Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

HIFiRE Direct-Connect Rig (HDCR) Phase I Ground Test Results from the NASA Langley Arc-Heated Scramjet Test Facility

The initial phase of hydrocarbon-fueled ground tests supporting Flight 2 of the Hypersonic International Flight Research Experiment (HIFiRE) Program has been conducted in the NASA Langley Arc-Heated Scramjet Test Facility (AHSTF). The HIFiRE Program, an Air Force-lead international cooperative program includes eight different flight test experiments designed to target specific challenges of hypersonic flight. The second of the eight planned flight experiments is a hydrocarbon-fueled scramjet flight test intended to demonstrate dual-mode to scramjet-mode operation and verify the scramjet performance prediction and design tools. A performance goal is the achievement of a combusted fuel equivalence ratio greater than 0.7 while in scramjet mode. The ground test rig, designated the HIFiRE Direct Connect Rig (HDCR), is a full-scale, heat sink, direct-connect ground test article that duplicates both the flowpath lines and the instrumentation layout of the isolator and combustor portion of the flight test hardware. The primary objectives of the HDCR Phase I tests are to verify the operability of the HIFiRE isolator/combustor across the Mach 6.0-8.0 flight regime and to establish a fuel distribution schedule to ensure a successful mode transition prior to the HiFIRE payload Critical Design Review. Although the phase I test plans include testing over the Mach 6 to 8 flight simulation range, only Mach 6 testing will be reported in this paper. Experimental results presented here include flowpath surface pressure, temperature, and heat flux distributions that demonstrate the operation of the flowpath over a small range of test conditions around the nominal Mach 6 simulation, as well as a range of fuel equivalence ratios and fuel injection distributions. Both ethylene and a mixture of ethylene and methane (planned for flight) were tested. Maximum back pressure and flameholding limits, as well as a baseline fuel schedule, that covers the Mach 5.84-6.5 test space have been identified.

Hass, Neal E.↗

A reliable solar-heating system--Huntsville, Alabama

Final report on solar-heating demonstration project in Huntsville, Alabama, is rich in technical data, planning considerations, test and maintenance data, and other information. It can be useful reference for those planning similar systems.

Source record↗

Space station docking mechanism dynamic testing

A prototype docking mechanism for the Space Station was designed and fabricated for NASA. This docking mechanism is actively controlled and uses a set of electromechanical actuators for alignment and load attenuation. Dynamic tests are planned using the Marshall Space Flight Center's 6-DOF Motion Simulator. The proposed tests call for basic functionality verification as well as complete hardware-in-the-loop docking dynamics simulations.

Howsman, Thomas G.↗

Hardware and Methods of the Optical End-to-End Test of the Far Ultraviolet Spectroscopic Explorer (FUSE)

The Far Ultraviolet Spectroscopic Explorer (FUSE), currently being tested and scheduled for a 1999 launch, is an astrophysics satellite designed to provide high spectral resolving power (Lambda/(Delta)Lambda = 24,000-30,000) over the interval 90.5-118.7 nm. The FUSE optical path consists of four co-aligned, normal incidence, off-axis parabolic, primary mirrors which illuminate separate Rowland circle spectrograph channels equipped with holographic gratings and delay line microchannel plate detectors. We describe the hardware and methods used for the optical end-to-end test of the FUSE instrument during satellite integration and test. Cost and schedule constraints forced us to devise a simplified version of the planned optical test which occurred in parallel with satellite thermal-vacuum testing. The optical test employed a collimator assembly which consisted of four co-aligned, 15" Cassegrain telescopes which were positioned above the FUSE instrument, providing a collimated beam for each optical channel. A windowed UV light source, remotely adjustable in three axes, was mounted at the focal plane of each collimator. Problems with the UV light sources, including high F-number and window failures, were the only major difficulties encountered during the test. The test succeeded in uncovering a significant problem with the secondary structure used for the instrument closeout cavity and, furthermore, showed that the mechanical solution was successful. The hardware was also used extensively for simulations of science observations, providing both UV light for spectra and visible light for the fine error sensor camera.

