Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Application of FREMES to Characterize and Sort Soil During Site Remediation - 20182

During decommissioning of buildings and the related release of nuclear sites, large amounts of bulk materials such as soil must be measured for clearance. These measurements are required to demonstrate that for example potentially contaminated soil is below the respective radiological limits. Doing so also helps to minimize the amount of bulk material which has to be disposed of as nuclear waste. NUKEM Technologies Engineering Services GmbH (NUKEM) applies their FREMES technology in a project at the former fuel element factory of FBFC International at Dessel, Belgium. The purpose is to measure and check for potential contamination within the excavated soil. The project started in 2017 with design and procurement of the necessary equipment. In October 2017 the FREMES system was installed at the site. After installation and an extensive test program the FREMES facility went fully into operation in July 2018. Original foreseen to measure between 4.000 and 8.000 tons of material, it has currently (mid 2019) measured 23.600 tons. It is expected that another 5.000 tons still have to be measured before the project successfully ends. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Preliminary Study on the Use of a NASA Developed Coatings Technology for Protecting Natural Science Collections from Molecular Contaminants

Many museum conservators and collection managers are faced with the challenge of molecular contaminants that can promote the degradation of specimens on display in exhibits or in cabinets at storage facilities. This has prompted the need to explore innovative techniques to alleviate the presence of chemical species that originate from atmospheric off-gassing of materials or cross-contamination among collection items. For example, the Smithsonian Institution's National Museum of Natural History (NMNH) has tackled this problem for many years, specifically targeting contaminants, such as mercury vapor, at its Museum Support Center (MSC) storage facility in Suitland, Maryland. Similarly, the presence of molecular contaminants poses a significant threat for NASA science and exploration missions. The deposition of chemical species on sensitive surfaces can degrade the performance and operational lifetime of satellites, telescopes, and instruments. As a result, a sprayable zeolite-based coatings technology was designed to passively capture molecular contaminants and reduce the risks associated with material outgassing in vacuum environments for aerospace applications. This technology, called the Molecular Adsorber Coating (MAC), was developed at NASA Goddard Space Flight Center (GSFC). MAC has been extensively used during thermal vacuum chamber testing of various spaceflight hardware and components, such as for the James Webb Space Telescope (JWST). The coating is also planned to fly aboard upcoming NASA missions to address on-orbit outgassing concerns within instrument and laser cavities. Recently, the MAC technology was evaluated as a possible solution for protecting the Smithsonian Institution's natural science specimens, specifically its mineral ore and botany collections at the MSC storage facility. The initial year-long study between NASA GSFC and NMNH involved investigating the effectiveness of the MAC technology in capturing molecular contaminants that are present within the collections and storage cabinets at ambient, non-vacuum conditions. The work included sample fabrication, installation and retrieval efforts, testing efforts and associated challenges, preliminary findings, and future plans for the multi-year project.

conservation↗

Preliminary Experiments to Determine Scale and Slip-Stream Effects on a 1/24th Size Model of a JN4H Biplane

This work was undertaken to obtain results on a small model of a complete airplane which might be used for comparison with corresponding tests made in full flight. Somewhat similar tests have been previously made at various other laboratories; but as certain discrepancies exist between corresponding tests in different tunnels, it has been deemed advisable to obtain a direct comparison for this particular installation. The present work covers tests on a one-twenty-fourth scale model at speeds varying from 6.7 m/sec. (15 m.p.h.) to 40.2 m/sec, (90 m.p.h.). A slip stream correction has been obtained by the use of a small belt-driven propeller mounted in front of the model, and force coefficients thus obtained are compared with the measurements of the same forces made in full flight on a geometrically similar airplane. This report gives lift, drag, and longitudinal moment values obtained in tests of a particularly accurate model over a wide range of speeds. A measure of the slip stream corrections on lift and drag forces was obtained by the use of a power-driven model propeller. Measurements were also made of forces and longitudinal moments for all angles from 0 degree to 360 degrees.

