A Component-Level Bottom-Up Cost Model for Pumped Storage Hydropower

Pumped Storage Hydropower (PSH) is currently the largest source of utility-scale electricity storage in the U.S. and worldwide. As the accelerating deployment of variable renewable technologies creates opportunity and value for energy storage, it has become increasingly important to characterize PSH costs to understand how it competes. Site-specific considerations and limited cost data in the public domain make it difficult to estimate capital costs for potential new PSH sites. This report documents a spreadsheet-based tool that addresses this challenge and creates a component-level bottom-up cost model for PSH that can be made publicly available for widespread use. It uses detailed site-level physical characteristics and design specifications to calculate key performance and cost parameters for individual components and the project as a whole. The model was developed in consultation with HDR, Inc. and Small Hydro Consulting to ensure it aligns with industry expectations. It enables PSH cost exploration across a wide range of system assumptions and could be customized or extended for the needs of a variety of users.

cost model↗

Nuclear Energy Cost Estimates for Net Zero World Initiative

This report provides recommended parameters for incorporating nuclear energy systems into decarbonization modeling scenarios. The values are primarily intended for the Net Zero World (NZW) Initiative but are expected to prove useful to other related efforts. Both costs and operational metrics are provided in the study. Several cost factors, namely overnight capital costs (OCC) and operational costs are taken to be country specific. OCC is defined as the value of building the reactor in one night considering all costs prior to the start of operations including fuel for the initial core load. The value assumes the build is neither a first nor a ‘Nth’ of a kind, but somewhere in between. All costs are escalated to 2022 USD values.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Energy Efficiency Improvement and Cost Saving Opportunities for the Glass Industry. An ENERGY STAR Guide for Energy and Plant Managers

The U.S. glass industry is comprised of four primary industry segments--flat glass, container glass, specialty glass, and fiberglass--which together consume $1.6 billion in energy annually. On average, energy costs in the U.S. glass industry account for around 14 percent of total glass production costs. Energy efficiency improvement is an important way to reduce these costs and to increase predictable earnings, especially in times of high energy price volatility. There is a variety of opportunities available at individual plants in the U.S. glass industry to reduce energy consumption in a cost-effective manner. This Energy Guide discusses energy efficiency practices and energy-efficient technologies that can be implemented at the component, process, system, and organizational levels. A discussion of the trends, structure, and energy consumption characteristics of the U.S. glass industry is provided along with a description of the major process steps in glass manufacturing. Expected savings in energy and energy-related costs are given for many energy efficiency measures, based on case study data from real-world applications in glass production facilities and related industries worldwide. Typical measure payback periods and references to further information in the technical literature are also provided, when available. The information in this Energy Guide is intended to help energy and plant managers in the U.S. glass industry reduce energy consumption in a cost-effective manner while maintaining the quality of products manufactured. Further research on the economics of the measures--as well on as their applicability to different production practices--is needed to assess potential implementation of selected technologies at individual plants.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance and Costs of Ductless Heat Pumps in Marine-Climate High-Performance Homes Habitat for Humanity The Woods

