Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Preliminary Audit Report on "Management Controls over the Commonwealth of Virginia's Efforts to Implement the American Recovery and Reinvestment Act Weatherization Assistance Program"

The Department of Energy's (Department) Weatherization Assistance Program received $5 billion under the American Recovery and Reinvestment Act of 2009 (Recovery Act) to improve the energy efficiency of homes, multi-family rental units and mobile homes owned or occupied by low-income persons. Subsequently, the Department awarded a three-year Weatherization Assistance Program grant for $94 million to the Commonwealth of Virginia (Virginia). This grant provided more than a ten-fold increase in funds available to Virginia for weatherization over that authorized in Fiscal Year (FY) 2009. Corresponding to the increase in funding, the Recovery Act increased the limit on the average amount spent to weatherize a home (unit) from $2,500 to $6,500. Virginia's Department of Housing and Community Development (DHCD) administers the Recovery Act grant through 22 local community action agencies. These agencies (sub-grantees) are responsible for determining applicant eligibility, weatherizing homes, and conducting home assessments and inspections. Typical weatherization services include installing insulation; sealing ducts; tuning and repairing furnaces; and, mitigating heat loss through windows, doors and other infiltration points. Virginia plans to use its Recovery Act Weatherization funding to weatherize about 9,193 units over the life of the grant - a significant increase over the 1,475 housing units that were planned to be completed in FY 2009. Given the significant increase in funding and the demands associated with weatherizing thousands of homes, we initiated this audit to determine if Virginia had adequate safeguards in place to ensure that the Weatherization Program was managed efficiently and effectively. The State of Virginia's DHCD had not implemented financial and reporting controls needed to ensure Weatherization Program funds are spent effectively and efficiently. Specifically, DHCD had not: (1) Performed on-site financial monitoring of any of its sub-grantees under the Recovery Act; (2) Reviewed documentation supporting sub-grantee requests for reimbursements to verify the accuracy of amounts charged; (3) Periodically reconciled amounts paid to sub-grantees to the actual cost to weatherize units; (4) Maintained vehicle and equipment inventories as required by Federal regulations and state and Federal program directives; and (5) Accurately reported Weatherization Program results to the Department. Exacerbating weaknesses in DHCD's financial controls, the Department's most recent program monitoring visit to Virginia, made in 2008 before passage of the Recovery Act, did not include a required financial review. Hence, the financial control weaknesses discussed above were not detected and had not been addressed. As described in this report, these control and reporting weaknesses increase the risk that Recovery Act objectives may not be achieved and that fraud, waste or abuse can occur and not be detected in this critically important program.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

FY 2009 Annual Report of Joule Software Metric SC GG 3.1/2.5.2, Improve Computational Science Capabilities

The Joule Software Metric for Computational Effectiveness is established by Public Authorizations PL 95-91, Department of Energy Organization Act, and PL 103-62, Government Performance and Results Act. The U.S. Office of Management and Budget (OMB) oversees the preparation and administration of the President s budget; evaluates the effectiveness of agency programs, policies, and procedures; assesses competing funding demands across agencies; and sets the funding priorities for the federal government. The OMB has the power of audit and exercises this right annually for each federal agency. According to the Government Performance and Results Act of 1993 (GPRA), federal agencies are required to develop three planning and performance documents: 1.Strategic Plan: a broad, 3 year outlook; 2.Annual Performance Plan: a focused, 1 year outlook of annual goals and objectives that is reflected in the annual budget request (What results can the agency deliver as part of its public funding?); and 3.Performance and Accountability Report: an annual report that details the previous fiscal year performance (What results did the agency produce in return for its public funding?). OMB uses its Performance Assessment Rating Tool (PART) to perform evaluations. PART has seven worksheets for seven types of agency functions. The function of Research and Development (R&D) programs is included. R&D programs are assessed on the following criteria: Does the R&D program perform a clear role? Has the program set valid long term and annual goals? Is the program well managed? Is the program achieving the results set forth in its GPRA documents? In Fiscal Year (FY) 2003, the Department of Energy Office of Science (DOE SC-1) worked directly with OMB to come to a consensus on an appropriate set of performance measures consistent with PART requirements. The scientific performance expectations of these requirements reach the scope of work conducted at the DOE national laboratories. The Joule system emerged from this interaction. Joule enables the chief financial officer and senior DOE management to track annual performance on a quarterly basis. Joule scores are reported as success, goal met (green light in PART), mixed results, goal partially met (yellow light in PART), and unsatisfactory, goal not met (red light in PART). Joule links the DOE strategic plan to the underlying base program targets.

