Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Cyber-Informed Engineering Overview: Joint NERC/INL/E-ISAC Webinar

In July, NERC, the Electricity Information Sharing and Analysis Center (E-ISAC), and Idaho National Laboratory (INL) will host a joint informational webinar to highlight areas focused on integrating cyber and physical security with conventional engineering practices (security integration). NERC's work on these topics represents one of the first focused applications of Cyber-Informed Engineering (CIE). INL is leading the development of philosophy and practices to identify and mitigate the inherent risks of digital technology by including cybersecurity as a core element of engineering risk management. This presentation will provide an overview of CIE, a discussion of how NERC's work represents one of the first new discipline-specific applications of CIE, and an update on significant milestones and resources from the CIE program.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Proton Improvement Plan – II: Overview of Progress in the Construction

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV linac, which comprises a room temperature front end followed by an SRF accelerator. The front end has been constructed and operated with (pulsed & CW) beam in the PIP-II Injector Test facility (PIP2IT). The SRF accelerator consists of five different types of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at state-of-the-art parameters. The first two PIP-II cryomodules, HWR and Single Spoke Resonator 1 (SSR1) are installed in PIP2IT and have accelerated beam to 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was recently baselined, and site construction is underway

43 PARTICLE ACCELERATORS↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

Big Data Health Physics

This project, in completion of the Illinois Institute of Technology’s Professional Masters of Health Physics program, represents a two part independent study wherein (1) a Statistical Analysis is performed on a new data process implemented at a Los Alamos National Laboratory facility and (2) a Project Management Plan is designed for the successful implementation of this new radiation protection management process.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High Temperature Electrolysis Hydrogen Production Plant

Two generic probabilistic risk assessments (PRA) for the addition of a heat extraction system (HES) addition to a light water reactor (LWR) are performed, one for a pressurized water reactor (PWR) and one for a boiling water reactor (BWR). The results investigate the applicability of the potential licensing approaches which do not require a full U.S. Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic, and some assumptions are made. Many conservative assumptions from a the preliminary PWR PRA report were eliminated using design data for both the HES and the high temperature electrolysis facility (HTEF). The results of the PRA indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all DBAs, none exceeding 5.6%. The PRA results for CDF and LERF support the use of RG 1.174 as further risk information that supports a change without a full LAR. Further insights provided through hazard analysis and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and a HTEF sited at 1.0 km from the NPP is strong and that the placement of a HTEF at 0.5 km is a viable case. Site specific information can alter these conclusions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Basic Energy Sciences Network Requirements Review (Final Report)

The Energy Sciences Network (ESnet) is the high-performance network user facility for the US Department of Energy (DOE) Office of Science (SC) and delivers highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the DOE science mission by connecting all of its laboratories and facilities in the US and abroad. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) program and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education networking community. Between March and September 2022, ESnet and the Office of Basic Energy Sciences (BES) of the DOE SC organized an ESnet requirements review of BES-supported activities. Preparation for these events included identification of key stakeholders: program and facility management, research groups, and technology providers. Each stakeholder group was asked to prepare formal case study documents about its relationship to the BES program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward. A series of pre-planning meetings better prepared case study authors for this task, along with guidance on how the review would proceed in a virtual fashion.

97 MATHEMATICS AND COMPUTING↗

High Energy Physics Network Requirements Review: One-Year Update

The Energy Sciences Network (ESnet) is the high-performance network user facility for the US Department of Energy (DOE) Office of Science (SC) and delivers highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the DOE science mission by connecting all its laboratories and facilities in the US and abroad. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) program and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education (R&E) networking community. In April 2022, ESnet and the Office of High Energy Physics (HEP) of the DOE SC organized an ESnet requirements review of HEP-supported activities. Preparation for the review included identification of key stakeholders: program and facility management, research groups, and technology providers. Each stakeholder group was asked to prepare formal case study documents about the group’s relationship to the HEP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward. A series of pre-planning meetings better prepared case study authors for this task, along with guidance on how the review would proceed in a virtual fashion.