Bacon, D L↗

Thermal balance testing of the Anik-E spacecraft

Spar Aerospace, Ltd. of Canada has recently completed the first of two infrared thermal balance/thermal vacuum tests on Canada's next generation of telecommunication satellites: Anik-E. Anik-E is a two spacecraft program using a three axis stabilized GE 5000 series bus as the vehicle for its payload. The infrared test setup consists of the mechanical hardware required to support the spacecraft within the thermal vacuum chamber and the infrared rig which supports the spacecraft. Spar developed a software package which calculated the lamp positions to provide the necessary uniform heat flux, based on the required heat inputs on the various isothermal zones of the spacecraft for the different phases of the tests. Infrared heat sensors, radiometers, were installed on the spacecraft surfaces. These were connected to the facility data processing system and continually monitored the flux absorbed by the various spacecraft surfaces. The test set up had distinct advantages. It enabled testing to progress directly from the thermal balance to thermal vacuum. Waveguide runs were installed for the communications portion of the testing prior to pumpdown. This precluded the requirement to return to ambient to reconfigure the setup.

Golob, Alex↗

Deep Neural Network Assisted Distributed Strain and Temperature Fiber Sensor System for Natural Gas Pipeline Monitoring

Natural gas pipeline integrity monitoring is crucial to detect potential leaks, find structural issues, and prevent environmental damage. This article presents a system of natural gas pipeline monitoring that uses a specialized double Brillouin peak sensing fiber along with the Brillouin optical time domain analysis (BOTDAs) technique. The calibrated sensing fiber coefficients for strain and temperature are 41.8 kHz/ με and 0.9 MHz/°C for peak 1; and 47.2 kHz/ με , and 1.11 MHz/°C for peak 2, respectively. Initially, lab tests were performed by installing a short section of double Brillouin peak fiber (DBPF) on a 1-in steel pipe under pressure up to 1000 per square inch (psi) at elevated temperatures. Simultaneous distributed measurements of temperature and pressure-induced hoop strain were successfully measured. Considering the long processing speed to extract Brillouin frequency shift (BFS), we employ a novel probabilistic deep neural network (PDNN) framework for rapid BFS prediction. Additionally, using the Finite Element Method, the effects of the pipeline pressure on hoop strain were modeled and compared to the experimental hoop strain under the same set of pipeline conditions. Finally, an actual 4-in outer diameter steel natural gas pipeline was used for pilot-scale tests, where hoop strain was measured at various pressure levels. Leaks were simulated to demonstrate accurate pipeline integrity monitoring. At an internal pipe pressure of 1000 psi, hoop strain of approximately 300 με was observed, and the sensitivity was calculated as 0.28 με /psi. The results of this pilot-scale study demonstrated that the system is capable of performing distributed monitoring sufficient to detect pipeline pressure and the presence of leaks to ensure the safe operation of gas pipelines in the field.

03 NATURAL GAS↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Description of recent changes in the Langley 6- by 28-inch transonic tunnel

Calibrations were obtained in the Langley 6 by 28-inch transonic tunnel with newly installed controllable reentry flaps and test section floor and ceiling. Using available theory, the top and bottom slotted walls were redesigned for minimum wind tunnel interference errors of blockage and stream-line curvature. To minimize Mach number gradients along the tunnel axis downstream of the model, controllable flaps were installed to regulate the flow reentering the test section through the slotted walls. The flap setting is independent of stagnation pressure and varies only with Mach number. The freestream Mach number is determined from the pressrue measured at a station 66.04 cm upstream of the model station. The model has no significant influence on the vertical Mach number distribution at this station. This method of Mach number determination appears to be more accurate than one using the plenum pressure.

Sewall, W. G.↗

Astrobee: Five years of Completed, Current, and Future Research on the International Space Station using Free Flying Robots.