99 GENERAL AND MISCELLANEOUS↗

Sandia National Laboratories, California Pollution Prevention Program annual report.

The annual program report provides detailed information about all aspects of the SNL/CA Pollution Prevention Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Pollution Prevention Program, one of six programs that supports environmental management at SNL/CA. Pollution Prevention supports the goals and objectives to increase the procurement and use of environmentally friendly products and materials and minimize the generation of waste (nonhazardous, hazardous, radiological, wastewater). Through participation on the Interdisciplinary Team P2 provides guidance for integration of environmentally friendly purchasing and waste minimization requirements into projects during the planning phase. Table 7 presents SNL's corporate objectives and targets that support the elements of the Pollution Prevention program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Performance Report 2012: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1-1B (Management Report)

This report presents a summary of NREL's environmental protection programs and activities for CY 2012. It is organized according to the different environmental media (e.g., air, waste, ground water, etc.), and includes a brief summary of how the program is managed in that area, any permitting or notification efforts that have been completed during the reporting period or are ongoing, and activities that have occurred during the reporting period in that environmental area. A description of the environmental condition and features of NREL's sites is also included to provide a basis for the program overview.

2012↗

Clean Energy Infrastructure Educational Initiative

The Clean Energy Infrastructure Educational Initiative represents a collaborative effort by the University of Dayton, Wright State University and Sinclair Community College. This effort above all aimed to establish energy related programs at each of the universities while also providing outreach to the local, state-wide, and national communities. At the University of Dayton, the grant has aimed at: solidfying a newly created Master's program in Renewable and Clean Energy; helping to establish and staff a regional sustainability organization for SW Ohio. As well, as the prime grantee, the University of Dayton was responsible for insuring curricular sharing between WSU and the University of Dayton. Finally, the grant, through its support of graduate students, and through cooperation with the largest utilities in SW Ohio enabled a region-wide evaluation of over 10,000 commercial building buildings in order to identify the priority buildings in the region for energy reduction. In each, the grant has achieved success. The main focus of Wright State was to continue the development of graduate education in renewable and clean energy. Wright State has done this in a number of ways. First and foremost this was done by continuing the development of the new Renewable and Clean Energy Master's Degree program at Wright State . Development tasks included: continuing development of courses for the Renewable and Clean Energy Master's Degree, increasing the student enrollment, and increasing renewable and clean energy research work. The grant has enabled development and/or improvement of 7 courses. Collectively, the University of Dayton and WSU offer perhaps the most comprehensive list of courses in the renewable and clean energy area in the country. Because of this development, enrollment at WSU has increased from 4 students to 23. Secondly, the grant has helped to support student research aimed in the renewable and clean energy program. The grant helped to solidify new research in the renewable and clean energy area. The educational outreach provided as a result of the grant included activities to introduce renewable and clean energy design projects into the Mechanical and Materials Engineering senior design class, the development of a geothermal energy demonstration unit, and the development of renewable energy learning modules for high school students. Finally, this grant supported curriculum development by Sinclair Community College for seven new courses and acquisition of necessary related instrumentation and laboratory equipment. These new courses, EGV 1201 Weatherization Training, EGV 1251 Introduction to Energy Management Principles, EGV 2301 Commercial and Industrial Assessment, EGV 2351 LEED Green Associate Exam Preparation, EGV 2251 Energy Control Strategies, EGV Solar Photovoltaic Design and Installation, and EGV Solar Thermal Systems, enable Sinclair to offer complete Energy Technology Certificate and an Energy Management Degree programs. To date, 151 students have completed or are currently registered in one of the seven courses developed through this grant. With the increasing interest in the Energy Management Degree program, Sinclair has begun the procedure to have the program approved by the Ohio Board of Regents.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Future Transition of WIPP from EM to Another DOE Office - 19256

The U. S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has a primary mission to assist federal government entities disposition transuranic (TRU) radioactive waste. The main resource for disposition is the deep geologic repository known as the Waste Isolation Pilot Plant (WIPP). Other resources include a complete transportation system and a program that assists in the certification and shipment of TRU waste to WIPP known as the National TRU Program (NTP). All of these resources are managed by CBFO, which currently is part of the DOE Environmental Management (EM) program. EM's primary mission for DOE is to clean up the legacy remaining from many years of nuclear weapons research and production. But, CBFO estimates the need for WIPP and NTP will continue beyond the mission of EM and will assist other entities such as the National Nuclear Security Administration (NNSA), the Office of Science (OS) and the Navy. As the inventory of legacy TRU waste is reduced, the inventory of new TRU waste will continue from ongoing missions. So, over the life span of WIPP the primary customers of CBFO will shift from legacy EM sites to newly-generated TRU waste sites. And, somewhere along the way CBFO estimates that it will transition, primarily from an EM support (legacy waste) entity to a primarily a NNSA support (newly-generated waste) entity to facilitate ongoing DOE missions. This paper will address the need for that change at a programmatic level and will include some ideas for conceptual planning for such a transition. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition of Site Programs and Implementation of Decommissioning Agent Oversight - 18653

