Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Using cross-layer adaptations for dynamic data management in large scale coupled scientific workflows, In: SC '13 Proceedings of the International Conference on High Performance Computing, Networking, Storage and Analysis

As system scales and application complexity grow, managing and processing simulation data has become a significant challenge. While recent approaches based on data staging and in-situ/in-transit data processing are promising, dynamic data volumes and distributions, such as those occurring in AMR-based simulations, make the efficient use of these techniques challenging. In this paper we propose cross-layer adaptations that address these challenges and respond at runtime to dynamic data management requirements. Specifically we explore (1) adaptations of the spatial resolution at which the data is processed, (2) dynamic placement and scheduling of data processing kernels, and (3) dynamic allocation of in-transit resources. We also exploit coordinated approaches that dynamically combine these adaptations at the different layers. We evaluate the performance of our adaptive cross-layer management approach on the Intrepid IBM-BlueGene/P and Titan Cray-XK7 systems using Chombo-based AMR applications, and demonstrate its effectiveness in improving overall time-to-solution and increasing resource efficiency.

Computer Science↗

Environmental Monitoring Plan, Revision 5

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for ensuring that this work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 5400.5, Radiation Protection of the Public and the Environment, and DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 450.1A, DOE Order 5400.5, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies. (See LLNL [1992] and LLNL [2008] for information about LLNL's CERCLA activities).

54 ENVIRONMENTAL SCIENCES↗

MV Sea Change: Fuel Cell, Emissions, and Hydrogen Fueling Performance

The Sea Change Project, managed and financed by SWITCH Maritime, produced the first zero-emission 100% hydrogen fuel-cell powered commercial ferry in the world. The MV Sea Change is a 70-foot catamaran equipped with a 360-kW fuel cell powertrain and a 250-bar 246 kg capacity hydrogen storage system. The 75-passenger vessel began public passenger service in July 2024 as part of the San Francisco Bay Ferry system. Summarized here are aspects of the design of the vessel, its construction, and vessel bunkering with high-pressure hydrogen. Results from a fuel cell performance analysis are also presented, along with estimates of the greenhouse gas (GHG) and criterial pollutant emissions assuming different sourcings of hydrogen. Lessons learned from the project will be briefly reviewed.

08 HYDROGEN↗

Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ranged from updating existing information systems to developing matrices designed to ensure that all required reporting and performance elements were addressed. Each of these activities required substantial effort and was accomplished within a relatively short period. Further, we noted that the Office of the Chief Financial Officer had been instrumental in helping impacted program elements identify issues that could adversely affect the Department's ability to execute its accounting, reporting, and performance monitoring responsibilities. While much has been done, additional work is necessary if the Department is to successfully manage Recovery Act-related risks. For example, as previously noted, OMB has issued guidance establishing Recovery Act monitoring and reporting requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Triplet Management at Ligand-Perovskite Interface to Enhanced Photovoltaics Performance

Aromatic organic molecules are widely used as passivators in perovskite solar cells (PSCs). Efforts have been devoted to improving the energy alignments, band edge states, and defect passivation functionalities. However, potential energy loss through triplet states in such conjugated molecules has not been investigated in the past. Here, we report the observation of charge transfer from FAPbI 3 to the triplet state of a pyrene (Pyr)-based cationic ligand. Such a potential loss channel can be suppressed via delicate triplet management in polycyclic aromatic compounds. Interestingly, a subtle structural modification from Pyr to the triphenylene (TP) core gave rise to shallower triplets that prohibit electron transfer from perovskites. This strategy has led to TP-passivated PSCs achieving an enhanced power conversion efficiency (PCE) of 24.69% from 23.10% in Pyr-passivated counterparts. Moreover, the devices retained above 80% initial PCE after 4000 h of light soaking, which likely benefited from the reduced triplet electron trapping at the ligand-perovskite interface.

14 SOLAR ENERGY↗

On the energy footprint of I/O management in Exascale HPC systems

The advent of unprecedentedly scalable yet energy hungry Exascale supercomputers poses a major challenge in sustaining a high performance-per-watt ratio. With I/O management acquiring a crucial role in supporting scientific simulations, various I/O management approaches have been proposed to achieve high performance and scalability. But, the details of how these approaches affect energy consumption have not been studied yet. Therefore, this paper aims to explore how much energy a supercomputer consumes while running scientific simulations when adopting various I/O management approaches. In particular, we closely examine three radically different I/O schemes including time partitioning, dedicated cores, and dedicated nodes. To accomplish this, we implement the three approaches within the Damaris I/O middleware and perform extensive experiments with one of the target HPC applications of the Blue Waters sustained-petaflop supercomputer project: the CM1 atmospheric model. Our experimental results obtained on the French Grid'5000 platform highlight the differences among these three approaches and illustrate in which way various configurations of the application and of the system can impact performance and energy consumption. Moreover, we propose and validate a mathematical model that estimates the energy consumption of a HPC simulation under different I/O approaches. This proposed model gives hints to pre-select the most energy-efficient I/O approach for a particular simulation on a particular HPC system and therefore provides a step towards energy-efficient HPC simulations in Exascale systems. To the best of our knowledge, our work provides the first in-depth look into the energy-performance tradeoffs of I/O management approaches.

