Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Mass Analyzers Facilitate Research on Addiction

The famous go/no go command for Space Shuttle launches comes from a place called the Firing Room. Located at Kennedy Space Center in the Launch Control Center (LCC), there are actually four Firing Rooms that take up most of the third floor of the LCC. These rooms comprise the nerve center for Space Shuttle launch and processing. Test engineers in the Firing Rooms operate the Launch Processing System (LPS), which is a highly automated, computer-controlled system for assembly, checkout, and launch of the Space Shuttle. LPS monitors thousands of measurements on the Space Shuttle and its ground support equipment, compares them to predefined tolerance levels, and then displays values that are out of tolerance. Firing Room operators view the data and send commands about everything from propellant levels inside the external tank to temperatures inside the crew compartment. In many cases, LPS will automatically react to abnormal conditions and perform related functions without test engineer intervention; however, firing room engineers continue to look at each and every happening to ensure a safe launch. Some of the systems monitored during launch operations include electrical, cooling, communications, and computers. One of the thousands of measurements derived from these systems is the amount of hydrogen and oxygen inside the shuttle during launch.

Source record↗

Solid Rocket Booster (SRB) Flight System Integration at Its Best

The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads, environments and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. However, the in-flight data and postflight assessment process revealed the hardware was affected much more strongly than originally anticipated. Assembly and integration of the booster subsystems required acceptance testing of reused hardware components for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed. The postflight assessment process was quite detailed and a significant portion of flight operations. The SRBs provided fully redundant critical systems including thrust vector control, mission critical pyrotechnics, avionics, and parachute recovery system. The design intent was to lift off with full redundancy. On occasion, the redundancy management scheme was needed during flight operations. This paper describes some of the design challenges and technical issues, how the design evolved with time, and key areas where hardware reusability contributed to improved system level understanding.

Wood, T. David↗

Digital Radiography Qualification of Tube Welding

The Orion Project will be directing Lockheed Martin to perform orbital arc welding on commodities metallic tubing as part of the Multi Purpose Crew Vehicle assembly and integration process in the Operations and Checkout High bay at Kennedy Space Center. The current method of nondestructive evaluation is utilizing traditional film based x-rays. Due to the high number of welds that are necessary to join the commodities tubing (approx 470), a more efficient and expeditious method of nondestructive evaluation is desired. Digital radiography will be qualified as part of a broader NNWG project scope.

Carl, Chad↗

NASA Tech Briefs, October 2011

Topics covered include: Laser Truss Sensor for Segmented Telescope Phasing; Qualifications of Bonding Process of Temperature Sensors to Deep-Space Missions; Optical Sensors for Monitoring Gamma and Neutron Radiation; Compliant Tactile Sensors; Cytometer on a Chip; Measuring Input Thresholds on an Existing Board; Scanning and Defocusing Properties of Microstrip Reflectarray Antennas; Cable Tester Box; Programmable Oscillator; Fault-Tolerant, Radiation-Hard DSP; Sub-Shot Noise Power Source for Microelectronics; Asynchronous Message Service Reference Implementation; Zero-Copy Objects System; Delay and Disruption Tolerant Networking MACHETE Model; Contact Graph Routing; Parallel Eclipse Project Checkout; Technique for Configuring an Actively Cooled Thermal Shield in a Flight System; Use of Additives to Improve Performance of Methyl Butyrate-Based Lithium-Ion Electrolytes; Li-Ion Cells Employing Electrolytes with Methyl Propionate and Ethyl Butyrate Co-Solvents; Improved Devices for Collecting Sweat for Chemical Analysis; Tissue Photolithography; Method for Impeding Degradation of Porous Silicon Structures; External Cooling Coupled to Reduced Extremity Pressure Device; A Zero-Gravity Cup for Drinking Beverages in Microgravity; Co-Flow Hollow Cathode Technology; Programmable Aperture with MEMS Microshutter Arrays; Polished Panel Optical Receiver for Simultaneous RF/Optical Telemetry with Large DSN Antennas; Adaptive System Modeling for Spacecraft Simulation; Lidar-Based Navigation Algorithm for Safe Lunar Landing; Tracking Object Existence From an Autonomous Patrol Vehicle; Rad-Hard, Miniaturized, Scalable, High-Voltage Switching Module for Power Applications; and Architecture for a 1-GHz Digital RADAR.

