Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

BEAM SIMULATIONS USING VIRTUAL DIAGNOSTICS FOR THE DRIVER LINAC

End-to-end beam simulations for the driver linac have shown that the design meets the necessary performance requirements including having adequate transverse and longitudinal acceptances. However, to achieve reliable operational performance, the development of appropriate beam diagnostic systems and control room procedures are crucial. With limited R&D funding, beam simulations provide a cost effective tool to evaluate candidate beam diagnostic systems and to provide a critical basis for developing early commissioning and later operational activities. We propose to perform beam dynamic studies and engineering analyses to define the requisite diagnostic systems of the driver linac and through simulation to develop and test commissioning and operational procedures.

43 PARTICLE ACCELERATORS↗

The Basic Results of Alignment and Summary of Operations of the Main K-1000-60/3000 Turbine Unit with a Small Number of Bearings at the Bushehr Nuclear Power Plant

The results of vibration alignment and the first years of use of the prototype K-1000-60/3000-3 turbine unit of the Bushehr NPP in 2011 – 2016 are examined. As a result of conducting an extensive set of studies and actions, the claimed high-quality operating characteristics of the new design bearings that were used and the high degree of vibrational reliability of the turbine unit were confirmed, and these made it possible to ensure successful commissioning on a short timeline, despite the novelty of the design and the uniqueness of development of the majority of units, taking into account the integration of the equipment with the existing base and the condenser group. During the commissioning work, it was shown that this turbine unit is not inferior in any manner to turbine units of analogous power from other firms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

First in-situ lattice strains measurements under load at VULCAN

The engineering materials diffractometer, VULCAN, at the Spallation Neutron Source began commissioning on June 26, 2009. This instrument is designed for materials science and engineering studies. In situ lattice strain measurements of a model metallic material under monotonic tensile load have been performed on VULCAN. The tensile load was applied under two different strain rates, and neutron diffraction measurements were carried out in both high-intensity and high-resolution modes. These experiments demonstrated VULCAN's in situ study capability of deformation behaviors even during the early phases of commissioning.

43 PARTICLE ACCELERATORS↗

Measurements of intermediate-frequency electric and magnetic fields in households

Historically, assessment of human exposure to electric and magnetic fields has focused on the extremely-low-frequency (ELF) and radiofrequency (RF) ranges. However, research on the typically emitted fields in the intermediate-frequency (IF) range (300 Hz to 1 MHz) as well as potential effects of IF fields on the human body remains limited, although the range of household appliances with electrical components working in the IF range has grown significantly (e.g., induction cookers and compact fluorescent lighting). In this study, an extensive measurement survey was performed on the levels of electric and magnetic fields in the IF range typically present in residences as well as emitted by a wide range of household appliances under real-life circumstances. Using spot measurements, residential IF field levels were found to be generally low, while the use of certain appliances at close distance (20 cm) may result in a relatively high exposure. Overall, appliance emissions contained either harmonic signals, with fundamental frequencies between 6 kHz and 300 kHz, which were sometimes accompanied by regions in the IF spectrum of rather noisy, elevated field strengths, or much more capricious spectra, dominated by 50 Hz harmonics emanating far in the IF domain. The maximum peak field strengths recorded at 20 cm were 41.5 V/m and 2.7 A/m, both from induction cookers. Finally, none of the appliance emissions in the IF range exceeded the exposure summation rules recommended by the International Commission on Non-Ionizing Radiation Protection guidelines and the International Electrotechnical Commission (IEC 62233) standard at 20 cm and beyond (maximum exposure quotients EQ{sub E} 1.0 and {sub E}Q{sub H} 0.13). - Highlights: • Survey of residential electric and magnetic fields at intermediate frequencies (IF). • IF-EF and -MF emitted by 280 household appliances were characterised. • Strongest emitters were induction cookers, CFLs, LCD-TVs, and microwave ovens. • No emissions exceeded ICNIRP limits (highest exposure quotient was 1.00).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modular Total Absorption Spectrometer at the HRIBF (ORNL, Oak Ridge)

The Modular Total Absorption Spectrometer (MTAS) array has been designed, constructed, characterized, and applied to the decay studies of {sup 238}U fission products at the Holifield Radioactive Ion Beam Facility (HRIBF) at Oak Ridge National Laboratory. A MTAS commissioning run was performed in January 2012 at the mass separator on-line to the HRIBF Tandem accelerator. Preliminary results of MTAS data confirm known decay patterns of {sup 142}Ba and {sup 142}La deduced from an earlier study using a total absorption spectrometer technique.

