Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “districts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Pre-Project Planning for a Flameless Pressurized Oxy-Combustion Pilot Plant (Final Technical Report)

The team of Southwest Research Institute® (SwRI®), ITEA, Electric Power Research Institute, Inc. (EPRI), GE Global Research (GE), Jacobs Engineering (Jacobs), and Peter Reineck Associates (PRA) are advancing Flameless Pressurized Oxy-Combustion (FPO), a novel coal technology. This effort seeks to complete the preliminary engineering and planning of a 50-MWth Pilot Plant that produces electricity and steam for district heating. The technology, pioneered by ITEA at the 5-MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this project was to bring all of the core cycle components to the same level of design maturity. Extensive cycle modeling and evaluation explored various configurations of the process. Different coals, operating conditions, and heat recovery devices were considered and modeled using Aspen Plus. The results of the cycle modeling informed the pilot plant configuration and the planned configuration at the commercial scale. The system pressurization is maintained in the flue gas clean-up and water removal. This allows for efficient and cost-effective carbon dioxide compression and sequestration package. Once the cycle was optimized, preliminary drawings, layouts, and plans defined the pilot facility. Process flow diagrams (PFD) were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. A detailed cost estimate for the planned configuration was completed with an Association for the Advancement of Cost Engineering (AACE) Class IV level of cost analysis. A site selection effort evaluated a variety of potential candidate sites. The selection effort focused on three sites for an in-depth evaluation of the merits and viability of hosting a pilot demonstration. The ability of the host site to support the project with cost sharing was also assessed. The selection process chose the University of Wyoming (UW) as the host site, and cost estimates for the pilot capital estimate were made using local data. A preliminary test plan and operation plan, which creates figures of merit, control, and instrumentation was produced. An effort that outlines methods of pilot cost reduction was completed near the end of the project. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗

Cost of Saving Electricity Through Efficiency Programs Funded by Customers of Publicly Owned Utilities: 2012–2017

This report finds that energy efficiency programs for customers of publicly owned utilities saved electricity at an average cost of 2.4 cents per kilowatt-hour (kWh) from 2012 to 2017. Utilities use such cost performance metrics to assess effectiveness of efficiency program portfolios, determine what programs to offer customers, and, more broadly, ensure electricity system reliability at the most affordable cost as part of electric utility resource adequacy planning and resource procurement processes. The study analyzed efficiency program data reported by 111 program administrators for 219 publicly owned utilities in 14 states — about 90 percent of the municipal utilities and public utility districts that report the data to the Energy Information Administration (EIA). The data represent 88 percent of all spending and 75 percent of all savings that publicly owned utilities reported to EIA in those years. Berkeley Lab used data from several sources, including data provided directly by American Public Power Association members, publicly available annual reports and regional data collections.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Revised Architectural Survey of the Nuclear Engine Maintenance Assembly and Disassembly Facility, Area 25, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) anticipates closure activities under the Federal Facility Agreement Consent Order (FFACO) and eventual demolition of the Engine Maintenance and Disassembly (E-MAD) facility, to meet Environmental Management mission requirements. The NNSA/NFO has obligations under Section 106 of the National Historic Preservation Act (NHPA) and its implementing regulations (36 C.F.R. Part 800) to consider the effects of its actions and undertakings on historically important properties and to develop and implement strategies to minimize or mitigate adverse effects to these resources. This Section 106 architectural survey and evaluation of the buildings and structures in the E-MAD facility was done under requirements of 36 C.F.R § 800.4 - Identification of historic properties. Desert Research Institute (DRI) completed an architectural survey of a 21-acre area of potential effect in February 2019. DRI previously surveyed the entire E-MAD facility as a single architectural resource eligible for inclusion in the National Register of Historic Places (NRHP or National Register) under Criteria A and C and Consideration G and as a contributor to the potential Nuclear Rocket Development Station (NRDS) Historic District (Beck et al. 1996).

