Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BEAM PRODUCTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,009 records · Page 56

Fermilab Recycler Collimation System Design

To provide 700 kW proton beams for neutrino production in the NuMI facility, we employ slip stacking in the Recycler with transfer to the Main Injector for recapture and acceleration. Slip stacking with 12 Booster batches per 1.33 sec cycle of the Main Injector has been implemented and briefly tested while extensive operation with 8 batches and 10 batches per MI cycle has been demonstrated. Operation in this mode since 2013 shows that loss localization is an essential component for long term operation. Beam loss in the Recycler will be localized in a collimation region with design capability for absorbing up to 2 kW of lost protons in a pair of 20-Ton collimators (absorbers). This system will employ a two stage collimation with a thin molybdenum scattering foil to define the bottom edge of both the injected and decelerated-for-slipping beams. Optimization and engineering design of the collimator components and radiation shielding are based on comprehensive MARS15 simulations predicting high collimation efficiency as well as tolerable levels of prompt and residual radiation. The system installation during the Fermilab 2016 facility shutdown will permit commissioning in the subsequent operating period.

43 PARTICLE ACCELERATORS↗

Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target

Upon completion of the Second Target Station (STS) Project in the mid 2030s, the Spallation Neutron Source accelerator at Oak Ridge National Laboratory will deliver a 2.7 MW proton beam to the neutron production targets. In the post-STS phase, the accelerator will have a reserve beam power capacity of at least 100 kW beyond what the two neutron production targets will receive, which could potentially be ramped up to 300 kW. In this paper, a design concept for a radioisotope production target that could utilize 250 kW of the reserve beam power capacity is presented. The target consists of thorium discs encapsulated in 316L austenitic steel shells that are cooled by water. The estimated post-irradiation activity of Ac-225 and Ra-225, critical medical radioisotopes used in targeted alpha therapy cancer treatment, is calculated at the end of bombardment after a 14 day long irradiation time. Thermal and structural analyses are performed on the basis of calculated nuclear heating data. The technical feasibility of a high-power target under a 250-kW beam load with an extremely low duty factor of $3.5\cdot 10^{-6}$ is presented from thermal, structural and fatigue lifetime perspectives.

Lee, Yong Joong [ORNL] (ORCID:0000000298381723)↗

Stripper foil considerations for PIP-II to Mu2e-II

The PIP-II linac produces 800 MeV H - beam. The Mu2eII production target is immersed in a high B-field, which would strip H - ions. Thus it is desired to strip the H- ions before they reach the mu2e facility. We discuss design considerations for the stripper foil and its location, foil heating and related extinction design issues.

43 PARTICLE ACCELERATORS↗

The Development and Evolution of Ion Implanters in the Semiconductor Industry

By the end of the 1960's, the development of ion beam systems for isotope separation and materials research had reached the stage at which knowledge bases in the areas of ion beam formation and transport and the physics of atomic collisions in solids made it practical to consider the use of ion implantation as a means of modifying the near surface properties of solid materials. The beam currents and energies available made the technique particularly compatible with the doping requirements of the silicon devices being produced at that time. However, incorporation of the technique into a high volume manufacturing environment required the immediate development of new target handling facilities and improvements in machine reliability. While the manner in which ion implanters have evolved over the past forty years has continued to be dictated by the changing demands of the silicon processing industry, the dramatic reduction in transistor size and the increase in integrated circuit complexity have had significant implications for the qualities of the ion beams themselves, particularly in high current, ultra-low energy applications. Since the first commercial implanters were introduced, highly developed medium current, high current and high energy machines have evolved. In the medium current and high energy sectors, well understood ion optical principles have enabled ingenious and highly effective beam formation and transport systems to be designed. As these machines evolved, extensive studies of the implanted material using ion beam based techniques such as Rutherford backscattering and channelling provided a growing understanding of the fundamental radiation damage and annealing processes that are inevitably associated with the implantation process. For high current machines, particularly those operating in the so-called eV implantation range, beam formation and transport processes become considerably more complex and established ion optical design principles must be combined with detailed considerations of the roles of emittance, space charge and beam plasma characteristics if beams compatible with production worthy ultra-shallow junction formation are to be obtained. For these shallow, high dose implants, the proximity of the surface has a significant effect on the radiation damage build-up and annealing processes. To develop an understanding of the physics of some aspects of these processes, high depth resolution analytical techniques such as medium energy ion scattering have been applied. In the present review, the process based evolution of ion implantation equipment is discussed alongside a consideration of the contribution made by the growth in understanding of the physics of both the beams themselves and the ion collection and radiation damage processes occurring in the implanted silicon.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