43 PARTICLE ACCELERATORS↗

SHARAQ Spectrometer - Current status and future experimental plans

The high-resolution SHARAQ spectrometer and the dedicated high-resolution beamline have been constructed at RI beam factory and commissioned in 2009. Lateral and angular dispersion matching conditions were achieved simultaneously for a primary beam with a momentum spread of 0.1% and an emittance of 3pi mmcentre dotmrad (sigma). An overview of the spectrometer and the beam-line, preliminary results from the commissioning runs, and future experimental plan with the system are described.

43 PARTICLE ACCELERATORS↗

New Soft X-ray Beamline (BL10) at the SAGA Light Source

A new soft X-ray beamline (BL10) at the SAGA Light Source (SAGA-LS) was constructed at the end of 2008. Commissioning of this new beamline started at the beginning of 2009. Synchrotron radiation from a variably polarizing undulator (APPLE-II) can be used in this beamline. The obtained light is monochromatized by a varied-line-spacing plane grating monochromator with the variable included angle mechanism. Its designed resolving power and photon flux are 3,000-10,000 and 10{sup 12}-10{sup 9} photons/s at 300 mA, respectively. The performance test results were generally satisfactory. An overview of the optical design of the beamline and the current status of commissioning are reported.

43 PARTICLE ACCELERATORS↗

Set-up of an XAFS beamline for measurements between 2.4-8 keV at DORIS III

In this paper results from the commissioning phase and from first user experiments of a new EXAFS beamline at the DORIS III storage ring are presented. The bending magnet EXAFS beamline A1 underwent a complete rebuild and now covers the energy range 2.4-8 keV. A Ni-coated toroidal mirror, placed in a 2:1 focusing position and a plane mirror with one Ni coated stripe and one uncoated (SiO{sub 2}) stripe are used for effective higher harmonics suppression and focusing. The UHV-compatible fixed-exit Double Crystal Monochromator (DCM) is equipped with two Si(111) crystal pairs. The second crystal of one of the two crystal pairs is tilted by 90 deg. around the surface normal to shift the position of glitches. It allows Bragg angles between 5 deg. and 55.5 deg. and continuous scans in quick-EXAFS mode. Test measurements during the commissioning phase proved the excellent performance of the monochromator and a high quality of the XAFS spectra over the entire working range.

43 PARTICLE ACCELERATORS↗

The Q{sub Weak}{sup p} Experiment A Search For Physics Beyond The Standard Model Via A Measurement Of The Proton's Weak Charge

The Qweak collaboration is currently preparing a measurement of the proton's weak charge Q{sub W}{sup p} = (1-4 sin{sup 2{theta}}{sub W}) at the Thomas Jefferson National Accelerator Facility (TJNAF). The experiment has been designed to produce a 4.1% measurement of the weak charge, via a 2.5% measurement of the parity violating asymmetry in the number of elastically scattered 1 GeV electrons from protons, at forward angles. At the proposed precision, the experiment would produce a 0.3% measurement of the weak mixing angle at a momentum transfer of {approx_equal} 16 GeV, making it the most precise stand alone measurement of the weak mixing angle at low momentum transfer. In combination with other parity measurements, Qweak will also provide a high precision determination of the weak charges of the up and down quarks. Our proposed measurement of Q{sub W}{sup p} will be performed with significantly smaller statistical and systematic errors than existing low Q{sup 2} data. Any significant deviation from the Standard Model prediction at low momentum transfer (Q{sup 2}) would be a signal of new physics, whereas agreement would place new and significant constraints on possible Standard Model extensions. The experiment is currently being installed. Commissioning of the experiment will begin in May 2010 and the first production data will be taken in the Fall of 2010.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of KSTAR 170 GHz, 1 MW Electron Cyclotron Heating and Current Drive System

A 170 GHz Electron Cyclotron Heating and Current Drive (ECH/CD) system on KSTAR is designed to launch total 2.4 MW of power for up to 300 sec into the plasma. At present the first 1 MW ECH/CD system is under installation and commissioning for 2011 KSTAR campaign. The 170 GHz, 1 MW, 300 sec gyrotron and the matching optics unit (MOU) will be provided from JAEA under collaboration between NFRI and JAEA. The transmission line consists of MOU and 70 m long 63.5 mm ID corrugated waveguides with the eight miter bends. The 1 MW, 10 sec launcher is developed based on the existing two-mirror front-end launcher in collaboration with Princeton Plasma Physics Laboratory and Pohang University of Science and Technology, and is installed on the low field side in the KSTAR equatorial plane. The mirror pivot is located at 30 cm below from the equatorial plane. 3.6 MVA power supply system is manufactured and now is under commissioning to meet the triode gun operation of JAEA gyrotron. The power supply consists of 66 kV/55 A cathode power supply, mode-anode system, and 50 kV/160 mA body power supply. In this paper, the current status of KSTAR 170 GHz, 1 MW ECH/CD system will be presented as well as the experimental plan utilizing 170 GHz new ECH/CD system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Performance Validation of Refrigeration Recovery for Experimental Hall High Target Loads