54 ENVIRONMENTAL SCIENCES↗

Washington Clean Energy Fund: Energy Storage System Consolidated Performance Test Results

This report provides an overview of test results for four energy storage systems funded under the Washington Clean Energy Fund deployed at three utilities in Washington State. Integration of energy storage into the U.S. grid has been gathering momentum across the industry, especially as penetration of power generated by renewable resources increases. Several states have storage procurement targets to deal with a variety of issues, such as afternoon total system load ramping requirements, frequency regulation/control, and integration power generated from by renewable resources. This report presents the performance test results for battery energy storage systems (BESS) funded by the Washington Clean Energy Fund (CEF) 1 Program ($\$$14.3 million in state funding supporting a total investment of $\$$43 million). For each project, the technical attributes of the BESS were tested, defined, and evaluated in detail. These projects were funded jointly by Avista, the Snohomish Public Utility District (SnoPUD), Puget Sound Energy (PSE), the Washington CEF, and the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE).

24 POWER TRANSMISSION AND DISTRIBUTION↗

ION Engineering Commercial Carbon Capture Design & Costing (C3DC) (Final Report)

ION Engineering LLC (ION) has coupled its proven, solvent-based CO 2 capture technology with an exceptionally qualified design and engineering team to complete a pre FEED for a 300-megawatt equivalent commercial-scale CO 2 capture plant for Gerald Gentleman Station’s (GGS) Generation Unit 2 (GGS2). The remarkable team was comprised of ION, Nebraska Public Power District (NPPD), Sargent & Lundy (S&L) with continued support from Koch Modular Process Systems (KMPS), and Siemens. The overall objective of the project was to provide the engineering design and cost estimate at an American Association of Cost Engineers (AACE) Class 3 estimate, resulting in accuracy ranges of -20 to +30% for the capital cost estimate. The project team was successful in completing this objective and was able to overcome the challenges that were presented during the process. A conservative interest rate of 7.0% with a financing term of 20 years was used based on interest rates utilized by S&L for this level of study. The resulting annualization factor is multiplied by the total EPC cost to calculate an annualized capital expenditure. It is estimated that the carbon capture facility treating a 300 MWe slipstream will capture 1.9 million tonnes per year of CO 2 at a capacity factor of 85%. The resulting cost of capture for the CO 2 island was determined to be $\$$36.55/tonne. Utilizing an interest rate of 4.5%, supported by historical rates for previous large capital projects in the power industry, reduces the cost of capture to $32.52/tonne. These cost of capture numbers continue to further ION’s case for commercial deployment of ION’s solvent technology.

20 FOSSIL-FUELED POWER PLANTS↗

Harnessing the Hydroelectric Potential of Engineered Drops (Final Technical Report)

The potential for low-head hydropower in the engineered drops in both federal and private irrigation system is well known and significant. The environmental and socio/recreational impacts of harnessing this renewable energy resource in man-made conduits are much less, and often insignificant, compared with comparable hydro-electric potential in natural water features on rivers, lakes, and streams. Yet, few new plants have been commissioned in more than two decades. Over the same time period, low head hydro installations in Germany have more than doubled. The challenge is in finding economical ways to harness the hydro-electric potential in the engineered drops, and efficiently deliver the power to the grid. The objectives of Percheron Power, LLC's (Percheron Power) Project were to design, develop, permit, and operate an innovative low-head hydro-electric generation facility on an existing engineered drop of a large irrigation canal system. The hydro-electric generation facility was designed to employ a new type of turbine and technology, called an Archimedes Hydrodynamic Screw (AHS), to harness the existing potential of the engineered drop. The goal was to demonstrate the new lower cost AHS technology system to federal agencies, irrigation districts and other system owners and to support further development of new small hydropower projects at previously marginal low-head sites in the U.S. The objective of this funding opportunity of the Department of Energy Water Power Technologies Office was to reduce the Levelized Cost of Energy (LCOE) for small hydropower to less than ${$}$0.07/kWh (${$}$70/MWh) to be competitive with existing base-load power sources such as coal-powered power plants.