After five years on the International Space Station (ISS), the Astrobee Research Facility, has completed over 160 Test Sessions logging over 1200 hours of operations. Managed by the NASA ISS Program OZ office and supported by NASA Ames Research Center (ARC) in California, the Astrobee Team currently maintains two identical free-flying Astrobee robots and a Docking Station for research on the ISS. As a technology demonstration platform, the Astrobee Robots are available for Guest Scientists to use for a spectrum of research capabilities. Using ambient air on the ISS, propelled by battery-operated fans, Astrobee is designed to autonomously operate throughout most of the USOS (US Orbital Segment), with the objective of minimizing the need for astronaut support. Astrobee carries a suite of six cameras, a two degree-of-freedom (DOF) arm with a gripper that can grasp ISS handrails and other objects, and three payload bays that provide power and data for guest science hardware. Astrobee can autonomously execute hours-long flight plans or be tele-operated from the ground. While the Astrobee Team continues to improve mapping and autonomous flight capabilities, one of the main goals of Astrobee Robots is to provide research opportunities for Guest Scientists. The Astrobee Robot Software (ARS) makes extensive use of the open-source Robot Operating System (ROS). The ARS can be used interchangeably with an Astrobee Simulator or as Astrobee’s onboard software. ARS features include autonomous docking and perching, real-time teleoperations from the ground, plan based autonomous tasks, multi Astrobee communication, among other capabilities. Through simulation software and ground testing laboratories, the Astrobee Team is available to support Guest Scientists during development and testing and lead real-time ISS operations. The Astrobee Team and Guest Scientists have completed research including Astrobatics maneuvers, RFID and sound sensing capabilities, Gecko materials studies, student Robotics Programming Challenges, and Free Flyer formation flight investigations. Current science with the Astrobee Robots is investigating new docking capabilities through software only research as well as testing new docking hardware installed on the Astrobees. The Astrobee Team and other researchers at NASA Ames continue to explore robotics applications for future NASA missions such as Gateway and potential experiments involving human-robot interactions. Continued advanced mapping resolution capabilities, and high-resolution panoramic imagery also remains areas of research. Exciting in development research involves docking for rendezvous proximity operation (CLINGERS), multi resolution 3D scanning (MRS), space debris removal in microgravity (REACCH). This presentation will mainly focus on completed research over the past year and current science being performed on the Astrobees. This presentation will also focus on how a Guest Scientist/Researcher progresses from conception to running their science on the Astrobees on the ISS, as well as discuss the Astrobee Facility resources available for supporting ground testing and real-time ISS operations.

Astrobee↗

The NASA Langley Research Center's Unmanned Aerial System Surrogate Research Aircraft

Research is needed to determine what procedures, aircraft sensors and other systems will be required to allow Unmanned Aerial Systems (UAS) to safely operate with manned aircraft in the National Airspace System (NAS). The NASA Langley Research Center has transformed a Cirrus Design SR22 general aviation (GA) aircraft into a UAS Surrogate research aircraft to serve as a platform for UAS systems research, development, flight testing and evaluation. The aircraft is manned with a Safety Pilot and systems operator that allows for flight operations almost anywhere in the NAS without the need for a Federal Aviation Administration (FAA) Certificate of Authorization (COA). The UAS Surrogate can be controlled from a modular, transportable ground station like a true UAS. The UAS Surrogate is able to file and fly in the NAS with normal traffic and is a better platform for real world UAS research and development than existing vehicles flying in restricted ranges or other sterilized airspace. The Cirrus Design SR22 aircraft is a small, singleengine, four-place, composite-construction aircraft that NASA Langley acquired to support NASA flight-research programs like the Small Aircraft Transportation System (SATS) Project. Systems were installed to support flight test research and data gathering. These systems include: separate research power; multi-function flat-panel displays; research computers; research air data and inertial state sensors; video recording; data acquisition; data-link; S-band video and data telemetry; Common Airborne Instrumentation System (CAIS); Automatic Dependent Surveillance-Broadcast (ADS-B); instrumented surfaces and controls; and a systems operator work station. The transformation of the SR22 to a UAS Surrogate was accomplished in phases. The first phase was to modify the existing autopilot to accept external commands from a research computer that was connected by redundant data-link radios to a ground control station. An electro-mechanical auto-throttle was added in the next phase to provide ground station control of airspeed. Additional phases are in progress to add waypoint navigation and long range satellite voice and data communications. Potential areas for UAS Surrogate research include the development, flight test and evaluation of sensors to aid in the process of air traffic detect-sense-and-avoid. These sensors could be evaluated in real-time and compared with onboard human evaluation pilots. This paper describes the systems and design considerations that were incorporated in the development of the UAS Surrogate along with details of development problems encountered and the corresponding solutions.