97 MATHEMATICS AND COMPUTING↗

Probabilistic Risk Assessment of a Light-Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This report details an expansion of the original two generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to a light-water reactor, one for a pressurized-water reactor and one for a boiling-water reactor. The new material in this revision includes a new HES design, direct electrical coupling of the nuclear power plant to the High-Temperature Electrolysis Facility (HTEF), and a smaller 100-MWt HTEF analysis. The results investigate the applicability of the potential licensing approaches, which do not require a full United States Nuclear Regulatory Commission licensing review. The PRAs are generic and include some assumptions. We eliminated many conservative assumptions from the preliminary pressurized-water reactor PRA report using design data for both the HES and HTEF. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 5.6%. The PRA results for core damage frequency and large early release frequency support the use of RG 1.174 as further risk information that supports a change without a full licensing amendment review. Further insights provided through hazard analyses and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and an HTEF sited 1.0 km from the nuclear power plant is strong and that the placement of a HTEF at 0.5 km is also a viable case. Site-specific information can alter these conclusions.

08 HYDROGEN↗

Biological and Environmental Research Network Requirements Review (Final Report)

The Energy Sciences Network (ESnet) is the high-performance network user facility for the US Department of Energy (DOE) Office of Science (SC) and delivers highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the DOE science mission by connecting all its laboratories and facilities in the US and abroad. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) program and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education (R&E) networking community. Between August 2022 and April 2023, ESnet and the Office of Biological and Environmental Research (BER) of the DOE SC organized an ESnet requirements review of BER-supported activities. Preparation for these events included identification of key stakeholders: program and facility management, research groups, and technology providers. Each stakeholder group was asked to prepare formal case study documents about its relationship to the BER ESS program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward. A series of pre-planning meetings better prepared case study authors for this task, along with guidance on how the review would proceed in a virtual fashion.

97 MATHEMATICS AND COMPUTING↗

Electric Grid Security (EGS) FY24 Annual Report

Sandia’s Electric Grid Security program advances a national vision of a secure, resilient, and affordable electric system for all users. Our achievements reflect a strategic approach combining technology development; modeling, simulation, and data analytics; and partnered demonstrations and outreach to further the adoption of advanced grid and storage technologies. Our FY24 efforts leverage the strengths of our partnerships—spanning Sandia’s core science and technology competencies as well as external technology leaders—to develop the solutions today which enable the grid of tomorrow. Key accomplishments in this report that support our strategy span our technical program areas and include: • The advancement of energy storage technologies, including creation of a national Long Duration Energy Storage Consortium; • Applications of artificial intelligence and machine learning to enhanced grid operations and planning; • Development of solid-state power conversion technologies and a new medium-voltage research lab; • New technologies to assess wildfire vulnerabilities and mitigate potential impacts; • Advanced applications of new cybersecurity technologies with industry partners; • Contributions to understanding the impacts of electromagnetic pulses and geomagnetic disturbances on grid components; and • Digital twin development for hybrid microgrids with multiple generators, storage, and loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Annual Site Environmental Report: 2019 (ASER) for the SLAC National Accelerator Laboratory

To satisfy the requirements of the United States Department of Energy (DOE) SLAC Site Office approved Site Compliance Plan for DOE Order 231.1B, “Environment, Safety and Health Reporting,” the Environment, Safety and Health Division (ES&H) of the SLAC National Accelerator Laboratory prepares an annual report describing its environmental programs and activities. This Annual Site Environmental Report: 2019 summarizes the SLAC National Accelerator Laboratory compliance with standards and requirements, describes the management and monitoring systems in place, and highlights significant accomplishments for the year.