The Washington State University (WSU) Energy Program's Building America (BA) team conducted a case study of a high-performance affordable housing community: The Woods (Figure 1). This BA effort is part of a larger-scale study of 30 homes funded from 2013-2016 by Tacoma Public Utilities (TPU) and the Bonneville Power Administration. The Woods is a Habitat for Humanity (HFH) community of homes certified by ENERGY STAR Homes Northwest (ESHNW); the community is in the marine climate of Tacoma/Pierce County, Washington. This research report builds on an earlier preliminary draft 2014 BA report and includes significant billing analysis and cost-effectiveness research from a collaborative and ongoing DHP research effort for TPU and the Bonneville Power Administration. This final BA report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing. The research goal of the U.S. Department of Energy's BA research team Building America Partnership for Improved Residential Construction was to compare a ductless heat pump (DHP) hybrid system (DHP in common area/electric resistance [ER] in bedrooms) to an all-electric zonal ER system in high-performance single-family affordable housing. This effort included assessing the costs and benefits of a DHP/ER hybrid system located in the main living area to offset the primary heating demand of zonal ER heaters in the bedroom zones and comparing these findings to data from of new affordable single-family housing in Washington State. This report includes: (1) Measured indoor and outdoor temperatures and relative humidity (RH) in the homes. (2) Field testing results of heating, ventilating, and air-conditioning equipment; ventilation system airflows; building envelope tightness; lighting, appliance, and other input data required for preliminary Building Energy Optimization (BEopt) modeling; and ENERGY STAR field verification (3) BEopt modeling results compared to measured energy use. (4) A comparison of the space heat energy consumption of a DHP/ER hybrid heating system and a traditional zonal ER heating system installed in the same home. This comparison is made by implementing a series of weekly "flip-flop tests" (referred to here as "switchback" tests per TPU) to compare space heating, temperature, and RH in zonal ER heating mode with a DHP/ER mode as discussed in the Building America Test Plan (Lubliner 2010a). (5) Cost data from HFH and other sources related to building efficiency measures focusing on the DHP/ER hybrid heating system. (6) An evaluation of the thermal performance and cost benefit of DHP/ER hybrid heating systems in these high-performance homes employing life cycle cost analysis for energy code policy and monthly cash flow analysis of HFH homeowners. (7) Post-monitoring occupant survey results. The report also provides the following stakeholder findings and recommendations: (1) DHP single-head systems at The Woods are cost-effective to new homebuyers of these high-performance all-electric homes. (2) Stakeholder education is needed on design, inspection, and commissioning; documentation is needed for heat recovery ventilation (HRV) and from ENERGY STAR builders, verifiers, and inspectors to help ensure that the houses meet the goal of "build tight, ventilate right." (3) A code gap in inspection and enforcement was identified that should be addressed by: (3a) Improving the fire marshal's approach to sprinkler attic piping freeze protection; (3b) Improving the maintenance of ceiling insulation continuity; and (3c) Educating the local building inspector on attic insulation inspection concerns that allow for maximizing design improveme...

affordable housing↗

Revisiting Dropout: Escaping Pressure for Training Neural Networks with Multiple Costs

A common approach to jointly learn multiple tasks with a shared structure is to optimize the model with a combined landscape of multiple sub-costs. However, gradients derived from each sub-cost often conflicts in cost plateaus, resulting in a subpar optimum. In this work, we shed light on such gradient conflict challenges and suggest a solution named Cost-Out, which randomly drops the sub-costs for each iteration. We provide the theoretical and empirical evidence of the existence of escaping pressure induced by the Cost-Out mechanism. While simple, the empirical results indicate that the proposed method can enhance the performance of multi-task learning problems, including two-digit image classification sampled from MNIST dataset and machine translation tasks for English from and to French, Spanish, and German WMT14 datasets.

97 MATHEMATICS AND COMPUTING↗

Optimization of Component Sizing for a Fuel Cell-Powered Truck to Minimize Ownership Cost

In this study, we consider fuel cell-powered electric trucks (FCETs) as an alternative to conventional medium- and heavy-duty vehicles. FCETs use a battery combined with onboard hydrogen storage for energy storage. The additional battery provides regenerative braking and better fuel economy, but it will also increase the initial cost of the vehicle. Heavier reliance on stored hydrogen might be cheaper initially, but operational costs will be higher because hydrogen is more expensive than electricity. Achieving the right tradeoff between these power and energy choices is necessary to reduce the ownership cost of the vehicle. This paper develops an optimum component sizing algorithm for FCETs. The truck vehicle model was developed in Autonomie, a platform for modelling vehicle energy consumption and performance. The algorithm optimizes component sizes to minimize overall ownership cost, while ensuring that the FCET matches or exceeds the performance and cargo capacity of a conventional vehicle. Class 4 delivery truck and class 8 linehaul trucks are shown as examples. We estimate the ownership cost for various hydrogen costs, powertrain components, ownership periods, and annual vehicle miles travelled.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Increasing the Cost-efficiency of the DSN

