Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stakeholder”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Q1-2024 Solar Cost Benchmarks

Each year, the U.S. Department of Energy’s (DOE) Solar Energy Technologies Office (SETO) and its national laboratory partners develop cost benchmarks for U.S. solar photovoltaic (PV) systems. These benchmarks track progress toward reducing solar costs and guide R&D priorities. Unlike typical studies that report only $/W, SETO uses intrinsic units (e.g., $/m² for mounting structures) to better capture how technology improvements such as module efficiency would impact system costs. This allows flexible modeling where inputs can vary significantly to assess cost sensitivity. Costs are reported in two ways: Minimum Sustainable Price (MSP): Long term, financially viable price under stable market conditions. Modeled Market Price (MMP): Actual market price, influenced by short term distortions such as tariffs or subsidies. Three national labs collect cost data from industry stakeholders, ensuring no duplication in outreach to stakeholders. Data reflects real transactions (primarily from Q1) and is weighted based on the number of sources per cost element. The PV System Cost Model (PVSCM) divides total installed system cost into eight categories: 1. Module (PV) 2. Inverter 3. Energy Storage System (ESS) 4. Structural BOS (SBOS) 5. Electrical BOS (EBOS) 6. Fieldwork 7. Office work 8. Other (developer/EPC costs) The first five are hardware costs, while the last three are soft costs. Each category includes fixed and variable cost components, where “size” depends on context (e.g., manufacturing capacity for modules vs. system capacity for installation costs). Variable costs are expressed using appropriate intrinsic units. The model reflects the owner’s upfront overnight capital cost, excluding tax credits. Tariffs and subsidies are treated as temporary market distortions affecting MMP but not MSP. PVSCM is implemented in Excel, where cost elements are aggregated into total system cost. Additional sheets handle unit conversions and operation & maintenance (O&M), with O&M costs levelized over the system’s lifetime.

14 SOLAR ENERGY↗

Office of Space Science: Integrated technology strategy

This document outlines the strategy by which the Office of Space Science, in collaboration with the Office of Advanced Concepts and Technology and the Office of Space Communications, will meet the challenge of the national technology thrust. The document: highlights the legislative framework within which OSS must operate; evaluates the relationship between OSS and its principal stakeholders; outlines a vision of a successful OSS integrated technology strategy; establishes four goals in support of this vision; provides an assessment of how OSS is currently positioned to respond to the goals; formulates strategic objectives to meet the goals; introduces policies for implementing the strategy; and identifies metrics for measuring success. The OSS Integrated Technology Strategy establishes the framework through which OSS will satisfy stakeholder expectations by teaming with partners in NASA and industry to develop the critical technologies required to: enhance space exploration, expand our knowledge of the universe, and ensure continued national scientific, technical and economic leadership.

Huntress, Wesley T., Jr.↗

Certify for success: A methodology for human-centered certification of advanced aviation systems

This position paper uses the methodology in Design for Success as a basis for a human factors certification program. The Design for Success (DFS) methodology espouses a multi-step process to designing and developing systems in a human-centered fashion. These steps are as follows: (1) naturalizing - understand stakeholders and their concerns; (2) marketing - understand market-oriented alternatives to meeting stakeholder concerns; (3) engineering - detailed design and development of the system considering tradeoffs between technology, cost, schedule, certification requirements, etc.; (4) system evaluation - determining if the system meets its goal(s); and (5) sales and service - delivering and maintaining the system. Because the main topic of this paper is certification, we will focus our attention on step 4, System Evaluation, since it is the natural precursor to certification. Evaluation involves testing the system and its parts for their correct behaviors. Certification focuses not only on ensuring that the system exhibits the correct behaviors, but ONLY the correct behaviors.

Small, Ronald L.↗

Communication Problems in Requirements Engineering: A Field Study

The requirements engineering phase of software development projects is characterized by the intensity and importance of communication activities. During this phase, the various stakeholders must be able to communicate their requirements to the analysts, and the analysts need to be able to communicate the specifications they generate back to the stakeholders for validation. This paper describes a field investigation into the problems of communication between disparate communities involved in the requirements specification activities. The results of this study are discussed in terms of their relation to three major communication barriers: (1) ineffectiveness of the current communication channels; (2) restrictions on expressiveness imposed by notations; and (3) social and organizational barriers. The results confirm that organizational and social issues have great influence on the effectiveness of communication. They also show that in general, end-users find the notations used by software practitioners to model their requirements difficult to understand and validate.

