At least 991 records · Page 55

Robot Serviced Space Facility

A robot serviced space facility includes multiple modules which are identical in physical structure, but selectively differing in function. and purpose. Each module includes multiple like attachment points which are identically placed on each module so as to permit interconnection with immediately adjacent modules. Connection is made through like outwardly extending flange assemblies having identical male and female configurations for interconnecting to and locking to a complementary side of another flange. Multiple rows of interconnected modules permit force, fluid, data and power transfer to be accomplished by redundant circuit paths. Redundant modules of critical subsystems are included. Redundancy of modules and of interconnections results in a space complex with any module being removable upon demand, either for module replacement or facility reconfiguration. without eliminating any vital functions of the complex. Module replacement and facility assembly or reconfiguration are accomplished by a computer controlled articulated walker type robotic manipulator arm assembly having two identical end-effectors in the form of male configurations which are identical to those on module flanges and which interconnect to female configurations on other flanges. The robotic arm assembly moves along a connected set or modules by successively disconnecting, moving and reconnecting alternate ends of itself to a succession of flanges in a walking type maneuver. To transport a module, the robot keeps the transported module attached to one of its end-effectors and uses another flange male configuration of the attached module as a substitute end-effector during walking.

Purves, Lloyd R.↗

Instructions for performing multi-line memory accesses

A system is described that performs memory access operations. The system includes a processor in a first node, a memory in a second node, a communication interconnect coupled to the processor and the memory, and an interconnect controller in the first node coupled between the processor and the communication interconnect. Upon executing a multi-line memory access instruction, the processor prepares a memory access operation for accessing, in the memory, a block of data including at least some of each of at least two lines of data. The processor then causes the interconnect controller to use a single remote direct memory access memory transfer to perform the memory access operation for the block of data via the communication interconnect.

Roberts, David A.↗

Capacity value assessments of wind power

This article describes some of the recent research into the capacity value of wind power. With the worldwide increase in wind power during the past several years, there is increasing interest and significance regarding its capacity value because this has a direct influence on the amount of other (nonwind) capacity that is needed. We build on previous reviews from IEEE and IEA W ind T ask 25 a and examine recent work that evaluates the impact of multiple‐year data sets and the impact of interconnected systems on resource adequacy. We also provide examples that explore the use of alternative reliability metrics for wind capacity value calculations. We show how multiple‐year data sets significantly increase the robustness of results compared to single‐year assessments. Assumptions regarding the transmission interconnections play a significant role. To date, results regarding which reliability metric to use for probabilistic capacity valuation show little sensitivity to the metric. WIREs Energy Environ 2017, 6:e226. doi: 10.1002/wene.226 This article is categorized under: Wind Power > Economics and Policy Wind Power > Systems and Infrastructure Energy Infrastructure > Economics and Policy

Milligan, Michael↗

A Station-hybrid HVDC System Structure and Control Strategies for Cross-seam Power Transmission

Cross-seam high voltage DC (HVDC) transmission in the United States can provide an efficient and flexible bulk power delivery highway between the interconnections. Recent studies have shown significant economic benefits of cross-seam HVDC transmission systems by taking the advantages of load diversity, frequency response, renewable energy diversity, and energy arbitrage in the different interconnections. This paper introduces a station-hybrid system scheme for cross-seam interconnections. Here, the proposed station-hybrid system combines the advantages of line commutated converter (LCC) and voltage source converter (VSC) technologies, thus enabling reliable and flexible bidirectional power flows across the interconnections. Control strategies of the station-hybrid system are investigated with a focus on power flow reversal control under normal operation conditions and grid support control under emergency conditions. The feasibility and effectiveness of the proposed station-hybrid system and corresponding control strategies are verified by simulations in PSCAD/EMTDC.

Station-hybrid system↗

Wind Generation Participation in Power System Frequency Response: Preprint

The electrical frequency of an interconnected power system must be maintained close its nominal level at all times. Excessive under- and overfrequency excursions can lead to load shedding, instability, machine damage, and even blackouts. There is a rising concern in the electric power industry in recent years about the declining amount of inertia and primary frequency response (PFR) in many interconnections. This decline may continue due to increasing penetrations of inverter-coupled generation and the planned retirements of conventional thermal plants. Inverter-coupled variable wind generation is capable of contributing to PFR and inertia with a response that is different from that of conventional generation. It is not yet entirely understood how such a response will affect the system at different wind power penetration levels. The modeling work presented in this paper evaluates the impact of wind generation's provision of these active power control strategies on a large, synchronous interconnection. All simulations were conducted on the U.S. Western Interconnection with different levels of instantaneous wind power penetrations (up to 80%). The ability of wind power plants to provide PFR - and a combination of synthetic inertial response and PFR - significantly improved the frequency response performance of the system.