San Onofre Nuclear Generating Station (SONGS), acting as the Decommissioning Agent (DA), retained its NRC License and contracted a Decommissioning General Contractor (DGC) to manage plant programs and execute the Demolition and Dismantlement (D and D) of the site. To support this effort, over twenty-one programs transitioned to the DGC, including Occupational Health and Safety, Radiation Protection, Maintenance, and Engineering. In addition, SONGS effected a cultural shift from an operating station performing work to one of overseeing it. The framework and road map for this kind of D and D model is new to the industry. This presentation shares the SONGS' experience and lessons learned associated with this transition. SONGS and the DGC entered an Agreement that established the contractual requirements and responsibilities of the parties, the Scope of Work, and the mechanisms to ensure effective transition of DA programs. As a part of defining the Scope of Work, the contract established functional areas and divisions of responsibilities divided into the roles of Governance, Oversight, Support, and Performance (GOSP). SONGS, as the site licensee, retained the Oversight Role, with exception of those areas that, as the licensee, would be considered 'non-transferrable'. Examples of those programs were Quality Assurance, Regulatory Affairs and the Employee Concerns Program. While the Company retained responsibility for those programs the DGC developed their own 'parallel' programs that the Company provided Oversight for. In 2017, SONGS completed program transition within one-year following the notice-to-proceed. The overall strategy was driven by three high-level principles: - Allow the DGC the most unfettered execution of the Scope of Work with limited interference and maximum self-governance. With the overriding principle that transitioned programs have a direct link to a basis in regulation or law. - Identify safety and compliance risks, and then bridge the transition of programs from the SONGS to the DGC such that identified risks are minimized and/or mitigated. - Allow the SONGS organization to transition from a Performance role to a primarily Oversight role as the DA. Working collaboratively with the DGC, programs were strategically grouped and sequenced for turnover. Central to the success of transition was fostering a collaborative environment with the DGC, facilitating knowledge transfer, applying schedule rigor, and keeping the team horizontally and vertically aligned to management expectations. SONGS achieved this alignment by embedding the formal process with management expectations for review and acceptance of proposed programs. SONGS' transitioned core programs to a general contractor and transition from a 'perform' organization to an 'oversight' organization. Lessons learned from this experience may benefit other nuclear generating station owners currently evaluating options for site D and D. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coupling Big Data Analytics and Reactive Transport Modeling for Cost-effective Groundwater Monitoring - 17163

This study presents an innovative approach for sustainable and cost-effective groundwater monitoring. This approach takes advantage of recent advances in various technologies: (1) in situ autonomous sensors, (2) big data analytics, and (3) parallel high-performance computing for flow and reactive transport modeling. In situ sensors are used to periodically measure the key variables (such as pH, redox potential, electrical conductivity, and groundwater level), which control contaminant mobility and the plume spatial and temporal distribution. Based on a limited number of groundwater sampling, the data analytics methods-data mining and machine learning-allow us to identify and quantify the correlations between the in situ-measured variables and contaminant concentrations, and also to detect significant changes associated with the plume mobility. In addition, a state-of-the-art parallel numerical flow and reactive transport simulator Amanzi, and uncertainty quantification software Agni are used to provide an improved physical and mechanistic understanding of the contaminated groundwater system behavior, and to predict the long-term plume distribution for optimizing and adapting the monitoring strategy. Amanzi and Agni were developed as part of the Advanced Simulation Capability for Environmental Management (ASCEM) program of the DOE Office of Environmental Management. Such modeling is critical, particularly, for assessing the impact of climate change and associated hydrological shifts. The developed approach is expected to significantly reduce the groundwater sampling frequency and associated cost. In addition, the real-time information on plume mobility serves as an early warning system, improving the resiliency of contaminated or potentially contaminated sites. We demonstrate this approach using as an example the Savannah River Site (SRS) F-Area, where groundwater is contaminated by various radionuclides, including uranium, tritium and technetium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ITER risk workshop facilitator guide

The goal of planning risk management is to make everyone involved in a program aware that risk should be a consideration in the design, development, and fielding of a system. Risk planning is a tool to assess and mitigate events that might adversely impact the program. Therefore, risk management increases the probability/likelihood of program success and can help to avoid program crisis management and improve problem solving by managing risk early in the acquisition cycle.