Al-Rawas, Amer↗

Using Remote Sensing Data and Research Results for Urban Heat Island Mitigation

This paper provides information on the characteristics of the urban heat island, research designed to provide the data needed to develop effective urban heat island reduction strategies, and the development of local working groups to develop implementation plans. As background, an overview of research results on the urban heat island phenomenon and the resultant effect on energy usage and air quality will be explored. The use of more reflective roofing materials, paving materials, tree planting, and other initiatives will be explored as a basis for strategies to mitigate urban heat islands and improve the urban environment. Current efforts to use aircraft remote sensing data in Atlanta, Baton Rouge, Sacramento, and Salt Lake City and our work with non-profit organizations designated to lead public education and strategic development efforts will be presented. Efforts to organize working groups comprised of key stakeholders, the process followed in communicating research results, and methodology for soliciting feedback and incorporating ideas into local plans, policies and decision-making will be discussed. Challenges in developing and transferring data products and research results to stakeholders will be presented. It is our ultimate goal that such efforts be integrated into plans and/or decision models that encourage sustainable development.

Estes, Maury↗

Scholarly Electronic Full-Text Publications via the Internet: Issues and Impacts

On-line access to complete texts of scholarly journal articles, conference papers, and books is facilitated by rapidly developing World-wide Web Internet access and capabilities. Meanwhile, print publications continue to be produced and read in spite of the proliferation of many networked electronic publications. The purpose of this presentation is to highlight fundamental issues impacting stakeholder groups, as the trend continues towards migration from paper to affordable ubiquitous networked full-text publications. Librarians, publishers, authors and end-users have various viewpoints, interests, and concerns. There are many issues challenging all stakeholder groups. For instance, all share concerns about administering copyright compliance and enforcing fair use. Uncontrollable electronic downstreaming could result in infringed copyright, while limiting a publisher's entitled revenue stream. Moreover, metered fee-based access may hamper scholarly information research. And, self-authoring on the Internet without peer filtering could lead to information clutter. Many related issues challenge librarians in particular. Among these are rising journal subscription prices, regardless if offered in print or electronic. Some electronic offerings are independent of print, others supplement or duplicate print; several publishers presently require subscribing to print in order to access electronic. Furthermore, numbers of publications are n'ow being marketed via the Internet directly to end-users, which can be viewed as encouraging users to bypass the traditional library. A key issue challenging publishers today is the rapidly expanding electronic user base that is demanding delivery of added-value full-text to desktop computers. Also of growing concern appears to be the decline in print sales to libraries, thereby reducing traditional revenue stream potential. Nowadays, publishers are more hesitant about investing in the production of publications geared toward small niche subjects, since these tend to require higher pricing and carry limited sales potential. Both electronic and print publications necessitate similar editorial, production, operating, and marketing dollars. Tradeoffs owing to delivery format difference do not necessarily mean less dollars need to be spent. Authors wishing to publish books are facing a decline in the role of scholarly monographs in electronic media. However, they are witnessing increased roles of electronic preprints and electronic journal articles. Moreover, the Internet fosters self-publishing without peer monitoring or formal review. Issues challenging end-users include electronic barriers to peer-reviewed formal published works (i.e., fee-based subscriptions to journal literature vs. traditional free-library concept). This often means password only access or IP address controlled site-licensed access. Also, in an uncontrolled Internet environment, sometimes there is a blurring of publication authorship/ownership, as various pieces of publications are cut/pasted into/re-posted on various, disconnected Web searchable home pages.