13 HYDRO ENERGY↗

Impacts of High Variable Renewable Energy Futures on Electric-Sector Decision Making: Demand-Side Effects

Previous work by the Berkeley Lab describes how high shares of variable renewable energy (VRE) such as wind and solar power could change wholesale electricity price dynamics. These include the timing of when electricity is cheap or expensive, locational differences in the cost of electricity, and the degree of regularity or predictability in those costs. Many decentralized decision-makers on the demand-side may not yet have considered the implications of these possible future changes. In this report, we evaluate the sensitivity of a set of demand-side decisions to different levels of VRE penetration ranging from a low of 5-20% to a high of 40-50%. The analysis builds on hourly wholesale energy and capacity prices in different VRE scenarios for four wholesale markets in the United States for the year 2030 (CAISO, ERCOT, NYISO, and SPP). The principal question for this exploration is whether private and public electric-sector decisions that are made based on assumptions reflecting low VRE levels still achieve their intended objective in a high VRE scenario with 40-50% wind and solar? This scoping report evaluates the impacts of changing patterns of peak system needs on the benefits of demand reductions by examining the altered value of different energy efficiency (EE) measures. Similarly, we investigate new opportunities for large energy consumers that may arise from periods with very low wholesale electricity prices. We calculate the value of new process investments (e.g., hydrogen production and other generalized electro-commodities), showcase the varying value of new product storage investments (such as reservoir extensions at a desalination plant), and estimate the benefits of increased process flexibility that uses electricity as a process-input in addition to traditional fossil fuels (e.g., district energy systems). Finally, many decentralized decision-makers and end-use customers are not directly exposed to wholesale electricity prices but instead receive price signals from their retail electricity rates. As wind and solar shares increase, we compare the economic efficiency of flat retail rates relative to more dynamic time-of-use tariffs with and without critical peak-pricing events.

14 SOLAR ENERGY↗

Final report: Conceptual design of a 10-megawatt electron beam irradiation facility for bio-solid waste treatment

In this report, a conceptual design is proposed for a 10 mega-watt (MW) electron beam accelerator for wastewater treatment. This is done by applying the latest accelerator technologies developed at Fermilab and within the Department of Energy (DOE) Office of Science laboratory complex. This report expands on previous work on the 1 MW accelerator, which was developed with requirements from Metropolitan Water Reclamation District (MWRD) in Chicago. The full report of the previous effort is available from the Office of High Energy Physics Accelerator Stewardship Program [1].

43 PARTICLE ACCELERATORS↗

Inspection Status Report of Site A/Plot M (Report for 2020)

The Site A/Plot M, Decommissioned Reactor Site was inspected on September 24, 2020. Site A/Plot M is located in the Palos Area Preserves, operated by the Forest Preserve District of Cook County. The site was found to be in good condition with minimal erosional concerns across the grass covered mound at Plot M. Landscaping timbers installed along the footpath north of Plot M is effective in reducing erosion down the hill. Erosion concerns at Plot M are being addressed by Argonne National Laboratory (ANL). The bike trail installed by Cook County Forest Preserve to the east of Plot M has helped reduce traffic at the site. The Plot M monument appears solid with no visible cracks. The Site A monument has several cracks present that will possibly widen over time. No cause for a follow up inspection was identified.

