transition Initiative,”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

994 records · Page 56

Development of the INL Thermal Energy Distribution System (TEDS) in the Modelica Eco-System for Validation and Verification

This report provides an overview on the development of the Thermal Energy Distribution System (TEDS) in the Modelica process model eco-system at Idaho National Laboratory as part of the integrated energy system initiative. Model development has led to the creation of a dynamic process model of the experimental TEDS facility housed within the Engineering Science Laboratory (ESL) at INL. The model was then used during the pre-construction phase of the experimental effort to inform experimental design (insulation requirements, bypass line placement, expected performance of components) and to test innovative control schemes prior to the initial operation. The TEDS model developed in Modelica includes the primary components of the TEDS experimental unit including: a 200kW Chromalox heater, a single-tank packed bed thermal energy storage system filled with 0.125 inch Alumina (Al 2 O 3 ), an ethylene-glycol to Therminol-66 heat exchanger, system piping, six control valves, and all associated temperature, pressure, and mass flow sensors. The model does not include nitrogen fill gas tanks, or associated overfill tanks, as these are not part of standard system control. Two simulation sets were run. The first is a five-hour test that operates as a shakedown test for the facility. This simulation puts the facility through all five potential operating modes and showcases the ability of valving, control sensors, and component controllers to meet the system demands. The second case imposes a typical summer day demand on the system from a region with mixed commercial and residential electrical needs where the generator alone cannot meet peak demand but instead requires the thermal storage unit to act as a peaking unit. Over the course of the fifteen-hour discharge cycle heat losses account for a heat loss of approximately 15°C in outlet temperature. Such heat losses would lead to a decrease in overall system efficiency and may lead to additional design changes for such designs in the future that may include a topping heater. Through commencement of this work, a systems level model of TEDS with associated control systems, sensors, piping diameters, and component capabilities has been created. This model has been utilized in the pre-experimental phase to inform system design, insulation thicknesses, and potential control schemes to operate the system effectively and safely. Once TEDS begins operation, this model will be refined, tuned, and used for validation and verification purposes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

Vitrification of Hanford Tank Wastes for Condensate Recycle and Feed Composition Changeover Testing

During the vitrification of Hanford Site nuclear waste at the Waste Treatment and Immobilization Plant (WTP), which is a part of the safe and efficient retrieval, treatment, and disposal mission of the U.S. Department of Energy Office of River Protection, the offgas condensate generated from the waste-to-glass conversion is currently planned to be concentrated by evaporation in the Effluent Management Facility (EMF). This concentrated condensate can then be recycled back to the incoming waste and vitrified. To test the recycle process, an apparatus was designed and built to mimic the EMF evaporator and was then used to concentrate a volume of condensate produced during the vitrification of a sample of Hanford tank 241-AP-107 (referred to herein as AP-107) waste in a continuous laboratory-scale melter (CLSM). The concentrated condensate was added to an additional sample of AP-107 waste, to mimic one round of the recycle process, and the combined solution was vitrified, producing a second round of recycle condensate. In the current study, the EMF test apparatus was used to concentrate the second-round recycle condensate under evaporation conditions (at 45 °C and 1.4 psia) designed to emulate EMF operation. The condensate was successfully concentrated by a factor of ~10 while retaining over 95 % of the technetium-99 ( 99 Tc), Cs, and I inventories in the concentrate. Another portion of AP-107 waste was retrieved by Washington River Protection Solutions, LLC (WRPS) and transferred to Pacific Northwest National Laboratory (PNNL), where it was pretreated and then combined with the second-round recycle AP-107 condensate concentrate and glass-forming chemicals (GFCs) to form the two-time recycle AP-107 melter feed, approximating a second round to the recycling action to be performed at the WTP. A portion of AP-105 waste was also retrieved by WRPS and provided to PNNL for pretreatment and combining with GFCs to form AP-105 melter feed. The two-time recycle AP-107 and AP-105 melter feeds were processed consecutively in the CLSM. The CLSM run proceeded for 13.63 hours, producing 9.70 kg of glass for an average glass production rate of 1464 kg m 2 d -1 during the two-time recycle AP-107 feed charging and 1568 kg m 2 d -1 during the AP-105 feed charging. The rate during AP-107 charging was essentially equivalent to the rate when processing no-recycle AP-107 feed and lower than that achieved when processing one-time recycle AP-107 feed. However, all rates were within the potential range of variability when processing melter feeds with similar composition in the CLSM. Likewise, the rate during AP-105 charging was higher than the previous rate processing AP-105, but within the potential CLSM range. The cold-cap characteristics changed from the typically thin AP-107 cold cap to a foamy-edged cold cap as previously seen with AP-105 shortly after transitioning to the AP-105 melter feed. The glass produced during the CLSM run was within 10 % of its target composition for the primary glass components. The CaO and Li 2 O targets varied by more than 1 wt% between the two-time recycle AP-107 and AP-105 glass targets and it took about 2 turnovers of the CLSM glass inventory to reach a relative chemical steady state in the glass for CaO and Li 2 O after the melter feed inputs were switched. The 99 Tc and total cesium content in the melter feeds were maintained at concentrations expected to be experienced at the WTP. During the CLSM run, while processing the two-time recycle AP-107 melter feed at a relative chemical steady state, the 99 Tc/Cs ratio was 10, and 34% of 99 Tc and 74% of Cs were retained in the glass. These values were higher than those measured in the CLSM run with one-time recycle AP-107 melter feed. After the transition to processing the AP-105 melter feed, when the production reached a relative chemical steady state, the 99 Tc/Cs ratio was 77 while 44% of 99 Tc was retained in the glass. The C's retention during this time frame reached 200% due to the excess C's in the glass after the target content decreased to 15% of its initial level in the two-time recycle AP-107 melter feed to the lower target in the Ap-105 melter feed. While iodine was below inductively coupled plasma mass spectrometry analytical reporting limits in the melter feed and glass samples, it was detected in quantities above the analytical reporting limits in the liquid and filter samples collected from the CLSM offgas treatment system. The behavior of iodine in the CLSM offgas treatment system followed a similar pattern to those of 99 Tc and Cs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