Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corridors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Network-Scale Ubiquitous Volume Estimation Using Tree-Based Ensemble Learning Methods

Currently ubiquitous volume data for roadway networks remains the key missing dimension in traffic operations. Most volume data are average annual daily traffic (AADT) measures derived from the Highway Performance Monitoring System (HPMS). Although methods to factor the AADT to hourly averages for typical day of week exist, actual volume data is limited to a sparse collection of locations in which volumes are continuously recorded. This paper/poster explores the use of state-of-art machine learning techniques to estimate accurate volume measures that span the highway network providing ubiquitous coverage in space, and point-in-time measures for a specific date and time. Three tree-based ensemble learning models, random forest (RF), gradient boost machine (GBM), and extreme gradient boost (XGBoost), were tested for volume estimation by learning from combined dataset of commercial probe data provided by TomTom, the FHWA's Travel Monitoring Analysis System (TMAS) data, and other infrastructure attributes such as number of lanes, speed limit, and weather. The methods were tested on major corridors and freeways in the metropolitan area of Denver. All three machine learning methods were able to provide hourly volume estimates 24 hours a day, 7 days a week, and 365 days a year with around 18% mean absolute error to true volume and about 5% of error with respect to roadway capacity. The low error measures allow the potential application by transportation agencies.

33 ADVANCED PROPULSION SYSTEMS↗

High Performance Computing Traffic Simulations for Real-Time Traffic Control of Mobility in Chattanooga Region

In 2019, highway congestion wasted over 3 billion gallons of fuel and caused 8.8 billion hours of lost productivity.1 Research has shown that introducing near-real time traffic controls can significantly reduce congestion. Validated and calibrated traffic simulations enable the modeling of transportation systems and the evaluation of different traffic control actions and schemes given a variety of circumstances that represent likely future scenarios. The developed scenarios can inform the deployment of controls in near real-time to improve freight and passenger vehicle congestion and energy use. In this work, we present simulations used to model the traffic in the Chattanooga, Tennessee, metropolitan area. Simulations were constructed and calibrated using a variety of local, data science enhanced, data sources utilizing open source software including the Simulation of Urban Mobility (SUMO) simulator. High-Performance Computing (HPC) provides a scalable platform with enough computing for the high-fidelity simulation of many scenarios and the application of advance data science especially for large-scale systems. Our simulations include microscopic simulations at a corridor level for traffic signal control, and mesoscopic simulations to evaluate regional operational controls and infrastructure.

97 MATHEMATICS AND COMPUTING↗

Ubiquitous Traffic Volume Estimation through Machine-Learning Procedure

Traffic volume data is one of the most important metrics for accurate assessment of the performance of a transportation system. Quality volume data is required to effectively assess extent of delay and congestion, detect real-time perturbations to the network, and understand traffic patterns during major weather events. Traffic volume on freeways are typically collected through continuous count stations installed by state DOTs, while there is lack of traffic volume observability on off-freeway roads. The National Renewable Energy Laboratory (NREL), in Collaboration with the I-95 Corridor Coalition and the University of Maryland, extended its research into estimating volumes anywhere anytime from industry probe based data for off-freeway roads. NREL combined vehicle probe count data with several other data sets (speed, whether, roadway geometry, time-of-day, day-of-week, etc.) to estimate hourly volumes as well as AADTs. The research validated and demonstrated the machine learning model, namely XGBoost, using data collected from Pennsylvania, North Carolina, and Tennessee.

47 OTHER INSTRUMENTATION↗

Impact of Tuned Lighting on Skilled Nursing Center Residents' Sleep

The Problem: Sleep disturbance is common among nursing center residents and places them at risk for poor health outcomes. Lighting that changes in color and intensity over the course of the day and night may improve sleep and other outcomes, like dementia behaviors, but has has not been rigorously evaluated under real-world conditions. The Resolution: This single-facility study establishes that facility-level tuned lighting is feasible to implement and evaluate in a nursing center. Researchers randomly-assigned three corridors to one of two lighting conditions, then the other. Residents experienced half as many sleep disturbances while exposed to tuned vs. static lighting. There was no effect on behaviors. Tips for Success: Tuned lighting is a low-risk intervention that could be employed in new construction or when retrofitting fixtures into existing buildings. Key Words: Nursing home, long-term care, lighting, sleep, behaviors