54 ENVIRONMENTAL SCIENCES↗

Catalina Repower Feasibility Study: NREL Phases I & II Summary Report

Engineers at the National Renewable Energy Laboratory (NREL) supported Southern California Edison (SCE) and the United States Environmental Protection Agency (EPA) by conducting technical and economic analyses for energy systems at Santa Catalina (Catalina) Island, which is located 22 miles off the coast of Long Beach, California. This effort was part of a broader Repower Catalina Feasibility Study that was also supported by NV5, an engineering consulting firm and project partner to NREL for this analysis. This document describes NREL’s techno-economic modeling and optimization analysis for the first two phases of this project which focus on supply-side generation and energy storage options for Catalina. SCE’s goal for this analysis is to determine a strategy for electricity generation on Catalina Island that results in lower energy costs, improved energy resiliency, and reduced air emissions. EPA goals for this effort are to reduce emissions of air pollution and encourage renewable energy development on contaminated and formerly contaminated lands when such development is aligned with the community’s vision for the site. Currently, an on-island SCE power plant serves the Catalina Island electrical load with 6 reciprocating diesel generators totaling 9.4 MW; 23 propane-fueled microturbines totaling 1.5 MW; and a 1-MW, 7.2-MWh sodium sulfur battery energy storage system (BESS). In 2017, the electricity consumption on the island was 29.1 GWh, with an average load of 3.3 MW and peak load of approximately 5.5 MW. Considering new environmental standards on diesel generator emissions from California’s South Coast Air Quality Management District, a 60% renewable energy target for 2030 laid out in California’s Senate Bill 100, SCE’s Clean Power Electrification Pathway, and the characteristics of the island’s existing diesel generators, SCE is seeking to evaluate the technical and economic implications of different energy technology options to determine a path forward. Phases I and II of the Repower Catalina Feasibility Study, summarized in this document, evaluated the following: Interconnection with the mainland via an undersea cable; On-island fossil fuel generation, including diesel, propane, and/or liquified natural gas (LNG); On-island renewable energy (RE) technologies, including solar photovoltaics (PV), wind turbines, and wave energy devices; BESS to support the above generation technologies; Initial analysis of the potential impacts of implementing energy efficiency measures. Results indicate strong techno-economic potential for a mix of on-island diesel and/or propane generators, solar PV, BESS, and energy efficiency measures to help SCE and Catalina achieve their goals compliant with California’s emissions and clean energy standards while minimizing electricity life cycle costs (LCC) over the 30-year analysis period. This document summarizes the considerations and findings of Phases I and II, focusing on high-level takeaways from Phase I and more detailed results from Phase II, and discusses a potential path forward for Phase III.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sources of Propane Consumed in California

Project Scope: The objective of this study is to specify the sources of propane consumed in California. It answers the questions, where does the propane used in California come from and how was it produced? The results of this study provide comprehensive, transparent, and verifiable estimates, based on the 2018 market. The information provided in this report is suitable for use to assess the life cycle carbon intensity of propane used as a transportation fuel in California. As the 2009 Low Carbon Fuel Standard (LCFS) aims to reduce California’s greenhouse gas (GHG) emissions and other smog-forming and toxic air pollutants, the appropriate designation of carbon intensity for propane as a transportation fuel is important for evaluating propane’s potential to contribute to GHG goals and understandings in the context of various actions. This study focuses on estimating the shares of total propane consumed in the state of California produced from petroleum refineries, natural gas plants, and bituminous sands sources inside California and elsewhere. Results: An estimated 590 million gallons of propane were consumed in California in 2018, of which, 59.5% originated from refinery production and 40.5% originated from natural gas plants. The majority of this was sourced from refinery production in California, 334 million gallons. Most of the propane imported to California for consumption was sourced from natural gas plants, 113 million gallons, with over half of the imported volume sourced from Canada. The volume sourced from bituminous sand upgrader and fractionator operations was negligible. Details from this analysis are presented in the table below which provides an overview of the propane flows estimated in this study by region and production method. The shares and volumes presented here represent a snapshot for 2018. A significant increase in propane demand, such as could be caused by increased use of propane as a transportation fuel in the state, would affect California’s propane production, imports, and exports. The method and data sources used for the estimates provided in this report also provide the framework which could be used for future updates. Key Method Considerations: The values presented here are based on a two-step approach where the first step was to determine the flows of propane into and out of California from different regions and the second step was to estimate the propane production methods in each region. A volume balance approach is used as the primary method for tracking the volume of propane in and out of California as propane production and import volumes are available by Petroleum Administration of Defense District (PADD) from EIA and neither inter-PADD propane transfers nor state-specific non-prime supplier consumption are available from a public data source. The volume balance performed for this study covered PADD 5 (the West Coast), which includes Arizona, California, Nevada, Oregon, and Washington. The volume balance used all available public datasets to determine propane production, imports, exports, and consumption. Volumes unaccounted for by these datasets were estimated using the resulting volume balance by assuming market equilibrium. Consumption within each state in PADD 5 was estimated based on known import, export, and production volumes and this amount was used to develop the volume balance. EIA only tracks consumption at the state level by prime supplier sales. The volume balance approach provides the basis to correct for additional propane consumed in-states where propane is transferred to California. To determine the California propane sources and trade in 2018. volume of propane consumed in California, the volume balance approach is again used where it was estimated all imported volumes not specifically flagged for re-export were consumed, and the remaining consumption was produced in-state. The California Energy Commission (CEC) provided the total volume of propane imported and exported from California in 2018; this volume data set along with commodity tracking from the Canada Energy Regulator (CER) and the International Trade Commission (ITC) which tracks port of entry and final destination was used to determine where propane originated from and where it was ultimately consumed. For example, the CER tracks propane leaving Canada and entering each state within the U.S. Imported propane from Canada to California – marked for California – is assumed to be consumed in California. When no further data were available, import volumes were assumed to be consumed in California without pass-through (i.e., no propane imported to California was directly sold and exported). In most cases, the production method for each propane source region was applied to the volume of propane transferred to California. In other words, the shares of propane sourced from natural gas and refineries for each production region was assigned to California imports based on their contribution to the total volume flows into California to determine the production method for propane consumed in-state. For volumes imported into California from PADD 4, Washington State, Canada, and the rest of the world (Argentina, Chile, Norway, Peru, South Korea, and Trinidad and Tobago), the volumes sourced from petroleum refineries and natural gas plants reflect the either production ratio for the region or, in cases where the sources specific to the amounts exported to California could be determined, the sources specific to the volumes transferred to California.