54 ENVIRONMENTAL SCIENCES↗

HDG-1 Experiment Irradiation Monitoring Data Qualification Final Report

SUMMARY The U.S. Department of Energy (DOE) Advanced Reactor Technologies (ART) Graphite Research and Development (GRD) Program is conducting a series of six experiments to quantify the effects of irradiation on nuclear-grade graphite. This report documents the qualification of irradiation monitoring data for the fifth experiment, High Dose Graphite-1 (HDG-1). Qualified monitoring data are required by the ART program to support the design and licensing of the first high-temperature reactor (HTR) nuclear plant. Data are classified as Qualified if they meet the usage requirements described in the experiment planning and quality assurance (QA) documents, Failed if they do not meet those requirements and provide no usable information, or Trend if they do not fully meet all requirements but still provide useful information subject to an assessment of how any deficiencies may affect a particular use of the data. HDG-1 irradiation began with Advanced Test Reactor (ATR) Cycle 168B on August 24, 2020, and concluded after Cycle 173C on January 27, 2025. The HDG-1 capsule was removed from the reactor core twice—during core internal change (CIC) Cycle 170A and powered axial locator mechanism (PALM) Cycle 172A—to prevent overheating of the graphite specimens during high-power PALM cycles. The capsule was therefore irradiated during a total of seven normal ATR cycles: 168B, 169A, 171A, 171B, 173A, 173B, and 173C. Irradiation monitoring data evaluated in this report include thermocouple (TC) temperature, gas flow rate, gas moisture, gas pressure, specimen load, and graphite stack displacement. Temperature. A total of 14,508,065 TC temperature records were captured. Of these, 13,901,785 (95.8%) are Qualified and 606,280 (4.2%) are Failed. The principal source of failed temperature data was the instrument failure of TC-9 (Zone 2) on June 24, 2024, and TC-10 (Zone 1) on July 5, 2024, near the end of Cycle 173A, which resulted in 595,554 Failed readings. An additional 379 missing values and 10,347 slightly negative values from TC-13 during ATR outages are also Failed. Neither TC-9 nor TC-10 was used as a temperature-control TC, and their failures did not compromise capsule condition monitoring. Correlation analysis of all 13 TCs found no evidence of virtual junction formation. Control chart analysis revealed clear downward drift of approximately 80°C for TC-6 (Zone 3) relative to other stable TCs, and possible downward drift of approximately 60°C for TC-13 relative to the Zone 5 control TC (TC-1), though TC-13 remained consistent with the Zone 2 control TC (TC-12). Gas flow. A total of 20,088,090 gas flow rate records were captured. Of these, 19,941,463 (99.3%) are Qualified and 146,627 (0.7%) are Failed due to missing values. All argon, helium, and total gas flow data were within expected ranges throughout the irradiation. Gas moisture. A total of 1,116,005 outlet gas moisture values were captured. Of these, 1,101,421 (98.7%) are Qualified and 14,584 (1.3%) are Failed, comprising 14,556 out-of-range values and 28 missing values. The out-of-range moisture values exceeded 22,000 ppmv for approximately 1 week at the beginning of Cycle 173A, when accumulated moisture evaporated after the capsule was retrieved from water storage during PALM Cycle 172A and reinserted into the east flux trap. Moisture levels returned to below 25 ppmv for the remaining three cycles, and the transient high-moisture event did not affect the integrity of specimen irradiation. Gas pressure. A total of 7,812,035 gas pressure values were captured. Of these, 6,642,048 (85.0%) are Qualified and 1,169,987 (15.0%) outlet pressure values are Failed, comprising 718,537 zero outlet pressure values due to sensor failure from Cycle 168B through Cycle 171B, 54,550 missing values, and 396,900 too-low outlet pressure values, ranging from 1.1 to 1.6 psia after sensor replacement during Cycle 173A. Load. A total of 6,696,030 load values were captured. Of these, 6,694,580 (99.98%) are Qualified and 1,450 (0.02%) are Failed due to missing values. Applied loads to the six specimen stacks were stable throughout the irradiation. Stack displacement. A total of 6,696,030 displacement values were captured. Of these, 5,713,297 (85.32%) are Qualified and 3,781 (0.06%) are Failed due to missing values. Stack displacement increased consistently throughout the irradiation, reaching approximately 3.08 in. for Channels 5 and 6 by the end of irradiation. 978,952 (14.62%) substantially elevated displacements observed for Channel 6 beginning in Cycle 171A and for Channel 5 beginning in Cycle 173A are assigned Trend status. Raising pressure. A total of 1,115,999 raising pressure values were captured. Of these, 1,115,430 (99.95%) are Qualified and 569 (0.05%) are Failed due to missing values. Ram pressure. A total of 6,696,030 ram pressure values were captured. Of these, 6,692,249 (99.95%) are Qualified and 3,484 (0.05%) are Failed due to missing values. Stack raising was perf

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2022 Small Turbine Certification Awardee: Ryse Energy LLC - Americas

