Fisheries Technology Associates, Inc. - Sweeping CHIRPs, Looming Darkness: In-Sync Stimuli - Fish Protection Prize (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

42 ENGINEERING↗

Neurotrophic Labs - Fish Exclusion Using a Floating Separator - Fish Protection Prize (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

42 ENGINEERING↗

Team Hogan - Air Bubble Curtain for Physical Exclusion - Fish Protection Prize (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

42 ENGINEERING↗

Fishway Entrance Palisade

This technical report summarizes work that was conducted by the University of Massachusetts Amherst and the U.S. Geological Survey, along with other project partners, on the Fishway Entrance Palisade, a project funded through the Department of Energy’s (DOE) funding opportunity titled ‘Innovative Solutions for Fish Passage at Hydropower Dams’ (DE-FOA-0001662). The period of performance spanned from September 1, 2018 through September 30, 2021. The Entrance Palisade is a novel fish passage engineering technology designed to provide more favorable entry conditions for fish into fishways and to reduce costs relative to conventional fishway auxiliary water systems.

59 BASIC BIOLOGICAL SCIENCES↗

Reservoir Lining for Pumped Storage Hydropower: Scoping Study of Geomembrane Lining Systems

This report summarizes the results of a scoping study performed to research the use of geomembrane lining systems for pumped storage hydropower (PSH) reservoirs. The study consisted of a literature review for pertinent and publicly available information about geomembrane lining materials and their use in dams, reservoirs, and PSH as well as an assessment of the applicability of geomembrane lining systems to PSH reservoirs.

13 HYDRO ENERGY↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

An Application of Faster R-CNNs in Object Detection Efforts Applied to the Critical Infrastructure Domain

Object detection and segmentation approaches have been successfully applied to multiple interdisciplinary domains ranging from medical imaging to autonomous vehicles. The following study details efforts to apply segmentation methods to the critical infrastructure domain. Specifically, the identification of critical sub-components of four facilities: airports, hospitals, hydroelectric dams, and water treatment plants. Data for this study was extracted from the U.S. Department of Agriculture’s National Agriculture Imagery Program data set. Each facility class was considered independently of the other facilities, producing four different segmentation models during the testing and training process. Ultimately, the study team concluded there are significant challenges associated with object detection modeling when applied to facility analysis within the critical infrastructure domain. The study team was able to identify possible sources of these challenges that could be potentially addressed in future work.

97 MATHEMATICS AND COMPUTING↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

The Prospects for Pumped Storage Hydropower in Alaska

Key Takeaways: The resource mapping analysis confirmed that numerous locations in Alaska are suitable for the development of pumped storage hydropower (PSH) projects, both larger grid scale projects and smaller projects that could be suitable for remote communities; The resource assessment for larger, grid-scale projects showed the potential for more than 1,800 closed-loop systems in Alaska, with a total energy storage capacity of about 4 terawatt hours (TWh); Because of their small reservoir sizes and dam heights, many locations were identified as potentially suitable for small-scale PSH systems. Nearly 50% of the identified potentially suitable small-scale PSH sites are in Southeast Alaska; PSH candidate sites were part of the optimal capacity expansion solution in all scenarios analyzed for the Railbelt system. Depending on the scenario, the new PSH capacity that the model selected for the analysis period until 2046 ranged from 300 MW to 600 MW. The locations and timing of new PSH investments vary in different scenarios; Lithium-ion batteries were also selected a source of new generating capacity in all analyzed scenarios for the Railbelt system, indicating that the system will need a mix of short- and long-duration energy storage to support variable renewable energy sources and provide system reliability in the future; For rural communities, analysis results showed that PSH suitability is very site-specific; in addition to diesel fuel costs and PSH capital costs, suitability depends heavily on available renewable resources and existing infrastructure (e.g., reservoirs, transmission access and construction road access); The analysis for rural communities also showed that PSH projects with 10-hour energy storage are likely to be more economical for remote community applications in Alaska than those with larger reservoirs that could provide 10 days of energy storage; Lithium-ion batteries seem to be an economically more viable energy storage option for small, remote communities in Alaska.

13 HYDRO ENERGY↗

Effects of Surface Water Fluctuations and Sediment Movement on Hyporheic Zone Biogeochemistry and Microbial Communities

The hyporheic zone (HZ) is the region beneath and adjacent to streams, rivers, and riverine estuaries where the bidirectional exchange of groundwater (GW) and surface water (SW) occurs. The HZ is an integral component of watersheds, a biologically-active zone providing critical control of SW quality and aquatic life. Much prior work has investigated microbially-mediated biogeochemical reactions in the HZ, mainly from a steady-state perspective. Yet key unique aspects of the HZ include 1) proximity to SW fluctuations (e.g., storms, dam operations) which cyclically drive DOC and DO into the bed and banks creating biogeochemical “hot moments,” and 2) continually shifting surface sediment. Both of these controls should substantially influence microbial communities, yet remain poorly understood, and a mechanistic predictive framework does not exist.