Source record↗

Monitoring Spacecraft Telemetry Via Optical or RF Link

A patent disclosure document discusses a photonic method for connecting a spacecraft with a launch vehicle upper-stage telemetry system as a means for monitoring a spacecraft fs health and status during and right after separation and deployment. This method also provides an efficient opto-coupled capability for prelaunch built-in-test (BIT) on the ground to enable more efficient and timely integration, preflight checkout, and a means to obviate any local EMI (electromagnetic interference) during integration and test. Additional utility can be envisioned for BIT on other platforms, such as the International Space Station (ISS). The photonic telemetry system implements an optical free-space link with a divergent laser transmitter beam spoiled over a significant cone angle to accommodate changes in spacecraft position without having to angle track it during deployment. Since the spacecraft may lose attitude control and tumble during deployment, the transmitted laser beam interrogates any one of several low-profile meso-scale retro-reflective spatial light modulators (SLMs) deployed over the surface of the spacecraft. The return signal beam, modulated by the SLMs, contains health, status, and attitude information received back at the launch vehicle. Very compact low-power opto-coupler technology already exists for the received signal (requiring relatively low bandwidths, e.g., .200 kbps) to enable transfer to a forward pass RF relay from the launch vehicle to TDRSS (Tracking and Data Relay Satellite System) or another recipient. The link would be active during separation and post-separation to monitor spacecraft health, status, attitude, or other data inventories until attitude recovery and ground control can be re-established. An optical link would not interfere with the existing upper stage telemetry and beacon systems, thus meeting launch vehicle EMI environmental constraints.

Fielhauer, K. B.↗

PCB-Based Break-Out Box

Break-out boxes (BOBs) are necessary for all electrical integration/cable checkouts and troubleshooting. Because the price of a BOB is high, and no work can be done without one, often the procedure stops, simply waiting for a BOB. A less expensive BOB would take less time in the integration, testing, and troubleshooting process. The PCB-based BOB works and looks the same as a standard JPL BOB, called Gold Boxes. The only differences between the old BOB and the new PCB-based BOB is that the new one has 80 percent of its circuitry in a printed circuit board. This process reduces the time for fabrication, thus making the BOBs less expensive. Moreover, because of its unique design, the new BOBs can be easily assembled and fixed. About 80 percent of the new PCB-based BOB is in a $22 (at the time of this reporting) custom-designed, yet commercially available PCB. This device has been used successfully to verify that BOB cables were properly made. Also, upon completion, the BOB was beeped out via a multimeter to ensure that all sockets on the connectors were properly connected to the respective banana jack. When compared to the Gold Box BOBs, the new BOB has many advantages. It is much more cost efficient, it delivers equal usability at substantially lower cost of the BOB, and the Gold Box is much heavier when compared to the new BOB. The new BOB is also a bit longer and much more versatile in that connectors are easily changeable and if a banana jack is broken, it can be replaced instead of throwing away an entire BOB.

Lee, Jason H.↗

Demonstration/Validation of Environmentally-Preferable Coatings for Launch Facilities