Kosmin, Linda J.↗

NASA EPSCoR Nebraska Preparation Grant: Year 1. Research Cluster: Small Aircraft Transportation System/Nebraska Implementation Template (SATS-NIT)

NASA, the U.S. Department of Transportation/Federal Aviation Administration, industry stakeholders, and academia have joined forces to pursue the NASA National General Aviation Roadmap leading to a Small Aircraft Transportation System (SATS). This strategic undertaking has a 25-year goal to improve air access and bring next-generation technologies to small communities. The envisioned outcome is to improve travel between remote communities and transportation centers in urban areas by utilizing the nation's 5,400 public use general aviation airports. To facilitate this initiative, SATS stakeholders must plan, coordinate, and implement a comprehensive upgrade of public infrastructure within the framework of the national air transportation system. Ultimately, SATS may permit tripling aviation system throughput capacity by tapping the under-utilized airspace and general aviation facilities. The SATS investments, which begin in FY 2001, are designed to support the national goal of doorstep-to-destination travel at four times the speed of highways for the nation's suburban, rural, and remote communities.

Bartle, John R.↗

Just being on the Internet is Old News

E-Gov is an idea that is very popular these days. Many government agencies are adopting electronic information technology to improve both their internal and external capabilities to communicate with stakeholders and customers. This is an area where the Internet offers huge improvements in responsiveness. Unfortunately, Internet outreach traditionally has not been a budget area that received strong support in most agencies. Today, almost every government agency has some Internet presence: some extensive; others minimal. However, if you really want to reach your stakeholders and customers, just putting information out is not enough to assure it is useful. The most effective outreach sites are those that have moved beyond first generation static designs and concepts to newer communications approaches that stress two-way communication and collection and analysis of customer-oriented performance metrics. This talk discusses a few basic concepts in customer/stakeholder interaction as practiced by the very successful NASA family of websites, Science@NASA. Started 7 years ago as a single website, focusing on the science output of the Space Science Lab at NASA's Marshall Space Flight Center, Science@NASA in 2002 consisted of 6 websites with 450,000 subscribers and garnered over 700 million hits (approx. 64 million visits) in 2002 plus 3 international awards in the past 3 years. Focused content, tying presentation techniques to advanced communications concepts, managing and soliciting subscribers lists, automatic collection of performance metrics, soliciting and responding to customer feedback, and subscriber surveys are among the topics to be discussed. The successful NASAKids Club and the interactivity offered to children will also be covered. The attempt to make the customer/stakeholder DO SOMETHING is critical to our success.

Koczor, Ronald J.↗

Requirements Development for the NASA Advanced Engineering Environment (AEE)

The requirements development process for the Advanced Engineering Environment (AEE) is presented. This environment has been developed to allow NASA to perform independent analysis and design of space transportation architectures and technologies. Given the highly collaborative and distributed nature of AEE, a variety of organizations are involved in the development, operations and management of the system. Furthermore, there are additional organizations involved representing external customers and stakeholders. Thorough coordination and effective communication is essential to translate desired expectations of the system into requirements. Functional, verifiable requirements for this (and indeed any) system are necessary to fulfill several roles. Requirements serve as a contractual tool, configuration management tool, and as an engineering tool, sometimes simultaneously. The role of requirements as an engineering tool is particularly important because a stable set of requirements for a system provides a common framework of system scope and characterization among team members. Furthermore, the requirements provide the basis for checking completion of system elements and form the basis for system verification. Requirements are at the core of systems engineering. The AEE Project has undertaken a thorough process to translate the desires and expectations of external customers and stakeholders into functional system-level requirements that are captured with sufficient rigor to allow development planning, resource allocation and system-level design, development, implementation and verification. These requirements are maintained in an integrated, relational database that provides traceability to governing Program requirements and also to verification methods and subsystem-level requirements.

Rogers, Eric↗

Integrated Risk Management Within NASA Programs/Projects

As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.

