Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commercial Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Thin-Film Solar Cells with 19% Efficiency by Thermal Evaporation of CdSe and CdTe

CdTe-based solar cells exhibiting 19% power conversion efficiency were produced using widely available thermal evaporation deposition of the absorber layers on SnO2-coated glass with or without a transparent MgZnO buffer layer. Evaporating CdSe and CdTe sequentially by thermal evaporation and subsequent CdCl2 annealing establishes efffective CdSeTe band grading as well as dense, large-grain films. These results show that high-performance II-VI photovoltaics can be made by inexpensive, commercially available evaporation systems without the need to build customized equipment, enabling CdTe photovoltaics research and manufacturing to be more accessible to the broader photovoltaics community.

14 SOLAR ENERGY↗

Distributed Wind Energy Futures Study

To better understand distributed wind opportunities in the United States, researchers at the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory explored cost, performance, and valuation benchmarks necessary for distributed wind to achieve widespread commercial viability in the United States by 2035. Building on DOE's prior benchmark report "Assessing the Future of Distributed Wind: Opportunities for Behind-the-Meter Projects", the new Distributed Wind Futures Study employs higher-resolution data and new modeling techniques to highlight geographic trends in technical and economic potential and to compare the cost and performance of distribution-connected, megawatt-scale wind applications (referred to as "front-of-the-meter" applications) and behind-the-meter systems, thereby informing the case for investment. The report identifies the best locations and sectors for behind-the-meter and front-of-the-meter applications and provides data to inform the trade-offs consumers face when deciding between distributed wind and solar photovoltaic (PV).

17 WIND ENERGY↗

Distributed Wind Energy Futures Study [Slides]

To better understand distributed wind opportunities in the United States, researchers at the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory explored cost, performance, and valuation benchmarks necessary for distributed wind to achieve widespread commercial viability in the United States by 2035. Building on DOE's prior benchmark report "Assessing the Future of Distributed Wind: Opportunities for Behind-the-Meter Projects", the new Distributed Wind Futures Study employs higher-resolution data and new modeling techniques to highlight geographic trends in technical and economic potential and to compare the cost and performance of distribution-connected, megawatt-scale wind applications (referred to as "front-of-the-meter" applications) and behind-the-meter systems, thereby informing the case for investment. The report identifies the best locations and sectors for behind-the-meter and front-of-the-meter applications and provides data to inform the trade-offs consumers face when deciding between distributed wind and solar photovoltaic (PV).

17 WIND ENERGY↗

Certified Green Building Materials: Policy Impact Assessment

Chinese building construction is rapidly expanding, making it critical to focus on energy efficiency to curb the increase of energy consumption and emissions over a building’s lifetime. A key mechanism to do so is through building material certification systems and programs. These establish how building materials will perform and can be used to promote energy and resource efficiency, which help create a more sustainable and healthy building industry. This report begins by identifying characteristics of a strong certification system and ways to improve existing systems. To curb building energy demand, the Chinese government began developing a building material certification program to encourage energy and resource efficiency in the building sector. A timeline is provided of their program’s development and provides analysis. China’s building material database is highlighted and analyzed for their significance and opportunities for improvement. The report then continues to analyze the importance of policies such as procurement programs, and the Chinese government is developing their procurement programs for certified green building materials. To understand the potential large-scale impacts of green building material certifications, we conducted an analysis of the environmental and market impact of a nationwide green building procurement policy for all new residential and commercial construction.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electromagnetic Propagation Prediction Inside Aircraft Cabins

Electromagnetic propagation models for signal strength prediction within aircraft cabins are essential for evaluating and designing a wireless communication system to be implemented onboard aircraft. A model was developed using Wireless Valley's SitePlanner; which is commercial grade software intended for predictions within office buildings. The performance of the model was evaluated through a comparison with test data measurements taken on several aircraft. The comparison concluded that the model can accurately predict power propagation within the cabin. This model can enhance researchers understanding of power propagation within aircraft cabins and will aid in future research.