03 NATURAL GAS↗

Wyandotte Integrated Renewable Energy Strategy (WIRES 2) (Final Technical Report)

Wyandotte Municipal Services (WMS), a Michigan Municipal Utility offering electric generation, transmission & distribution, water filtration & distribution and Broadband/Video sought to deploy a set of renewable energy projects for their Electric Utility that contributed to reducing the City’s environmental and energy impact, provided examples that would encourage businesses and citizens to adopt cleaner energy practices and help WMS meet the required renewable energy standards of the State of Michigan (10% in 2015, 15% in 2021). WMS generates and delivers roughly 280,000 megawatt hours (MWh) of electricity annually to more than 10,000 homes and 1,000 businesses within the City of Wyandotte. The Wyandotte Integrated Renewable Energy Strategy – WIRES 2 resulted in deployment of a set of community-scale micro-wind turbines, evaluation and installation of energy-efficient and low-maintenance light-emitting diode (LED) street lights and park lights in highly visible locations in the City and expansion of the geothermal heating and cooling district that already included residential geothermal systems, to include larger scale business/institutional systems at the Utility’s largest electric customer and at the City Library. Finally, WMS identified the need for job training in energy efficiency and renewable energy technologies to further develop a local skilled workforce in these areas. Partially funded by the grant, the wind turbine project provides a benchmark for WMS, local businesses and residents in the evaluation of utility-scale wind v. micro-wind in an urban environment as a renewable energy strategy. Also partially funded by the grant, the LED project benefited the City of Wyandotte by reducing load on the electric system for the public utility but also reduced City costs for streetlighting, parking lot lighting and park lighting without a compromise in security. The project also resulted in a visual success that has led to additional approvals for non-Grant related LED lighting installations resulting in further reduction in the electric load in the City. Commercial Geothermal installations resulted in the Utility being able to eliminate steam customers who formerly utilized the byproduct of steam from WMS electric production. Due to the reduction in natural gas prices and the overall reduction in market purchased power, it was no longer feasible for WMS to operate its Power Plant as a base load plant and to only operate on a market dispatch philosophy when market prices dictated that WMS could produce electricity cheaper than the market purchase price. This has resulted in fewer operating days for the WMS Power Plant, resulting in less environmental impact. WMS has now completely exited the steam business and the ability to offer a geothermal option to two (2) former steam customers (BASF-Wyandotte and the Bacon Memorial Library) allowed for that. In addition, peak loads have been shaved for these two (2) large customers due to the consistent temperature offered by geothermal heating and cooling, reducing the swings associated with thermostat changes caused by outside temperature changes during extreme high and low temperatures. Finally, energy efficiency and renewable energy college-level classes at Wayne County Community College allowed a group of interested students to pursue studies in those technologies through grant provided tuition, books and course materials. This effort provided a foundation of potential future employees not only for WMS but other energy efficiency/renewable energy employers such as Franklin Energy, a partner with WMS in energy optimization efforts with Wyandotte businesses.

