Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “collaborative teams”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Performance Specifications for Grid-Forming Technologies

Standards and specifications for inverter-based resources (IBRs) focus primarily on grid-following (GFL) technologies at present. Therefore, these may generally not be appropriate for application in power systems to ensure acceptable operation with grid-forming (GFM) technologies. In some cases, the direct application of prevailing standards and specifications may not be appropriate for - or may even inadvertently limit the potential of - GFM resources. The Universal Interoperability for Grid- Forming Inverters (UNIFI) Consortium is a U.S. Department of Energy funded effort to advance GFM technology. The UNIFI team brings together academic, industrial, and national-lab researchers as well as industry stakeholders (utilities, system operators, vendors) to collaboratively pursue advances in a broad range of GFM technologies. This paper introduces a set of system- and unit-level specifications driven by consensus across the UNIFI project team. These are intended to seamlessly integrate GFM technologies at any scale into power-systems operation and control in a vendor-agnostic manner. A suite of illustrative simulation results that demonstrate the application of and adherence to the proposed specifications are included.

grid-forming inverter↗

Improving Fission Products at CARIBU: Near Field Detection (Q4/FY19 Quarterly Progress Report)

We have been having ongoing discussions about the analysis and the text of the 95 Zr manuscript with our collaborators at Texas A&M University (TAMU). K. Kolos has travelled to Texas to discuss, once again, some details of our GEANT4 simulation used to determine the gas-counter efficiency. In that process, we discovered that there was a slight disagreement (~0.5%) between our results and the results obtained with the EGS code used by the TAMU group. We are currently working to determine and magnitude and source of the discrepancy. This has taken a considerable amount of time and, unfortunately, has hindered us from sending out the paper to all of our collaborators. We also recently found out that Benjamin Schroeder, the Texas A&M student supported by the CENTUAR Center of Excellence who joined our project earlier this year, has decided to leave graduate school after obtaining his Master Thesis. Although this is a loss for our team, we do not foresee this to cause a major disruption in the project. Our TAMU collaborators are still committed to the success of these measurements.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol(Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

activity planning↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol(Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

activity planning↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol (Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

Kanefsky, Bob↗

High Optical Access Trap 2.0.

The High Optical Access (HOA) trap was designed in collaboration with the Modular Universal Scalable Ion-trap Quantum Computer (MUSIQC) team, funded along with Sandia National Laboratories through IARPA's Multi Qubit Coherent Operations (MQCO) program. The design of version 1 of the HOA trap was completed in September 2012 and initial devices were completed and packaged in February 2013. The second version of the High Optical Access Trap (HOA-2) was completed in September 2014 and is available at IARPA's disposal.

47 OTHER INSTRUMENTATION↗

Automated Planning and Scheduling for Planetary Rover Distributed Operations

Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

Backes, Paul G.↗

An X-ray Luminous, Distant (z=0.78) Cluster of Galaxies

This granted funded ASCA studies of the most X-ray luminous clusters of galaxies in the Extended Medium Sensitivity Survey. These studies leveraged further observations with Chandra and sparked a new collaboration between the PI and John Carlstrom's Sunyaev-Zel'dovich team. The major scientific results due largely or in part from these observations: the first z=0.5-0.8 cluster temperature function, constraints on cluster evolution which showed definitively that the density of the universe divided by the critical density, Omega-m, could not be 1.0, constraints on cluster evolution limiting Omega_m to 0.2-0.5, independent of lambda, the first detections of intracluster iron in a z>0.6 cluster of galaxies. These results are independent of the supernova and cosmological microwave background results, and provide independent constraint on cosmological parameters.

Donahue, Megan↗

Flight Team Development in Support of LCROSS - A Class D Mission

The LCROSS (Lunar Crater Observation and Sensing Satellite) project presented a number of challenges to the preparation for mission operations. A class D mission under NASA s risk tolerance scale, LCROSS was governed by a $79 million cost cap and a 29 month schedule from "authority to proceed" to flight readiness. LCROSS was NASA Ames Research Center s flagship mission in its return to spacecraft flight operations after many years of pursuing other strategic goals. As such, ARC needed to restore and update its mission support infrastructure, and in parallel, the LCROSS project had to newly define operational practices and to select and train a flight team combining experienced operators and staff from other arenas of ARC research. This paper describes the LCROSS flight team development process, which deeply involved team members in spacecraft and ground system design, implementation and test; leveraged collaborations with strategic partners; and conducted extensive testing and rehearsals that scaled in realism and complexity in coordination with ground system and spacecraft development. As a testament to the approach, LCROSS successfully met its full mission objectives, despite many in-flight challenges, with its impact on the lunar south pole on October 9, 2009.

