Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “terms”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

FY2023 Status Report: Model 9975 O-Ring Fixture Long-Term Leak Performance

Leak testing experiments to monitor the aging performance of Viton ® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Chemical Analyses in Biota Collected Upstream of the Pajarito Canyon Flood Retention Structure and Los Alamos Canyon Weir at Los Alamos National Laboratory

The Cerro Grande wildfire was a major disaster that burned during the summer of 2000 in the Jemez Mountains and parts of Los Alamos National Laboratory (LANL or Laboratory). As an immediate response to the fire, the United States Department of Energy generated a list of post-fire actions needed to mitigate the impacts of this disaster, including flooding and the potential for erosion. Two structures built post-fire include the Pajarito Canyon flood retention structure (FRS) and the Los Alamos Canyon weir. Environmental monitoring at these two structures has occurred since the early 2000s as part of ongoing efforts to evaluate impacts of the fire.

54 ENVIRONMENTAL SCIENCES↗

The Near Term Race for the Neutrino Mass Ordering

The muon neutrino disappearance experiments T2K and NOvA, measure a different combination of Delta m^2_31 and Delta m^2_32 then the electron neutrino disappearance experiments Daya Bay and JUNO. This can be used to determine the neutrino mass ordering, one of the outstanding questions of the neutrino sector. In this talk I will explain why this happens and what is the current state and future prospects for the mass ordering determination using this method.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cation Migration and LSCF/SDC Decomposition Related to Long-Term Operation Mode as Revealed by Electron Microscopy

This study utilized energy dispersive spectroscopy (EDS) in a scanning electron microscope (SEM) and a scanning transmission electron microscope (STEM) in order to track cation migration and related particle decomposition for air electrode components of solid oxide cells. The influence of a Sm-doped ceria (SDC) barrier layers was assessed for three operation modes (fuel cell, electrolysis, reversible) over long time periods (1000-1500 hours). Composition profiles across air electrode/electrolyte interfaces indicated negligible accumulation of La/Sr cations to the yttria-stabilized zirconia (YSZ) electrolyte during operation. Instead, air electrode particles composed of SDC and/or La-Sr-Co-Fe-oxides (LSCF) exhibited decomposition by Sr evaporation and Sm migration to LSCF particle edges.

Picard, Yoosuf↗

Advanced Process Control and Dynamic Optimization of Reversible Solid Oxide Cell Systems for Performance and Long-Term Health

This presentation was delivered at the 2024 Hydrogen Annual Merit Review Meeting. It focuses on three aspects of projects focusing on solid oxide cell systems- advanced control including nonlinear model predictive control and traditional control, dynamic optimization with due consideration of chemical degradation over the cell lifetime, dynamic optimization considering physical degradation.

Allan, Douglas↗

Model 9975 O Ring Fixture Long-Term Leak Performance (FY2024 Status Report)

Leak testing experiments to monitor the aging performance of Viton ® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months of testing while fixture #18 remained leak tight. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F.

42 ENGINEERING↗

Comparison of Projections for a Short-Term Release, CAP88 vs NARAC

The purpose of this study was to compare the projected dose using different plume models, evaluating a short duration release of tritium to the 16 compliance sectors and 4 additional points of interest using local meteorology. This report is written as guidance to the decision makers when reviewing this specific Gaussian plume model intended for radiological dose assessment and regulatory compliance, called CAP88 1 , as compared to a more-complex model designed for emergency response. The emergency response model, NARAC 2 , can be used to supplement the CAP88 compliance model evaluations, since NARAC is intended for use in situations where releases are shorter in duration and have increased complexity in terrain and meteorology.

54 ENVIRONMENTAL SCIENCES↗

FEED Study for Climeworks Direct Air Capture at a California Geothermal Facility with Long-Term Storage (Final Scientific/Technical Report)

The overall objective of the project is to execute and complete a front-end engineering and design (FEED) study of an advanced Direct Air Capture (DAC) and Storage (DAC+S) system that is capable of removing and sequestering a minimum of 5,000 tonne/yr of CO 2 from the air based on cradle-to-gate life cycle assessment (LCA). The project will examine retrofitting and utilizing an existing domestic geothermal resource. The selected DAC system will be technology from Climeworks AG (Climeworks) that consists of an adsorption-desorption process to remove CO 2 from ambient air by using a selective filter. The geothermal host site is operated by Ormat Technologies Inc. (ORMAT). The DAC system will capture CO 2 using thermal energy from the host geothermal resource. This Final Scientific/Technical Report is a collection of the deliverables for the project. The project team was not able to successfully complete all the necessary tasks for this project. Shortly after the start of the project, two (2) project partners removed themselves from the study. The Awardee attempted to find a replacement for the direct air capture technology provider and geothermal energy provider. Due to this the awardee submitted a letter of cancellation for the project, letter is attached in the appendix. No funds were expended during the course of the project.

15 GEOTHERMAL ENERGY↗

Complete Development of Critical Capabilities for TRISO Fission Product Source Term Calculations and Quantify Mechanisms for Pd Penetration of SiC

Overall fission product (FP) release will be an important consideration for the licensing and deployment of advanced reactors utilizing tristructural isotropic (TRISO) fuels. This work focuses on enhancing and applying the BISON models needed to predict FP transport within TRISO particles and particle failure probability, both of which factor directly into release predictions. Specifically, this report details (1) the development of the models needed to predict palladium (Pd) conservation at the engineering scale and the application of those models to characterize Pd fluxes for input into a mechanistic multiscale model for Pd penetration; (2) the refinement of sorption mass transfer models and the development of models for trapping in porous layers, which were applied and compared to particle scans from AGR-2 to provide proof of concept for a method of particle-scale validation that may reduce uncertainties compared to compact-scale validation using data from integral effects tests; (3) the development of a failure-statistics-informed, mesh-independent methodology for applying smeared cracking, enabling further study of the localized multiphysics behaviors associated with cascading particle failure mechanisms; and (4) the preliminary characterization of those coupled multiphysics particle failure behaviors using smeared, nonretentive diffusivities to provide a baseline for future study and to guide ongoing engineering applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