Hankins, Genevieve↗

Low-Latency Lunar Surface Telerobotics from Earth-Moon Libration Points

Concepts for a long-duration habitat at Earth-Moon LI or L2 have been advanced for a number of purposes. We propose here that such a facility could also have an important role for low-latency telerobotic control of lunar surface equipment, both for lunar science and development. With distances of about 60,000 km from the lunar surface, such sites offer light-time limited two-way control latencies of order 400 ms, making telerobotic control for those sites close to real time as perceived by a human operator. We point out that even for transcontinental teleoperated surgical procedures, which require operational precision and highly dexterous manipulation, control latencies of this order are considered adequate. Terrestrial telerobots that are used routinely for mining and manufacturing also involve control latencies of order several hundred milliseconds. For this reason, an Earth-Moon LI or L2 control node could build on the technology and experience base of commercially proven terrestrial ventures. A lunar libration-point telerobotic node could demonstrate exploration strategies that would eventually be used on Mars, and many other less hospitable destinations in the solar system. Libration-point telepresence for the Moon contrasts with lunar telerobotic control from the Earth, for which two-way control latencies are at least six times longer. For control latencies that long, telerobotic control efforts are of the "move-and-wait" variety, which is cognitively inferior to near real-time control.

Lester, Daniel↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Stephen D.↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Steve↗

Clinical Decision Support - Concepts of Operation

We are entering a new era in space exploration to return to the moon and explore Mars. These ambitious goals will require significant changes to in-flight and habitat medical care due to constraints on mass, volume, power, crew time and medical evacuation capabilities. These constraints make it absolutely necessary to develop transformative solutions using new technologies. The Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP) pushes the boundary of space medical systems to advance the care of astronauts on future exploration missions beyond low Earth orbit by identifying and testing next-generation medical care and crew health maintenance technologies. The Clinical Decision Support (CDS) project addresses the gap Medical-701 within the Inflight Medical Conditions risk: Enhance medical capabilities within an exploration medical system. For long-duration, deep space missions, computational and data resources will play an important role in maintaining crew health, wellness and performance where the crew will need to be more self-reliant. The aim of the CDS project is to develop and provide recommended requirements for an in-vehicle CDSS that acts as an assistant for delivering optimal health and performance and medical care during exploration missions. The CDSS is envisioned as a software-based tool that will augment a crewmembers’ knowledge, skills and abilities to assist in decision-making and crew health and performance (CHP) management thus increasing CHP systems capabilities. The human interface will be context aware and lessen the cognitive load to assimilate and use information as well as combine large disparate data sets in such a manner that provides the crew with actionable insight to decisions related to crew medical, health and performance management. Crew autonomy will be provided through a CDS that presents knowledge and data in a context aware manner to augment a crew members’ knowledge, skills and abilities during the process of observation, orientation, decisions and action. The CDS project addresses the need for crew members to operate independently during long duration space exploration missions that require medical Levels of Care (LoC) V, the highest level specified by NASA-STD-3001 and described in more detail by the ExMC interpretation of LoC document (NASA/TM-2017-219290), where significant changes to in-flight and habitat medical care necessitate increasing crew autonomy in decision making and task performance. The CDS project will develop and test a series of iterative and increasingly more complex system prototypes. These annual demonstrations of the data system integration with the crew health and performance domain will inform exploration medical system requirements for an on-board Clinical Decision Support System (CDSS) through a series of use cases that guide CDS prototype functionality. CDS concepts are based on ExMC Concept of Operations documents (presented separately) and will highlight architecture extensibility to other more complex analyses and tests using core crew health and performance integrated data management, processing and visualization capabilities. This approach also establishes how externally developed analyses and approaches could be added to expand a clinical decision support system and thus highlight how a comprehensive system can be commercially and/or globally developed. The CDS project will build upon the concept of an integrated data management approach based on the Medical Data Architecture (MDA) project to more fully address challenges associated with in-flight and habitat medical, health and performance care due to constraints on mass, volume, power, crew time and medical evacuation capabilities required for medical LoC V. These requirements will be derived through systems engineering approaches and software prototype developments over the course of the multi-year CDS project to address crew health and performance decision-making and task performance, often autonomously executed by the crew, in a manner that is consistent with the appropriate medical level of care for the mission. This presentation will provide an overview of the vision for the CDS project and highlight the initial accomplishments in project planning, implementation and requirements identification in fiscal year 2020.