DUNE and MINERvA Flux Studies and a Measurement of the Charged-Current Quasielastic Antineutrino Scattering Cross Section with $<E_{\nu}> \sim 6 $ GeV on a CH Target

One of the biggest open questions in physics is the prevalence of matter over anti-matter in the present universe. One of possible answers lies in the violation of charge and parity symmetry in the lepton sector that would favor matter over anti-matter so that the universe becomes dominated by matter over time. Recent results from neutrino experiments like T2K and NOvA have indicated that there is CP violation in the leptonic sector \citep{Abe:2019vii}. However, the precise measurement of CP violation will require an unprecedented level of accuracy in these oscillation experiments. One of the challenges lies with the systematic uncertainties that come with the measurements, which include uncertainties related to the neutrino flux modeling, interaction modeling and detector related systematic uncertainties.\\ The first part of this thesis will go through the challenges related to flux uncertainties. It will discuss the flux uncertainties related to hadron production in the LBN F beamli ne for the DUNE experiment. Hadron production models used in flux simulations vary widely depending on the simulation and choice of physics models used to simulate the hadron production. This thesis will explain the method of using existing hadron production data to constrain these uncertainties, a method which has been used in MINERvA experiment.\\ The second part of the thesis goes through the effect of possible flux mismodeling and MINERvA's approach to address this effect. In doing so, we discovered that the suspected mismodeling could also result from incorrect estimation of the energy scale of the muons. This project not only demonstrated the challenges of flux modeling but also led to a novel approach of using neutrino energy spectra to understand the correlation between detector and neutrino beamline parameters. \\ A high statistics measurement of the anti-neutrino scattering cross section in the charged current quasielastic (CCQE) channel is the final part of the th esis. Th e 2-body interactions in this channel have the advantage of allowing reconstruction of the interaction kinematics from the outgoing muon trajectory which can be measured very well. Double differential cross sections as a function of muon kinematics, one of the deliverables of this analysis, will help future oscillation experiments understand their data. The cross-section as a function of the four-momentum transferred from the leptonic system to the hadronic system ($Q^{2}_{QE}$) can be used to test models used in simulating antineutrino interactions and the nuclear effects that can modify the predicted cross sections. Nuclear effects arise from the complex nuclear environment and both modify the initial scattering and change the fate of the particles produced from in neutrino-nucleus interactions. Study of nuclear effects will help to understand the structure of the atomic nucleus and its impact on neutrino interactions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Achievement in Beam Power Records for the NOvA Target System

We began updating the NOvA target system for 1-Mega Watt (1-MW) beam operation in 2017. Major changes include maintaining the quality of neutrino beams with reliable instrumentation, reducing instantaneous beam heating on the target, increasing cooling power to handle the high power beam, and controlling tritium water production rate. We successfully achieved a onehour beam power report of 1.018 MW in Summer 2024. This achievement marks an important milestone for Fermilab, demonstrating the capability of the accelerator complex to handle highintensity proton beams at a fast repetition rate. We are now prepared to proceed with a new accelerator upgrade plan, known as the Accelerator Complex Evolution - Main Injector Ramp and Targetry R&D (ACE-MIRT) to support future operates at beam power exceeding 2 MW for the Long Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE). We present the improvement of the target system to exceed the beam power 1-MW.

Yonehara, Katsuya [Fermilab] (ORCID:00000002544041↗

Tracking studies of the Compact Linear Collider collimation system

A collimation system performance study includes several types of computations performed by different codes. Optics calculations are performed with codes such as MADX, tracking studies including additional effects such as wakefields, halo and tail generation, and dynamical machine alignment are done with codes such as PLACET, and energy deposition can be studied with BDSIM. More detailed studies of hadron production in the beam halo interaction with collimators are better performed with GEANT4 and FLUKA. A procedure has been developed that allows one to perform a single tracking study using several codes simultaneously. In this paper we study the performance of the Compact Linear Collider collimation system using such a procedure.