Kennedy Space Center (KSC) is responsible for a number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of an applied coating system. Applied coating systems work via a variety of methods (barrier, galvanic and/or inhibitor) and adhere to the substrate through a combination of chemical and physical bonds. Maintenance at KSC and other NASA Centers is governed by NASA-STD-50088 (Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment) which establishes practices for the protective coating of ground support equipment and related facilities used by or for NASA programs and projects. The Standard is for the design of non-flight hardware used to support the operations of receiving, transportation, handling, assembly, inspection, test, checkout, service, and launch of space vehicles and payloads at NASA launch, landing, or retrieval sites. These criteria and practices contained within the Standard may be used for items used at the manufacturing, development, and test sites upstream of the launch, landing, or retrieval sites. The objective of this effort is to demonstrate and validate environmentally-preferable alternatives in accordance with NASA-STD-50088 and KSC requirements which can then be added to the Approved Products List. This Test Protocol contains the critical requirements and tests necessary to qualify alternatives for structural steel applications. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of KSC participants. A Test Report will document the results of the testing as well as any test modifications made during the execution of the testing. Users of this Test Protocol should check the project's Test Report for additional test details or minor modifications that may have been necessary in the execution of the testing. The technical stakeholders will have agreed upon test procedures modifications documented in the Test Report.

Lewis, Pattie↗

Structural Dynamic Assessment of the GN2 Piping System for NASA's New and Powerful Reverberant Acoustic Test Facility

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has led the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA from 2007 to 2011. SAIC-Benham has completed construction of a new reverberant acoustic test facility to support the future testing needs of NASA's space exploration program and commercial customers. The large Reverberant Acoustic Test Facility (RATF) is approximately 101,000 cubic feet in volume and was designed to operate at a maximum empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. Initial checkout acoustic testing was performed on March 2011 by SAIC-Benham at test levels up to 161 dB OASPL. During testing, several branches of the gaseous nitrogen (GN2) piping system, which supply the fluid to the noise generating acoustic modulators, failed at their T-junctions connecting the 12 in. supply line to their respective 4 in. branch lines. The problem was initially detected when the oxygen sensors in the horn room indicated a lower than expected oxygen level from which was inferred GN2 leaks in the piping system. In subsequent follow up inspections, cracks were identified in the failed T-junction connections through non-destructive evaluation testing. Through structural dynamic modeling of the piping system, the root cause of the T-junction connection failures was determined. The structural dynamic assessment identified several possible corrective design improvements to the horn room piping system. The effectiveness of the chosen design repairs were subsequently evaluated in September 2011 during acoustic verification testing to 161 dB OASPL.

McNelis, Mark E.↗

Space Software Defined Radio Characterization to Enable Reuse

NASA's Space Communication and Navigation Testbed is beginning operations on the International Space Station this year. The objective is to promote new software defined radio technologies and associated software application reuse, enabled by this first flight of NASA's Space Telecommunications Radio System architecture standard. The Space Station payload has three software defined radios onboard that allow for a wide variety of communications applications; however, each radio was only launched with one waveform application. By design the testbed allows new waveform applications to be uploaded and tested by experimenters in and outside of NASA. During the system integration phase of the testbed special waveform test modes and stand-alone test waveforms were used to characterize the SDR platforms for the future experiments. Characterization of the Testbed's JPL SDR using test waveforms and specialized ground test modes is discussed in this paper. One of the test waveforms, a record and playback application, can be utilized in a variety of ways, including new satellite on-orbit checkout as well as independent on-board testbed experiments.

Mortensen, Dale J.↗

Solar Thermal Upper Stage Liquid Hydrogen Pressure Control Testing and Analytical Modeling

The demonstration of a unique liquid hydrogen (LH2) storage and feed system concept for solar thermal upper stage was cooperatively accomplished by a Boeing/NASA Marshall Space Flight Center team. The strategy was to balance thermodynamic venting with the engine thrusting timeline during a representative 30-day mission, thereby, assuring no vent losses. Using a 2 cubic m (71 cubic ft) LH2 tank, proof-of-concept testing consisted of an engineering checkout followed by a 30-day mission simulation. The data were used to anchor a combination of standard analyses and computational fluid dynamics (CFD) modeling. Dependence on orbital testing has been incrementally reduced as CFD codes, combined with standard modeling, continue to be challenged with test data such as this.