clinical decision support↗

Clinical Decision Support - Overview and Update

We are entering a new era in space exploration to return to the moon and explore Mars. These ambitious goals will require significant changes to in-flight and habitat medical care due to constraints on mass, volume, power, crew time and medical evacuation capabilities. These constraints make it absolutely necessary to develop transformative solutions using new technologies. The Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP) pushes the boundary of space medical systems to advance the care of astronauts on future exploration missions beyond low Earth orbit by identifying and testing next-generation medical care and crew health maintenance technologies. The Clinical Decision Support (CDS) project addresses the gap Medical-701 within the Inflight Medical Conditions risk: Enhance medical capabilities within an exploration medical system. For long-duration, deep space missions, computational and data resources will play an important role in maintaining crew health, wellness and performance where the crew will need to be more self-reliant. The aim of the CDS project is to develop and provide recommended requirements for an in-vehicle CDSS that acts as an assistant for delivering optimal health and performance and medical care during exploration missions. The CDSS is envisioned as a software-based tool that will augment a crewmembers’ knowledge, skills and abilities to assist in decision-making and crew health and performance (CHP) management thus increasing CHP systems capabilities. The human interface will be context aware and lessen the cognitive load to assimilate and use information as well as combine large disparate data sets in such a manner that provides the crew with actionable insight to decisions related to crew medical, health and performance management. Crew autonomy will be provided through a CDS that presents knowledge and data in a context aware manner to augment a crew members’ knowledge, skills and abilities during the process of observation, orientation, decisions and action. The CDS project addresses the need for crew members to operate independently during long duration space exploration missions that require medical Levels of Care (LoC) V, the highest level specified by NASA-STD-3001 and described in more detail by the ExMC interpretation of LoC document (NASA/TM-2017-219290), where significant changes to in-flight and habitat medical care necessitate increasing crew autonomy in decision making and task performance. The CDS project will develop and test a series of iterative and increasingly more complex system prototypes. These annual demonstrations of the data system integration with the crew health and performance domain will inform exploration medical system requirements for an on-board Clinical Decision Support System (CDSS) through a series of use cases that guide CDS prototype functionality. CDS concepts are based on ExMC Concept of Operations documents (presented separately) and will highlight architecture extensibility to other more complex analyses and tests using core crew health and performance integrated data management, processing and visualization capabilities. This approach also establishes how externally developed analyses and approaches could be added to expand a clinical decision support system and thus highlight how a comprehensive system can be commercially and/or globally developed. The CDS project will build upon the concept of an integrated data management approach based on the Medical Data Architecture (MDA) project to more fully address challenges associated with in-flight and habitat medical, health and performance care due to constraints on mass, volume, power, crew time and medical evacuation capabilities required for medical LoC V. These requirements will be derived through systems engineering approaches and software prototype developments over the course of the multi-year CDS project to address crew health and performance decision-making and task performance, often autonomously executed by the crew, in a manner that is consistent with the appropriate medical level of care for the mission. This presentation will provide an overview of the vision for the CDS project and highlight the initial accomplishments in project planning, implementation and requirements identification in fiscal year 2020.

clinical decision support system↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