60 APPLIED LIFE SCIENCES↗

Raising the Bar in High Performance Laboratory Design

Laboratory facilities are expensive to build and operate, they consume energy at high rates compared to other types of buildings, and modifications are frequently required to accommodate ever-changing research activities. PNNL sought ways to address these issues in the design and construction of a 14,700 sq. ft. new laboratory building. To improve adaptability to change a high roof structure was used that allows raising the ceiling when needed with minimal disruption to installed HVAC and electrical utilities. Also, HVAC equipment was located on a mezzanine above the central corridor rather than above ceilings. This eliminates the need for maintenance personnel to routinely access lab spaces, reducing disruption to research staff and improving maintenance access. To improve the reliability of operations while reducing energy consumption, heat pipe heat recovery with evaporative cooling, zoned heating/cooling coils, high-efficiency condensing boilers, district cooling, VAV fume hoods, DDC controls, energy use monitoring, and implementation of the US Department of Energy’s Guiding Principles for Federal Leadership in Sustainable Buildings were all used. The energy model developed during design projected energy use at 2,840 MBtu/yr, a 13.5% savings over ASHRAE Standard 90.1-2010. The first full year of operation resulted in actual energy use of 2,661 MBtu, a savings of 19% over Standard 90.1. As a result of the project design’s demonstrated success, these strategies will be incorporated into a significantly larger (125,000 sq ft), $65 million lab facility to be constructed on the PNNL campus in 2020.

Scott, Jeffery M.↗

Developing a Hybrid Electric Vehicle Eco-Cooperative Adaptive Cruise Control System at Signalized Intersections.

This study develops an eco-driving strategy for hybrid electric vehicles (HEVs) in the vicinity of signalized intersections, entitled HEV Eco-Cooperative Adaptive Cruise Control at Intersections (Eco-CACC-I). The proposed system computes real-time, energy-optimized vehicle trajectories using HEV vehicle dynamics and energy consumption models. In the proposed system, a simple HEV energy model is used to compute the instantaneous fuel consumption. This HEV energy model is selected since it is general, transferable, and can be easily used to compute instantaneous energy consumption levels for HEVs without the additional input of vehicle engine data or complicated power control strategies. In addition, a vehicle dynamics model is used to capture the relationship between speed, acceleration level, and tractive/resistance forces on vehicles. The energy-optimum problem is formulated as an optimization problem with constraints, which is solved using a moving-horizon dynamic programming approach. The proposed HEV Eco-CACC-I system was tested to evaluate its performance for various speed limits, roadway grades, and signal timings. Lastly, the proposed HEV controller was implemented in a microscopic traffic simulation software to test its network-wide performance. The test results from an arterial corridor with three signalized intersections demonstrate that the proposed system can effectively reduce stop-and-go traffic in the vicinity of signalized intersections producing savings of 7.4% in energy consumption, 5.8% in traffic delay and 23% vehicle stops, respectively.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RouteE: A Vehicle Energy Consumption Prediction Engine

The emergence of connected and automated vehicles and smart cities technologies create the opportunity for new mobility modes and routing decision tools, among many others. To achieve maximum mobility and minimum energy consumption, it is critical to understand the energy cost of decisions and optimize accordingly. The Route Energy prediction model (RouteE) enables accurate estimation of energy consumption for a variety of vehicle types over trips or sub-trips where detailed drive cycle data are unavailable. Applications include vehicle route selection, energy accounting and optimization in transportation simulation, and corridor energy analyses, among others. The software is a Python package that includes a variety of pre-trained models from the National Renewable Energy Laboratory (NREL). However, RouteE also enables users to train custom models using their own data sets, making it a robust and valuable tool for both fast calculations and rigorous, data-rich research efforts. The pre-trained RouteE models are established using NREL's Future Automotive Systems Technology Simulator paired with approximately 1 million miles of drive cycle data from the Transportation Secure Data Center, resulting in energy consumption behavior estimates over a representative sample of driving conditions for the United States. Validations have been performed using on-road fuel consumption data for conventional and electrified vehicle powertrains. Transferring the results of the on-road validation to a larger set of real-world origin-destination pairs, it is estimated that implementing the present methodology in a green-routing application would accurately select the route that consumes the least fuel 90% of the time. The novel machine learning techniques used in RouteE make it a flexible and robust tool for a variety of transportation applications.