Connley, Warren↗

The Center Master Plan For NASA Glenn Research Center

The Center Master Plan for NASA Glenn Research Center is a comprehensive survey of NASA Glenn's current facility assets and a vision of how we see the facilities will change over the next 20 years in order to support the changing NASA Mission. This Center Master Plan is a vital management tool used by all organizations for making near term decisions and in future planning. During the summer of 2004, I worked with Joseph Morris, the Chief Architect in the Facilities Division, on beginning this Center Master Planning Process. The previous Master Plan was completed by the Center in 1985 and contained general information on the background of the facility as well as maps detailing environmental and historic records, land use, utilities, etc. The new Master Plan is required for the Center by NASA headquarters and will include similar types of information as used in the past. The new study will provide additional features including showing how individual buildings are linked to the programs and missions that they serve. The Master Plan will show practical future options for the facility s assets with a twenty year look ahead. The Plan will be electronically retrievable so that it becomes a communications tool for Center personnel. A Center Master Plan, although required, is very beneficial to NASA Glenn Research Center in aiding management with the future direction of the campus. Keeping up-to-date information and future plans readily available to all of NASA Glenn will insure that future real property development efficiently and effectively supports the missions camed out and supported by the Center. A Center Master Plan will also facilitate coordination with Center supported programs, stakeholders, and customers. In addition, it will provide a basis for cooperative planning with local and other governmental organizations and ultimately ensure that future budgets include the Center program needs described in the plan. This will ensure that development plans are safe, practical, and cost effective. To properly formulate any future plans, background information and research are required. Before bringing in a consultant to tackle the three year process anticipated to prepare a Center Master Plan, my job was to gather information on different organizations contributions to the NASA mission, their facility needs, consistent trends they observe, etc. I conducted numerous interviews with personnel such as Directorate Representatives, Division Chiefs, Branch Chiefs, System Managers and Building Managers. I documented the information I received from them for future use. I used the information to create various color-coded maps layering the different data. This was done with the ending objective being to collect the information and place it in a database that will be linked with Aperture (a computer program that generates color-coded map layers from database information) and made electronically retrievable to the Planning Consultant, NASA personnel, program stakeholders, and other governmental agencies. My goal this summer was to gather information and ideas appropriate for use in NASA Glenn Research Center s Master Plan and organize them for future application by the Planning Consultant. By the end of the summer, after completion of my goal, I will utilize my knowledge and create an array of preliminary future plans for the facility that can be passed along as a guidance tool.

Bigach, Kristin M.↗

Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative

NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Space and Ground Trades for Human Exploration and Wearable Computing

Human exploration of the Moon and Mars will present unique trade study challenges as ground system elements shift to planetary bodies and perhaps eventually to the bodies of human explorers in the form of wearable computing technologies. This presentation will highlight some of the key space and ground trade issues that will face the Exploration Initiative as NASA begins designing systems for the sustained human exploration of the Moon and Mars, with an emphasis on wearable computing. We will present some preliminary test results and scenarios that demonstrate how wearable computing might affect the trade space noted below. We will first present some background on wearable computing and its utility to NASA's Exploration Initiative. Next, we will discuss three broad architectural themes, some key ground and space trade issues within those themes and how they relate to wearable computing. Lastly, we will present some preliminary test results and suggest guidance for proceeding in the assessment and creation of a value-added role for wearable computing in the Exploration Initiative. The three broad ground-space architectural trade themes we will discuss are: 1. Functional Shift and Distribution: To what extent, if any, should traditional ground system functionality be shifted to, and distributed among, the Earth, Moon/Mars, and the human. explorer? 2. Situational Awareness and Autonomy: How much situational awareness (e.g. environmental conditions, biometrics, etc.) and autonomy is required and desired, and where should these capabilities reside? 3. Functional Redundancy: What functions (e.g. command, control, analysis) should exist simultaneously on Earth, the Moon/Mars, and the human explorer? These three themes can serve as the axes of a three-dimensional trade space, within which architectural solutions reside. We will show how wearable computers can fit into this trade space and what the possible implications could be for the rest of the ground and space architecture(s). We intend this to be an example of explorer-centric thinking in a fully integrated explorer paradigm, where integrated explorer refers to a human explorer having instant access to all relevant data, knowledge of the environment, science models, health and safety-related events, and other tools and information via wearable computing technologies. The trade study approach will include involvement from the relevant stakeholders (Constellation Systems, CCCI, EVA Project Office, Astronaut office, Mission Operations, Space Life Sciences, etc.) to develop operations concepts (and/or operations scenarios) from which a basic high-level set of requirements could be extracted. This set of requirements could serve as a foundation (along with stakeholder buy-in) that would help define the trade space and assist in identifying candidate technologies for further study and evolution to higher-level technology readiness levels.