POWOW: A Modular, High Power Spacecraft Concept

A robust space infrastructure encompasses a broad range of mission needs along with an imperative to reduce costs of satellites meeting those needs. A critical commodity for science, commercial and civil satellites is power at an affordable cost. The POWOW (POwer WithOut Wires) spacecraft concept was created to provide, at one end of the scale, multi-megawatts of power yet also be composed of modules that can meet spacecraft needs in the kilowatt range. With support from the NASA-sponsored Space Solar Power Exploratory Research and Technology Program, the POWOW spacecraft concept was designed to meet Mars mission needs - while at the same time having elements applicable to a range of other missions. At Mars, the vehicle would reside in an aerosynchronous orbit and beam power to a variety of locations on the surface. It is the purpose of this paper to present the latest concept design results. The Space Power Institute along with four companies: Able Engineering, Inc., Entech, Inc., Primex Aerospace Co., and TECSTAR have produced a modular, power-rich electrically propelled spacecraft design that meets these requirements. In addition, it also meets a range of civil and commercial needs. The spacecraft design is based on multijunction Ill-V solar cells, the new Stretched Lens Aurora (SLA) module, a lightweight array design based on a multiplicity of 8 kW end-of-life subarrays and electric thrusters. The solar cells have excellent radiation resistance and efficiencies above 30%. The SLA has a concentration ratio up to 15x while maintaining an operating temperature of 80 C. The design of the 8 kW array building block will be presented and its applicability to commercial and government missions will be discussed. Electric propulsion options include Hall, MPD and ion thrusters of various power levels and trade studies have been conducted to define the most advantageous options. The present baseline spacecraft design providing 900 kW using technologies expected to be available in 2003 will be described. Areal power densities of nearly 400 W/meters squared at 80 C operating temperatures and wing level specific powers of over 400 W/kg are projected. Details of trip times and payloads to Mars will be presented as well as trade studies of various electric propulsion options. Trip times compare favorably with chemical propulsion options. Because the design is modular, learning curve methodology can be applied to determine expected cost reductions. These results will also be included. This paper has not been presented at a previous meeting.

Brandhorst, Henry W., Jr.↗

MEASUR Up: Identifying opportunities in a facility

The commercial and industrial sectors account for nearly half of the total U.S. energy consumption. To help these sectors reduce their energy intensity, the U.S. Department of Energy (DOE) designed the Better Buildings, Better Plants Initiative. Through this initiative, more than 900 industrial, commercial, public and residential organizations commit to long-term sustainability goals and share their proven energy efficiency strategies, which inspire others to tap into the continued potential for energy efficiency. Collectively, these organizations have saved 2.5 quadrillion BTUs of energy, equivalent to US$15.3 billion, and 155 million metric tons of carbon dioxide. Within the initiative, the Better Plants side of the program focuses specifically on the industrial sector. More than 270 industrial partners have taken advantage of the unique selection of resources offered including workforce development programs, information sharing, peer-to-peer networking, diagnostic tool loans and software tools. One of the most powerful tools off ered is a revitalization of the legacy DOE software tools used by industry for decades. These have been transformed into a new, free, opensource software tool suite: MEASUR (Manufacturing Energy Assessment Software for Utility Reduction)

Armstrong, Kristina↗

Development and application of nonflammable, high-temperature beta fibers

Recent advances in fiber technology have contributed to the success of the U.S. space program. The inorganic fiber Beta, developed as a result of efforts begun in the early 1960's and heightened following the January 27, 1967 Apollo fire is unique among inorganic and organic fibers. It has been developed into woven, nonwoven, knitted, braided, coated and printed structures. All of these were used extensively for the Apollo, Skylab, Apollo-Soyuz test project, space shuttle, Spacelab, and satellite programs. In addition to being used successfully in the space program, Beta fibers are being used commercially as firesafe fabrics in homes, hospitals, institutions, public buildings, aircraft, and public transportation, wherever total nonflammability is required. One of the most unique applications of the Beta composite structure is the roofing material for the 80,000-seat Detroit Lion's Silverdome and 5 square miles of the Jeddah International Airport in Saudi Arabia. This fiber has been successfully incorporated into 165 major public construction projects around the globe. The United States alone has used more than 12 million square yards of the material. Beta fiber has been used successfully to date and has a promising future with unlimited potential for both space and commercial application. Efforts are currently underway to improve Beta fiber to meet the requirements of extended service life for the Space Station Freedom, lunar outpost, and Mars exploration missions.