Howell, Charles T., III↗

Heat Transfer Experiments of a 1st Stage Blade Cascade for Supercritical CO2 Oxy-Combustion Turbine Application

The results of internally cooled 1st stage blade (S1B) cascade testing in a supercritical CO2 environment is presented. The turbine blade design has been previously established for the end application of an oxy-combustion turbine operating in the Allam-Fetvedt cycle with turbine inlet conditions of 305 bar and 1150°C. The internally cooled blade features leading edge (LE) region impingement cooling, mid-section ribbed serpentine passages, and a pin-finned trailing edge (TE) region before cooling ejection holes. The geometry for the tested blade cascade has a cooled central blade with un-cooled blades on either side to match flowpath areas of the actual turbine. The flowpath reuses internal components previously employed for mid-section region ribbed serpentine passage experiments that established Nusselt number enhancement ratios over a range of Reynolds numbers from 100,000-400,000. New components include flow conditioning plates upstream and downstream of the blade cascade to adequately represent the flow field and blade external heat transfer coefficient profiles for the actual turbine. The cooled central blade utilizes uniform crystal temperature sensors (UCTS) with six sensors each on the blade pressure and suction surfaces distributed radially and from LE to TE. The post-processed UCTS quantified the maximum wall temperature seen at each installed sensor location. The test procedure consisted of establishing supercritical CO2 cooling flow temperature and flow rate and maintaining it throughout the test. The flow rate aims to match that for the actual in-service turbine blade design and is maintained through an orifice restriction to keep the pressure differential between internal cooling flow and external hot flow nearly constant. For the sCO2 flow path external to the blade, temperatures were ramped throughout the test via control of the test loop’s natural gas burner heater. The maximum temperature seen was 468°C and held constant for a duration of 10 minutes at which the blade metal temperature was predicted to be at its maximum before ramping down. For the turbine blade design for service inlet conditions, external flow path computational fluid dynamics (CFD) results and an internal cooling 1-D thermal and hydraulic flow network model using experimentally validated correlations served as thermal finite element (FE) boundary conditions to predict blade metal temperatures. These predicted temperatures were subsequently utilized in a structural FE model to predict blade life ratings dictated by Haynes 282 creep strength data, having a strong dependence on temperature. The boundary conditions experienced during testing are used in the same workflow and compared to the experimental results, with the goal of validating the analysis methodology and providing insight on the uncertainty in local metal temperature predictions.

20 FOSSIL-FUELED POWER PLANTS↗

Development of hollow electron beams for proton and ion collimation

Magnetically confined hollow electron beams for controlled halo removal in high-energy colliders such as the Tevatron or the LHC may extend traditional collimation systems beyond the intensity limits imposed by tolerable material damage. They may also improve collimation performance by suppressing loss spikes due to beam jitter and by increasing capture efficiency. A hollow electron gun was designed and built. Its performance and stability were measured at the Fermilab test stand. The gun will be installed in one of the existing Tevatron electron lenses for preliminary tests of the hollow-beam collimator concept, addressing critical issues such as alignment and instabilities of the overlapping proton and electron beams.

