Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

The Effect of Transfer Line Length and Heat Rejection Temperature Distribution on the Thales Linear Pulse Tube (LPT) Cryocoolers

Four Thales LPT9310 and four Thales LPT9510 commercial off-the-shelf (COTS) cryocoolers were parametrically performance tested. The LPT9310 coolers had transfer lines of various lengths while the LPT9510 coolers all had the same transfer line geometry. The LPT9510 test results revealed unit-tounit thermodynamic performance variation, quantified the effect of compressor temperature on thermodynamic performance and quantified the heat flow distribution between the compressor and expander as a function of their temperature distribution. The LPT9310 test results revealed the optimal drive frequency as a function of transfer line length, quantified the effect of heat rejection temperature distribution on thermodynamic performance and enabled the development and verification of a thermodynamic performance prediction tool that accounted for cold tip temperature, heat lift, heat rejection temperature and transfer line length.

Rodriguez, J.I.↗

Random vibration, exported vibration, and passive isolation testing of the Ricor K508N cryocooler

The Ricor K508N is a rotary Stirling Cryocooler whose predecessor, the K508, has extensive flight heritage. The K508N has significant potential as a low-cost option for CubeSat infrared electro-optical payload applications. This paper will explore the work done by the ATA project on the exported vibration characterization of a set of standard K508N cryocoolers (35 atm) and the implementation and performance comparison of several passive vibration isolation and damping technologies to help mitigate the jitter effect of COTS cryocoolers. Kistler Force dynamometers and accelerometers were used to measure the K508N’s body and cold tip Multicomponent Exported Forces and Torques (EFT). Wire rope and Pyrolytic Graphite Sheet thermal straps are used as vibration isolation technologies. The K508N also underwent sine sweep resonant and peak profile testing as well as random vibration testing to GEVS launch loads in a NanoRacks soft stow configuration.

Mok, M↗

Development of Two High-Energy Bus ‘Cores’

For several years the TechEdSat flight series (TES-n), developed by the Nano Orbital Workshop (NOW) group at NASA Ames, has relied upon an in-house developed unit to serve both EPS (Electrical Power System) and C&DH (Command and Data Handling) roles along with low data-rate telemetry functions, i.e., serving as the ‘core’ of the spacecraft bus. This ‘core’ has a considerable task given the rapid cadence of the TES program and the typically low-TRL of payloads; configurability and compatibility are key to prevent mission-specific hardware. However, at only 15 watts the current core has become insufficient to support the program’s growing missions and increasingly demanding payloads. To this end, the NOW program is developing new cores to support two TES mission classes: a single-PCB ‘MiniCore’ designed to support 80-watt missions 6U or smaller in LEO, and a three-PCB, radiation-tolerant ‘StackCore’ designed to support 6U and larger missions over 500 watts in LEO and beyond. The ‘MiniCore’ design consists of three main segments: a processor-agnostic C&DH, a software-configured EPS, and a backup low data-rate radio. The design philosophy was to enable rapid-manufacture in a turbulent supply chain, hence the design consists of COTS parts with a focus on those able to be drop-in replaced with radiation-tolerant versions when demanded by the mission. As a single PC-104 sized circuit board, power density and ease of integration also dominated design, demanding the use of modern features such as single-point USB-C for easy charging and monitoring of the spacecraft on the ground. The ‘MiniCore’ can support 80 watts of load, 140 watt-hours of storage, and over 20 watts of optimized solar generation with extensive power monitoring throughout. The ‘MiniCore’ supports one battery pack, six solar-panels, six loads, five actuators, Iridium SBD, and an internal 802.15.4 network. Additionally, the processor-agnostic design can accept any PJRC Teensy 3.x or Adafruit Feather microcontroller unit to enable processor scaling with mission requirements or environment. It is expected a development unit of this design will be completed before conference. The ‘StackCore’ design consists of three stacked PC-104 sized circuit boards: one dedicated to power generation and storage, one dedicated to power distribution, and one dedicated to C&DH tasks. This delineation is necessary to support the transition from highly integrated ICs to discrete analog circuitry, enabling a primarily analog control power system able to operate without software in a radiation environment with finer monitoring compared to the ‘MiniCore’ design. The planned base architecture supports over 500 watts of load, 250 watt-hours of storage, and over 80 watts of optimized solar generation. The power distribution board allows for the use of daughter cards hosting custom converters or interfaces for payloads, in addition to the software-configured supplies used on the ‘MiniCore’. This core stack will be managed by a Vorago ARM M4 microcontroller and support the same wireless communications as the ‘MiniCore’, with optional integration of a NOW S-band radio and attitude determination sensors for ‘black box’ functionality. It is expected the prototype will still be in development during conference.