JPL has operated the Deep Space Network (DSN) on behalf of NASA since the 1960's. Over the last two decades, the DSN budget has generally declined in real-year dollars while the aging assets required more attention, and the missions became more complex. As a result, the budget has been increasingly consumed by Operations and Maintenance (O and M), significantly reducing the funding wedge available for technology investment and for enhancing the DSN capability and capacity. Responding to this budget squeeze, the DSN launched an effort to improve the cost-efficiency of the O and M. In this paper we: Analyze the components of O&M. We note for example that, for the DSN, less than 20% of the staff engage in the traditional human-in-front-a-console role, so any effort to increase the cost efficiency must go beyond reducing the number of "Real-time operators." Explain the underlying organizational and cultural structures. Any cost-efficiency activities changes either accept, or carefully modify these structures. For example, the DSN O&M is based on the concept that there are three nearly identical antenna complexes separated by approximately 1200 in latitude and that each antenna complex is operated by a different contractor (driven by international agreements). Explore planned changes in the customer interface, e.g. web-based automated scheduling, and the processes required for a transition. Changes have to be evaluated in the larger end-to-end context, e.g. do the changes provide a net cost-efficiency for the DSN and the missions, or do they merely shift cost from the DSN to the missions. Consider possible significant changes in real-time pass management, e.g. full-remoting of operations, and lights-dim operations, while maintaining (or improving) the performance metrics of the DSN. Investigate how procedural and administrative changes could increase cost-efficiency, in conjunction with changes in the customer interfaces and real-time pass management. Examples would be handling of inter-governmental agreements, improved sharing of resources with other agencies, and better use of commercial (rather than government) resources

Deep Space Network (DSN)↗

The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

Schedule↗

Lessons Learned from NASA Goddard Space Flight Center’s Product Development Lead Training Schedule and Cost Development Workshop: Continuous Improvement

This presentation provides a status of the Goddard Space Flight Center (GSFC) effort to increase foundational knowledge of Product Development Leads (PDLs) in schedule and cost management including earned value management (EVM). In 2012, GSFC’s Engineering and Technology Directorate (ETD) implemented an in-house training program to prepare PDLs for managing the technical, cost, schedule, and risk aspects of spaceflight systems to meet their subsystem commitments. Developed in-house, the PDL training program provides an integrated approach to requirements development, risk, schedule and cost management, EVM, performance tracking, and other areas. The program has been held twice yearly since its inception with 531 participating and 451 completing the curriculum. In 2017, the program won the Robert H. Goddard award for Quality and Process Improvement. Program development and evolution were presented in the 2018 NASA Schedule and Cost Symposium. The presentation was so well received that this year we focus on one workshop within the program: Schedule and Cost Development, including EVM. We examine the on-going logic modeling process and how participant and stakeholder data influence workshop content and design, and how the disciplines of schedule and cost contribute to mission success. In this presentation we refresh you on how the approach integrates lecture, small group discussion, estimating, case study exercises, and problem solving. We update you on the data collected from participants and stakeholders, and we discuss how we use these data to measure training effectiveness. Specific topics include: • How the logic model is used as the backbone for continuous program improvement, • How feedback influences implementation and curriculum updates, • How data collection and analysis inform workshop content and development, including participant discoveries of EVM data, • How including the resource analyst and planner in the product development team supports project success.

Lessons Learned↗

Larger Turbines and the Future Cost of Wind Energy (Poster)

The move to larger turbines has been observed in the United States and around the world. Turbine scaling increases energy capture while reducing general project infrastructure costs and landscape impacts, each of which of can reduce the cost of wind energy. However, scaling in the absence of innovation, can increase turbine costs. The ability of turbine designers and manufacturers to continue toscale turbines, while simultaneously reducing costs, is an important factor in long-term viability of the industry. This research seeks to better understand how technology innovation can allow the continued development of larger turbines on taller towers while also achieving lower cost of energy. Modeling incremental technology improvements identified over the past decade demonstrates that costreductions on the order of 10%, and capacity factor improvements on the order of 5% (for sites with annual mean wind speed of 7.25 m/s at 50m), are achievable for turbines up to 3.5 MW. However, to achieve a 10% cost reduction and a 10% capacity factor improvement for turbines up to 5 MW, additional technology innovations must be developed and implemented.