43 PARTICLE ACCELERATORS↗

Design and Testing of a Solid-Liquid Interface Monitor for High-Level Waste Tanks

A high-level waste (HLW) monitor has been designed, fabricated and tested at full-scale for deployment inside a Hanford tank. The Solid-Liquid Interface Monitor (SLIM) integrates a commercial sonar system with a mechanical deployment system for deploying into an underground waste tank. The system has undergone several design modifications based upon changing requirements at Hanford. We will present the various designs of the monitor from first to last and will present performance data from the various prototype systems. We will also present modeling of stresses in the enclosure under 85 mph wind loading. The system must be able to function at winds up to 15 mph and must withstand a maximum loading of 85 mph. There will be several examples presented of engineering tradeoffs made as FIU analyzed new requirements and modified the design to accommodate. We will present our current plans for installing into the Cold Test Facility at Hanford and into a double-shelled tank at Hanford. Finally, we will present our vision for how this technology can be used at Hanford and Savannah River Site to improve the filling and emptying of high-level waste tanks. In conclusion: 1. The manually operated first-generation SLIM is a viable option on tanks where personnel are allowed to work on top of the tank. 2. The remote controlled second-generation SLIM can be utilized on tanks where personnel access is limited. 3. The totally enclosed fourth-generation SLIM, when the design is finalized, can be used when the possibility exists for wind dispersion of any HLW that maybe on the system. 4. The profiling sonar can be used effectively for real-time monitoring of the solid-liquid interface over a large area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MICROPHONICS TESTING OF LCLS II CRYOMODULES AT JLAB

Jefferson Lab is partnering with Fermilab to build 40 cryomodules for the LCLS II accelerator that will be installed at the Stanford Linear Accelerator (SLAC). The LCLS II cryomodule is an 8-seat CW cryomodule which operates at 1300 MHz and is based on the XFEL design. The cavities have design loaded-Q of 4×107, which means that it has a control bandwidth of 16 Hz. The JLab prototype cryomodule was instrumented with a series of 10 accelerometers, and impulse hammer response measurements were made while the cryomodule was being built and after it was installed in the JLAB cryomodule test facility. This was done so that we could better understand the shapes of the modes of the structure. These results were compared to impulse hammer testing from the outside of the cryomodule to individual cavity frequency shifts when the cryomodule was cold. Additionally, background microphonics and transfer function measurements were made on several other LCLS II cryomodules in the JLab cryomodule test facility (CMTF). The prototype cryomodule had excessive microphonics up to 100 Hz peak due to a thermo-acoustic oscillation in the cryogenic supply circuit. Design modifications were implemented and subsequently the cryomodules had microphonics on the order of 10 to 20 Hz.

Powers, Thomas↗

New Remote Method for Estimation of Contamination Levels of Reactor Equipment - 13175