47 OTHER INSTRUMENTATION↗

An Innovative Secure mmWave M2M Communication Network for Operating Drones

Analyze RF (Radio Frequency) coverage in the sky with the innovative use of mmWave phased arrays aimed towards the drone corridor to harness the power of 5G – multiplicative improvement in data throughput & reduction in latency, and support of massive M2M communications. Apply MA (Multiple Access) technology to increase the spectral efficiency by covering a swarm of drones with a single mmWave beam and associated radio resources. Design energy efficient low-bit quantization to form mmWave beams for drone operation. Use drones’ navigation capabilities to significantly improve security by e.g. evading attackers. Utilize intra-drone communication to improve reliability as well as security. Demonstrate the simulated recovery of a critical infrastructure such as a power grid that requires a black restart with mmWave modeling and experiments .

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Verification and Validation of START: A Spent Nuclear Fuel Routing and Decision Support Tool

The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based geospatial decision-support tool being developed by the US Department of Energy’s Office of Integrated Waste Management (IWM) to support federal interim storage for spent nuclear fuel (SNF) and associated transportation. START provides many functions for the IWM program including: serving as a communications tool for conveying geospatial data and information, an options analysis tool for exploring potential transport modes and routes for transporting SNF from nuclear power plants to future federal interim storage facilities, an emergency response planning tool for Tribes and States to identify training needs along potential SNF transport corridors, an environmental analysis tool for estimating potential radiation dose exposure from incident-free and incident-case SNF transport conditions, and a systems analysis support tool providing route-related inputs for system throughput analysis. As part of the START development process, a verification and validation (V&V) effort is being undertaken. In the initial V&V phase, several outputs of the START tool were checked such as the total distance, population and population densities within the buffer zone, and incident free dose. The V&V process is fluid as it will be utilized after each version change to ensure that the core functionalities of the tool are maintained and the results are consistent with the previous versions. Efforts have also been put into developing scripts to aid in the process of automating certain sections of the V&V work. As some of the V&V efforts use Environmental Systems Research Institute’s (ESRI) tools upon which the START framework is built, the START data were compared against outputs from tools like Quantum Geographic Information System (QGIS) for buffer zone populations and route lengths to ensure independence of the V&V process. Good agreement was observed between the START results and the independent V&V studies with the majority of the differences falling between 1% and 5% for populations within the buffer zone and route distance. This presentation describes the development and design of the START tool, V&V methods employed for various metrics of interest and their respective results, and future plans.

START, transportation, GIS, V&V↗

Wind Energy Accomplishments and Year-End Performance Report: Fiscal Year 2022

Four decades ago, construction was just beginning on experimental turbines at the National Wind Technology Center (NWTC). Today, the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) facility is the centerpiece of the laboratory's Flatirons Campus, a world-class hub for renewable energy research. The nation's shift to 100% clean electricity by 2035 will require a mix of renewable energy sources and strategies - and together, wind and solar energy could account for 60% to 80% of that clean energy resource. In Fiscal Year (FY) 2022, NREL scientists, engineers, and analysts contributed to these visionary goals through their wind energy research. As wind innovations push into new areas, NREL continues to play a vital role in advancing technology and addressing deployment barriers in pursuit of more efficient, reliable, and predictable wind energy systems. FY 2022 wind research and development explored the potential for dramatic growth in land-based systems, the launch of the nation's first commercial-scale offshore installations, and transmission infrastructure buildout. Land-based wind energy is one of the most cost-effective electricity supply options - but utility-scale deployment will require up to 10 times the current number of turbines. An NREL plan addressed this need to accelerate U.S. wind technology rollout at distributed and utility scales. Another project conducted by NREL and the Pacific Northwest National Laboratory (PNNL) helps position the nation's first major offshore wind corridor for success. The WETO-funded Atlantic Offshore Wind Transmission Study is evaluating options for balancing electricity supply and demand, while supporting resilience of the grid and marine industries. WETO, NREL, and other partners are working to enable the enormous supply chain and workforce changes the U.S. wind energy industry will need to meet net-zero-carbon-emissions targets. As part of a seminal series of DOE-funded supply chain studies, NREL analysts reported on the trade-offs involved in manufacturing large volumes of wind technologies, while addressing cost, workforce, and logistics issues. All of this research is supported by NREL's outstanding research teams, tools, data, and facilities. A WETO-funded international wind energy field campaign, the American WAKE experimeNt (AWAKEN), has brought together experts from NREL, PNNL, and Sandia National Laboratories to create the world's most comprehensive set of high-resolution data on wind energy atmospheric phenomenon. This study could lead to more accurate predictions of losses from turbine-to-turbine wake interactions, eventually helping wind plants capture more energy and operators save millions of dollars. In addition, NREL researchers developed testing, modeling, and analysis tools to improve the security of power grids by identifying wind power plant dynamic stability problems. A new Stochastic Soaring Raptor Simulator (SSRS) protects golden eagles from turbine encounters by predicting flight paths. This report provides more detail on these top achievements and other accomplishments made by NREL and its partners during FY 2022 (between October 1, 2021, and September 30, 2022).