Avery Brock↗

CubeSat Active Thermal Control in Support of Advanced Payloads: The Active Thermal Architecture Project

The Active Thermal Architecture (ATA) is an advanced sub-1U Active Thermal Control technology (ATC) for high power payload support in 6U CubeSat form factors and above. The design utilizes a two-stage, single-phase mechanically pumped fluid loop coupled through a two-axis flexible rotary fluid hinge, to reject thermal power to a deployable tracking radiator. A COTS Ricor K508N cryocooler forms the second stage and provides cryogenic cooling to a custom Kevlar detector mount through a TMT pyrolytic graphene thermal strap. Passive vibration isolation and damping technologies prevent the transfer of jitter to the satellite systems. The ATA design utilizes state-of-the-art 3D fabrication techniques such as Ultrasonic Additive Manufacturing (UAM) to directly embed the working fluid channels into the HX, radiator, and CubeSat chassis allowing for the miniaturization and simplification of the ATA system into an integrated thermal control solution. This paper will focus on the design and ground-based characterization and qualification of the ATA system and provide performance metrics for its use as a thermal support subsystem for advanced infrared electro-optical CubeSat payloads. The ATA project is funded through a NASA Small Satellite Technology Program (SSTP) and is a partnership between the Center for Space Engineering at Utah State University and the Jet Propulsions Laboratory. The ATA active thermal control system has been raised to a TRL of 6 and hopes to provide payload support to advanced missions such as the SABER-Lite and JPL CIRAS projects.

Mok, Mason↗

Night Sky Testing of the Lunar Flashlight Star Tracker

Lunar Flashlight (LF) is a 6U, 14 kg spacecraft being built by the NASA Jet Propulsion Laboratory (JPL). The mission will use IR laser technology to search for volatiles and surface water ice deposits in the permanently shadowed regions (PSR) of the moon in preparation for future human lunar exploration. The fine pointing provided by the Guidance, Navigation and Control (GNC) system is crucial for the spacecraft to successfully reach the moon, enter a lunar orbit, and acquire scientific data. At the center of the GNC system’s ability to determine the spacecraft’s attitude is a star tracker. The LF star tracker is a commercial-off-the-shelf (COTS) unit built into the integrated GNC system provided by Blue Canyon Technologies. Blue Canyon tested the star tracker in a lab environment for basic functionality and attitude estimation capabilities; upon delivery of the hardware to JPL, further testing with a real night sky was desired to determine expected in-flight operational characteristics. JPL maintains the Table Mountain Facility with its suite of ground telescopes, including a 0.6m telescope with an equatorial mount. This stable platform provided a highly accurate method of providing slews and attitude holds akin to what the spacecraft will perform in flight. Therefore, by analyzing the data from these representative night-sky ground tests performed in March, 2021, it is possible to acquire expected flight performance of the star tracker, particularly in regard to the ability of the star tracker to maintain lock on the starfield during planned maneuver types. This paper presents the various tests that have been performed to ensure that the LF star tracker will function as part of the overall GNC system and integrated spacecraft once launched. Test data is included for several key tests, and a path forward towards future integration and testing at the spacecraft level is described.