Olsen, A. D.↗

Test Rack Development for Extended Operation of Advanced Stirling Convertors at NASA Glenn Research Center

The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sun power Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC's support of ASRG development includes extended operation testing of Advanced Stirling Convertors (ASCs) developed by Sunpower Inc. In the past year, NASA GRC has been building a test facility to support extended operation of a pair of engineering level ASCs. Operation of the convertors in the test facility provides convertor performance data over an extended period of time. Mechanical support hardware, data acquisition software, and an instrumentation rack were developed to prepare the pair of convertors for continuous extended operation. Short-term tests were performed to gather baseline performance data before extended operation was initiated. These tests included workmanship vibration, insulation thermal loss characterization, low-temperature checkout, and fUll-power operation. Hardware and software features are implemented to ensure reliability of support systems. This paper discusses the mechanical support hardware, instrumentation rack, data acquisition software, short-term tests, and safety features designed to support continuous unattended operation of a pair of ASCs.

Dugala, Gina M.↗

Automated Data Production For A Novel Airborne Multiangle Spectropolarimetric Imager (AIRMSPI)

A novel polarimetric imaging technique making use of rapid retardance modulation has been developed by JPL as a part of NASA's Instrument Incubator Program. It has been built into the Airborne Multiangle SpectroPolarimetric Imager (AirMSPI) under NASA's Airborne Instrument Technology Transition Program, and is aimed primarily at remote sensing of the amounts and microphysical properties of aerosols and clouds. AirMSPI includes an 8-band (355, 380, 445, 470, 555, 660, 865, 935 nm) pushbroom camera that measures polarization in a subset of the bands (470, 660, and 865 nm). The camera is mounted on a gimbal and acquires imagery in a configurable set of along-track viewing angles ranging between +67 deg and -67 deg relative to nadir. As a result, near simultaneous multi-angle, multi-spectral, and polarimetric measurements of the targeted areas at a spatial resolution ranging from 7 m to 20 m (depending on the viewing angle) can be derived. An automated data production system is being built to support high data acquisition rate in concert with co-registration and orthorectified mapping requirements. To date, a number of successful engineering checkout flights were conducted in October 2010, August-September 2011, and January 2012. Data products resulting from these flights will be presented.

Multi-angle↗

Robonaut 2 - Preparing for Intra-Vehicular Mobility on the International Space Station

Robonaut 2 (R2) has been undergoing experimental trials on board the International Space Station (ISS) for more than a year. This upper-body anthropomorphic robotic system shown in Figure 1 has been making steady progress after completing its initial checkout. R2 demonstrated free space motion, physically interacted with its human crew mates, manipulated interfaces on its task board and has even used its first tool. This steady growth in capability will lead R2 to its next watershed milestone. Developers are currently testing prototype robotic climbing appendages and a battery backpack in preparation of sending flight versions of both subsystems to the ISS in late 2013. Upon integration of its new components, R2 will be able to go mobile inside the space station with a twofold agenda. First, R2 will learn to maneuver in microgravity in the best possible laboratory for such a task. Second, it will start providing early payback to the ISS program by helping with intra-vehicular (IVA) maintenance tasks. The experience gained inside the ISS will be invaluable in reducing risk when R2 moves to its next stage and is deployed as an extra-vehicular (EVA) tool. Even on its current fixed base stanchion, R2 has already shown its capability of performing several maintenance tasks on the ISS. It has measured the air flow through one of the stations vents and provided previously unavailable real time flow data to ground operators. R2 has cleaned its first handrail, exciting some crew members that perhaps Saturday morning housekeeping on the station may someday become a task they can hand off to their robotic colleague. Other tasks, including using radio frequency identification (RFID) tools for inventory tasks or vacuuming air filters, have also been suggested and will be explored. Once mobile, R2 will take on these tasks and more to free up crew time for more important science and exploration pursuits. In addition to task exploration, research and testing is happening on orbit to prepare for R2 mobility operations. The current vision system in R2 s head is being used to identify and localize IVA handrails throughout the US Lab and ground control software is being updated and integrated in advance of supporting mobility operations.