Conard, Steven J.↗

JPL Radiation Effects Facilities

Radiation Effects Group investigates the effects of space radiation on present and future microelectronic and optoelectronic technologies, evaluate the risk of using them in specific space missions, and recommend component and design techniques for JPL and NASA programs to reduce reliability risk from space radiation.

radiation test planning↗

Recent Progress with the JWST Observatory

The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 micrometers - 28 micrometers. JWST's primary science goal is to detect and characterize the first galaxies. It will also study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. JWST is a segmented mirror telescope operating at (is) approximately 40K, a temperature achieved by passive cooling of the observatory, via a large, 5-layer membrane-based sunshield. We present an overview of the observatory systems design, the science instruments and the mission science objectives. With the completion of the Spacecraft Critical Design Review, the spacecraft has also fully transitioned to fabrication. We will discuss recent highlights associated with the Observatory, including completion and delivery of the primary mirror segments, delivery of the primary mirror backplane and its wings, and the delivery of five template membrane layers. We will also summarize the current predicted performance of the telescope, including stray light, pointing and image quality following the completion of the final design review. Finally, the current schedule through to launch will be presented with a summary of integration and test activities planned when the science payload is delivered to Northrop Grumman following cryo-optical testing at the Johns Space Flight Center.

James Webb Space Telescope (JWST)↗

Computational Modeling of Two Mars Powered Descent Vehicle Concepts Tested in the Langley Unitary Plan Wind Tunnel

Future human Mars missions will require powered descent starting at supersonic conditions, something which has never been done before at Mars. Computational powered descent flowfield simulations have been completed at full-scale Mars conditions, but the available ground test data are not suitable for calibrating computational uncertainties for aerodynamic interference on proposed Mars descent vehicles. Testing was conducted in the NASA Langley Unitary Plan Wind Tunnel in order to investigate the aerodynamic interference of sub-scale versions of two Mars powered descent vehicle concepts at supersonic Mach numbers (2.4 and 3.5): a model based on a blunt hypersonic inflatable aerodynamic decelerator (HIAD) and the second representing a more slender rigid vehicle with body flaps (CobraMRV). This paper covers computational flowfield predictions completed at wind tunnel conditions and comparisons to the test data. On the blowing HIAD models, the time-averaged pressure inboard of the nozzles was generally well-predicted, especially if the nozzles are canted outward, when the nozzles are located further from the nose. At intermediate CobraMRV thrust coefficients, CFD pressures are more accurately predicted than they are for the HIAD models, largely due to the nozzle locations and pointing directions. Overall, the CFD pressure coefficients were predicted within 0.2 of the steady pressure measurements for all blowing models, with smaller discrepancies at higher HIAD thrust, and larger discrepancies at lower HIAD CobraMRV thrust. All HIAD models were predicted to have a gradually decreasing axial force coefficient as the total thrust increases, in agreement with available pressure sensitive paint data. On models with canted nozzles or with nozzles further from the nose, the force coefficient was slightly higher for a given thrust. On the CobraMRV model, the CFD also shows consistent results between solvers and follows trends revealed in the data; the aerodynamic force coefficient remains near the non-blowing value at a tunnel Mach number of 2.4 regardless of thrust, and increases above that level at a Mach number of 3.5, consistent with the discrete pressure data. CFD analysis at tunnel and flight conditions will continue as flight system designs concepts mature.

Supersonic Retropropulsion↗

Computational Modeling of Two Mars Powered Descent Vehicle Concepts Tested in the Langley Unitary Plan Wind Tunnel

Future human Mars missions will require powered descent starting at supersonic conditions, something which has never been done before at Mars. Computational powered descent flowfield simulations have been completed at full-scale Mars conditions, but the available ground test data are not suitable for calibrating computational uncertainties for aerodynamic interference on proposed Mars descent vehicles. Testing was conducted in the NASA Langley Unitary Plan Wind Tunnel in order to investigate the aerodynamic interference of sub-scale versions of two Mars powered descent vehicle concepts at supersonic Mach numbers (2.4 and 3.5): a model based on a blunt hypersonic inflatable aerodynamic decelerator (HIAD) and the second representing a more slender rigid vehicle with body flaps (CobraMRV). This paper covers computational flowfield predictions completed at wind tunnel conditions and comparisons to the test data. On the blowing HIAD models, the time-averaged pressure inboard of the nozzles was generally well-predicted, especially if the nozzles are canted outward, when the nozzles are located further from the nose. At intermediate CobraMRV thrust coefficients, CFD pressures are more accurately predicted than they are for the HIAD models, largely due to the nozzle locations and pointing directions. Overall, the CFD pressure coefficients were predicted within 0.2 of the steady pressure measurements for all blowing models, with smaller discrepancies at higher HIAD thrust, and larger discrepancies at lower HIAD CobraMRV thrust. All HIAD models were predicted to have a gradually decreasing axial force coefficient as the total thrust increases, in agreement with available pressure sensitive paint data. On models with canted nozzles or with nozzles further from the nose, the force coefficient was slightly higher for a given thrust. On the CobraMRV model, the CFD also shows consistent results between solvers and follows trends revealed in the data; the aerodynamic force coefficient remains near the non-blowing value at a tunnel Mach number of 2.4 regardless of thrust, and increases above that level at a Mach number of 3.5, consistent with the discrete pressure data. CFD analysis at tunnel and flight conditions will continue as flight system designs concepts mature.