Tompkins, Paul D.↗

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities The HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture To complete the development of the HDU from conception in June 2009 to rollout for operations in July 2010, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads, such as the Geology Lab, that those systems will support The utilization of interface design standards and uniquely tailored reviews have allowed for an accelerated design process Scheduled activities include early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development Modeling tools have been effective in hardware systems layout, cable routing and length estimation, and human factors analysis Decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations Incremental test operations leading up to an integrated systems test allows for an orderly systems test program The HDU will begin its journey as an emulation of a Pressurized Excursion Module (PEM) for 2010 field testing and then may evolve to a Pressurized Core Module (PCM) for 2011 and later field tests, depending on agency architecture decisions The HDU deployment will vary slightly from current lunar architecture plans to include developmental hardware and software items and additional systems called opportunities for technology demonstration One of the HDU challenges has been designing to be prepared for the integration of presently unanticipated systems Results of the HDU field tests will influence future designs of habitat systems.

Gill, Tracy↗

Enterprise Reference Library

Introduction: Johnson Space Center (JSC) offers two extensive libraries that contain journals, research literature and electronic resources. Searching capabilities are available to those individuals residing onsite or through a librarian s search. Many individuals have rich collections of references, but no mechanisms to share reference libraries across researchers, projects, or directorates exist. Likewise, information regarding which references are provided to which individuals is not available, resulting in duplicate requests, redundant labor costs and associated copying fees. In addition, this tends to limit collaboration between colleagues and promotes the establishment of individual, unshared silos of information The Integrated Medical Model (IMM) team has utilized a centralized reference management tool during the development, test, and operational phases of this project. The Enterprise Reference Library project expands the capabilities developed for IMM to address the above issues and enhance collaboration across JSC. Method: After significant market analysis for a multi-user reference management tool, no available commercial tool was found to meet this need, so a software program was built around a commercial tool, Reference Manager 12 by The Thomson Corporation. A use case approach guided the requirements development phase. The premise of the design is that individuals use their own reference management software and export to SharePoint when their library is incorporated into the Enterprise Reference Library. This results in a searchable user-specific library application. An accompanying share folder will warehouse the electronic full-text articles, which allows the global user community to access full -text articles. Discussion: An enterprise reference library solution can provide a multidisciplinary collection of full text articles. This approach improves efficiency in obtaining and storing reference material while greatly reducing labor, purchasing and duplication costs. Most importantly, increasing collaboration across research groups provides unprecedented access to information relevant to NASA s mission. Conclusion: This project is an expansion and cost-effective leveraging of the existing JSC centralized library. Adding key word and author search capabilities and an alert function for notifications about new articles, based on users profiles, represent examples of future enhancements.

Bickham, Grandin↗

Clinical Outcome Metrics for Optimization of Robust Training

Introduction: The emphasis of this research is on the Human Research Program (HRP) Exploration Medical Capability's (ExMC) "Risk of Unacceptable Health and Mission Outcomes Due to Limitations of In-Flight Medical Capabilities." Specifically, this project aims to contribute to the closure of gap ExMC 2.02: We do not know how the inclusion of a physician crew medical officer quantitatively impacts clinical outcomes during exploration missions. The experiments are specifically designed to address clinical outcome differences between physician and non-physician cohorts in both near-term and longer-term (mission impacting) outcomes. Methods: Medical simulations will systematically compare success of individual diagnostic and therapeutic procedure simulations performed by physician and non-physician crew medical officer (CMO) analogs using clearly defined short-term (individual procedure) outcome metrics. In the subsequent step of the project, the procedure simulation outcomes will be used as input to a modified version of the NASA Integrated Medical Model (IMM) to analyze the effect of the outcome (degree of success) of individual procedures (including successful, imperfectly performed, and failed procedures) on overall long-term clinical outcomes and the consequent mission impacts. The procedures to be simulated are endotracheal intubation, fundoscopic examination, kidney/urinary ultrasound, ultrasound-guided intravenous catheter insertion, and a differential diagnosis exercise. Multiple assessment techniques will be used, centered on medical procedure simulation studies occurring at 3, 6, and 12 months after initial training (as depicted in the following flow diagram of the experiment design). Discussion: Analysis of procedure outcomes in the physician and non-physician groups and their subsets (tested at different elapsed times post training) will allow the team to 1) define differences between physician and non-physician CMOs in terms of both procedure performance (pre-IMM analysis) and overall mitigation of the mission medical impact (IMM analysis); 2) refine the procedure outcome and clinical outcome metrics themselves; 3) refine or develop innovative medical training products and solutions to maximize CMO performance; and 4) validate the methods and products of this experiment for operational use in the planning, execution, and quality assurance of the CMO training process The team has finalized training protocols and developed a software training/testing tool in collaboration with Butler Graphics (Detroit, MI). In addition to the "hands on" medical procedure modules, the software includes a differential diagnosis exercise (limited clinical decision support tool) to evaluate the diagnostic skills of participants. Human subject testing will occur over the next year.

