Earth Observing 1 (EO-1) Decommission Overview Mission Operation Working Group (MOWG)
This presentation provides an updated status of Earth Observing 1 operations status for the 2016 Mission Operations Working Group.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This presentation provides an updated status of Earth Observing 1 operations status for the 2016 Mission Operations Working Group.
An apparatus that passes vibrational energy across a mechanical structure lacking a perforation. The disclosed apparatus and method provide the ability to transfer work (rotary or linear motion) across pressure or thermal barriers or in a sterile environment without generating contaminants; the presence of reflectors in the solid barrier to enhance the efficiency of the energy/power transmission, and the ability to produce a bi-directional driving mechanism using a plurality of different mode resonances, such as a fundamental frequency resonance and a higher frequency resonance. In some instances, a plane within the mechanical structure lacking a perforation is a nodal plane of the vibrational energy field.
This is NASA FAA UTM Research Transition Team Communications and Navigation working group kick off meeting presentation that addresses the followings. Objectives overview Overall timeline and scope Outcomes and expectations Communication method and frequency of meetings Upcoming evaluation Next steps.
SPHERES/Astrobee Working Group (SAWG) Quarterly meeting. Membership includes MIT, FIT, AFS, DARPA, CASIS, SJSU, and NASA (HQ, KSC, JSC, MSFC, and ARC)Face-to-Face, twice a year Purpose: Information sharing across the SPHERES community Program office shares National Lab Facility availability Status of resources (batteries, CO2 tanks, etc.), Overall Calendar (scheduled Test Sessions, up mass return), and Updates on new PD, Investigations, and ISS infrastructure. Provide the SPHERES community (PD, investigators, etc.) with up-to-date information to determine opportunities to use the NL Facility Discuss proposed changes updates to SPHERES Nat Lab which may be required to support a specific activity or research. Discuss specific support requests made to the ISS Office.
This presentation at the Earth Science Constellation Mission Operations Working Group meeting at KSC in December 2017 to discuss EOS (Earth Observing System) Aqua Earth Science Constellation status. Reviewed and approved by Eric Moyer, ESMO (Earth Science Mission Operations) Deputy Project Manager.
Particle adhesion is relevant in fields ranging from aerospace and energy to civil engineering and medicine. The functions of aerodynamic surfaces, heat exchangers, solar panels, ventilation systems, and blood vessels are affected by the buildup of particulates on their surfaces. Direct measurement of the adhesive force between a particle and a surface is key to understanding and mitigating particle fouling. Approaches such as the Johnson-Kendall-Roberts (JKR) and Derjaguin-Muller-Toporov (DMT) models offer a first approximation of the forces involved but do not account for non-idealities like roughness or plastic deformation. Experimental measurements of adhesive forces often deviate significantly from predictions. One approach to measure adhesion is the colloidal probe technique, which uses a particle attached to the tip of an atomic force microscope (AFM) cantilever. The particle is touched to a surface and then withdrawn and a pull-off force (FPO) determined by cantilever deflection. FPO can be used to estimate work of adhesion (Wa) and other properties from existing models. We describe a new method for producing colloidal probes using wax as an adhesive to attach micrometer-scale spheres to AFM tips. This method can be used with a range of particles and minimizes the potential for changes to the particle surface chemistry or geometry from exposure to heat, chemicals, radiation, or external forces. Particle attachment to AFM tips is robust and reversible, allowing old particles to be replaced with new ones in a few minutes. Pull-off measurements using polystyrene (PS) particles, pristine and modified with myristyltrimethylammonium bromide (14-TAB), were collected from various substrates to demonstrate the viability of this technique and investigate the impact of particle surface modification.
This document is a product of the joint NASA and FAA Research Transition Team's (RTT) Concept Working Group (CWG) as part of the UAS Traffic Management (UTM) project. The scope of the document covers Technical Capability Level (TCL) 3 of the UTM research path and presents the 1) Terms and Definitions, 2) Foundational Principles, 3) Concept Narratives, 4) Use Cases, 5) Operational Views (OVs), and 6) Roles and Responsibilities of actors interacting within a TCL3 environment. The document includes additional use cases to accompany the RTT CWG Package #2 document.
Mr. Guit will be presenting EOS Aqua Mission Operations Status at the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) Meeting at GSFC in December 2018.