Supersonic Retropropulsion↗

Cluster Development Test 2: An Assessment of a Failed Test

On 31 July 2008 the National Aeronautics and Space Administration Crew Exploration Vehicle Parachute Assembly System team conducted the final planned cluster test of the first generation parachute recovery system design. The two primary test objectives were to demonstrate the operation of the complete parachute system deployed from a full scale capsule simulator and to demonstrate the test technique of separating the capsule simulator from the Low Velocity Air Drop pallet used to extract the test article from a United States Air Force C-17 aircraft. The capsule simulator was the Parachute Test Vehicle with an accurate heat shield outer mold line and forward bay compartment of the Crew Exploration Vehicle Command Module. The Parachute Test Vehicle separated cleanly from the pallet following extraction, but failed to reach test conditions resulting in the failure of the test and the loss of the test assets. No personnel were injured. This paper will discuss the design of the test and the findings of the team that investigated the test, including a discussion of what were determined to be the root causes of the failure.

Machin, Ricardo A.↗

Engineering evaluation of 24 channel multispectral scanner

The results of flight tests to evaluate the performance of the 24 channel multispectral scanner are reported. The flight plan and test site are described along with the time response and channel registration. The gain and offset drift, and moire patterns are discussed. Aerial photographs of the test site are included.

Lambeck, P. F.↗

Aircraft radial-belted tire evaluation

An overview is given of the ongoing joint NASA/FAA/Industry Surface Traction And Radial Tire (START) Program being conducted at NASA Langley's Aircraft Landing Dynamics Facility (ALDF). The START Program involves tests using three different tire sizes to evaluate tire rolling resistance, braking, and cornering performance throughout the aircraft ground operational speed range for both dry and wet runway surfaces. Preliminary results from recent 40 x 14 size bias-ply, radial-belted, and H-type aircraft tire tests are discussed. The paper concludes with a summary of the current program status and planned ALDF test schedule.

Yager, Thomas J.↗

Lab Development for INS/GPS Testing of Launch and Space Vehicles

NASA Marshall Space Flight Center's experience with different GPS simulators and receivers over the last 10 years has shown a need for testing the receivers in more than just a nominal mission. The Spaceliner 100 program is researching blended INS/GPS data tuned specifically for launch vehicles and orbital deployments. The paper will discuss layout of the testing lab, the test equipment, test scenarios that all receivers will be evaluated under, and a discussion of receiver types planned to test. It will conclude with a discussion of some of the current tests and goals of future testing.

Schrock, Ken↗

Cryo Testing of tbe James Webb Space Telescope's Integrated Science Instrument Module

The Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope will be integrated and tested at the Environmental Test Facilities at Goddard Space Flight Center (GSFC). The cryogenic thermal vacuum testing of the ISIM will be the most difficult and problematic portion of the GSFC Integration and Test flow. The test is to validate the coupled interface of the science instruments and the ISIM structure and to sufficiently stress that interface while validating image quality of the science instruments. The instruments and the structure are not made from the same materials and have different CTE. Test objectives and verification rationale are currently being evaluated in Phase B of the project plan. The test program will encounter engineering challenges and limitations, which are derived by cost and technology many of which can be mitigated by facility upgrades, creative GSE, and thorough forethought. The cryogenic testing of the ISIM will involve a number of risks such as the implementation of unique metrology techniques, mechanical, electrical and optical simulators housed within the cryogenic vacuum environment. These potential risks are investigated and possible solutions are proposed.