43 PARTICLE ACCELERATORS↗

Early Fermi Gamma-ray Space Telescope Observations of the Quasar 3C454.3

This is the first report of Fermi Gamma-ray Space Telescope observations of the quasar 3C 454.3, which has been undergoing pronounced long-term outbursts since 2000. The data from the Large Area Telescope (LAT), covering 2008 July 7-October 6, indicate strong, highly variable {gamma}-ray emission with an average flux of {approx} 3 x 10{sup -6} photons cm{sup -2} s{sup -1}, for energies > 100 MeV. The {gamma}-ray flux is variable, with strong, distinct, symmetrically-shaped flares for which the flux increases by a factor of several on a time scale of about three days. This variability indicates a compact emission region, and the requirement that the source is optically thin to pair-production implies relativistic beaming with Doppler factor {delta} > 8, consistent with the values inferred from VLBI observations of superluminal expansion ({delta} {approx} 25). The observed {gamma}-ray spectrum is not consistent with a simple power-law, but instead steepens strongly above {approx} 2 GeV, and is well described by a broken power-law with photon indices of {approx} 2.3 and {approx} 3.5 below and above the break, respectively. This is the first direct observation of a break in the spectrum of a high luminosity blazar above 100 MeV, and it is likely direct evidence for an intrinsic break in the energy distribution of the radiating particles. Alternatively, the spectral softening above 2GeV could be due to -ray absorption via photonphoton pair production on the soft X-ray photon field of the host AGN, but such an interpretation would require the dissipation region to be located very close ({approx}< 100 gravitational radii) to the black hole, which would be inconsistent with the X-ray spectrum of the source.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A 12 GHz RF Power Source for the CLIC Study

The CLIC RF frequency has been changed in 2008 from the initial 30 GHz to the European X-band 11.9942 GHz permitting beam independent power production using klystrons for CLIC accelerating structure testing. A design and fabrication contract for five klystrons at that frequency has been signed by different parties with SLAC. France (IRFU, CEA Saclay) is contributing a solid state modulator purchased in industry and specific 12 GHz RF network components to the CLIC study. RF pulses over 120 MW peak at 230 ns length will be obtained by using a novel SLED-I type pulse compression scheme designed and fabricated by IAP, Nizhny Novgorod, Russia. The X-band power test stand is being installed in the CLIC Test Facility CTF3 for independent structure and component testing in a bunker, but allowing, in a later stage, for powering RF components in the CTF3 beam lines. The design of the facility, results from commissioning of the RF power source and the expected performance of the Test Facility are reported.

43 PARTICLE ACCELERATORS↗

Molecular ion sources for low energy semiconductor ion implantation (invited)

Smaller semiconductors require shallow, low energy ion implantation, resulting space charge effects, which reduced beam currents and production rates. To increase production rates, molecular ions are used. Boron and phosphorous (or arsenic) implantation is needed for P-type and N-type semiconductors, respectively. Carborane, which is the most stable molecular boron ion leaves unacceptable carbon residue on extraction grids. A self-cleaning carborane acid compound (C{sub 4}H{sub 12}B{sub 10}O{sub 4}) was synthesized and utilized in the ITEP Bernas ion source resulting in large carborane ion output, without carbon residue. Pure gaseous processes are desired to enable rapid switch among ion species. Molecular phosphorous was generated by introducing phosphine in dissociators via 4PH{sub 3} = P{sub 4} + 6H{sub 2}; generated molecular phosphorous in a pure gaseous process was then injected into the HCEI Calutron-Bernas ion source, from which P{sub 4}{sup +} ion beams were extracted. Results from devices and some additional concepts are described.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Penning trap mass measurements on nobelium isotopes

The Penning trap mass spectrometer SHIPTRAP at GSI Darmstadt allows accurate mass measurements of radionuclides, produced in fusion-evaporation reactions and separated by the velocity filter SHIP from the primary beam. Recently, the masses of the three nobelium isotopes {sup 252-254}No were determined. These are the first direct mass measurements of transuranium elements, which provide new anchor points in this region. The heavy nuclides were produced in cold-fusion reactions by irradiating a PbS target with a {sup 48}Ca beam, resulting in production rates of the nuclei of interest of about one atom per second. In combination with data from decay spectroscopy our results are used to perform a new atomic-mass evaluation in this region.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Generation of metal ions in the beam plasma produced by a forevacuum-pressure electron beam source