42 ENGINEERING↗

ITER risk workshop participant guide

The goal of planning risk management is to make everyone involved in a program aware that risk should be a consideration in the design, development, and fielding of a system. Risk planning is a tool to assess and mitigate events that might adversely impact the program. Therefore, risk management increases the probability/likelihood of program success and can help to avoid program crisis management and improve problem solving by managing risk early in the acquisition cycle.

42 ENGINEERING↗

Geographic Information System Based Emergency Response Training Assessments for DOE Radioactive Materials Transport - 20027

Safety and security are priorities of U.S. Department of Energy (DOE) radioactive materials shipping campaigns. In the more than 70-year history of domestic transport of spent nuclear fuel (SNF), there has never been a transportation-related radiological injury. To support transportation planning, among the tools that DOE uses is the Stakeholder Tool for Assessing Radioactive Transportation (START). START contains geospatial data and transportation route analyses capabilities designed to support a range of DOE transportation planning initiatives. One of those functions is the capability to support emergency response planning and training for State and Tribal jurisdictions located on routes used for DOE shipments of radioactive materials. As part of the Department's commitment to public safety, DOE provides federally-funded radiological response training to emergency responders along DOE radioactive materials transportation corridors through its Transportation Emergency Preparedness Program (TEPP). START contains spatial data representing the locations and emergency-response capabilities of fire departments, police, hospitals, State emergency response centers, and where TEPP-trained personnel are based. The START tool supports State and Tribal users' ability to evaluate emergency-response coverage on active and potential DOE radioactive materials transport routes through their jurisdictions, provide expected response times to reach the scene of an incident, identify equipment available to support a response, and identify the number of response personnel and their respective training levels. In addition, START can be used to identify gaps in coverage along a transportation corridor where additional radiological emergency response training may be needed. This paper describes the data, features, and functionality DOE uses to provide a resource for emergency response training needs assessments for States and Tribes along active and potential routes for transporting radioactive materials, and illustrates its use. It also discusses future plans to integrate TEPP and Federal Emergency Management Agency (FEMA) radiological training data to provide a more comprehensive source of geospatial information on personnel who have received equivalent radiological response training. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sociological survey in a municipality with a high level separate collection programme in an area of historic unpopularity

Highlights: • Behaviours, opinions and knowledge of citizens on MSW management were investigated. • The knowledge level was better than that of nearby university students and citizens. • The higher the education level, the greater the level of knowledge was. • The local authority showed a leading role in terms of waste management. • Trust is the key to any social program success including waste management programs. - Abstract: Behaviours, opinions and knowledge of citizens on MSW and separate collection were investigated in the city of Mercato San Severino (about 22,000 people), in the Campania region of Southern Italy that is an area suffering from a serious solid waste emergency that has lasted over 17 years due to the absence of treatment facilities. The image of heaps of rubbish in the streets of Naples and other nearby cities is only one side of the coin. Mercato San Severino has adopted an effective kerbside collection system since 2001 and a pay-as-you-throw program during 2005, guaranteeing more than the minimum level of recycling required by the Italian legislation. Structured questionnaires were administered to a sample of 500 people in 2010. Chi-square tests of independence were applied to state whether the differences were statistically significant (5%). About 90% of the sample stated that the success of the separate collection program was due to either the citizens and local authority or only the local authority, highlighting the leading role of the local authority and confirming that trust is the key to any social program success. The registered level of knowledge was better than that of nearby university students and citizens. The higher the education level, the greater the level of knowledge was.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia National Laboratories, California Pollution Prevention Program annual report.

The annual program report provides detailed information about all aspects of the SNL/CA Pollution Prevention Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Pollution Prevention Program, one of six programs that supports environmental management at SNL/CA.