97 MATHEMATICS AND COMPUTING↗

2008 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs) for each of the facilities, with the results submitted annually to U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) performed an annual review in fiscal year (FY) 2008 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs. This annual summary report presents data and conclusions from the FY 2008 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analyses for the Hanford Integrated Disposal Facility Performance Assessment - 20102

In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA Performance Plan

The Government Performance and Results Act (GPRA) passed by Congress and signed by the President in 1993 provides a new tool to improve the efficiency of all Federal agencies. The goals of GPRA are to: Improve citizen confidence in Government performance; Improve Federal program management, effectiveness, and public accountability; and Improve congressional decisionmaking on where to commit the Nation's financial and human resources. The Act directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The first plans were submitted in September 1998 as part of the Fiscal Year 1999 (FY99) budget process. These budget submissions were expected to support the goals expressed in the agency strategic plans. The Act also directs agencies to manage and measure results to justify congressional appropriations and authorizations. Six months after the completion of the fiscal year, agencies will report on the degree of success in achieving the goals and evaluation measures defined in the strategic and performance plans. The plans required by GPRA have been submitted to the Office of Management and Budget (OMB) and to Congress. Copies of NASA plans are available from the Office of Policy and Plans at NASA Headquarters and can be accessed on the i nterinet web sites identified in the Appendix.

Source record↗

DOSE ASSESSMENT OF THE FINAL INVENTORIES IN CENTER SLIT TRENCHES ONE THROUGH FIVE

In response to a request from Solid Waste Management (SWM), this study evaluates the performance of waste disposed in Slit Trenches 1-5 by calculating exposure doses and concentrations. As of 8/19/2010, Slit Trenches 1-5 have been filled and are closed to future waste disposal in support of an ARRA-funded interim operational cover project. Slit Trenches 6 and 7 are currently in operation and are not addressed within this analysis. Their current inventory limits are based on the 2008 SA and are not being impacted by this study. This analysis considers the location and the timing of waste disposal in Slit Trenches 1-5 throughout their operational life. In addition, the following improvements to the modeling approach have been incorporated into this analysis: (1) Final waste inventories from WITS are used for the base case analysis where variance in the reported final disposal inventories is addressed through a sensitivity analysis; (2) Updated K{sub d} values are used; (3) Area percentages of non-crushable containers are used in the analysis to determine expected infiltration flows for cases that consider collapse of these containers; (4) An updated representation of ETF carbon column vessels disposed in SLIT3-Unit F is used. Preliminary analyses indicated a problem meeting the groundwater beta-gamma dose limit because of high H-3 and I-129 release from the ETF vessels. The updated model uses results from a recent structural analysis of the ETF vessels indicating that water does not penetrate the vessels for about 130 years and that the vessels remain structurally intact throughout the 1130-year period of assessment; and (5) Operational covers are included with revised installation dates and sets of Slit Trenches that have a common cover. With the exception of the modeling enhancements noted above, the analysis follows the same methodology used in the 2008 PA (WSRC, 2008) and the 2008 SA (Collard and Hamm, 2008). Infiltration flows through the vadose zone are identical to the flows used in the 2008 PA, except for flows during the operational cover time period. The physical (i.e., non-geochemical) models of the vadose zone and aquifer are identical in most cases to the models used in the 2008 PA. However, the 2008 PA assumed a uniform distribution of waste within each Slit Trench (WITS Location) and assumed that the entire inventory of each trench was disposed of at the time the first Slit Trench was opened. The current analysis considers individual trench excavations (i.e., segments) and groups of segments (i.e., Inventory Groups also known as WITS Units) within Slit Trenches. Waste disposal is assumed to be spatially uniform in each Inventory Group and is distributed in time increments of six months or less between the time the Inventory Group was opened and closed.