We report on the production of metal ions of magnesium and zinc in the beam plasma formed by a forevacuum-pressure electron source. Magnesium and zinc vapor were generated by electron beam evaporation from a crucible and subsequently ionized by electron impact from the e-beam itself. Both gaseous and metallic plasmas were separately produced and characterized using a modified RGA-100 quadrupole mass-spectrometer. The fractional composition of metal isotopes in the plasma corresponds to their fractional natural abundance.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Pion Production for Neutrino Factory-challenges

One of the key issues in the design of a Neutrino Factory target station is the determination of the optimum kinetic energy of the proton beam due to the large uncertainties in simulations of protons impinging on nuclear targets. In this paper we have developed a procedure to correct GEANT4 simulations for the HARP data, and we have determined the yield of muons expected at the front-end of a Neutrino Factory as a function of target material (Be, C, Al, Ta and Pb) and energy (3-12 GeV).The maximum muon yield is found between 5 and 8 GeV for high Z targets and 3 GeV for low Z targets.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Radiation Safety System for SPIDER Neutral Beam Accelerator

SPIDER (Source for Production of Ion of Deuterium Extracted from RF Plasma only) and MITICA (Megavolt ITER Injector Concept Advanced) are the ITER neutral beam injector (NBI) testing facilities of the PRIMA (Padova Research Injector Megavolt Accelerated) Center. Both injectors accelerate negative deuterium ions with a maximum energy of 1 MeV for MITICA and 100 keV for SPIDER with a maximum beam current of 40 A for both experiments. The SPIDER facility is classified in Italy as a particle accelerator. At present, the design of the radiation safety system for the facility has been completed and the relevant reports have been presented to the Italian regulatory authorities. Before SPIDER can operate, approval must be obtained from the Italian Regulatory Authority Board (IRAB) following a detailed licensing process. In the present work, the main project information and criteria for the SPIDER injector source are reported together with the analysis of hypothetical accidental situations and safety issues considerations. Neutron and photon nuclear analysis is presented, along with special shielding solutions designed to meet Italian regulatory dose limits. The contribution of activated corrosion products (ACP) to external exposure of workers has also been assessed. Nuclear analysis indicates that the photon contribution to worker external exposure is negligible, and the neutron dose can be considered by far the main radiation protection issue. Our results confirm that the injector has no important radiological impact on the population living around the facility.

43 PARTICLE ACCELERATORS↗

Toward the Discovery of New Elements: Production of Livermorium (𝑍 = 116) with 50 Ti

The 244 Pu ⁢(50 Ti ,𝑥⁢𝑛)⁢ 294−𝑥 Lv reaction was investigated at Lawrence Berkeley National Laboratory’s 88-Inch Cyclotron. The experiment was aimed at the production of a superheavy element with 𝑍 ≥114 by irradiating an actinide target with a beam heavier than 48 Ca. Produced Lv ions were separated from the unwanted beam and nuclear reaction products using the Berkeley Gas-filled Separator and implanted into a newly commissioned focal-plane detector system. Two decay chains were observed and assigned to the decay of 290 Lv . The production cross section was measured to be 𝜎 prod = 0.44($^{+0.58}_{−0.28}$) pb at a center-of-target center-of-mass energy of 220(3) MeV. Furthermore, this represents the first published measurement of the production of a superheavy element near the “island of stability,” with a beam of 50 Ti and is an essential precursor in the pursuit of searching for new elements beyond 𝑍 =118.