17 WIND ENERGY↗

Persistence of crystal orientations across sub-micron-scale "super-grains" in self-organized Cu-W nanocomposites

We use precession electron diffraction to investigate the crystallographic character of copper (Cu)-tungsten (W) nanocomposites fabricated via physical vapor co-deposition at 400 oC. We observe sub-micron-scale regions, where apparently disconnected Cu and W grains have near identical crystallographic orientations. This persistence of grain orientations suggests Cu and W grains within these regions are interconnected in 3-D when they first form and may be considered as intercalated, sub-micron-scale "super-grains". Indeed, atom probe tomography provides direct evidence of 3-D interconnectivity of W domains. Our findings shed light on the structure and self organization mechanisms of nanocomposites formed by spontaneous phase separation of co-deposited metals.

Yadav, Digvijay↗

Microstructure of multistage annealed nanocrystalline SmCo 2 Fe 2 B alloy with enhanced magnetic properties

The microstructure and chemistry of SmCo 2 Fe 2 B melt-spun alloy after multistage annealing was investigated using high resolution transmission electron microscopy (HRTEM) and 3D atom probe tomography. The multistage annealing resulted in an increase in both the coercivity and magnetization. The presence of Sm(Co,Fe) 4 B (1:4:1) and Sm 2 (Co,Fe) 17 B x (2:17:x) magnetic phases were confirmed using both techniques. Fe 2 B at a scale of -5 nm was found by HRTEM precipitating within the 1:4:1 phase after the second-stage annealing. Ordering within the 2:17:x phase was directly identified both by the presence of antiphase boundaries observed by TEM and the interconnected isocomposition surface network found in 3D atom probe results in addition to radial distribution function analysis. The variations in the local chemistry after the secondary annealing were considered pivotal in improving the magnetic properties.

Environmental Molecular Sciences Laboratory↗

A generative graph model for electrical infrastructure networks

We propose a generative graph model for electrical infrastructure networks that accounts for heterogeneity in both node and edge type. To inform the design of this model, we analyze the properties of power grid graphs derived from the U.S. Eastern Interconnection, Texas Interconnection, and Poland transmission system power grids. Across these datasets, we find subgraphs induced by nodes of the same voltage level exhibit shared structural properties atypical to small-world networks, including low local clustering, large diameter and large average distance. On the other hand, we find subgraphs induced by transformer edges linking nodes of different voltage types contain a more limited structure, consisting mainly of small, disjoint star graphs. The goal of our proposed model is to match both these inter and intra-network properties by proceeding in two phases: we first generate subgraphs for each voltage level and then generate transformer edges that connect these subgraphs. The first phase of the model adapts the Chung-Lu random graph model, taking desired vertex degrees and desired diameter as inputs, while the second phase of the model is based on a simpler random star graph generation process. We test the performance of our model by comparing its output across many runs to the aforementioned real data. In nearly all categories tested, we find our model is more accurate in reproducing the unusual mixture of properties apparent in the data than the Chung-Lu model. We also include graph visualization comparisons, as well as a brief analysis of edge-deletion resiliency. Ultimately, our model may be used to generate synthetic graph data, test hypotheses and algorithms at different scales, and serve as a baseline model on top of which further electrical network properties, device models, and interdependencies to other networks, may be appended.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scaling deep learning workloads: NVIDIA DGX-1/Pascal and Intel Knights Landing