Badger, Julia↗

Automated Translation of Safety Critical Application Software Specifications into PLC Ladder Logic

The numerous benefits of automatic application code generation are widely accepted within the software engineering community. A few of these benefits include raising the abstraction level of application programming, shorter product development time, lower maintenance costs, and increased code quality and consistency. Surprisingly, code generation concepts have not yet found wide acceptance and use in the field of programmable logic controller (PLC) software development. Software engineers at the NASA Kennedy Space Center (KSC) recognized the need for PLC code generation while developing their new ground checkout and launch processing system. They developed a process and a prototype software tool that automatically translates a high-level representation or specification of safety critical application software into ladder logic that executes on a PLC. This process and tool are expected to increase the reliability of the PLC code over that which is written manually, and may even lower life-cycle costs and shorten the development schedule of the new control system at KSC. This paper examines the problem domain and discusses the process and software tool that were prototyped by the KSC software engineers.

Leucht, Kurt W.↗

Operating the Dual-Orbiter GRAIL Mission to Measure the Moon's Gravity

NASA's mission to measure the Moon's gravity and determine the interior structure, from crust to core, has almost completed its 3-month science data collection phase. The twin orbiters of the Gravity Recovery and Interior Laboratory (GRAIL) mission were launched from Florida on September 10, 2011, on a Delta-II launch vehicle. After traveling for nearly four months on a low energy trajectory to the Moon, they were inserted into lunar orbit on New Year's Eve and New Year's Day. In January 2012 a series of circularization maneuvers brought the orbiters into co-planar near-circular polar orbits. In February a distant (75- km) rendezvous was achieved and the science instruments were turned on. A dual- frequency (Ka and S-band) inter-orbiter radio link provides a precise orbiter-to-orbiter range measurement that enables the gravity field estimation. NASA's Jet Propulsion Laboratory in Pasadena, CA, manages the GRAIL project. Mission management, mission planning and sequencing, and navigation are conducted at JPL. Lockheed Martin, the flight system manufacturer, operates the orbiters from their control center in Denver, Colorado. The orbiters together have performed 28 propulsive maneuvers to reach and maintain the science phase configuration. Execution of these maneuvers, as well as the payload checkout and calibration activities, has gone smoothly due to extensive pre-launch operations planning and testing. The key to the operations success has been detailed timelines for product interchange between the operations teams and proven procedures from previous JPL/LM planetary missions. Once in science phase, GRAIL benefitted from the payload operational heritage of the GRACE mission that measures the Earth's gravity.

Moon missions↗

Imagine Moving Off the Planet

Moving off the planet will be a defining moment of this century as landing on the Moon was in the last. For that to happen for humans to go where humans cannot go-- simulation is the sole solution. NASA supports simulation for life-cycle activities: design, analysis, test, checkout, operations, review and training. We contemplate time spans of a century and more, teams dispersed to different planets and the need for systems that endure or adapt as missions, teams and technology change. Without imagination such goals are impossible. But with imagination we can go outside our present perception of reality to think about and take action on what has been, is and, especially, what might be. Consciously maturing an imagined, possibly workable, idea through framing it to optimization to design, and building the product provides us with a new approach to innovation and simulation fidelity. We address options, analyze, test and make improvements in how we think and work. Each step includes increasingly exact information about costs, schedule, who will be needed, where, when and how. NASA i integrating such thinking into its Exploration Product Realization Hierarchy for simulation and analysis, test and verification, and stimulus response goals. Technically NASA follows a timeline of studies, analysis, definition, design, development and operations with concurrent documentation. We have matched this Product Realization Hierarchy with a continuum from image to realization that incorporates commitment, current and needed research and communication to ensure superior and creative problem solving as well as advances in simulation. One result is a new approach to collaborative systems. Another is a distributed observer network prototyped using game engine technology bringing advanced 3-D simulation of a simulation to the desktop enabling people to develop shared consensus of its meaning. Much of the value of simulation comes from developing in people their ability to make good decisions and reflexes supporting impressive achievement. Synthesizing imagination systematically into our work - and thus our success - is a challenge. NASA engineers have inventive minds, and the task is determining how best to enable them to devise the simulation and other innovations that will make a story so clear and so intellectually sound that people can carry out the mission for 50-100 years. This demands skills and knowledge traditionally under-respected and under-represented in technology organizations. But we are beginning to see that the process encourages efficiency and enables us to attain more effective results. We have to elicit imaginative, intelligent and effective ways to make better use than ever of the minds we have and will have available. We have to accept the challenge to accomplish tasks among dispersed interdisciplinary teams who must overcome changing priorities and technology, time and distance in order to maximize interactivity and innovation as never before. Attention to the process of innovation is a practical means to increase the efficiency of our intelligence. We have an obligation to reexamine and improve the process by which we approach and exercise innovation as we accept the charge to move off the planet.