Baker, John↗

Flight Software Dictionary Development for the Mars2020 Rover

The Mars2020 project, developed and operated by the Jet Propulsion Laboratory (JPL), successfully landed the Perseverance rover and its flying companion Ingenuity on the surface of Mars on February 18th 2021. Perseverance combines heritage and cutting-edge flight software and hardware to accomplish crucial mission requirements related to Martian surface sampling. The design, development, and operation of NASA’s large strategic science missions require the ability to communicate spacecraft capabilities to hundreds of engineers across multiple disciplines. The interaction between flight and ground software development, Verification and Validation (V&V), Assembly, Test, and Launch Operations (ATLO), and management each demand quick understanding of unique slices of information for each discipline. This information includes the current capabilities of the flight system as well as future capabilities and their status as they are developed and tested. Despite the fundamental and critical nature of this information, the flight software dictionaries used to track it are a stumbling block for many projects. These dictionaries provide the cornerstone for the interpretation of data sent from the spacecraft, allowing for quick comprehension by engineers on the ground. During both spacecraft development and operations, flight software dictionary management includes significant challenges due to the large number of interfacing systems and the subtle yet distinct needs of each.The engineering of flight software dictionaries for Mars2020 had numerous challenges, most-notably: parallel dictionary development to support simultaneous separate flight software build campaigns for each mission phase (cruise and surface), managing requests for operations-enabling information without perturbing the heritage interface with the rover, and the introduction of new tools by the dictionary stakeholders that forced the dictionary team to innovate and redesign the heritage tool chain. These challenges generated guiding principles for the dictionary development effort: emphasize coding best practices and unit testing in the dictionary code development tool chain, use institutionally provided COTS (commercial-off-the-shelf) tools whenever possible, and maintain the heritage flight-ground interface all while advancing operations-enabling information via a loosely coupled interface.Throughout development and operations, the Mars2020 dictionary toolchain included IBM DOORS Next Generation, GitHub, Microsoft Excel, Docker, Jenkins, and a significant custom-built Python codebase. Significant interfaces included JPL’s command and control software, heritage flight software team tools and processes, and the many cloud-based ground tools developed for the mission.This paper will discuss the requirements for the Mars2020 dictionary development, the development team’s response to those requirements, lessons learned throughout the process, steps taken towards automated deliveries and continuous integration of stakeholder inputs, potential toolchain improvements for Mars2020, and key takeaways that could be applied to future missions.

Pyrzak, Guy↗

Metrics for Flight Operations: Application to Europa Clipper Tour Selection

Objective measures are ubiquitous in the formulation, design and implementation of deep space missions. Tour durations, flyby altitudes, propellant budgets, power consumption, and other metrics are essential to developing and managing NASA missions. But beyond the simple metrics of cost and workforce, it has been difficult to identify objective, quantitative measures that assist in evaluating choices made during formulation or implementation phases in terms of their impact on flight operations. As part of the development of the Europa Clipper Mission system, a set of operations metrics have been defined along with the necessary design information and software tooling to calculate them. We have applied these methods and metrics to help assess the impact to the flight team on the six options for the Clipper Tour that are currently being vetted for selection in the fall of 2021. To generate these metrics, the Clipper MOS team first designed the set of essential processes by which flight operations will be conducted, using a standard approach and template to identify (among other aspects) timelines for each process, along with their time constraints (e.g., uplinks for sequence execution). Each of the resulting 50 processes is documented in a common format and concurred by stakeholders. Process timelines were converted into generic schedules and workforce-loaded using COTS scheduling software, based on the inputs of the process authors and domain experts. Custom code was generated to create an operations schedule for a specific portion of Clipper's prime mission, with instances of a given process scheduled based on specific timing rules (e.g., process X starts once per week on Thursdays) or relative to mission events (e.g., sequence generation process begins on a Monday, at least three weeks before each Europa closest approach). Over a 5-month period, and for each of six Clipper candidate tours, the result was a 20,000+ line, workforce-loaded schedule that documents all of the process-driven work effort at the level of individual roles, along with a significant portion of the level-of-effort work. Post-processing code calculated the absolute and relative number of work hours during a nominal 5 day / 40 hour work week, the work effort during 2nd and 3rd shift, as well as 1st shift on weekends. The resultant schedules and shift tables were used to generate objective measures that can be related to both human factors and to operational risk and showed that Clipper tours which utilize 6:1 resonant (21.25 day) orbits instead of 4:1 resonant (14.17 day) orbits during the first dozen or so Europa flybys are advantageous to flight operations. A similar approach can be extended to assist missions in more objective assessments of a number of mission issues and trades, including tour selection and spacecraft design for operability.