VanCampen, Julie↗

High-Propellant Throughput Sub-kW Electric Propulsion System for Deep Space Science and Exploration

The National Aeronautics and Space Administration (NASA) is maturing high-propellant throughput sub-kilowatt electric propulsion technologies to enable small spacecraft deep space science and exploration missions with high delta-v requirements. The pathfinder model (PM) propulsion system consists of the H71M-PM Hall-effect thruster, a breadboard 1-kW power processing unit (PPU), and a propellant flow control system. The propulsion system requirements balance the needs of various high delta-v NASA and commercial industry mission concepts to achieve a design that both enables a variety of NASA small spacecraft deep space missions, while remaining viable for select commercial applications. The H71M-PM thruster has completed performance characterization and three 500-h short duration wear tests (SDWT). The propulsion system provides stable thrust generation over a wide range of operating conditions from 200 W to 1 kW, and 200 V to 400 V. The thruster has demonstrated a thrust as high as 68 mN at 300 V and 1 kW. The thruster has similarly demonstrated a specific impulse of 1850 s at 400 V and 1 kW. Key surfaces were machined between each SDWT to simulate accelerated discharge channel and pole cover erosion. Profilometry scans across masked pole cover surfaces were conducted to determine erosion rates. SDWT results support that a target thruster lifetime of 14 kh with 50% margin is achievable. Component testing has demonstrated propellant azimuthal flow uniformity better than ± 2 percent of the nominal value, azimuthal magnetic field uniformity better than ± 0.5 percent of the nominal value, and cathode heater cycle testing to greater than 30,000 cycles. Propulsion system integrated system testing is planned to use the H71M-PM and a breadboard 1-kW PPU. Pathfinder model test results are now supporting the design of the H71M-EM engineering model thruster. A second-generation breadboard PPU has been fabricated and is currently under test. NASA has made these technologies available to U.S. industry through a no cost, nonexclusive license agreement.

Hall↗

High Misalignment Carbon Seals for the Fan Drive Gear System Technologies

Aircraft engines of the future will require capability bearing compartment seals than found in current engines. Geared systems driving the fan will be subjected to inertia and gyroscopic forces resulting in extremely high angular and radial misalignments. Because of the high misalignment levels, compartment seals capable of accommodating angularities and eccentricities are required. Pratt & Whitney and Stein Seal Company selected the segmented circumferential carbon seal as the best candidate to operate at highly misaligned conditions. Initial seal tests established the misalignment limits of the current technology circumferential seal. From these results a more compliant seal configuration was conceived, designed, fabricated, and tested. Further improvements to the design are underway and plans are to conduct a durability test of the next phase configuration. A technical approach is presented, including design modification to a "baseline"seal, carbon grade selection, test rig configuration, test plan and results of analysis of seal testing.

Shaughnessy, Dennis↗

Solar heater/cooler for mass market

Report describes project to design, build, and test simple and affordable solar systems. Four combinations of heating, cooling, and domestic hot water supply systems were developed and installed. Test sites, plan for systems and components, and performance are discussed; text is complimented by detailed drawings and test data.

Source record↗

Space Environment Testing of Photovoltaic Array Systems at NASA's Marshall Space Flight Center

To successfully operate a photovoltaic (PV) array system in space requires planning and testing to account for the effects of the space environment. It is critical to understand space environment interactions not only on the PV components, but also the array substrate materials, wiring harnesses, connectors, and protection circuitry (e.g. blocking diodes). Key elements of the space environment which must be accounted for in a PV system design include: Solar Photon Radiation, Charged Particle Radiation, Plasma, and Thermal Cycling. While solar photon radiation is central to generating power in PV systems, the complete spectrum includes short wavelength ultraviolet components, which photo-ionize materials, as well as long wavelength infrared which heat materials. High energy electron radiation has been demonstrated to significantly reduce the output power of III-V type PV cells; and proton radiation damages material surfaces - often impacting coverglasses and antireflective coatings. Plasma environments influence electrostatic charging of PV array materials, and must be understood to ensure that long duration arcs do not form and potentially destroy PV cells. Thermal cycling impacts all components on a PV array by inducing stresses due to thermal expansion and contraction. Given such demanding environments, and the complexity of structures and materials that form a PV array system, mission success can only be ensured through realistic testing in the laboratory. NASA's Marshall Space Flight Center has developed a broad space environment test capability to allow PV array designers and manufacturers to verify their system's integrity and avoid costly on-orbit failures. The Marshall Space Flight Center test capabilities are available to government, commercial, and university customers. Test solutions are tailored to meet the customer's needs, and can include performance assessments, such as flash testing in the case of PV cells.

Phillips, Brandon S.↗