To meet the growing demands of the distributed wind market and comply with current U.S. standards, Ryse Energy LLC-Americas (Ryse Energy, formerly Primus Wind Power) plans to update all six products in its AIR Range family of micro wind turbines. A new, more cost-effective circuit board will be paired with other hardware upgrades, advanced control algorithms, and a Bluetooth function that allows users to more easily program and control the turbine. This Competitiveness Improvement Project (CIP) award will fund certification testing of the new circuit board to make sure it meets American National Standards Institute/American Clean Power Association (ANSI/ACP) and UL Federal Communications Commission (FCC) safety and quality standards. Primus Wind Power developed the prototype for the new circuit board with an earlier round of CIP funding, and Primus has received CIP awards supporting other certification and optimization projects.

CIP↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan outlines the strategy, mission, scope, near-term and long-term goals, structure, and organization associated with nuclear fuels and materials research, development, and demonstration activities within the Department of Energy’s (DOE) Nuclear Fuel Cycle and Supply Chain (NFCSC) program. NFCSC has been given responsibility to identify and mature advanced fuel technologies for the DOE using a science-based approach, focused on developing a fundamental understanding of nuclear fuels and materials to drive development of integrated nuclear fuel and materials technology. This science-based approach combines theory, experiments, and multiscale modeling and simulation to achieve a predictive understanding of relevant behaviors ranging from fuel fabrication processes (and their resulting fuel microstructures) through fuel/cladding performance under irradiation (in contrast to more empirical, observation-based approaches frequently used in fuel performance modeling and fuel qualification). The traditional scope of AFC includes the evaluation and development of multiple fuel forms to support two fuel cycle options: once-through and full recycle. The word “fuel” is used generically to include conventional fuels, transmutation targets, and any associated cladding or duct materials. The once-through fuel cycle addresses advanced light water reactor fuels with enhanced performance, extended burnup, and reduced waste generation. In fiscal year (FY) 2012, AFC’s scope expanded to include research, development, and demonstration (RD&D) for light water reactor (LWR) fuels with enhanced accident tolerance. Fuel fabrication activities include the development of innovative methods to enhance process efficiencies, reduce waste, and improve control over as-fabricated fuel microstructural properties to achieve desired in-reactor performance. Using modern modeling and simulation approaches, the objective is to predict fresh fuel properties given the feedstock characteristics and fabrication process parameters. The performance-related activities include small-scale, in-reactor, and out-of-reactor phenomenological testing (distinct from, but synergistic with, integral prototypic testing) and extensive, quantitative characterization (focusing on characterization of fuel and cladding materials at the scale of microstructure) both before and after testing. Larger-scale, prototypic experiments are conducted in concert with phenomenological testing to drive a Fuel Development and Qualification program, incorporating a fundamental understanding of fuel behavior performance characteristics. Then, using the tools developed under the productive science-based approach, fuels will be optimized to meet specific performance requirements, thereby minimizing the need to repeatedly perform large-scale, integral experiments over a wide parametric range as a means of experimental exploration. Two significant initiatives are underway within AFC. First, a gap analysis completed in early FY 2019 identified critical irradiation testing needs that are lacking within the national light water reactor (LWR) fuels testbed since the shutdown of the Halden Reactor in 2018. The identified gaps are for instrumented, prototypic testing of LWR fuels, especially under boiling water reactor conditions, ramp conditions, and conditions leading to fuel failure; these needs exist for supporting current LWR fuels and their possible extension to higher burnups, but are especially urgent relative to near-term development and qualification of accident-tolerant fuels. Recommendations that resulted from the Halden Gap Analysis focused on enhancements at Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) to fill gaps in testing capabilities relative to these needs. Second, a concerted effort to develop and demonstrate a systematic approach to accelerating the development, testing, and qualification of new fuel systems has been initiated. This is highlighted by a test strategy that combines the considerable advances in multiscale, mechanistic fuel modeling of recent years with a MiniFuel separate effects test program in the High Flux Isotope Reactor (HFIR) and a Fission Accelerated Steady-state Testing (FAST) semi-integral accelerated test program in ATR. This approach is being tested/demonstrated using the metallic fuel system, but if successful it is expected to be extensible to multiple fuel types and diverse applications. This document includes an overview of the NFCSC program, a definition of science-based development of nuclear fuels, near-term goals for Advanced LWR fuels (ALFs), and longer-term goals for Advanced Reactor Fuels (ARFs) RD&D. This includes the activities that will be conducted to achieve success toward the grand challenge, as well as the goals and milestones to be achieved over the next few decades of research and development. Long-term goals are based on the DOE Office of Nuclear Energ