Projects for decommissioning of shutdown reactors and reactor facilities carried out in several countries, including Russia. In the National Research Centre 'Kurchatov Institute' decontamination and decommissioning of the research reactor MR (Material Testing Reactor) has been initiated. The research reactor MR has a long history and consists of nine loop facilities for experiments with different kinds of fuel. During the operation of main and auxiliary equipment of reactors it was subjected to strong radioactive contamination. The character of this contamination requires individual strategies for the decontamination work. This requires information about the character of the distribution of radioactive contamination of equipment in the premises. A detailed radiation survey of these premises using standard dosimetric equipment is almost impossible because of high levels of radiation and high-density of the equipment that does not allow identifying the most active fragments using standard tools of measurement. The problem can be solved using the method of remote measurements of distribution of radioactivity with help of the collimated gamma-ray detectors. For radiation surveys of the premises of loop installations remotely operated spectrometric collimated system was used [1, 2, 3]. As a result of the work, maps of the distribution of activity and dose rate for surveyed premises were plotted and superimposed on its photo. The new results of measurements in different areas of the reactor and at its loop installations, with emphasis on the radioactive survey of highly-contaminated samples, are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities. The HDU previously served as a test bed for testing technologies and sub-systems in a terrestrial surface environment. in 2010 in the Pressurized Excursion Module (PEM) configuration. Due to the amount of work involved to make the HDU project successful, the HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators The size of the team and number of systems involved With the HDU makes Integration a complicated process. However, because the HDU shell manufacturing is complete, the team has a head start on FY--11 integration activities and can focus on integrating upgrades to existing systems as well as integrating new additions. To complete the development of the FY-11 HDU from conception to rollout for operations in July 2011, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads. The highlighted HDU work for FY-11 will focus on performing upgrades to the PEM configuration, adding the X-Hab as a second level, adding a new porch providing the astronauts a larger work area outside the HDU for EVA preparations, and adding a Hygiene module. Together these upgrades result in a prototype configuration of the Deep Space Habitat (DSH), an element under evaluation by NASA's Human Exploration Framework Team (HEFT) Scheduled activates include early fit-checks and the utilization of a Habitat avionics test bed prior to installation into HDU. A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development. Modeling tools have been effective in hardware systems layout, cable routing, sub-system interface length estimation and human factors analysis. Decision processes on integration and use of all new subsystems will be defined early in the project to maximize the efficiency of both integration and field operations. In addition a series of tailored design reviews are utilized to quickly define the systems and their integration into the DSH configuration. These processes are necessary to ensure activities, such as partially reversing integration of the X-Hab second story of the HDU and deploying and stowing the new work porch for transportation to the JSC Rock Yard and to the Arizona Black Point Lava Flow Site are performed with minimal or no complications. In addition, incremental test operations leading up to an Integrated systems test allows for an orderly systems test program. For FY-11 activities, the HDU DSH will act as a laboratory utilizing a new X-Hab inflatable second floor with crew habitation features. In addition to the day to day operations involving maintenance of the HDU and exploring the surrounding terrain, testing and optimizing the use of the new X-Hab, work porch, Hygiene Module, and other sub-system enhancements will be the focus of the FY-11 test objectives. The HDU team requires a successful integration strategy using a variety of tools and approaches to prepare the DSH for these test objectives. In a challenging environment where the prototyping influences the system design, as well as Vice versa, results of the HDU DSH field tests will influence future designs of habitat systems.

Gill, Tracy↗

Evaluation of Fabric Membranes for Use in Saltstone Drain Water System

Saltstone Disposal Unit 2 contains a sheet drain fabric intended to separate solids from drain water to be returned to the Salt Feed Tank. A similar system installed in Vault 4 appears to be ineffective in keeping solids out of the drain water return lines. Waste Solidification Engineering is considering installation of an additional fabric membrane to supplement the existing sheet drain in SDU 2. Amerdrain 200 is the product currently installed in SDU 2. This product is no longer available, so Sitedrain 94 was used as the replacement product in this testing. Fabrics with apparent opening sizes of 10, 25, 50 and 100 microns were evaluated. These fabrics were evaluated under three separate test conditions, a water flow test, a solids retention test and a grout pour test. A flow test with water showed that installation of an additional filter layer will predictably reduce the theoretical flux through the sheet drain. The manufacturer reports the flux for Sitedrain 94 as 150 gpm/ft 2 by ASTM D-4491. This compares reasonably well with the 117 gpm/ft 2 obtained in this testing. A combination of the 10 micron fabric with Sitedrain 94 could be expected to decrease flux by about 10 times as compared to Sitedrain 94 alone. The different media were used to filter a slag and fly ash mixture from water. Slag historically has the smallest nominal particle size of the premix components. Cement was omitted from the test because of its reactivity with water would prohibit accurately particle size measurements of the filtered samples. All four media sizes were able to remove greater than 95% of particles larger than 100 microns from the slurry. The smaller opening sizes were increasingly effective in removing more particles. The 10 micron filter captured 15% of the total amount of solids used in the test. This result implies that some insoluble particles may still be able to enter the drain water collection system, although the overall solids rejection is significantly improved over the current design. Test boxes were filled with grout to evaluate the performance of the sheet drain and fabrics in a simulated vault environment. All of the tests produced a similar amount of drain water, between 8-11% of the amount of water in the mix, which is expected with the targeted formulation. All of the collected drain waters contained some amount of solids, although the 10 micron filter did not appear to allow any premix materials to pass through. The solids collected from this box are believed to consist of calcium carbonate based on one ICP-AES measurement. Any of the four candidate fabrics would be an improvement over the sheet drain alone relative to solids removal. The 10 micron fabric is the only candidate that stopped all premix material from passing. The 10 micron fabric will also cause the largest decrease in flux. This decrease in flux was not enough to inhibit the total amount of drain water removed, but may lead to increased time to remove standing water prior to subsequent pours in the facility. The acceptability of reduced liquid flux through the 10 micron fabric will depend on the amount of excess water to be removed, the time available for water removal and the total area of fabric installed at the disposal cell.