17 WIND ENERGY↗

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2020

This report summarizes the progress of fuel cell electric bus (FCEB) development in the United States and discusses the achievements and challenges of introducing fuel cell propulsion in transit. The report provides a summary of results from evaluations performed by the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL). The 2020 summary results primarily focus on the most recent data on these FCEBs, from January 2020 through July 2020. The primary results presented in the report are from 25 FCEBs deployed at three agencies: Alameda-Contra Costa Transit District (AC Transit) in Oakland, California (10 FCEBs); Orange County Transportation Authority (OCTA) in Santa Ana, California (10 FCEBs); SunLine Transit Agency in Thousand Palms, California (5 FCEBs).

08 HYDROGEN↗

Washington Clean Energy Fund Grid Modernization Projects: Economic Analysis (Final Report)

As part of CEF Round 1 funding, Pacific Northwest National Laboratory (PNNL) was engaged by the U.S. Department of Energy (DOE) and the Washington Department of Commerce to work with Puget Sound Energy (PSE), Avista, and Snohomish Public Utility District (SnoPUD) in evaluating the economic and technical performance of each of their battery energy storage systems (BESSs). This report presents the final results of the economic assessment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

State Strategies to Bring Solar to Low- and Moderate-Income Communities

This Final Technical Report describes the goals, objectives, activities, results, and accomplishments of the State Strategies to Bring Solar to Low- and Moderate-Income Communities Project, managed by the Clean Energy States Alliance. This project enabled five states (Connecticut, Minnesota, New Mexico, Oregon, and Rhode Island) and the District of Columbia to develop and implement strategies for expanding market penetration of solar PV among LMI residents and communities. The project disseminated successful strategies and lessons learned from those states to other states and stakeholders across the country.

14 SOLAR ENERGY↗

Construction Support for New Slab Creek Powerhouse Project (Final Technical Report)

The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1.5 million. Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft. Water is conveyed from Slab Creek Reservoir through a 4.9 mile power tunnel to the 224 MW White Rock Powerhouse which discharges into Chili Bar Reservoir. A small 450 kW powerhouse located at Slab Creek Dam utilizes the original license in-stream flow requirement. The new license (FERC Project No. 2101-084) requires significantly more instream flows immediately below the dam for aquatic preservation and recreational flows over the original license. The terms of the new license allow the Slab Creek Powerhouse to utilize the original required dam releases, while the new South Fork Powerhouse will use the new instream flow requirements above the original license requirement. The South Fork Powerhouse routes flows back to the South Fork of the American River via a new penstock that is tied into the White Rock Tunnel at Adit #3. This new penstock bifurcates at the Adit #3 portal with one leg going to the BFRF and the other to the new powerhouse. The South Fork Powerhouse is a single generating unit with a capacity of 2.98 kVA. The BFRF is valve house with an energy dissipation chamber for a 60” fixed cone valve capable of passing 1,300 cfs for meeting the recreational flow requirements of the license.

power tunnel↗

Cost-Effectiveness Analysis of the Residential Provisions of the 2015 IECC for Alabama

These analyses evaluate the cost-effectiveness of the prescriptive path of the 2015 edition of the International Energy Conservation Code (IECC), relative to the 2012 and 2009 IECC for all 50 states and the District of Columbia. The analysis covers one- and two-family dwelling units, townhomes, and low-rise multifamily residential buildings covered by the residential provisions of the 2015 IECC. These reports were originally published in October 2015, and revised in February 2016 to update numbers reported in certain results tables.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness Analysis of the Residential Provisions of the 2015 IECC for Connecticut

These analyses evaluate the cost-effectiveness of the prescriptive path of the 2015 edition of the International Energy Conservation Code (IECC), relative to the 2012 and 2009 IECC for all 50 states and the District of Columbia. The analysis covers one- and two-family dwelling units, townhomes, and low-rise multifamily residential buildings covered by the residential provisions of the 2015 IECC. These reports were originally published in October 2015, and revised in February 2016 to update numbers reported in certain results tables.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