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan outlines the strategy, mission, scope, near-term and long-term goals, structure, and organization associated with nuclear fuels and materials research, development, and demonstration activities within the Department of Energy’s (DOE) Nuclear Fuel Cycle and Supply Chain (NFCSC) program. NFCSC has been given responsibility to identify and mature advanced fuel technologies for the DOE using a science-based approach, focused on developing a fundamental understanding of nuclear fuels and materials to drive development of integrated nuclear fuel and materials technology. This science-based approach combines theory, experiments, and multiscale modeling and simulation to achieve a predictive understanding of relevant behaviors ranging from fuel fabrication processes (and their resulting fuel microstructures) through fuel/cladding performance under irradiation (in contrast to more empirical, observation-based approaches frequently used in fuel performance modeling and fuel qualification). The traditional scope of AFC includes the evaluation and development of multiple fuel forms to support two fuel cycle options: once-through and full recycle. The word “fuel” is used generically to include conventional fuels, transmutation targets, and any associated cladding or duct materials. The once-through fuel cycle addresses advanced light water reactor fuels with enhanced performance, extended burnup, and reduced waste generation. In fiscal year (FY) 2012, AFC’s scope expanded to include research, development, and demonstration (RD&D) for light water reactor (LWR) fuels with enhanced accident tolerance. Fuel fabrication activities include the development of innovative methods to enhance process efficiencies, reduce waste, and improve control over as-fabricated fuel microstructural properties to achieve desired in-reactor performance. Using modern modeling and simulation approaches, the objective is to predict fresh fuel properties given the feedstock characteristics and fabrication process parameters. The performance-related activities include small-scale, in-reactor, and out-of-reactor phenomenological testing (distinct from, but synergistic with, integral prototypic testing) and extensive, quantitative characterization (focusing on characterization of fuel and cladding materials at the scale of microstructure) both before and after testing. Larger-scale, prototypic experiments are conducted in concert with phenomenological testing to drive a Fuel Development and Qualification program, incorporating a fundamental understanding of fuel behavior performance characteristics. Then, using the tools developed under the productive science-based approach, fuels will be optimized to meet specific performance requirements, thereby minimizing the need to repeatedly perform large-scale, integral experiments over a wide parametric range as a means of experimental exploration. Two significant initiatives are underway within AFC. First, a gap analysis completed in early FY 2019 identified critical irradiation testing needs that are lacking within the national light water reactor (LWR) fuels testbed since the shutdown of the Halden Reactor in 2018. The identified gaps are for instrumented, prototypic testing of LWR fuels, especially under boiling water reactor conditions, ramp conditions, and conditions leading to fuel failure; these needs exist for supporting current LWR fuels and their possible extension to higher burnups, but are especially urgent relative to near-term development and qualification of accident-tolerant fuels. Recommendations that resulted from the Halden Gap Analysis focused on enhancements at Advanced Test Reactor (ATR) and Transient Reactor Test Facility (TREAT) to fill gaps in testing capabilities relative to these needs. Second, a concerted effort to develop and demonstrate a systematic approach to accelerating the development, testing, and qualification of new fuel systems has been initiated. This is highlighted by a test strategy that combines the considerable advances in multiscale, mechanistic fuel modeling of recent years with a MiniFuel separate effects test program in the High Flux Isotope Reactor (HFIR) and a Fission Accelerated Steady-state Testing (FAST) semi-integral accelerated test program in ATR. This approach is being tested/demonstrated using the metallic fuel system, but if successful it is expected to be extensible to multiple fuel types and diverse applications. This document includes an overview of the NFCSC program, a definition of science-based development of nuclear fuels, near-term goals for Advanced LWR fuels (ALFs), and longer-term goals for Advanced Reactor Fuels (ARFs) RD&D. This includes the activities that will be conducted to achieve success toward the grand challenge, as well as the goals and milestones to be achieved over the next few decades of research and development. Long-term goals are based on the DOE Office of Nuclear Energ