36 MATERIALS SCIENCE↗

National Transport Code Collaboration PTRANSP (Final Report)

PTRANSP, which is the predictive version of the TRANSP code, was developed in a collaborative effort involving the Princeton Plasma Physics Laboratory, General Atomics Corporation, Lawrence Livermore National Laboratory, and Lehigh University. The PTRANSP/TRANSP suite of codes is the premier integrated tokamak modeling software in the United States. A production service for PTRANSP/TRANSP simulations is maintained at the Princeton Plasma Physics Laboratory; the server has a simple command line client interface and is subscribed to by about 100 researchers from tokamak projects in the US, Europe, and Asia. This service produced nearly 13000 PTRANSP/TRANSP simulations in the four year period FY 2005 through FY 2008. Major archives of TRANSP results are maintained at PPPL, MIT, General Atomics, and JET. Recent utilization, counting experimental analysis simulations as well as predictive simulations, more than doubled from slightly over 2000 simulations per year in FY 2005 and FY 2006 to over 4300 simulations per year in FY 2007 and FY 2008. PTRANSP predictive simulations applied to ITER increased eight fold from 30 simulations per year in FY 2005 and FY 2006 to 240 simulations per year in FY 2007 and FY 2008, accounting for more than half of combined PTRANSP/TRANSP service CPU resource utilization in FY 2008. PTRANSP studies focused on ITER played a key role in journal articles. Examples of validation studies carried out for momentum transport in PTRANSP simulations were presented at the 2008 IAEA conference. The increase in number of PTRANSP simulations has continued (more than 7000 TRANSP/PTRANSP simulations in 2010) and results of PTRANSP simulations appear in conference proceedings, for example the 2010 IAEA conference, and in peer reviewed papers. PTRANSP provides a bridge to the Fusion Simulation Program (FSP) and to the future of integrated modeling. Through years of widespread usage, each of the many parts of the PTRANSP suite of codes has been thoroughly validated against experimental data and benchmarked against other codes. At the same time, architectural modernizations are improving the modularity of the PTRANSP code base. The NUBEAM neutral beam and fusion products fast ion model, the Plasma State data repository (developed originally in the SWIM SciDAC project and adapted for use in PTRANSP), and other components are already shared with the SWIM, FACETS, and CPES SciDAC FSP prototype projects. Thus, the PTRANSP code is already serving as a bridge between our present integrated modeling capability and future capability. As the Fusion Simulation Program builds toward the facility currently available in the PTRANSP suite of codes, early versions of the FSP core plasma model will need to be benchmarked against the PTRANSP simulations. This will be necessary to build user confidence in FSP, but this benchmarking can only be done if PTRANSP itself is maintained and developed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Northstar Mo100 Target Beam Spot Size Sensitivity Study

Northstar Mo100 target for production of the medical isotope Mo99 is particularly sensitive to beam over focusing because of the intended high power density. At 38 MeV and 6.32 mA (240 kW beam power, nominally 160 kW th in the target), small deviation from the nominal 12 mm FWHM beam can significantly increase the target disk temperatures and more importantly the load bearing target window temperature. A rhodotron will be the source of the electron beam to be used in the isotope production. This machine operates in a pulsed beam mode, currently expected to be at 50 Hz, which results in a 100 C temperature oscillation above and below the steady state temperature that is the focus of this study. This must be considered in the determination of minimum beam spot size that can be accepted by the target without risk of failure. In addition to the nominal beam spot size of 12 mm, the analysis of 10, 11 and 14.5 mm beam spot sizes are analyzed. The primary conclusion is that an over focused beam to just 11 mm FWHM is the minimum beam spot allowable, based on window temperature and the Ultimate Tensile Stress (UTS) of the window material Inconel 718 as a function of temperature. In contrast an under focused beam of 14.5 mm FWHM has much reduced target and window temperatures, but there is a resulting 6% drop in isotope production, all other factor staying the same. These results are presented herein.

07 ISOTOPE AND RADIATION SOURCES↗

Measurement of {upsilon} Production for p+p and p+d Interactions at 800 GeV/c

We report a high statistics measurement of {upsilon} production with an 800 GeV/c proton beam on hydrogen and deuterium targets. The dominance of the gluon-gluon fusion process for {upsilon} production at this energy implies that the cross section ratio, {sigma}(p+d{yields}{upsilon})/2{sigma}(p+p{yields}{upsilon}), is sensitive to the gluon content in the neutron relative to that in the proton. Over the kinematic region 0<x{sub F}<0.6, this ratio is found to be consistent with unity, in striking contrast to the behavior of the Drell-Yan cross section ratio {sigma}(p+d){sub DY}/2{sigma}(p+p){sub DY}. This result shows that the gluon distributions in the proton and neutron are very similar. The {upsilon} production cross sections are also compared with the p+d and p+Cu cross sections from earlier measurements.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