Sarrel, Marc↗

Polar Resources Ice Mining Experiment-1 (PRIME-1) NASA’s First Polar Drilling and Volatiles Detection Mission

The US Administration announced in 2019 that NASA would return to the Moon where it would seek to establish a sustainable lunar presence. In Situ Resource Utilization (ISRU) is needed to sustain and grow hu-man surface exploration and it is therefore a vital part of ensuring this bold endeavor. ISRU requires ground-truth on physical, mineral, and volatile characteristics of the resources. Water, a key and game-changing resource, exists in the polar regions of the Moon. Learning to harvest and use this resource first requires understanding where the resource is abundantly located and on what scales. Harvested water, which is usable for life support and fuel, must be identified, quantified, and assessed for its mining feasibility. The project goal for PRIME-1 is to develop a flight-ready instrumentation package that can assess the volatiles at a polar lunar landing location. PRIME-1 is the combination of two instruments; Mass Spectrometer observing lunar operations (MSolo) and The Regolith and Ice Drill for Exploring New Terrain (TRIDENT). TRIDENT is an 1-meter augering drill capable of bringing incremental lunar regolith samples to the surface for volatile analysis. MSolo is a modified, commercial-off-the-shelf (COTS) mass spectrometer capable of qualifying and quantifying atomic species in the 1-100 amu range, including isotopic differentiation. These two lunar flight instruments operating together make up the PRIME-1 instrument suite. PRIME-1 intends to fly on and operate from a static lunar lander acquired by the NASA Commercial Lunar Payload Services (CLPS) acquisition process. The PRIME-1 payload suite was selected to fly on Intuitive Machines Nova-C lander, and is currently targeting a late Fall 2023 landing attempt.

MSolo↗

Windform® XT 2.0 Use as 3U CubeSat Primary Structure

CubeSats provide a platform for small-scale space research and technology demonstration at reduced complexity, cost, and development time. These advantages drove the NASA Langley Research Center (LaRC) to develop and launch the GPX2 3U CubeSat to explore the viability of using Commercial Off-The-Shelf (COTS) differential GPS (dGPS) in low earth orbit. To reduce manufacturing costs and increase design flexibility, the project chose additive manufactured Windform® XT 2.0 as the primary bus material rather than traditional subtractive manufactured (milled) metal. The bus is a two-part, Selective Laser Sintered, 3D-print structure consisting of a single-piece, five-walled chassis and single-walled cover. The bus was specially designed to allow the project to accommodate the payload electronics stack as well as antennas, receivers, and deployable mechanisms. By using an additive manufactured solution, LaRC was able to design in features unrealizable through traditional milling, with a lead-time of roughly two weeks. In comparison, traditional subtractive manufacturing limits geometry options due to toolpath reach and bus construction would have required multiple components for each wall. This would have resulted in a more costly, longer lead-time article with more joints, fasteners, and complexity with a commensurate increase in overall mass. A number of lessons-learned were captured during the design, analysis, and testing of the GPX2 CubeSat covering thermal and structural analysis, vibration modeling, and geometric tolerancing. Additionally, a variety of material testing and verification were performed before and during spacecraft design and integration to assure the suitability of Windform® XT 2.0 for the launch and mission environments. This article provides the highlights of designing and testing the GPX2 bus.

CubeSat↗

Vertical Lunar Regolith Conveying as a Flight Experiment in Simulated Lunar-Gravity