The Qweak experiment at Jefferson Lab (JLab) is a 3000 W hydrogen target scheduled to run until the planned shutdown in the spring of 2012 for the 12 GeV installation. As detailed in previous proceedings, support of this target's cryogenic load was made possible by incorporating modifications to the End Station Refrigerator (ESR) to recover the refrigeration supplied by the Central Helium Liquefier (CHL). Testing and commissioning for these modifications was performed in January and February 2010 demonstrating that the performance met or exceeded projected expectations. In this paper, we present the analysis of the test results in regards to the actual loads capable of being supported and the process boundaries encountered, as well as a discussion of the commissioning results for the cryogenic support of the Qweak target.

08 HYDROGEN↗

The Radiochemical Analysis of Gaseous Samples (RAGS) apparatus for nuclear diagnostics at the National Ignition Facility (invited)

The Radiochemical Analysis of Gaseous Samples (RAGS) diagnostic apparatus was recently installed at the National Ignition Facility (NIF). Following a NIF shot, RAGS is used to pump the gas load from the NIF chamber for purification and isolation of the noble gases. After collection, the activated gaseous species are counted via gamma spectroscopy for measurement of the capsule areal density and fuel-ablator mix. Collection efficiency was determined by injecting a known amount of {sup 135}Xe into the NIF chamber, which was then collected with RAGS. Commissioning was performed with an exploding pusher capsule filled with isotopically enriched {sup 124}Xe and {sup 126}Xe added to the DT gas fill. Activated xenon species were recovered post-shot and counted via gamma spectroscopy. Results from the collection and commissioning tests are presented. The performance of RAGS allows us to establish a noble gas collection method for measurement of noble gas species produced via neutron and charged particle reactions in a NIF capsule.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Startup of the Kling Center for Proton Therapy

In November of 2011 Mevion Medical Systems (formerly Still River Systems) delivered the Mevion S250 proton therapy system accelerator to the Kling Center for Proton Therapy at the Siteman Cancer Center in Saint Louis. The Mevion system is unique, with an in-room gantry-mounted superconducting synchrocyclotron. This is the first true single-room proton therapy system and it has a greatly reduced size as well as cost. A month after its arrival, the installation was complete and the superconducting magnet was ramped up to full current ({approx}2000 amperes). In March of 2012, full energy beam (250 MeV) was extracted and radiation surveys were performed to verify the shielding. Once that was shown to be sufficient, Mevion began fine-tuning the system to provide a highly isocentric beam from the 50 ton system. In June of 2012 the field-shaping system (energy degraders, contoured scatterers and range modulators) were installed and measurements of the clinical beam properties commenced. Monte Carlo simulations (MCNPX) have been performed for the system and validated with beam measurements done at the factory. These simulations have been used for a preliminary commissioning of our treatment planning system. Additionally, predictions of the neutron background have been made and validated with factory measurements. Final commissioning of the treatment planning system and verification of the neutron background will be accomplished with measurements made later in 2012. Based on current progress, patient treatments are scheduled to begin in late 2012. Beam and radiation background data will be presented.

43 PARTICLE ACCELERATORS↗

High-flux neutron source based on a liquid-lithium target

A prototype compact Liquid Lithium Target (LiLiT), able to constitute an accelerator-based intense neutron source, was built. The neutron source is intended for nuclear astrophysical research, boron neutron capture therapy (BNCT) in hospitals and material studies for fusion reactors. The LiLiT setup is presently being commissioned at Soreq Nuclear research Center (SNRC). The lithium target will produce neutrons through the {sup 7}Li(p,n){sup 7}Be reaction and it will overcome the major problem of removing the thermal power generated by a high-intensity proton beam, necessary for intense neutron flux for the above applications. The liquid-lithium loop of LiLiT is designed to generate a stable lithium jet at high velocity on a concave supporting wall with free surface toward the incident proton beam (up to 10 kW). During off-line tests, liquid lithium was flown through the loop and generated a stable jet at velocity higher than 5 m/s on the concave supporting wall. The target is now under extensive test program using a high-power electron-gun. Up to 2 kW electron beam was applied on the lithium flow at velocity of 4 m/s without any flow instabilities or excessive evaporation. High-intensity proton beam irradiation will take place at SARAF (Soreq Applied Research Accelerator Facility) superconducting linear accelerator currently in commissioning at SNRC.