Deep Learning (DL) algorithms have become ubiquitous in data analytics. As a result, major computing vendors --- including NVIDIA, Intel, AMD, and IBM --- have architectural road-maps influenced by DL workloads. Furthermore, several vendors have recently advertised new computing products as accelerating large DL workloads. Unfortunately, it is difficult for data scientists to quantify the potential of these different products. This paper provides a performance and power analysis of important DL workloads on two major parallel architectures: NVIDIA DGX-1 (eight Pascal P100 GPUs interconnected with NVLink) and Intel Knights Landing (KNL) CPUs interconnected with Intel Omni-Path or Cray Aries. Our evaluation consists of a cross section of convolutional neural net workloads: CifarNet, AlexNet, GoogLeNet, and ResNet50 topologies using the Cifar10 and ImageNet datasets. The workloads are vendor-optimized for each architecture. Our analysis indicates that although GPUs provide the highest overall performance, the gap can close for some convolutional networks; and the KNL can be competitive in performance/watt. We find that NVLink facilitates scaling efficiency on GPUs. However, its importance is heavily dependent on neural network architecture. Furthermore, for weak-scaling --- sometimes encouraged by restricted GPU memory --- NVLink is less important.

Gawande, Nitin A.↗

Power Hardware-in-the-Loop Evaluation of PV Inverter Grid Support on Hawaiian Electric Feeders

As more grid-connected photovoltaic (PV) inverters become compliant with evolving interconnections requirements, there is increased interest from utilities in understanding how to best deploy advanced grid-support functions (GSF) in the field. One efficient and cost-effective method to examine such deployment options is to leverage power hardware-in-the-loop (PHIL) testing methods, which combine the fidelity of hardware tests with the flexibility of computer simulation. This paper summarizes a study wherein two Hawaiian Electric feeder models were converted to real-time models using an OPAL-RT real-time digital testing platform, and integrated with models of GSF capable PV inverters based on characterization test data. The integrated model was subsequently used in PHIL testing to evaluate the effects of different fixed power factor and volt-watt control settings on voltage regulation of the selected feeders using physical inverters. Selected results are presented in this paper, and complete results of this study were provided as inputs for field deployment and technical interconnection requirements for grid-connected PV inverters on the Hawaiian Islands.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Machine Learning-Based PV Reserve Determination Strategy for Frequency Control on the WECC System

Frequency control from photovoltaic (PV) power plants has great potential to address the frequency response challenge of the power system with high penetrations of renewable generation. Using model-based approaches to determine the optimal PV headroom reserve, however, requires significant online computation and is intractable for an interconnection level system. This paper proposes a machine learning based strategy, that is suitable for real-time operation, to determine the optimal PV reserve for frequency control. The proposed machine learning algorithm is trained and tested on 1,987 offline simulations of a 60% renewable penetration Western Electricity Coordinating Council (WECC) system. Furthermore, the proposed reserve determination strategy is applied on a realistic 1-day operation profile of the WECC system and demonstrates a savings of more than 40% PV headroom compared to a conservative approach. It is evident that the proposed strategy can efficiently and effectively determine the optimal PV frequency control reserve for realistic interconnection systems.

frequency control↗

STEPS: A Portable Numerical Simulation Toolkit for Electrical Power System Dynamic Studies

Numerical simulation is the key technique for large scale power system analysis. Redistribution of global renewable power via international interconnections requires new simulation tools to study the interconnected systems with different nominal frequencies as a whole. In this paper we introduce an open source simulation toolkit for electrical power systems (STEPS) which is hosted at Github. Its kernel is coded in C++ with major functions of power flow and electro-mechanical dynamic simulation. Flexible options are provided and configurable to improve power flow solution and dynamic simulation. Common devices and models are supported in STEPS for AC/DC hybrid system studies. Studies of interconnected systems with different nominal frequencies is supported in STEPS for research of international interconnection. Application program interfaces are provided and wrapped with Python to enable high-level interfaces for general applications. STEPS is thread safe and parallel computation is supported in both kernel and script levels to accelerate simulation. It is portable and works on Windows and GNU/Linux platforms. Cases from small to large scale systems are thoroughly tested to validate the toolkit with commercial packages as benchmarks.