42 ENGINEERING↗

In‐operando thermal transport characterization of moving particle bed heat exchanger

The project aimed to develop modulated photothermal radiometry (MPR) for conducting in-operando measurements of thermal transport in moving particle bed heat exchangers (MPBE) located at Sandia National Laboratory (SNL). The plan was to initially conduct lab-scale measurements on a 1-meter-long particle channel at UCSD, followed by in- operando measurements at SNL on a 20 kWth MPBE prototype built for this project, and if time permitting, potential final deployment on SNL’s 1 MWth G3P3 MPBE. The first two goals were successfully achieved but due to changes with commissioning timeline of the G3P3 MPBE, in-operando measurements on the G3P3 MPBE could not be conducted. The measurement campaigns have resulted in some promising results and the MPR tool has been handed over to trained SNL personnel for future use. MPR measurements on UCSD’s 1-meter-long particle channel showed a peculiar length dependence of the particle bed thermal conductivity and near-wall thermal resistance. The bed thermal conductivity increased, and the near-wall thermal resistance decreased, with increasing distance from the channel inlet, both eventually reaching a plateau. This was found to be due to hydrostatic pressure screening by the channel walls, known as the “Janssen effect”, and is the first experimental study on its role in granular heat transfer. A 20 kWth small-scale MPBE prototype, the first of its kind with 3 mm particle channels and 2 mm sCO2 plates, was designed and manufactured by Vacuum Process Engineering (VPE) for this project. This MPBE prototype was installed in SNL’s HEX test stand and the MPR tool was integrated into the test stand for in-operando measurements. Several modifications have been made to the MPR setup for facile installation and easy operation at SNL. Measurements with Carbo HSP40/70 particles were conducted with various particle and sCO2 temperatures and flow rates. Further, apart from regular MPBE operation, fault scenarios such as plate warping, particle stagnation, and choking were also detected and MPR showed excellent sensitivity to the detection of such conditions. Through the course of this project, MPR has evolved from a sensitive laboratory technique to a rugged industrial tool with various applications in high temperature measurements and diagnostics.

14 SOLAR ENERGY↗

Final Assembly and Factory Testing of the Jefferson Lab SHMS Spectrometer Quadrupole and Dipole Superconducting Magnets

Jefferson Lab is constructing an 11 Gev/c electron spectrometer called the Super High Momentum Spectrometer (SHMS) as part of the 12 GeV JLAB upgrade for experimental Hall C. Three of the five superconducting(SC) SHMS magnets are under construction at SigmaPhi in Vannes France as a result of an international competition for design and fabrication. The three magnets Q2 and Q3 60 cm bore quadrupoles and the 60 cm warm bore dipole are complete or near complete and have many design features in common. All three magnets share a common superconductor, collaring system, cryostat design, cold to warm support, cryogenic interface, burnout resistant current leads, DC power supply, quench protection, instrumentation and controls. The three magnets are collared, installed in cryostats and welded up and in various stages of final testing. The Q2 quadrupole is due to ship from France to America in August arriving during this ASC conference and has passed all final hipot, leak and pressure tests. The dipole is in leak and pressure testing as of July 2016 while the Q3 quadrupole requires some outer vacuum vessel assembly. Delivery of the Q3 and Dipole magnets will follow the Q2 at about 1 month intervals. Lastly, factory testing have included hipot and electrical tests, magnetic tests at low field, mechanical alignments to center the coils, leak tests and ASME Code required pressure tests. Upon installation in Hall C at JLAB cold testing will commence.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