54 ENVIRONMENTAL SCIENCES↗

Audit Report on "The Department's Management of the ENERGY STAR Program"

The American Recovery and Reinvestment Act (Recovery Act) authorized about $300 million in consumer rebate incentives for purchases of products rated under the 'ENERGY STAR' Program. ENERGY STAR, a voluntary labeling program established in 1992, provides consumers with energy efficiency data for a range of products so that they can make informed purchase judgments. The overall goal of the program is to encourage consumers to choose energy efficient products, advancing the nationwide goal of reducing energy consumption. The U.S. Environmental Protection Agency (EPA) managed the ENERGY STAR Program on a stand-alone basis until 1996 when it joined forces with the Department of Energy (Department). A Memorandum of Cooperation expanded the ENERGY STAR product categories, giving the Department responsibility for overseeing eight product categories such as windows, dishwashers, clothes washers, and refrigerators, while EPA retained responsibility for electronic product categories and heating, ventilating, and cooling equipment. Each agency is responsible for setting product efficiency specifications for those items under its control and for ensuring the proper use of the ENERGY STAR label in the marketplace. In August 2007, the EPA Office of Inspector General issued an audit report identifying significant control weaknesses in EPA's management of ENERGY STAR. The Department, concerned by the findings at EPA and eager to improve its own program, developed an approach to verify adherence to product specifications, ensure proper use of the ENERGY STAR label in the marketplace, and improve the establishment of product specifications. As evidenced by the commitment of $300 million in Recovery Act funds, the ENERGY STAR Program plays an important role in the U.S. efforts to reduce energy consumption. We initiated this audit to determine whether the Department had implemented the actions it announced in 2007 to strengthen the Program. The Department had not implemented planned improvements in the ENERGY STAR Program. Our audit revealed that officials had not: (1) Developed a formal quality assurance program to help ensure that product specifications were adhered to; (2) Effectively monitored the use of the ENERGY STAR label to ensure that only qualifying products were labeled as compliant; and (3) Formalized procedures for establishing and revising product specifications and for documenting decisions regarding those specifications. In our judgment, the delay in the Department's planned improvements in its management of the ENERGY STAR Program could reduce consumer confidence in the integrity of the ENERGY STAR label. Such loss of credibility could reduce energy savings, increase consumer risk, and diminish the value of the recent infusion of $300 million for ENERGY STAR rebates under the Recovery Act.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EMSL Quarterly Highlights Report Second Quarter, Fiscal Year 2010 (January 1, 2010 through March 31, 2010)

The Environmental Molecular Sciences Laboratory (EMSL) is a U.S. Department of Energy (DOE) national scientific user facility located at Pacific Northwest National Laboratory (PNNL) in Richland, Washington. EMSL is operated by PNNL for the DOE-Office of Biological and Environmental Research. At one location, EMSL offers a comprehensive array of leading-edge resources and expertise. Access to the instrumentation and expertise is obtained on a peer-reviewed proposal basis. Staff members work with researchers to expedite access to these capabilities. The "EMSL Quarterly Highlights Report" documents current research and activities of EMSL staff and users.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Executive summary of major NuMI lessons learned: a review of relevant meetings of Fermilab's DUSEL Beamline Working Group

We have gained tremendous experience with the NuMI Project on what was a new level of neutrino beams from a high power proton source. We expect to build on that experience for any new long baseline neutrino beam. In particular, we have learned about some things which have worked well and/or where the experience is fairly directly applicable to the next project (e.g., similar civil construction issues including: tunneling, service buildings, outfitting, and potential claims/legal issues). Some things might be done very differently (e.g., decay pipe, windows, target, beam dump, and precision of power supply control/monitoring). The NuMI experience does lead to identification of critical items for any future such project, and what issues it will be important to address. The DUSEL Beamline Working Group established at Fermilab has been meeting weekly to collect and discuss information from that NuMI experience. This document attempts to assemble much of that information in one place. In this Executive Summary, we group relevant discussion of some of the major issues and lessons learned under seven categories: (1) Differences Between the NuMI Project and Any Next Project; (2) The Process of Starting Up the Project; (3) Decision and Review Processes; (4) ES&H: Environment, Safety, and Health; (5) Local Community Buy-In; (6) Transition from Project Status to Operation; and (7) Some Lessons on Technical Elements. We concentrate here on internal project management issues, including technical areas that require special attention. We cannot ignore, however, two major external management problems that plagued the NuMI project. The first problem was the top-down imposition of an unrealistic combination of scope, cost, and schedule. This situation was partially corrected by a rebaselining. However, the full, desirable scope was never achievable. The second problem was a crippling shortage of resources. Critical early design work could not be done in a timely fashion, leading to schedule delays, inefficiencies, and corrective actions. The Working Group discussions emphasized that early planning and up-front appreciation of the problems ahead are very important for minimizing the cost and for the greatest success of any such project. Perhaps part of the project approval process should re-enforce this need. The cost of all this up-front work is now reflected in the DOE cost of any project we do. If we are being held to an upper limit on the project cost, the only thing available for compromise is the eventual project scope.

43 PARTICLE ACCELERATORS↗