Ebert, D.↗

Surface Operations Simulator and Scheduler (SOSS) Presentation

NASA - KAIA (Korea Agency for Infrastructure Technology Advancement) - KARI (Korea Aerospace Research Institute) collaboration surface air traffic management research has been ongoing since May 2015. In the first year collaboration, NASA's SOSS software has been transferred to KAIA and KARI teams to provide fast time simulation capability. Incheon International Airport model has been developed for SOSS.

surface traffic management↗

A Tale of Two Chambers: Iterative Approaches and Lessons Learned from Life Support Systems Testing in Altitude Chambers

With a brand new fire set ablaze by a serendipitous convergence of events ranging from a science fiction novel and movie ("The Martian"), to ground-breaking recent discoveries of flowing water on its surface, the drive for the journey to Mars seems to be in a higher gear than ever before. We are developing new spacecraft and support systems to take humans to the Red Planet, while scientists on Earth continue using the International Space Station as a laboratory to evaluate the effects of long duration space flight on the human body. Written from the perspective of a facility test director rather than a researcher, and using past and current life support systems tests as examples, this paper seeks to provide an overview on how facility teams approach testing, the kind of information they need to ensure efficient collaborations and successful tests, and how, together with researchers and principal investigators, we can collectively apply what we learn to execute future tests.

Callini, Gianluca↗

NASA SSERVI: Merging Science and Human Exploration

The NASA Solar System Exploration Research Virtual Institute (SSERVI) is a virtual institute focused on research at the intersection of science and exploration, training the next generation of lunar scientists, and community development. As part of the SSERVI mission, we act as a hub for opportunities that engage the larger scientific and exploration communities in order to form new interdisciplinary, research-focused collaborations. This talk will describe the research efforts of the thirteen domestic teams that constitute the U.S. complement of the Institute and how we will engage the community through workshops, conferences, online seminars and classes, student exchange programs and internships.

SSERVI↗

Initial Criticality Assessments to Guide FMEAs on Rocket Engine Hot Fire Testing

Presented is an explanation of the use of the Initial Criticality Assessment (ICA) technique, a triage process for prioritizing required Failure Modes and Effects Analysis (FMEAs), for the European Service Module's main propulsion system's hot-fire test bed at White Sands New Mexico. Rather than instinctively performing many FMEAs of subsystems, or one large system level FMEA where every subcomponent is analyzed, the ICA guided an informed analysis of only the hardware that had a large impact to hazards. The low criticality hardware was documented via the ICA and no FMEA was performed; the work could then focus on the high criticality hardware. Thus a savings of Program resources was achieved. The experiences gained in creating these ICAs for this international collaborative project confirmed that the need for continuous communication across the technical teams is one of the greatest areas of emphasis. The European Space Agency (ESA) is developing the European Service Module (ESM), with its primary contractor, Airbus Defence and Space in Germany, for delivery to the National Aeronautics and Space Administration (NASA). The module will be equipped with a total of 21 engines to support NASA’s Orion spacecraft: one U.S. Space Shuttle Orbital Maneuvering System-Engine (OMS-E), eight auxiliary thrusters and 12 smaller RCS (Reaction Control System) thrusters. The main ESM propulsion system, used for large translational maneuvers, consists of one OMS-E... To qualify the design of the ESM propulsion subsystem (PSS) an all-steel Propulsion Qualification Module (PQM) structure is used to test the propulsion systems on Orion, including “hot firing” of the OMS engine, thrusters, and RCS. The PQM has been developed as a hot-fire test bed to be tested at the NASA White Sands Test Facility (WSTF). One of the objectives of the testing is to assure that the OMS-E can be safely operated with the PQM. Testing will also demonstrate that the PQM can set the proper upstream pressures and temperatures for the OMS-E to operate nominally given the PQM has never been tested in hot-fire operation with OMS-E before. In order to safely conduct the test campaign, hardware such as the engine subassembly, fluid feed lines, valves, electrical power lines, instrumentation, stiff links, installation Ground Support Equipment (GSE), and diffuser [whose objectives are to collect the exhaust of the OMS-E to actively cool down the exhaust gases, reduce thermal exchanges, and create a vacuum at OMS-E level before igniting], had to be analyzed for any hazards and failure modes.

Fault Tolerance↗