accomplishments↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗

Charging Needs for Battery Electric Semi-Trucks

Battery-electric vehicles provide a pathway to decarbonize heavy-duty trucking, but the market for heavy-duty battery-electric semi-trailer trucks is nascent, and specific charging requirements remain uncertain. We leverage large-scale vehicle telematics data (>205 million miles of driving) to estimate the charging behaviors and infrastructure requirements for U.S. battery-electric semi-trailer trucks within three operating segments: local, regional, and long-haul. We model two types of charging; mid-shift (fast) and off-shift (slow), and show that off-shift charging at speeds compatible with current light-duty charging infrastructure (i.e., =350 kW) can supply 35 to 77% of total energy demand for local and regional trucks with =300-mile range. Megawatt-level speeds are required for mid-shift charging, which make up 44 to 57% of energy demand for long-haul trucks with =500-mile range. However, demand shifts from mid-shift to off-shift charging as the range for battery-electric trucks increases and when off-shift charging is widely available. Finally, we observe geographic trends in charging demand, finding that local trucks have greater demand within urban areas, whereas long-haul trucks have more demand along rural interstate corridors. As the range for battery-electric trucks increases, we show that charging demand shifts from rural to urban locations due to observed vehicle dwell tendencies.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Collaboration in Long-Term Stewardship at DOE's Hanford Site - 13019

The U.S. Department of Energy's (DOE) Hanford Site comprises approximately 1,517 km{sup 2} (586 mi{sup 2}) of land in southeastern Washington. The site was established in 1943 as part of the Manhattan Project to produce plutonium for the nation's nuclear weapons program. As the Cold War era came to an end, the mission of the site transitioned from weapons production to environmental cleanup. As the River Corridor area of the site cleanup is completed, the mission for that portion of the site will transition from active cleanup to continued protection of environment through the Long-Term Stewardship (LTS) Program. The key to successful transition from cleanup to LTS is the unique collaboration among three (3) different DOE Programs and three (3) different prime contractors with each contractor having different contracts. The LTS Program at the site is a successful model of collaboration resulting in efficient resolution of issues and accelerated progress that supports DOE's Richland Office 2015 Vision for the Hanford Site. The 2015 Vision for the Hanford Site involves shrinking the active cleanup footprint of the surface area of the site to approximately 20 mi{sup 2} on the Central Plateau. Hanford's LTS Program is defined in DOE's planning document, Hanford Long-Term Stewardship Program Plan [1]. The Plan defines the relationship and respective responsibilities between the federal cleanup projects and the LTS Program along with their respective contractors. The LTS Program involves these different parties (cleanup program and contractors) who must work together to achieve the objective for transition of land parcels. Through the collaborative efforts with the prime contractors on site over the past two years,, 253.8 km{sup 2} (98 mi{sup 2}) of property has been successfully transitioned from the cleanup program to the LTS Program upon completion of active surface cleanup. Upcoming efforts in the near term will include transitioning another large parcel that includes one of the six (6) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dismantling of Loop-Type Channel Equipment of MR Reactor in NRC 'Kurchatov Institute' - 13040