Regolith conveying will be an essential task for supplying regolith feedstock to In-Situ Resource Utilization (ISRU) reactor systems for regolith processing on the Moon and Mars. The Vertical Lunar Regolith Conveyor (VLRC) is a technology being developed at NASA Kennedy Space Center (KSC) as a regolith transport task for the GCD ISRU FLEET project led by NASA Glenn Research Center (GRC). Single test loop versions of the VLRC are being developed at NASA KSC as a technology demonstration for a flight experiment. The NASA Flight Opportunities program selected the VLRC for a technology demonstration opportunity on a future Blue Origin New Shepard suborbital launch vehicle to study regolith transport physics in a relevant environment in a vacuum chamber under simulated lunar gravity conditions in order to advance its technology readiness level (TRL) for future space applications. The VLRC system includes four primary subsystems to achieve the objectives of the lunar gravity (Lunar-G) flight experiment. (1) An eccentric vibratory conveyor stack to convey regolith particles consisting of three single-loop helical surface conveyors with each actuated by two vibratory motors that vibrate in unison. One of the three single-loops contains a 0.8°-3.1° inclined helical path and the other two contain a 1.6°-6.2° incline. (2) A stick-slip conveyor stack to convey regolith particles consisting of three single-loop helical surface conveyors with each actuated by the same motor to move in unison in a stick-slip motion. One of the three single-loops contains a 0.8°-3.1° inclined helical path and the other two contain a 1.6°-6.2° incline. (3) A regolith containment system to contain the regolith in each single-loop track during launch before the start of the experiment using containment caps that will be lifted in unison at the start of Lunar-G. (4) COTS cameras will record the motion of regolith and tracer particles. Post-flight analysis of the videos will be used to determine convey speeds and flow rates. The VLRC experiment will use the well-known technique of Particle Image Velocimetry (PIV) image analysis to determine the velocity of tracer particles entrained in the regolith flow. This velocity will be used to calculate the mass flow rate of the regolith being conveyed.

ISRU↗

A Confidence-Based Approach to Including Survivors in a Probabilistic TID Failure Assessment

A probabilistic total ionizing dose (TID) failure assessment is extended to include survivor data, enabling the bounding of failure probability to a desired confidence level (CL) without failure data. The extension provides an avenue for analyzing microelectronics tested for TID without reaching a failure mode, a scenario often encountered by missions utilizing commercial-off-the-shelf (COTS) technologies. Using the type-I censored likelihood formulation and a realistic upper bound on expected device performance, the failure probability space is bounded by confidence contours within the context of a variable environment. The framework accommodates any type of distribution assumed for the part failure or the environment under consideration. Furthermore, the framework can be utilized pre-emptively to plan future device TID tests, minimizing costs while meeting survival requirements. Heritage data may also be used as survivors to further minimize testing costs when parts are from the same lot, but the amount of constraint derived from heritage is limited. Altogether, the framework enables a formal, mathematically rigorous analysis of radiation tolerant devices tested to a maximum dose, as well as flight heritage, in a hardness assurance methodology.

confidence↗

Measurement Techniques for the High-Contrast and in-Field Stray-Light Performance of Oci

Scheduled for launch in January 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records [1]. A key feature of PACE is the inclusion of an advanced satellite radiometer known as the Ocean Color Instrument (OCI), a global mapping radiometer that combines multispectral and hyperspectral remote sensing. A critical requirement for OCI is the high-contrast or spatial cross-talk specification (also referred to as in-field stray-light response). The requirement states that for global top-of-atmosphere radiances based on measured MODIS radiances, the global average residual contamination shall be less than 0.15% for any multispectral band. Accurate resolution of high contrast in TOA radiance images is important to estimate stray light contamination due to clouds, for studying small scale features like ocean fronts and for working in coastal and estuarine areas where the scales are 1km. This occurs in all wavelengths in the spatial direction. Knowledge of high contrast resolution makes up part of the artifact budget. Accurate measurement of the high-contrast performance of OCI requires laboratory Ground Support Equipment (GSE) that projects a scene of sufficient quality that the unwanted stray light of the GSE itself is not confused with the stray light response of the telescope. This paper concerns the development, analyses and test of the GSE to ensure the quality of the projected image is sufficient to verify the OCI requirements. Optical models were developed for both the instrument as well as the GSE and laboratory environment. Simulation of various non-ideal parameters were critical to accurately predict performance. Measurements using COTS cameras and lenses were also made of the projected GSE image to reasonably verify the optical model predictions. Measured and modelled results from OCI are discussed.