Lupisella, Mark↗

Integrating Human Factors into Crew Exploration Vehicle Design

With NASA's new Vision for Exploration to send humans beyond Earth orbit, it is critical to consider the human as a system that demands early and continuous user involvement, and an iterative prototype/test/redesign process. Addressing human-system interface issues early on can be very cost effective even cost reducing when performed early in the design and development cycle. To achieve this goal within Crew Exploration Vehicle (CEV) Project Office, human engineering (HE) team is formed. Key tasks are to apply HE requirements and guidelines to hardware/software, and provide HE design, analysis and evaluation of crew interfaces. Initial activities included many practice-orientated evaluations using low-fidelity CEV mock-ups. What follows is a description of such evaluations that focused on a HE requirement regarding Net Habitable Volume (NHV). NHV is defined as the total remaining pressurized volume available to on-orbit crew after accounting for the loss of volume due to deployed hardware and structural inefficiencies which decrease functional volume. The goal of the NHV evaluations was to develop requirements providing sufficient CEV NHV for crewmembers to live and perform tasks in support of mission goals. Efforts included development of a standard NHV calculation method using computer models and physical mockups, and crew/ stakeholder evaluations. Nine stakeholders and ten crewmembers participated in the unsuited evaluations. Six crewmembers also participated in a suited evaluation. The mock-up was outfitted with volumetric representation of sub-systems such as seats, and stowage bags. Thirteen scenarios were developed to represent mission/crew tasks and considered to be primary volume drivers (e.g., suit donning) for the CEV. Unsuited evaluations included a structured walkthrough of these tasks. Suited evaluations included timed donning of the existing launch and entry suit to simulate a contingency scenario followed by doffing/ stowing of the suits. All mockup evaluations were videotaped. Structured questionnaires were used to document user interface issues and volume impacts of layout configuration. Computer model and physical measures of the NHV agreed within 1 percent. This included measurement of the gross habitable volume, subtraction of intrusive volumes, and other non-habitable spaces. Calculation method developed was validated as a standard means of measuring NHV, and was recommended as a verification method for the NHV requirements. Evaluations confirmed that there was adequate volume for unsuited scenarios and suit donning/ doffing activity. Seats, suit design stowage and waste hygiene system noted to be critical volume drivers. The low-fidelity mock-up evaluations along with human modeling analysis generated discussions that will lead to high-level systems requirements and human-centered design decisions. This approach allowed HE requirements and operational concepts to evolve in parallel with engineering system concepts and design requirements. As the CEV design matures, these evaluations will continue and help with design decisions, and assessment, verification and validation of HE requirements.

Whitmore, Mihriban↗

Working Group Reports and Presentations: Mars Settlement and Society

The long-term implications of space exploration must be considered early in the process. With this in mind, the Mars Settlement and Society Group focused on five key areas: Philosophical Framework, Community Infrastructure and Government, Creating Stakeholders, Human Subsystems, and Habitat Design. The team proposes long and short term goals to support getting to and then staying long-term on Mars. All objectives shared the theme that they should engage, inspire, and educate the public with the intent of fostering stakeholders in the exploration of Mars. The objectives of long-term settlement on Mars should not neglect group dynamics, issues of reproduction, and a strong philosophical framework for the establishment of a society.