Elfrey, Priscilla R.↗

Kennedy's Biomedical Laboratory Makes Multi-Tasking Look Easy

If it is one thing that Florida has in abundance, it is sunshine and with that sunshine heat and humidity. For workers at the Kennedy Space Center that have to work outside in the heat and humidity, heat exhaustion/stroke is a real possibility. It might help people to know that Kennedy's Biomedical Laboratory has been testing some new Koolvests(Trademark) that can be worn underneath SCAPE suits. They have also been working on how to block out high noise levels; in fact, Don Doerr, chief of the Biomedical Lab, says, "The most enjoyable aspect is knowing that the Biomedical Lab and the skills of its employees have been used to support safe space flight, not only for the astronaut flight crew, but just as important for the ground processing personnel as well." The NASA Biomedical Laboratory has existed in the John F. Kennedy's Operations and Checkout Building since the Apollo Program. The primary mission of this laboratory has been the biomedical support to major, manned space programs that have included Apollo, Apollo-Soyuz, Skylab, and Shuttle. In this mission, the laboratory has been responsible in accomplishing much of the technical design, planning, provision, fabrication, and maintenance of flight and ground biomedical monitoring instrumentation. This includes the electronics in the launch flight suit and similar instrumentation systems in the spacecraft. (Note: The Lab checked out the system for STS-128 at Pad A using Firing room 4 and ground support equipment in the lab.) During Apollo, there were six engineers and ten technicians in the facility. This has evolved today to two NASA engineers and two NASA technicians, a Life Science Support contract physiologist and part-time support from an LSSC nurse and physician. Over the years, the lab has enjoyed collaboration with outside agencies and investigators. These have included on-site support to the Ames Research Center bed rest studies (seven years) and the European Space Agency studies in Toulouse, France (two years). The lab has also actively collaborated with the US Army Institute for Surgical Research, the USAF School of Aerospace Medicine, and the USN Naval Experimental Diving Unit. Because the lab often evaluates various forms of commercial-off-the-shelf life support equipment, the laboratory works closely with private companies, both domestic and foreign. The European companies seem to be more proactive and participatory with the advancement of personal protective equipment. Because these companies have viewed the space program's unique need for advanced forms of personal protective equipment, some have responded with new designs based on the prediction that these advances will soon find markets in the commercial sector. Using much of the same skills and equipment, the laboratory also addresses physiological testing of humans by supporting flight experiments and personnel involved with ground processing. While Johnson Space Center is primarily responsible for flight experiments, the Kennedy's Biomedical Lab provides the local support. However, as stated above, there are many challenges facing KSC workers that gain the attention of this lab in the measurement of the problem and the selection and testing of countermeasures. These include respiratory protection, whole body suits, hearing protection and heat stress, among many others.

Dunn, Carol Anne↗

Evaluation of Acoustic Emission SHM of PRSEUS Composite Pressure Cube Tests

A series of tests of the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) pressure cube were conducted during third quarter 2011 at NASA Langley Research Center (LaRC) in the Combined Loads Test facility (COLTS). This is a report of the analysis of the Acoustic Emission (AE) data collected during those tests. The AE signals of the later tests are consistent with the final failure progression through two of the pressure cube panels. Calibration tests and damage precursor AE indications, from preliminary checkout pressurizations, indicated areas of concern that eventually failed. Hence those tests have potential for vehicle health monitoring.

Horne, Michael R.↗