54 ENVIRONMENTAL SCIENCES↗

Hydropower Investment and Public-Private Ecosystem Assessment

The U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO) commissioned this Report to evaluate the primary challenges in raising investment in medium-sized hydropower and PSH, defined as projects with five (5) to 30 megawatts (MW) of installed capacity, and to understand potential opportunities to increase mobilization of private sector investment in hydropower and PSH projects in the future. Based on stakeholder interviews, a market survey, and industry reports, this Report considers the investment and development trends and future opportunities for five hydropower project types: capacity additions, conduits, PSH (both open and closed loop), non-powered dams (NPDs), and new stream-reach development (NSD).

13 HYDRO ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

13 HYDRO ENERGY↗

Impact of Lost Generation at the Glen Canyon Powerplant due to the Environmental Requirements for the Years 2024 to 2027

This report was prepared by Argonne National Laboratory (Argonne) and the National Renewable Energy Laboratory (NREL) in support of an economic and financial analysis conducted for the U.S. Department of Energy’s Western Area Power Administration (WAPA) of the loss in Glen Canyon power generation due to the environmental requirements for the years 2024 to 2027. WAPA markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation (Reclamation). The facilities known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming.

13 HYDRO ENERGY↗

Quantifying Socioeconomic Impacts of Electricity Generating Technologies

The levelized cost of energy (LCOE) and other cost metrics used in energy planning do not account for out-of-market impacts of the technology choice. While a decision-maker at the utility or asset owner level may compare multiple forms of electricity generating technology using LCOE, a decision-maker over energy policy or community stakeholders may be interested in considering impacts beyond those that LCOE measures. This report quantifies economic impacts such as jobs and wage growth across electricity generation technologies then develops an approach to systematically compare socioeconomic metrics across technology choices. To address additional workforce related impacts, this report also compares the typical workforce education requirements and annual income levels for multiple types of electricity generating facilities. The grid scale electricity generating technologies analyzed in this report produce power using conventional hydroelectric dams, coal, natural gas, nuclear reactors, solar PV, land-based wind turbines, geothermal heat, and woody biomass combustion. Although it doesn’t generate electricity itself, the economic impacts associated with battery storage equipment manufacturing and installation were also analyzed.

03 NATURAL GAS↗

Hydro-EKG: In-Stream Streaming-potential (SP) Electrical Monitoring of the Lifeblood of Watersheds during Disturbance

In order to develop improved methods for characterization and monitoring of hyporheic exchange along stream and river corridors, this project evaluated and compared concentration (C) and discharge (Q) correlations between the dam-managed, intermittent Rio Grande River and the perennial East Fork Poplar Creek in Oak Ridge, Tennessee. Additionally, a multimethod geoelectric survey was implemented between January and March 2022 along a 220-meter long reach of the bedrock-lined East Fork Poplar Creek in Oak Ridge, Tennessee to identify locations of surface-water and groundwater exchange in the bedrock-lined streambed and characterize the subsurface flow paths that convey water between the stream and flood plain.

54 ENVIRONMENTAL SCIENCES↗

Particulate organic matter (POM) transport and transformation at the terrestrial-aquatic interface (Final Report)

This project investigates the input, transport, and degradation of particulate organic matter (POM) in near-surface riverbed sediments at the Hanford 300 Area of the Columbia River, a dynamic, regulated river system influenced by upstream dam operations. Riverbed sediments are biogeochemical hot spots where organic carbon inputs stimulate intense microbial activity, affecting nutrient cycling and redox transformations in the hyporheic zone (HZ). While dissolved organic matter (DOM) cycling has been studied extensively, little is known about the infiltration and transformation of POM—particularly under variable flow regimes common in large, regulated rivers.

54 ENVIRONMENTAL SCIENCES↗

Post-2026 Environmental Impact Statement Rate Analysis for the Colorado River Storage Project

The Glen Canyon Dam (GCD) is a principal power-generating asset within the Colorado River Storage Project (CRSP), accounting for approximately 70–80% of CRSP power production over the past two decades. In June 2023, the U.S. Bureau of Reclamation (Reclamation) issued a Notice of Intent to prepare an Environmental Impact Statement (EIS) outlining operational guidelines and strategies for Colorado River Basin reservoirs after 2026 (Reclamation, 2023). Power generation is among CRSP’s statutory purposes under the Colorado River Storage Project Act of 1956 (U.S. Congress, 1956). Assessing how alternative policy frameworks affect CRSP power production and the resulting electricity rates for U.S. customers is therefore essential to inform decision-making. This report evaluates projected electricity rates and the market value of electricity from the Western Area Power Administration (WAPA) CRSP GCD under multiple post-2026 policy scenarios to support Reclamation’s EIS development. Results from advanced econometric and machine learning models indicate that the Enhanced Coordination alternative (EnhanCoor), Maximum Operational Flexibility alternative (CCA), and Supply Driven - 55 alternative (SD55) alternatives yield more favorable hydropower generation and capacity outcomes, which are objectives outlined in Reclamation’s documentations (Reclamation, 2007; Reclamation, 2016). Specifically, these scenarios are associated with higher electricity production, lower projected rate trajectories, and greater economic value to the U.S. power system from CRSP generation. The remaining five scenarios generally produce lower generation, higher rate trajectories, and reduced long-term market values.

13 HYDRO ENERGY↗