An overview of three missions connected with NASA's Goddard Space Flight Center at the present time: (1) NASA's flagship mission, the James Webb Space Telescope, is nearing its 2021 launch date. The James Webb, which is considered the successor to the Hubble Space Telescope, will orbit at the Earth-Sun Lagrangian Point Two where it will peer back in time, using infrared detectors, to the beginnings of our Universe. (2) NASA is conducting pioneering work in the field of robotic satellite servicing in earth orbit. The RESTORE-L project, which is slated for a 2021 launch date, is expected to pave the way for the inception of robotic assembly for deep space exploration as well as the commercialization of satellite servicing. (3) The Transiting Exoplanet Survey Satellite (TESS) has been orbiting the Earth actively searching for new planets since April of 2018. The discoveries that TESS has made to-date have benefited from a careful characterization of the refractive lens assemblies on its science instruments. The presentation will provide a detailed description of how the index of refraction of the glasses used to fabricate the TESS lens assemblies were measured at Goddard to an accuracy that enables the ability to make exoplanet discoveries hundreds of light years from Earth.
This presentation provides mission operations status for the Earth Observing System (EOS) Aqua satellite for the past six-months (December 2018 through May 2019). It only contains information that is of interest to the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) member missions. It will be presented at the bi-annual MOWG Meeting in Toulouse, France on Wednesday, June 5, 2019. These meetings have been occurring twice a year since the MOWG was formed in 2003.
Spacesuits allow humans to function in an incredibly harsh environment. However, they introduce some restrictions to human capabilities. In general, crewmembers in a spacesuit have a restricted maximal reach envelope, reduced field of view, and reduced tactility. When tasks and interfaces are being designed, they need to take into account the restrictions associated with working in an Extravehicular Activity (EVA) suit.
NASA's Psyche Mission is engaged with a growing number of capstone teams pursuing topics relevant to the mission, including partnering with four universities to trial cross-university teaming. Creating interdisciplinary capstone teams with students from different universities provides an opportunity to prepare students to engage with a diversity of disciplines and collaborate in remote teams in the workplace. Additionally, through such capstones, universities may gain access to non-local, specialized technical mentors and to disciplines not offered at their institutions. An added benefit is providing greater fidelity to NASA space missions, which involve teams working together at a distance. We discuss early lessons learned from the first three inter-university, interdisciplinary capstone teams participating with the Psyche mission and discuss plans for improvement and future expansion.
SPHERES Astrobee Working Group (SAWG) Quarterly meeting. Membership includes MIT, FIT, AFS, DARPA, CASIS, SJSU, and NASA (HQ, KSC, JSC, MSFC, and ARC). Face-to-Face, twice a year Purpose: Information sharing across the SPHERES community. Program office shares National Lab Facility availability. Status of resources (batteries, CO2 tanks, etc.), Overall Calendar (scheduled Test Sessions, upmassreturn), and Updates on new PD, Investigations, and ISS infrastructure. Provide the SPHERES community (PD, investigators, etc.) with up-to-date information to determine opportunities to use the NL Facility. Discuss proposed changes updates to SPHERES Nat Lab which may be required to support a specific activity or research. Discuss specific support requests made to the ISS Office
This presentation provides mission operations status for the Earth Observing System (EOS) Aqua satellite for the past six-months (June 2019 through November 2019). It only contains information that is of interest to the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) member missions. It will be presented at the bi-annual MOWG Meeting in Gilbert, Arizona on Tuesday, December 3, 2019. These meetings have been occurring twice a year since the MOWG was formed in 2003.
SPHERES Working Group (SWG) Quarterly meeting. Membership includes MIT, FIT, AFS, DARPA, CASIS, SJSU, and NASA (HQ, KSC, JSC, MSFC, and ARC). Face-to-Face, twice a year. Next Face-to-Face will be scheduled in Feb. 2017 at NASA Ames. Purpose: Information sharing across the SPHERES community. Program office shares National Lab Facility availability. Status of resources (batteries, CO2 tanks, etc.), Overall Calendar (scheduled Test Sessions, upmassreturn), and Updates on new PD, Investigations, and ISS infrastructure.Provide the SPHERES community (PD, investigators, etc.) with up-to-date information to determine opportunities to use the NL Facility. Discuss proposed changes updates to SPHERES Nat Lab which may be required to support a specific activity or research. Discuss specific support requests made to the ISS Office.
This report documents the 2008 Turbomachinery Technology Assessment and Recommendations of the NASA-led Aerothermodynamics Technical Working Group (TWG). It includes technology review, assessment, and recommendation for future research and development. The areas covered are summarized as follows. Inlet Flow Distortion Sensitivity and Stability, Tip Leakage Flows in High-Pressure Cores, Endwall Contouring, Turbine Tip Flows, Combustor and Cooled-Turbine Interaction, Highly Loaded Low-Pressure Turbines.
There are physiological limits to human performance, influenced by the internal programming of the sleep homeostat and circadian rhythms. There are known fatigue-related risks related to different work scheduling factors. This presentation was for presentation to supervisors and managers at Stennis Space Center to provide information about physiological risks factors associated with shiftwork scheduling practices and facilitate discussion about approaches to manage the related risks.
Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.