Transportation of Radioactive Waste in Support of Ontario Power Generation's Darlington Nuclear Generating Station Refurbishment Project - 19384
Ontario Power Generation's (OPG) Darlington Nuclear Generating Station (DNGS) is currently executing a major refurbishment of the first of their four Candu reactors. As expected, the volumes of Low and Intermediate Level Waste (LILW) generated from this large-scale project have been significant. As a result, unique solutions were needed for the safe and efficient transportation of radioactive waste from the Darlington Nuclear Generating Station to OPG's Western Waste Management Facility for volume reduction and interim storage. OPG's Nuclear Waste Management Division and the Darlington Refurbishment Project worked together to identify unique radioactive waste transportation solutions. These solutions included staging and temporary storage facilities, new waste containers and specialized transportation packages, additional human resources and enhanced planning and logistics required to transport large volumes of routine and non-routine radioactive waste in a manner that minimized the impact on employee and public safety, project schedule and project costs. From a facilities perspective a shielded 'Marshalling Area' that allowed for loaded transportation packages to be staged was built on the Darlington site and a temporary licensed off-site radioactive waste storage facility close to the DNGS was contracted through a third party vendor. These two facilities allowed for more consistent and efficient schedules that limited radioactive waste shipments during off-hours and avoided peak traffic periods thereby limiting the risk to Refurbishment critical path activities. Special purpose-built transportation packages and waste containers were designed and fabricated to handle unique waste streams such as feeder pipes and other miscellaneous intermediate level waste items associated with reactor dismantling. Twenty-four Type A qualified transportation packages mounted to six flat deck trailers were designed and fabricated to support the shipment of contaminated feeder pipes. An Intermediate Level Waste Utility Container (ILWUC) to be used in conjunction with the Type B qualified Trillium Transportation Package was designed and fabricated to handle unique intermediate level waste streams arising from the reactor dismantling process. Logistics software was used to plan the shipments to ensure waste transportation packages could be loaded, transported, unloaded and returned safely to the project site in a timely manner without impacting project schedules. Several shipping scenarios were simulated and adjusted using the software to ensure that the most efficient use of equipment and resources for the radioactive waste transportation aspects of the project. (authors)