17 WIND ENERGY↗

Wind Plant Cost of Energy: Past and Future (Presentation)

This presentation examines trends in wind plant cost of energy over the last several decades and discusses methods and examples of projections for future cost trends. First, the presentation explores cost trends for wind energy from the 1980s, where there had been an overall downward trend in wind plant energy costs. Underlying factors that influenced these trends, including turbine technology innovation for lower wind speed sites, are explored. Next, the presentation looks at projections for the future development of wind energy costs and discusses a variety of methods for establishing these projections including the use of learning curves, qualitative assessment using expert elicitation, and engineering-based analysis. A comparison of the methods is provided to explore their relative merits. Finally, a brief introduction is provided for the U.S. Department of Energy program-wide shift towards an integrative use of qualitative and quantitative methods for assessing the potential impacts of wind plant technology innovations on reducing the wind plant cost of energy.

17 WIND ENERGY↗

Bottom-Up Cost Analysis of a High Concentration PV Module; NREL (National Renewable Energy Laboratory)

We present a bottom-up model of III-V multi-junction cells, as well as a high concentration PV (HCPV) module. We calculate $0.65/Wp(DC) manufacturing costs for our model HCPV module design with today’s capabilities, and find that reducing cell costs and increasing module efficiency offer the promising pathways for future cost reductions. Cell costs could be significantly reduced via an increase in manufacturing scale, substrate reuse, and improved manufacturing yields. We also identify several other significant drivers of HCPV module costs, including the Fresnel lens primary optic, module housing, thermal management, and the receiver board. These costs could potentially be lowered by employing innovative module designs.

$/W↗

Process-Based Balance-of-System Cost Modeling for Offshore Wind Power Plants in the United States: Preprint

This work describes the development of a process based and open source balance of system cost model which provides the capability to evaluate both existing and novel offshore wind technologies. Individual design and installation steps are represented with bottom-up engineering models that compute the times and costs associated with the process; furthermore, operational constraints are assigned to each process so that delays due to weather and presence of marine mammals may be accounted for in the overall project timeline. The model structure, assumptions, inputs, and results are vetted with industry partners and compared against actual projects for validation; installation times are shown to agree with real data with relative errors of less than 35\%. Case studies are presented to demonstrate the functionality of the model. First, individual vessel efficiencies are computed for varying numbers of installation vessels and weather time series to show the diminishing returns of more than two feeder barges. Then, array cable capital costs and installation times are determined for a representative project with different turbine sizes. This quantifies the cost benefit tradeoffs of decreasing number of turbines, increased turbine spacing, and fewer turbine terminations and shows a net cost savings. These results demonstrate that the BOS model features the accuracy, functionality, and accessibility to serve as the foundation for a wide range of analyses to identify cost reduction potentials for offshore wind energy in the United States.

17 WIND ENERGY↗

High Temperature Steam Electrolysis Process Performance and Cost Estimates - DOE Hydrogen Program AMR Presentation