OCI↗

Measurement Techniques for the High-Contrast and in-Field Stray-Light Performance of OCI

Scheduled for launch in January 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records [1]. A key feature of PACE is the inclusion of an advanced satellite radiometer known as the Ocean Color Instrument (OCI), a global mapping radiometer that combines multispectral and hyperspectral remote sensing. A critical requirement for OCI is the high-contrast or spatial cross-talk specification (also referred to as in-field stray-light response). The requirement states that for global top-of-atmosphere radiances based on measured MODIS radiances, the global average residual contamination shall be less than 0.15% for any multispectral band. Accurate resolution of high contrast in TOA radiance images is important to estimate stray light contamination due to clouds, for studying small scale features like ocean fronts and for working in coastal and estuarine areas where the scales are 1km. This occurs in all wavelengths in the spatial direction. Knowledge of high contrast resolution makes up part of the artifact budget. Accurate measurement of the high-contrast performance of OCI requires laboratory Ground Support Equipment (GSE) that projects a scene of sufficient quality that the unwanted stray light of the GSE itself is not confused with the stray light response of the telescope. This paper concerns the development, analyses and test of the GSE to ensure the quality of the projected image is sufficient to verify the OCI requirements. Optical models were developed for both the instrument as well as the GSE and laboratory environment. Simulation of various non-ideal parameters were critical to accurately predict performance. Measurements using COTS cameras and lenses were also made of the projected GSE image to reasonably verify the optical model predictions. Measured and modelled results from OCI are discussed.

OCI, PACE, LSF, PSF, Stray-light, Contrast, Cross-↗

Earth Independent Medical Operations (EIMO) Datascope: Challenges and Potential Solutions

Data flows and storage/retrieval capacity are severely constrained during missions in space and challenges will become even greater during exploration class missions. There is a need for an artificial intelligence (AI)-based clinical decision support system (CDSS) to monitor and analyze data to provide real-time consultative support for crew medical officer (CMO) decision-making. EIMO is defined as the gradual transition of medical care and decision making from terrestrial to space-based assets, enabling support of astronaut health and performance and reducing overall mission risk. While a hallmark of this paradigm shift from low-earth orbit is that on-board care will increasingly become the responsibility of the astronauts for primary management and decision making, terrestrial assets will continue to be paramount in pre-mission screening and planning, as well as prevention, health maintenance and long-term care contingencies. New capabilities and systems that enable progressively more robust and resilient systems and crews will be necessary to reduce risk and increase probability of deep space exploration mission success. An aspiration for EIMO is to develop AI-enhanced solutions for analysis of crew health & performance data and to facilitate clinical decision support for autonomous medical operations. A “system of systems” approach is envisioned whereby EIMO will deploy AI-supported natural language processing and machine learning (ML) techniques to utilize embedded reference databases and real-time data streams [input vectors] from multiple data sources. Constituent input vectors may include environmental controls, countermeasures data, behavioral data, physiologic wearables, point-of-care laboratory tests, personalized medical records, inventory trade space risk assessments, COTS medical databases, and ground support inputs. An ideal AI capability would possess trained fusion algorithms to cross reference input vectors with medical ‘knowledge’ [cultivated database] to stratify relevant data streams for predictive and actionable capabilities. In addition, EIMO will feature mobility, in that it can be accessed and can push/pull data within and between multiple vehicles/habitats. Large amounts and variable sources of data can be leveraged to diagnose, inform treatment strategies, and potentially predict medical events and performance decrements. Inclusion of advanced training tools using extended reality will enable increasingly autonomous medical care to aid a CMO when ground support is unavailable or time-delayed beyond required action window, e.g., emergent medical situations. EIMO CDSS would require very large datasets to train pre-flight and significant amounts of data are needed to support ML via in-flight CDSS operations. An additional challenge will be to find sufficient data to train a model relevant to astronaut demographics. The rapid, accelerating evolution of this field creates a propitious solution space to leverage multi-modal AI through public-private partnership(s). The status of multi-modal AI systems today would preclude their use for long duration missions as they remain unreliable and are subject to “digital hallucinations” and other errors that could pose operational risk. A federated labs structure is being considered to test and optimize data flow from the multiple input vectors leading to field testing in suitable ground/flight analogs. Critical to the success of an EIMO CDSS will be integration and interoperability and success will be defined by a system that can serve as an in-flight medical consult for the CMO providing critical support during medical contingencies. Benefits to terrestrial medicine may be significant as an outflow of the EIMO medical system, particularly for remote areas and communities lacking significant infrastructure, personnel and resources.