McKay, Chris↗

High Altitude Long Endurance Remotely Operated Aircraft - National Airspace System Integration - Simulation IPT: Detailed Airspace Operations Simulation Plan. Version 1.0

The primary goal of Access 5 is to allow safe, reliable and routine operations of High Altitude-Long Endurance Remotely Operated Aircraft (HALE ROAs) within the National Airspace System (NAS). Step 1 of Access 5 addresses the policies, procedures, technologies and implementation issues of introducing such operations into the NAS above pressure altitude 40,000 ft (Flight Level 400 or FL400). Routine HALE ROA activity within the NAS represents a potentially significant change to the tasks and concerns of NAS users, service providers and other stakeholders. Due to the complexity of the NAS, and the importance of maintaining current high levels of safety in the NAS, any significant changes must be thoroughly evaluated prior to implementation. The Access 5 community has been tasked with performing this detailed evaluation of routine HALE-ROA activities in the NAS, and providing to key NAS stakeholders a set of recommended policies and procedures to achieve this goal. Extensive simulation, in concert with a directed flight demonstration program are intended to provide the required supporting evidence that these recommendations are based on sound methods and offer a clear roadmap to achieving safe, reliable and routine HALE ROA operations in the NAS. Through coordination with NAS service providers and policy makers, and with significant input from HALE-ROA manufacturers, operators and pilots, this document presents the detailed simulation plan for Step 1 of Access 5. A brief background of the Access 5 project will be presented with focus on Steps 1 and 2, concerning HALE-ROA operations above FL400 and FL180 respectively. An overview of project management structure follows with particular emphasis on the role of the Simulation IPT and its relationships to other project entities. This discussion will include a description of work packages assigned to the Simulation IPT, and present the specific goals to be achieved for each simulation work package, along with the associated deliverables necessary to achieve these goals and the needs of other Access 5 IPTs. The simulation environment chosen for this task is then outlined. This section includes a description of the system architecture, a list of the necessary assumptions made by the Simulation IPT, and the roles, responsibilities and interactions of simulation participants. The method of simulation conduct is presented in the next section with particular emphasis on scenario development and applicability to evaluation of Step 1 HALE-ROA operations. Following, data collection and analysis methods are discussed for air traffic specialists and air vehicle control station operators. Lastly, a schedule of Step 1 simulation activities is presented for reference.

Source record↗

Marshall Space Flight Center Propulsion Systems Department (PSD) Knowledge Management (KM) Initiative

NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppo~th e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

Does NASA's Constellation Architecture Offer Opportunities to Achieve Multiple Additional Goals in Space?

Every major NASA human spaceflight program in the last four decades has been modified to achieve goals in space not incorporated within the original design goals: the Apollo Applications Program, Skylab, Space Shuttle, and International Space Station. Several groups in the US have been identifying major future science goals, the science facilities necessary to investigate them, as well as possible roles for augmented versions of elements of NASA's Constellation program. Specifically, teams in the astronomy community have been developing concepts for very capable missions to follow the James Webb Space Telescope that could take advantage of - or require - free-space operations by astronauts and/or robots. Taking as one example, the Single-Aperture Far-InfraRed (SAFIR) telescope with a approx. 10+ m aperture proposed for operation in the 2020 timeframe. According to current NASA plans, the Ares V launch vehicle (or a variant) will be available about the same time, as will the capability to transport astronauts to the vicinity of the Moon via the Orion Crew Exploration Vehicle and associated systems. [As the lunar surface offers no advantages - and major disadvantages - for most major optical systems, the expensive system for landing and operating on the lunar surface is not required.] Although as currently conceived, SAFIR and other astronomical missions will operate at the Sun-Earth L2 location, it appears trivial to travel for servicing to the more accessible Earth-Moon L1,2 locations. Moreover. as the recent Orbital Express and Automated Transfer Vehicle missions have demonstrated, future robotic capabilities should offer capabilities that would (remotely) extend human presence far beyond the vicinity of the Earth. In addition to multiplying the value of NASA's architecture for future human spaceflight to achieve the goals multiple major stakeholders. if humans one day travel beyond the Earth-Moon system - say, to Mars - technologies and capabilities for operating for long periods in free space must be developed. The engineering, management. and operational successes of the Space Station have demonstrated that international collaboratio~i is possible. However, there is a danger that the hard-won lessons of cLul+sent programs will be lost without continuing development of in-space operations. A program to achieve. for example. major astronomical goals in space using astronauts and robots will sustain international capabilities. produce highly visible achievements. and appeal to a11 additional broad community of stakeholders not currently involved with missions to the lunar surface.

Thronson, Harley↗