Technology readiness levels (TRLs) of electrolysis systems have dramatically increased in recent years as the interest in clean hydrogen production and decarbonization of transportation, industrial and other sectors increases across the globe. This is especially true of high temperature steam electrolysis (HTSE) / solid oxide electrolysis cell (SOEC) systems which show promise of much higher system efficiencies than other more developed electrolysis technologies. This possibility of higher efficiencies of HTSE / SOEC systems has been previously assumed to be theoretically possible but in recent years it has become less theoretical and more realistic as an increasing amount of suppliers complete lab and pilot tests showing very promising results. Research in the areas of manufacturing techniques, material selection, electrode and electrolyte compositions, and balance of plant size and integration continues at a fast pace as an increasing number of suppliers both internationally and domestically become involved. The advantages of HTSE become more pronounced when HTSE is coupled with nuclear power plants (NPPs). This is because thermal energy produced by the nuclear reactor can be used in a series of heat transfer loops and heat exchangers to vaporize HTSE feedwater, which drastically improves the economics of the process. Idaho National Laboratory (INL) has been very involved in the research and modeling of HTSE systems for a number of years, in collaboration with other national laboratories, academia, and industry stakeholders both on the hydrogen production as well as the hydrogen demand side. The modeling completed over the years on a large variety of projects has led to a wealth of knowledge at INL including in the area of the technoeconomic assessment (TEA) of HTSE systems. TEAs include process modeling of the HTSE systems to calculate system energy requirements and equipment sizing, followed by estimation of capital and operating costs to enable calculation of the levelized cost of hydrogen (LCOH). The TEA work performed has produced incremental improvements and tuning of the methods, assumptions, models, and results of the analyses as well as providing some opportunities for validating these results. The purpose of this document is to record the current baseline HTSE analyses led by INL to show the current status of assumptions and costs of these systems. Given the rapid development of this technology, the variety of suppliers entering the space, and the increasing attention government and industry are giving to such systems, this document may be updated on a periodic basis with updated analysis and assumptions. This document compiles various analyses results and approaches completed over a period of years into a single document to be used as a baseline going forward. It represents what the INL HTSE analysis group assumes to be the internal best estimate of the current operation, costs, and landscape of the HTSE industry state of the art capability for current SOEC technology in an Nth-of-a-Kind (NOAK) plant, which in this study is defined as existence of the manufacturing capacity to support previous deployment of N = 100 count of 25 MWe modular HTSE blocks (with modular equipment component cost reductions specified as following a 95% learning curve). That said, this is a public document and as such so no proprietary data was used or included in this report. There may be HTSE suppliers that have performance specifications, and cost estimates, and test data that differ from the analysis presented in this document. This document is meant to be a best conservative estimate of the technology and not an absolute reference.

08 HYDROGEN↗

Decommissioning Cost Estimating Factors And Earned Value Integration

The Rocky Flats 771 Project progressed from the planning stage of decommissioning a plutonium facility, through the strip-out of highly-contaminated equipment, removal of utilities and structural decontamination, and building demolition. Actual cost data was collected from the strip-out activities and compared to original estimates, allowing the development of cost by equipment groupings and types and over time. Separate data was developed from the project control earned value reporting and compared with the equipment data. The paper discusses the analysis to develop the detailed factors for the different equipment types, and the items that need to be considered during characterization of a similar facility when preparing an estimate. The factors are presented based on direct labor requirements by equipment type. The paper also includes actual support costs, and examples of fixed or one-time start-up costs. The integration of the estimate and the earned value system used for the 771 Project is also discussed. The paper covers the development of the earned value system as well as its application to a facility to be decommissioned and an existing work breakdown structure. Lessons learned are provided, including integration with scheduling and craft supervision, measurement approaches, and verification of scope completion. In summary: The work of decommissioning the Rocky Flats 771 Project process equipment was completed in 2003. Early in the planning process, we had difficulty in identifying credible data and implementing processes for estimating and controlling this work. As the project progressed, we were able to collect actual data on the costs of removing plutonium contaminated equipment from various areas over the life of this work and associate those costs with individual pieces of equipment. We also were able to develop and test out a system for measuring the earned value of a decommissioning project based on an evolving estimate. These were elements that would have been useful to us in our early planning process, and we would expect that they would find application elsewhere as the DOE weapons complex and some commercial nuclear facilities move towards closure. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and the effective pooling and exchange of knowledge and experience can only be of benefit to all participants to help complete the cleanup mission more quickly and more cost effectively. This paper examines in detail the tools and processes used to promote information exchange and the progress made to date. It also discusses the challenges and issues involved and proposes recommendations to others who are involved in similar activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benchmarking NPP Decommissioning Costs - Outcomes of the OECD Nuclear Energy Agency Activity - 19117