J Lemery↗

NASA Exploration Toilet Hardware Status and Crew Feedback from ISS Artemis-2 Demonstration

The Universal Waste Management System (UWMS), ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continues to be made with each on-orbit operation and will ultimately culminate with nominal US crew use of the hardware on ISS. During 2023, the Artemis-2 Demonstration was started, and this paper discusses issues encountered, on-orbit troubleshooting, subsequent ground failure investigation and proposed repairs as well as near-term plans to resume the Artemis-2 demo. Also discussed is an update to the commercial-off-the-shelf (COTS) Conductivity Monitor which is planned to be flown for the resumption of the demo along with additional UWMS hardware and Toilet Integration Hardware (TIH). An updated design of the commode seat and fecal bag for Artemis-2 UWMS will be demonstrated on ISS and a summary of the hardware is included in the paper. Use of the hardware during the first days of the aborted demonstration by crewmembers and feedback received is summarized as well as hardware updates resulting from that feedback. The paper will also provide an overview of the demo results to date that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

Mark I Silicon Carbide Integrated Circuit Test Oven Assembly and Programming Guide

This report provides a parts list, with assembly and programming instructions for building firstgeneration (Mark I) compact test ovens; this oven design is customized for prolonged functional electrical testing of prototype silicon carbide (SiC) devices at temperatures up to 500 °C (932 °F). The general approach of using multiple compact ovens to perform long-term, high-temperature electronics testing efficiently is described in a conference paper (Izadnegahdar, Alain, et al.: Alternative Setup for LongDuration Low-Duty-Cycle 600 °C Ambient Testing of SiC Integrated Circuits. International Microelectronics Assembly and Packaging Society (iMAPS) HiTECH 2021 Technology Crossover Extravaganza, 2021), available at https://ntrs.nasa.gov/citations/20210011676. The new Mark I oven design described here offers several significant improvements over the compact oven described in that paper. For example, it is constructed from commercial off-the-shelf (COTS) components and requires minimal assembly. Much of the work involves drilling holes in the two aluminum project boxes, which contain the control electronics and the oven itself. The cost of components is less than $200 (USD) per oven, which makes constructing multiple ovens affordable. In addition, the two-box design separates the high-temperature heater from the electronics, which keeps the electronics cool, prolonging the lifetime of these components.

high temperature↗

NASA’s Quiet Electric ENgines (QUEEN): Summary of the QUEEN V2 Test

A liquid-cooled electric ducted fan system was designed, built, and tested at the NASA Glenn Research Center. Main components of the system include a Commercial-Off- the-Shelf (COTS) fan and motor, and a custom-designed heat exchanger integrated into the fan duct. Fan speed, thrust, and cooling system thermal performance was measured in this static ground test of the propulsor. This propulsor prototype is one of NASA’s Quiet Electric ENgines (QUEENs) and is designated the ‘QUEEN V2.’ The Quiet Electric Engines are being developed for the 25% scale model of the Subsonic Aft Engine (SUSAN) Flight Research Vehicle and are intended to explore the potential of distributed electric propulsion for regional single-aisle aircraft. This test demonstrated the functionality of the QUEEN V2, quantified the thrust produced by the electrofan, and characterized the electrical and thermal performance of the system. Lessons learned will be used to guide development of future QUEEN prototypes.

Aerodynamics↗

NASA’s Quiet Electric ENgines (QUEEN): Summary of the QUEEN V2 Test

A liquid-cooled electric ducted fan system was designed, built, and tested at the NASA Glenn Research Center. Main components of the system include a Commercial-Off- the-Shelf (COTS) fan and motor, and a custom-designed heat exchanger integrated into the fan duct. Fan speed, thrust, and cooling system thermal performance was measured in this static ground test of the propulsor. This propulsor prototype is one of NASA’s Quiet Electric ENgines (QUEENs) and is designated the ‘QUEEN V2.’ The Quiet Electric Engines are being developed for the 25% scale model of the Subsonic Aft Engine (SUSAN) Flight Research Vehicle and are intended to explore the potential of distributed electric propulsion for regional single-aisle aircraft. This test demonstrated the functionality of the QUEEN V2, quantified the thrust produced by the electrofan, and characterized the electrical and thermal performance of the system. Lessons learned will be used to guide development of future QUEEN prototypes.

Aeronautics-General↗