43 PARTICLE ACCELERATORS↗

An all permanent magnet electron cyclotron resonance ion source for heavy ion therapy

A high charge state all permanent Electron Cyclotron Resonance ion source, Lanzhou All Permanent ECR ion source no. 3-LAPECR3, has been successfully built at IMP in 2012, which will serve as the ion injector of the Heavy Ion Medical Machine (HIMM) project. As a commercial device, LAPECR3 features a compact structure, small size, and low cost. According to HIMM scenario more than 100 eμA of C{sup 5+} ion beam should be extracted from the ion source, and the beam emittance better than 75 π*mm*mrad. In recent commissioning, about 120 eμA of C{sup 5+} ion beam was got when work gas was CH{sub 4} while about 262 eμA of C{sup 5+} ion beam was obtained when work gas was C{sub 2}H{sub 2} gas. The design and construction of the ion source and its low-energy transportation beam line, and the preliminary commissioning results will be presented in detail in this paper.

43 PARTICLE ACCELERATORS↗

Novel aspects of plasma control in ITER

ITER plasma control design solutions and performance requirements are strongly driven by its nuclear mission, aggressive commissioning constraints, and limited number of operational discharges. In addition, high plasma energy content, heat fluxes, neutron fluxes, and very long pulse operation place novel demands on control performance in many areas ranging from plasma boundary and divertor regulation to plasma kinetics and stability control. Both commissioning and experimental operations schedules provide limited time for tuning of control algorithms relative to operating devices. Although many aspects of the control solutions required by ITER have been well-demonstrated in present devices and even designed satisfactorily for ITER application, many elements unique to ITER including various crucial integration issues are presently under development. We describe selected novel aspects of plasma control in ITER, identifying unique parts of the control problem and highlighting some key areas of research remaining. Novel control areas described include control physics understanding (e.g., current profile regulation, tearing mode (TM) suppression), control mathematics (e.g., algorithmic and simulation approaches to high confidence robust performance), and integration solutions (e.g., methods for management of highly subscribed control resources). We identify unique aspects of the ITER TM suppression scheme, which will pulse gyrotrons to drive current within a magnetic island, and turn the drive off following suppression in order to minimize use of auxiliary power and maximize fusion gain. The potential role of active current profile control and approaches to design in ITER are discussed. Issues and approaches to fault handling algorithms are described, along with novel aspects of actuator sharing in ITER.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Installation and first operation of the International Fusion Materials Irradiation Facility injector at the Rokkasho site

The International Fusion Materials Irradiation Facility (IFMIF) linear IFMIF prototype accelerator injector dedicated to high intensity deuteron beam production has been designed, built, and tested at CEA/Saclay between 2008 and 2012. After the completion of the acceptance tests at Saclay, the injector has been fully sent to Japan. The re-assembly of the injector has been performed between March and May 2014. Then after the check-out phase, the production of the first proton beam occurred in November 2014. Hydrogen and deuteron beam commissioning is now in progress after having proceeded with the final tests on the entire injector equipment including high power diagnostics. This article reports the different phases of the injector installation pointing out the safety and security needs, as well as the first beam production results in Japan and chopper tests. Detailed operation and commissioning results (with H{sup +} and D{sup +} 100 keV beams) are reported in a second article.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Latest experiences and future plans on NSLS-II insertion devices

National Synchrotron Light Source-II (NSLS-II) is the latest storage ring of 3 GeV energy at the Brookhaven National Laboratory (BNL). The horizontal emittance of the electron beam with the currently installed six damping wigglers is 0.9 nm.rad, which could be further reduced to 0.5 nm.rad with more insertion devices (IDs). With only one RF cavity the beam current is restricted to 200 mA. Five hundred mA operation is envisaged for next year with an addition of the second cavity. Six (plus two branches) beamlines have been commissioned in the initial phase of the project. In July 2015, three NIH funded beamlines called “Advanced Beamlines for Biological Investigations with X-rays” (ABBIX) will be added for operation. This paper describes the experiences of ID development, installation, and commissioning for the NSLS-II project as well as our future plans to improve the performance of the facility in terms of source development.

43 PARTICLE ACCELERATORS↗