42 ENGINEERING↗

Enabling Resiliency Operations across Multiple Microgrids with Grid Friendly Appliance Controllers

Changes in economic, technological, and environmental policies are resulting in a re-evaluation of the dependence on large central generation facilities and their associated transmission networks. Emerging concepts of smart communities/cities are examining the potential to leverage cleaner sources of generation, as well as integrating electricity generation with other municipal functions. When grid connected, these generation assets can supplement the existing interconnections with the bulk transmission system, and in the event of an extreme event, they can provide power via a collection of microgrids. To achieve the highest level of resiliency, it may be necessary to conduct switching operations to interconnect individual microgrids. While the interconnection of multiple microgrids can increase the resiliency of the system, the associated switching operations can cause large transients in low inertia microgrids. The combination of low system inertia and IEEE 1547 and 1547a-compliant inverters can prevent multiple microgrids from being interconnected during extreme weather events. This study will present a method of using end-use loads equipped with Grid Friendly™ Appliance controllers to facilitate the switching operations between multiple microgrids; operations that are necessary for optimal operations when islanded for resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

New trends in photonic switching and optical networking architectures for data centers and computing systems [Invited]

The rapid increases in data traffic coupled with user preferences are driving the data center and computing system service providers to offer energy-efficient, intelligent, flexible, cost-effective, high-capacity, and low-latency data services without added complexity to the users. Disaggregated heterogeneous reconfigurable computing systems realized by photonic switching and interconnects can enhance throughput and energy efficiency for artificial intelligence/machine learning (AI/ML) workloads, especially when aided by the AI/ML-enhanced control plane. Photonic switching and new optical networking architectures are expected to solve many of these challenging problems. This paper discusses new trends in photonic switching and optical network architectures for future data centers and computing systems summarized as follows: (1) flat reconfigurable disaggregated computing enabled by high-radix photonic switching and interconnects in data centers; (2) chiplet-based computing architectures empowered by embedded photonics toward heterogeneous reconfigurable computing; (3) nanosecond-scale photonic switching in data centers and computing systems; (4) AI/ML in self-driving, application-aware, and situation-aware data centers; (5) the emergence of flexible networking for cloud computing, edge computing, and split computing, as well as flexible networking for 5G/6G RF-optical networks; and (6) the deployment of embedded co-designed silicon photonics being considered for future data centers.

Yoo, S. J. Ben (ORCID:0000000274201871)↗

Advanced Inverter Technology for High Penetration Levels of PV Generation in Distribution Systems

This subcontract report was completed under the auspices of the NREL/SCE High-Penetration Photovoltaic (PV) Integration Project, which is co-funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) and the California Solar Initiative (CSI) Research, Development, Demonstration, and Deployment (RD&D) program funded by the California Public Utility Commission (CPUC) and managed by Itron. This project is focused on modeling, quantifying, and mitigating the impacts of large utility-scale PV systems (generally 1-5 MW in size) that are interconnected to the distribution system. This report discusses the concerns utilities have when interconnecting large PV systems that interconnect using PV inverters (a specific application of frequency converters). Additionally, a number of capabilities of PV inverters are described that could be implemented to mitigate the distribution system-level impacts of high-penetration PV integration. Finally, the main issues that need to be addressed to ease the interconnection of large PV systems to the distribution system are presented.

14 SOLAR ENERGY↗

Virginia Offshore Wind Technology Advancement Project (VOWTAP) DOE EE0005985 Final Technical Report Rev 1a

The primary purpose of the VOWTAP was to advance the offshore wind industry in the United States (U.S.) by demonstrating innovative technologies and process solutions that would establish offshore wind as a cost-effective renewable energy resource. The VOWTAP Team proposed to design, construct, and operate a 12 megawatt (MW) offshore wind facility located approximately 27 statute miles (mi) (24 nautical miles [nm], 43 kilometers [km]) off the coast of Virginia. The proposed Project would consist of two Alstom Haliade™ 150-6 MW turbines mounted on inward battered guide structures (IBGS), a 34.5-kilovolt (kV) alternating current (AC) submarine cable interconnecting the WTGs (inter-array cable), a 34.5-kV AC submarine transmission cable (export cable), and a 34.5 kV underground cable (onshore interconnection cable) that would connect the Project with existing Dominion infrastructure located in Virginia Beach, Virginia (Figure 1). Interconnection with the existing Dominion infrastructure would also require an onshore switch cabinet, a fiber optic cable, and new interconnection station to be located entirely within the boundaries of the Camp Pendleton State Military Reservation (Camp Pendleton). The VOWTAP balanced technology innovation with commercial readiness such that turbine operations were anticipated to commence by 2018. Dominion, as the leaseholder of the Virginia Wind Energy Area (WEA), anticipated leveraging lessons learned through the VOWTAP, and applying them to future commercial-scale offshore wind development.