In 2009 the project of decommissioning of MR and RTF reactors was developed and approved by the Expert Authority of the Russian Federation (Gosexpertiza). The main objective of the decommissioning works identified in this project: - complete dismantling of reactor equipment and systems; - decontamination of reactor premises and site in accordance with the established sanitary and hygienic standards. At the preparatory stage (2008-2010) of the project the following works were executed: loop-type channels' dismantling in the storage pool; experimental fuel assemblies' removal from spent fuel repositories in the central hall; spent fuel assembly removal from the liquid-metal-cooled loop-type channel of the reactor core and its placement into the SNF repository; and reconstruction of engineering support systems to the extent necessary for reactor decommissioning. The project assumes three main phases of dismantling and decontamination: - dismantling of equipment/pipelines of cooling circuits and loop-type channels, and auxiliary reactor equipment (2011-2012); - dismantling of equipment in underground reactor premises and of both MR and RTF in-vessel devices (2013-2014); - decontamination of reactor premises; rehabilitation of the reactor site; final radiation survey of reactor premises, loop-type channels and site; and issuance of the regulatory authorities' de-registration statement (2015). In 2011 the decommissioning license for the two reactors was received and direct MR decommissioning activities started. MR primary pipelines and loop-type facilities situated in the underground reactor hall were dismantled. Works were also launched to dismantle the loop-type channels' equipment in underground reactor premises; reactor buildings were reconstructed to allow removal of dismantled equipment; and the MR/RTF decommissioning sequence was identified. In autumn 2011 - spring 2012 results of dismantling activities performed are: - equipment from underground rooms (No. 66, 66A, 66B, 72, 64, 63) - as well as from water and gas loop corridors - was dismantled, with the total radwaste weight of 53 tons and the total removed activity of 5,0 x 10{sup 10} Bq; - loop-type channel equipment from underground reactor hall premises was dismantled; - 93 loop-type channels were characterized, chopped and removed, with radwaste of 2.6 x 10{sup 13} Bq ({sup 60}Co) and 1.5 x 10{sup 13} Bq ({sup 137}Cs) total activity removed from the reactor pool, fragmented and packaged. Some of this waste was placed into the high-level waste (HLW) repository of the Center. Dismantling works were executed with application of remotely operated mechanisms, which promoted decrease of radiation impact on the personnel. The average individual dose for the personnel was 1.9 mSv/year in 2011, and the collective dose is estimated as 0.0605 man x Sv/year. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered during remediation. A wide variety of industrial activity on the Pier including extensive foundry operations as well as the industrial nature of the fill used to construct the Pier has resulted in extensive contamination distribution. The Pier structure will require reinforcement to permit both the remediation of the Pier and the adjacent Harbour and remediation techniques will need to be well suited to minimize disruption of wall structures as well as being able to deal with fill ranging from ash to boulders. - Multiple stakeholders are responsible for building demolition, remediation of radiological impacts, remediation of industrial impacts and the use of the site as a staging area for Harbour sediment remediation. The successful remediation of the Centre Pier will require careful negotiation and planning for the various remediation activities noted above. - The depth of contamination on the Pier would result in the complete removal of the Pier if all contamination were to be excavated. Therefore, a Risk Assessment will be conducted to determine the appropriate means for in situ risk management for materials to be left in place below a proposed depth of 1.5 m below current grade. With the concurrence of the property owners and Provincial regulators, the Risk Assessment will be undertaken in accordance with the Provincial requirements that will ensure adequate protection of the environment and future users of the site. - The end use of the Pier has yet to be confirmed by the Municipality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying Lean Concepts to Waste Site Closure - 13137

Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How the Lean Management System is Working on a Closure Project - 13242

Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remedial Investigation of Hanford Site Releases to the Columbia River - 13603

In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previously investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation/feasibility study (RI/FS) reports developed for upland areas, riparian areas, and groundwater in the Hanford Site River Corridor. The RI/FS reports will evaluate the impacts to soil, groundwater, and river sediments and lead to proposed cleanup actions and records of decision to address releases from the Hanford Site reactor operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