Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Phased development plan

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is made up of computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

Advanced space engine component technology status

Key to the achievement of maximum benefit from the Space Tug transportation system is the availability of a low-cost, high-performance engine system. To define this engine system, studies have been conducted under Air Force and NASA direction, and pertinent hardware technology programs have been initiated. From among the several candidate systems studied, the cryogenic, staged-combustion cycle, high chamber pressure system in conjunction with a large-area-ratio nozzle was selected for component and subsystem demonstration. Main turbopump, high-area-ratio thrust chamber, preburner, and igniter components are being evaluated. A brief description of the engine capabilities, the main liquid hydrogen and liquid oxygen turbopump/preburner, and the main thrust chamber programs are presented; designs and progress in fabrication are shown and test results discussed.

Zachary, A. T.↗

Space shuttle auxiliary propulsion system design study. Phase A report: Requirements definition

The analyses and rationale used to develop requirements for the oxygen-hydrogen auxiliary propulsion systems to be used with the space shuttle are presented. The requirements apply to a fully reusable space shuttle vehicle system using internal, reusable main engine propellant tanks in both the orbiter and booster stages. Requirements of principal interest are engine thrust, number of engines, maximum system thrust, total impulse, and total impulse expenditure history.

Orton, G. F.↗

Solar power satellite system definition study. Volume 5: Space transportation analysis, phase 3

A small Heavy Lift Launch Vehicle (HLLV) for the Solar Power Satellites (SPS) System was analyzed. It is recommended that the small HLLV with a payload of 120 metric tons be adopted as the SPS launch vehicle. The reference HLLV, a shuttle-derived option with a payload of 400 metric tons, should serve as a backup and be examined further after initial flight experience. The electric orbit transfer vehicle should be retained as the reference orbit-to-orbit cargo system.

Source record↗

Space station data system analysis/architecture study. Task 5: Program plan

Cost estimates for both the on-board and ground segments of the Space Station Data System (SSDS) are presented along with summary program schedules. Advanced technology development recommendations are provided in the areas of distributed data base management, end-to-end protocols, command/resource management, and flight qualified artificial intelligence machines.

Source record↗

Study of Systems Using Inertia Wheels for Precise Attitude Control of a Satellite

Systems using inertia wheels are evaluated in this report to determine their suitability for precise attitude control of a satellite and to select superior system configurations. Various possible inertia wheel system configurations are first discussed in a general manner. Three of these systems which appear more promising than the others are analyzed in detail, using the Orbiting Astronomical Observatory as an example. The three systems differ from each other only by the method of damping, which is provided by either a rate gyro, an error-rate network, or a tachometer in series with a high-pass filter. An analytical investigation which consists of a generalized linear analysis, a nonlinear analysis using the switching-time method, and an analog computer study shows that all three systems are theoretically capable of producing adequate response and also of maintaining the required pointing accuracy for the Orbiting Astronomical Observatory of plus or minus 0.1 second of arc. Practical considerations and an experimental investigation show, however, that the system which uses an error-rate network to provide damping is superior to the other two systems. The system which uses a rate gyro is shown to be inferior because the threshold level causes a significant amount of limit-cycle operation, and the system which uses a tachometer with a filter is shown to be inferior because a device with the required dynamic range of operation does not appear to be available. The experimental laboratory apparatus used to investigate the dynamic performance of the systems is described, and experimental results are included to show that under laboratory conditions with relatively large extraneous disturbances, a dynamic tracking error of less than plus or minus 0.5 second of arc was obtained.

White, John S.↗

Future space transportation systems analysis study. Phase 1 extension: Executive summary

Potential future space programs are analyzed beyond the scope of the current shuttle traffic model to determine their transportation needs and alternative ways of evolving future space transportation systems from the baseline space transportation system (space shuttle and upper stage). Objectives of the entire study are summarized along with results to date.

Source record↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Concept document

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station Payload of experiments that will be onboard the Space Station Freedom. The simulation will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

Lunar lander and return propulsion system trade study - Methodology with results

A trade study was initiated at the NASA/Johnson Space Center in May of 1992 to develop and evaluate main propulsion system alternative configurations for the First Lunar Outpost (FLO) lander and return vehicles. This paper outlines the trade methodology utilized in the FLO vehicle study. Emphasis is placed on the trade attributes, selection criteria, and evaluation process established to perform the comprehensive analysis required to rank the diverse alternative vehicle configurations considered. The use of sensitivity analyses to determine the relative importance of each attribute and selection criteria on the trade results is also presented. Lastly, the paper discusses FLO vehicle configuration recommendations and general vehicle design conclusions which can be drawn from the trade study results.

Moreland, Robert J.↗

Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 1: Overview and summary

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned Marshall Space Flight Center (MSFC) Payload Training Complex (PTC) required to meet this need will train the space station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs. This study was performed August 1988 to October 1989. Thus, the results are based on the SSFP August 1989 baseline, i.e., pre-Langley configuration/budget review (C/BR) baseline. Some terms, e.g., combined trainer, are being redefined. An overview of the study activities and a summary of study results are given here.

Source record↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Volume 2: Baseline architecture report

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Volume 1: Baseline architecture report

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is made up of the computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

Antimisting kerosene JT3 engine fuel system integration study

An analytical study and laboratory tests were conducted to assist NASA in determining the safety and mission suitability of the modified fuel system and flight tests for the Full-Scale Transport Controlled Impact Demonstration (CID) program. This twelve-month study reviewed and analyzed both the use of antimisting kerosene (AMK) fuel and the incorporation of a fuel degrader on the operational and performance characteristics of the engines tested. Potential deficiencies and/or failures were identified and approaches to accommodate these deficiencies were recommended to NASA Ames -Dryden Flight Research Facility. The result of flow characterization tests on degraded AMK fuel samples indicated levels of degradation satisfactory for the planned missions of the B-720 aircraft. The operability and performance with the AMK in a ground test engine and in the aircraft engines during the test flights were comparable to those with unmodified Jet A. For the final CID test, the JT-3C-7 engines performed satisfactorily while operating on AMK right up to impact.

Fiorentino, A.↗

Agency Recognized for Integrated Controls for HVAC and Lighting Systems - Case Study: Denver Water

This case study highlights the strategies Denver Water used at its Administration Building for integrating HVAC and lighting systems. They employed advanced lighting controls, integrated with building automation systems, as well as lighting system occupancy sensors integrated with HVAC controls. The project was recognized by DOE's Integrated Lighting Campaign.

integrated lighting, lighting, controls, HVAC, bui↗

Oceanographic scanner system design study, volume 1

The design is reported of a dual mode multispectral scanner, capable of satisfying both overland and oceanographic requirements. A complete system description and performance summary of the scanner are given. In addition, subsystem and component descriptions and performance analyses are treated in individual sections. The design of the scanner, with minimum modifications, interfaces to the ERTS spacecraft and the ground data handling system.

Source record↗