17 WIND ENERGY↗

Novel Methods to Determine Feeder Locational PV Hosting Capacity and PV Impact Signatures

Often PV hosting capacity analysis is performed for a limited number of distribution feeders. For medium - voltage distribution feeders, previous results generally analyze less than 20 feeders, and then the results are extrapolated out to similar types of feeders. Previous hosting capacity research has often focused on determining a single value for the hosting capacity for the entire feeder, whereas this research expands previous hosting capacity work to investigate all the regions of the feeder that may allow many different hosting capacity values wit h an idea called locational hosting capacity (LHC)to determine the largest PV size that can be interconnected at different locations (buses) on the study feeders. This report discusses novel methods for analyzing PV interconnections with advanced simulati on methods. The focus is feeder and location - specific impacts of PV that determine the locational PV hosting capacity. Feeder PV impact signature are used to more precisely determine the local maximum hosting capacity of individual areas of the feeder. T he feeder signature provides improved interconnection screening with certain zones that show the risk of impact to the distribution feeder from PV interconnections.

30 DIRECT ENERGY CONVERSION↗

Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions

Disclaimer: The following document includes draft certification protocols and should not be viewed as a consensus-based performance standard. Distributed energy resources (DERs), such as photovoltaic (PV) systems, when deployed in a large scale, are capable of significantly influencing the operation of bulk and local power systems. Looking to the future, European and American stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. One of the jurisdictions considering modifications to the DER interconnection requirements is California. To determine what changes could improve electric grid reliability and allow greater penetrations of renewable energy, the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), in conjunction with consultant Frances Cleveland, convened the Smart Inverter Working Group (SIWG) in January 2013. The SIWG--composed of state agencies, utility engineers, national laboratories, manufacturers, trade associations, and advocacy groups--provided the CPUC a set of recommendations in early 2014 1 . The recommendations included specific advanced DER functions and interoperability requirements, along with a proposed timeline, for California to add new capabilities to grid-interconnected DER. On August 18, 2014 the three California Investor-Owned Utilities (IOUs)--Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE) and San Diego Gas & Electric Company (SDG&E)--drafted a Advice Letter filing to the CPUC setting forth revisions to Electric Tariff Rule 21 to conform to the seven recommendations made by the Working Group 2 . After a comment period, the CPUC issued an update to the IOU recommendations 3 . At the time of this publication, there was no final legal ruling on the CPUC Rulemaking (R.) 11-09-011 ("Order Instituting Rulemaking on the Commission's Own Motion to improve distribution level interconnection rules and regulations for certain classes of electric generators and electric storage resources"). In the U.S., Nationally Recognized Test Laboratories (NRTLs) independently verify products to safety and functional standards. PV inverters are certified to Underwriters Laboratories (UL) Standard 1741 4 . However, new advanced inverter functions described in the SIWG and IOU proposals are not included in this standard, so there is a critical need to develop test protocols for these functions in preparation of a positive ruling by the CPUC. Through a California Solar Initiative Grant, Sandia National Laboratories (Sandia or SNL), Underwriters Laboratories (UL), Electric Power Research Institute, Inc. (EPRI), Xanthus Consulting, SunSpec Alliance, Loggerware, and utility and PV inverter manufacturers have collaborated to draft this certification protocol for the Rule 21 SIWG Phase 1 advanced inverter functions. This report also includes test procedures for Phase 2 and Phase 3 functions that will be demonstrated later in the CSI4 project. This collaborative effort was performed in close junction with the UL 1741 Standards Technical Panel (STP) working group. This document represents a snapshot of the draft testing protocols at the time of publication and not a consensus certification protocol for advanced inverters. 1 California Public Utilities Commission, "Recommendations for Updating the Technical Requirements for Inverters in Distributed Energy Resources, Smart Inverter Working Group Recommendations," Filed 7 Feb 2014. 2 J.J. Newlander, R.G. Litteneker, S.W. Walter, M. Dwyer, Joint motion of Pacific Gas and Electric Company (U 39 E), Southern California Edison Company (U 338 E) and San Diego Gas & Electric Company (U 902 E) regarding implementation of smart inverter functionalities, Rulemaking 11-09-011 Advice Letter, 18 July, 2014. 3 J.T. Sullivan, CPUC Rulemaking 11-09-011 Agenda ID #13460, 13 Nov, 2014. 4 Underwriters Laboratories Std. 1741 Ed. 2, "Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources," 2010.

42 ENGINEERING↗