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fast model-based scenario optimization in NSTX-U enabled by analytic gradient computation

Model-based optimization offers a systematic approach to advanced scenario planning. In this case, the feedforward-control inputs (actuator trajectories) that are needed to attain and sustain a desired scenario are obtained by solving a nonlinear constrained optimization problem. This class of problems generally minimize a cost function that measures the difference between desired and actual plasma states. Several numerical optimization algorithms, such as sequential quadratic programming, require repeated calculation of the cost function gradients with respect to the input trajectories. Calculating these gradients numerically can be computationally intensive, increasing the time needed to solve the feedforward-control optimization problem. Here, this work introduces a method to analytically calculate these cost function gradients from the current profile evolution model. This can significantly reduce the computational time and allow for fast feedforward-control optimization, which would eventually enable optimal scenario planning between discharges. The performance of the feedforward optimizer with analytical gradients is compared to a traditional optimization algorithm based on numerical gradients for different NSTX-U scenarios. The plasma dynamics in the optimization algorithm are simulated using the Control Oriented Transport SIMulator (COTSIM). Results of the work show that analytical gradients consistently reduce the computation time while achieving trajectories that are comparable to those obtained by traditional optimization algorithms based on numerical gradients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

East Tennessee Technology Park Biological Monitoring and Abatement Program 2024 Calendar Year Report

The East Tennessee Technology Park (ETTP) Biological Monitoring and Abatement Program (BMAP) consists of three tasks that reflect different but complementary approaches to evaluating the ecological integrity of waters near ETTP. These tasks include (1) bioaccumulation monitoring of fish and clams, (2) benthic macroinvertebrate species richness and density monitoring, and (3) fish community monitoring. The sampling and analysis requirements for the ETTP BMAP in calendar year 2024, covering in part both FY 2024 and FY 2025, are outlined in the respective FY sampling and analysis plans (UCOR 2023, 2024). Sampled water bodies and locations for the ETTP BMAP are shown in Figures 1 and 2. This ETTP BMAP report presents the CY 2024 results and provides context with results from previous years. The report also includes Oak Ridge National Laboratory (ORNL)–generated biological monitoring data collected for other US Department of Energy programs, including the UCOR Water Resources Restoration Program (WRRP) off-site fish bioaccumulation data (UCOR 2023) and select Y-12 National Security Complex (Y-12) BMAP fish bioaccumulation data. Historical data collected for the ETTP BMAP and other programs in the nearby Poplar Creek and Clinch River are provided where appropriate. This progress report provides an update on the biological monitoring activities supporting the ETTP UCOR Environmental Compliance organization, which sponsors the ETTP BMAP. In addition to this internal reporting, ETTP BMAP results are provided in the annual remediation effectiveness reports and the annual site environmental reports, both of which are publicly available. BMAP data are also available to the public via the Oak Ridge Environmental Information System (https://ucor.com/oak-ridge-environmental-information-system-oreis/).

54 ENVIRONMENTAL SCIENCES↗

A scalable planning framework of energy storage systems under frequency dynamics constraints

As the penetration of renewables increases in power systems, the declining system inertia can cause frequency stability issues. Battery energy storage systems (BESSs) respond fast and therefore can relieve the low inertia difficulty but need to be appropriately sized considering the associated cost. This paper presents a novel stochastic optimization model for economically planning BESS capacity while considering the spatial–temporal correlation of wind generation and generator outages under frequency stability constraints, which include the rate-of-change of frequency (RoCoF), frequency nadir (FN), and quasi-steady-state (QSS) frequency. A set of new FN constraints that can be easily linearized is developed. To account for renewable uncertainties, a realistic uncertainty modeling approach, Random Field, is adopted to generate wind generation scenarios by considering both spatial and temporal evolutions of wind speed profiles. The ESS sizing is formulated as a mixed-integer linear programming problem and solved by using a scalable decomposition-and-coordination approach, Surrogate Absolute Value Lagrangian Relaxation (SAVLR). To further improve the scalability and reduce computational burdens, a rolling-horizon-based update is developed and incorporated into SAVLR for providing a practical solution to the long-term planning of very large-scale power systems. Finally, a modified IEEE 118-bus system and the Polish system are used to validate the effectiveness and scalability of the model and solution methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