54 ENVIRONMENTAL SCIENCES↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

CMS Computing Resources: Meeting the demands of the high-luminosity LHC physics program

The high-luminosity program has seen numerous extrapolations of its needed computing resources that each indicate the need for substantial changes if the desired HL-LHC physics program is to be supported within the current level of computing resource budgets. Drivers include large increases in event complexity (leading to increased processing time and analysis data size) and trigger rates needed (5-10 fold increases) for the HL-LHC program. The CMS experiment has recently undertaken an effort to merge the ideas behind short-term and long-term resource models in order to make easier and more reliable extrapolations to future needs. Near term computing resource estimation requirements depend on numerous parameters: LHC uptime and beam intensities; detector and online trigger performance; software performance; analysis data requirements; data access, management, and retention policies; site characteristics; and network performance. Longer term modeling is affected by the same characteristics, but with much larger uncertainties that must be considered to understand the most interesting handles for increasing the "physics per computing dollar" of the HL-LHC. In this presentation, we discuss the current status of long term modeling of the CMS computing resource needs for HL-LHC with emphasis on techniques for extrapolations, uncertainty quantification, and model results. We illustrate potential ways that high-luminosity CMS could accomplish its desired physics program within today's computing budgets.

97 MATHEMATICS AND COMPUTING↗

High Performance Molecular Dynamic Simulation on Single and Multi-GPU Systems

The programming techniques supported and employed on these GPUs and Multi-GPUs systems are not sufficient to address problems exhibiting irregular, and unbalanced workload such as Molecular Dynamic (MD) simulations of systems with non-uniform densities. In this paper, we propose a task-based dynamic load-balancing solution to employ on MD simulations for single- and multi-GPU systems. The solution allows load balancing at a finer granularity than what is supported in existing APIs such as NVIDIA’s CUDA. Experimental results with a single-GPU configuration show that our fine-grained task solution can utilize the hardware more efficiently than the CUDA scheduler. On multi-GPU systems, our solution achieves near-linear speedup, load balance, and significant performance improvement over techniques based on standard CUDA APIs.

97 MATHEMATICS AND COMPUTING↗

A performance measurement system for engineering services

A performance measurement system which provides both a means of monitoring performance and a resource to support management decision making is described. The process of performance indicator development is discussed and typical indicators are described. The paper concludes with a summary of some of the lessons learned in applying productivity measurements to engineering services tasks and in automating data collection, evaluation and interpretation.

West, R. L.↗

Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A)

This is the twentieth monthly report for the Earth Observing System/Advanced Microwave Sounding Unit-A (EOS/AMSU-A), Contract NAS5-32314, and covers the period from 1 August 1994 through 31 August 1994. This period is the eighth month of the Implementation Phase which provides for the design, fabrication, assembly, and test of the first EOS/AMSU-A, the Protoflight Model. During this period the number one priority for the program continued to be the issuance of Requests for Quotations (RFQ) to suppliers and the procurement of the long-lead receiver components. Significant effort was also dedicated to preparation and conduct of internal design reviews and preparation for the PDR scheduled in September. An overview of the program status, including key events, action items, and documentation submittals, is provided in Section 2 of this report. The Program Manager's 'Priority Issues' are defined in Section 3. Section 4 through 7 provide detailed progress reports for the system engineering effort, each subsystem, performance assurance, and configuration/data management. Contractual matters are discussed in Section 8.

Source record↗

Sustainable Thorium Nuclear Fuel Cycles: A Comparison of Intermediate and Fast Neutron Spectrum Systems

This paper presents analyses of possible reactor representations of a nuclear fuel cycle with continuous recycling of thorium and produced uranium (mostly U-233) with thorium-only feed. The analysis was performed in the context of a U.S. Department of Energy effort to develop a compendium of informative nuclear fuel cycle performance data. The objective of this paper is to determine whether intermediate spectrum systems, having a majority of fission events occurring with incident neutron energies between 1 eV and 10 5 eV, perform as well as fast spectrum systems in this fuel cycle. The intermediate spectrum options analyzed include tight lattice heavy or light water-cooled reactors, continuously refueled molten salt reactors, and a sodium-cooled reactor with hydride fuel. All options were modeled in reactor physics codes to calculate their lattice physics, spectrum characteristics, and fuel compositions over time. Based on these results, detailed metrics were calculated to compare the fuel cycle performance. These metrics include waste management and resource utilization, and are binned to accommodate uncertainties. The performance of the intermediate systems for this selfsustaining thorium fuel cycle was similar to a representative fast spectrum system. However, the number of fission neutrons emitted per neutron absorbed limits performance in intermediate spectrum systems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Measurement of Nuclear Power Plant Construction Performance Using EVMS Model

The Earned Value Management System (EVMS) method integrates three critical elements of project management: scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. Application of earned value management techniques is scalable to individual projects as determined by their size and complexity. Effective management of quality, cost, and time is the utmost objective for any type of construction project. An EVMS model provides an advanced systematic method of controlling these three performance measures in an integrated way. However, the additional management effort required to develop and maintain an effective Work Breakdown Structure (WBS) has been highlighted as a major barrier to application of this concept. This paper examines the influencing attributes that would facilitate effective EVMS implementation including a restructuring of the WBS for nuclear power plant construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