Dawn, Frederic S.↗

System for Photogrammetric Imaging, Detection, and Ranging (SPIDR)

The System for Photogrammetric Imaging, Detection, and Ranging (SPIDR) project aims to advance the state-of-the-art (SOA) technology in camera tracking. SPIDR will advance this technology in the following ways: 1) perform autonomous tracking of rocket launches, 2) allow modularity for camera payloads to enable various types of imagery capture (standard video, high-speed, infrared, etc.), 3) enable additional imagery assets for increased scope of imagery analysis, and 4) serve as a viable tracking replacement for the existing Kineto Tracking Mount (KTM) system used by the Exploration Ground Systems (EGS) program. The project initially aimed to build an in-house mechanical design and control system, but realigned to a commercial off-the-shelf (COTS) mechanical design. During the FY23 CIF timeline, the SPIDR team made significant advances in building a machine-learning (ML) based object detection model for various rockets and their plumes. The team will continue advancing the model, and begin work on the pan and tilt unit (PTU) control system and tracking algorithm development.

Alden Param↗

Damage tolerance in the graphite cores of UK power reactors and implications for new build

The United Kingdom has been operating graphite-moderated gas-cooled commercial nuclear power reactors for more than 60 years. Both Generation I Magnox reactors and Generation II Advanced Gas-cooled Reactors have operated beyond their nominal design lifetimes and the safety cases for continued operation have had to address the issue of damage tolerance of the graphite cores. This review describes the designs of the reactors and the methodologies employed for their assessment. Emerging issues arising from extended operation and ageing of the cores are discussed together with the evolution of assessment methodologies to address predicted and observed damage. The UK nuclear regulator perspective is summarised and some conclusions are drawn on the implications for new build.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NASA’s Progress Toward Commercial Space Communications—SATCOM Demonstrations and Wideband Multilingual Terminal Development

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program is continuing to forge a path toward programmatic and operational transformation enabling commercialization of communications and navigation services to the greatest extent possible for near Earth users. National Space Policy is driving government agencies to incorporate commercial offerings and services to the maximum extent possible. As such, NASA has no plans to build or deploy Tracking and Data Relay Satellites, but will seek to fill NASA mission space-relay capability needs using commercial satellite communications (SATCOM) providers and services. The goal is to support an approach that is both flexible to commercial service constructs and provides continuity of support with current assets as long as required. Progress toward commercialization is advancing in two key areas: (1) awards have been made for demonstrations of SATCOM services, and (2) development of wideband and multilingual user terminals has advanced to the flight demonstration phase. The Communications Services Project (CSP) at Glenn Research Center (GRC), has awarded Funded Space Act Agreements (FSAA) to six industry vendors. Inmarsat Government Inc., Kuiper Government Solutions (KGS) LLC, SES Government Solutions, Space Exploration Technologies, Telesat U.S. Services LLC, and Viasat Incorporated received a combined $278.5 million to complete technology development and in-space demonstrations over the next several years. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. In the current market, industry vendors operate at a range of different frequencies and use variable, sometime proprietary, coding and modulations schemes. As NASA strives for a network comprised of services provided by multiple distinct suppliers, interoperability is a fitting solution to unify the network. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. This paper provides a discussion of the progress toward NASA’s commercial space communications goals and consideration of key challenges and next steps.

space communications↗

Ten questions concerning energy flexibility in buildings

Demand side energy flexibility is increasingly being viewed as an essential enabler for the swift transition to a low-carbon energy system that displaces conventional fossil fuels with renewable energy sources while maintaining, if not improving, the operation of the energy system. Building energy flexibility may address several challenges facing energy systems and electricity consumers as society transitions to a low-carbon energy system characterized by distributed and intermittent energy resources. For example, by changing the timing and amount of building energy consumption through advanced building technologies, electricity demand and supply balance can be improved to enable greater integration of variable renewable energy. Although the benefits of utilizing energy flexibility from the built environment are generally recognized, solutions that reflect diversity in building stocks, customer behavior, and market rules and regulations need to be developed for successful implementation. In this paper, we pose and answer ten questions covering technological, social, commercial, and regulatory aspects to enable the utilization of energy flexibility of buildings in practice. In particular, we provide a critical overview of techniques and methods for quantifying and harnessing energy flexibility. We discuss the concepts of resilience and multi-carrier energy systems and their relation to energy flexibility. We argue the importance of balancing stakeholder engagement and technology deployment. Finally, we highlight the crucial roles of standardization, regulation, and policy in advancing the deployment of energy flexible buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