This paper describes work at the OECD Nuclear Energy Agency (NEA) on benchmarking in the context of nuclear power plant decommissioning costs. The NEA's Decommissioning Cost Estimation Group (DCEG) benchmarking activity was conducted during 2017-2018, and the report is scheduled for publication by NEA during the first half of 2019. The DCEG's activity focuses on identifying possible benchmarking approaches and discussing their specific application to decommissioning costing, including the 'added value' in developing decommissioning cost benchmarking approaches. It includes consideration of prevailing barriers to the sharing of information and data required for decommissioning cost benchmarking, and explores a range of possible initiatives intended to facilitate implementation of benchmarking approaches in nuclear decommissioning costing (i.e. a possible 'road map' for implementation). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost Analysis of Wind and Uranium from Seawater Acquisition symbiotic Infrastructure using Shell Enclosures

At current consumption rates, global conventional reserves of uranium, estimated to be 7.6 million tonnes, could be depleted in a little over a century. As these reserves decrease, extraction of uranium is expected to shift to lower quality sites, resulting in higher extraction costs and greater environmental impact. Fortunately, the ocean contains approximately 4.5 billion tonnes of uranium, as uranyl ions at low concentrations of about 3 ppb. Uranium from seawater is a widely studied topic due to the long term security it can assure the nuclear fuel cycle. Additionally, harvesting uranium from seawater could reduce some of the environmental impacts associated with the recovery of land-based uranium. Seawater uranium is meant to create a cost ceiling that provides economic stability and potential savings, not to act as a direct competitor to terrestrial uranium. A recent review of uranium recovery technologies by found uranium adsorption by chelating polymers to be the most promising in terms of adsorbent capacity, environmental footprint, and cost. In this technology, chelating polymers are deployed in seawater and remain submerged until the amount of captured uranium approaches the adsorption capacity. Then, an elution bath is used to strip metal ions, such as uranium, off the adsorbent polymer. A polymer may be immersed in a number of elution baths before it is regenerated by an alkali wash to free its functional groups, allowing for the reuse of the polymer. The output from the elution process undergoes purification and precipitation typical for mined uranium to produce yellowcake. Offshore systems for the extraction of uranium from seawater have been developed since the early 2000's. The system currently studied by a nationwide consortium of national laboratory and university partners utilizes continuous adsorbent polyethylene fibers that are braided around a porous polypropylene float which can be made into long lengths. However, because this deployment scheme requires the adsorbent be brought to a mother-ship for the elution process and redeployed afterward, it has significant practical and economic deployment challenges. Detailed economic analysis have identified the adsorbent production and mooring as the most expensive components of the recovery process. Based on these results, proposed an alternative deployment method that is attached to an offshore wind turbine and continuously takes the adsorbent, that is fabricated into a belt, from the ocean through an elution process and before submerging it back into the sea. However, it has been found that adsorbents with high tensile strength and durability often have very low uranium adsorption properties. Hence, the Wind and Uranium from Seawater Acquisition symbiotic Infrastructure (WUSABI) previously studied, which requires the adsorbent into a belt held in tension, could face difficulties in an ocean environment. Instead, the design, further referred to in this paper as WUSABI-Koosh, utilized a two-part system to decouple the mechanical and chemical needs of an adsorbent for seawater harvesting of uranium. In these designs, the uranium adsorbent material with high adsorbent capacity is enclosed in a hard permeable outer shell with sufficient mechanical strength and durability for use in an offshore environment and chemical resilience against elution treatments. The integration of the design of a uranium harvesting system into an offshore wind turbine tower is pursued because the development of offshore wind or uranium harvesting by themselves bears a high capital cost for the structures, but if the mooring function can be shared, the overall cost for each will be lower. Furthermore, initial design analysis and prototyping of these symbiotic systems has proven they are technically feasible. This paper presents preliminary cost analysis for comparison to uranium recovery via alternative deployment schemes.

07 ISOTOPE AND RADIATION SOURCES↗