Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Metric analysis and data validation across FORTRAN projects

The desire to predict the effort in developing or explaining the quality of software has led to the proposal of several metrics. As a step toward validating these metrics, the Software Engineering Laboratory (SEL) has analyzed the software science metrics, cyclomatic complexity, and various standard program measures for their relation to effort (including design through acceptance testing), development errors (both discrete and weighted according to the amount of time to locate and fix), and one another. The data investigated are collected from a project FORTRAN environment and examined across several projects at once, within individual projects and by reporting accuracy checks demonstrating the need to validate a database. When the data comes from individual programmers or certain validated projects, the metrics' correlations with actual effort seem to be strongest. For modules developed entirely by individual programmers, the validity ratios induce a statistically significant ordering of several of the metrics' correlations. When comparing the strongest correlations, neither software science's E metric cyclomatic complexity not source lines of code appears to relate convincingly better with effort than the others.

Basili, Victor R.↗

Elementary and middle school science improvement project

The Alabama A & M University Elementary and Middle School Science Improvement Project (Project SIP) was instituted in response to a need to improve the ability of North Alabama teachers to teach science effectively using the experimental or hands-on approach. The major component of the project was a two-week workshop. Follow-up visits were made to the classrooms of many of the participating teachers to obtain information on how the program was being implemented in the classroom. The administrative aspects of the program, the delivery of the services to participating teachers, and the project outcomes are addressed.

Mcguire, Saundra Yancy↗

NASA PC software evaluation project

The USL NASA PC software evaluation project is intended to provide a structured framework for facilitating the development of quality NASA PC software products. The project will assist NASA PC development staff to understand the characteristics and functions of NASA PC software products. Based on the results of the project teams' evaluations and recommendations, users can judge the reliability, usability, acceptability, maintainability and customizability of all the PC software products. The objective here is to provide initial, high-level specifications and guidelines for NASA PC software evaluation. The primary tasks to be addressed in this project are as follows: to gain a strong understanding of what software evaluation entails and how to organize a structured software evaluation process; to define a structured methodology for conducting the software evaluation process; to develop a set of PC software evaluation criteria and evaluation rating scales; and to conduct PC software evaluations in accordance with the identified methodology. Communication Packages, Network System Software, Graphics Support Software, Environment Management Software, General Utilities. This report represents one of the 72 attachment reports to the University of Southwestern Louisiana's Final Report on NASA Grant NGT-19-010-900. Accordingly, appropriate care should be taken in using this report out of context of the full Final Report.

Dominick, Wayne D.↗

Projections from the rostral mesencephalic reticular formation to the spinal cord - An HRP and autoradiographical tracing study in the cat

Horseradish peroxidase was injected, or implanted unilaterally, into various levels of the spinal cord of anesthetized cats, to trace the distribution of projections to the spinal cord, of neurons in Field H of Forel, including the rostral interstitial nucleus of the medial longitudinal fasciculus (riMLF), and the interstitial nucleus of Cajal with adjacent reticular formation (INC-RF). Results indicate that, unlike the neurons projecting to the extraocular muscle motoneurons, the major portion of the spinally projecting neurons are not located in the riMLF or INC proper, but in adjacent areas, i.e., the ventral and lateral parts of the caudal third of the Field H of Forel and in the INC-RF. Neurons in caudal Field H of Forel, project, via the ventral part of the ventral funicululs, to the lateral part of the upper cervical ventral horn.

Holstege, G.↗

Advanced spacecraft fire safety: Proposed projects and program plan

A detailed review identifies spacecraft fire safety issues and the efforts for their resolution, particularly for the threats posed by the increased on-orbit duration, size, and complexity of the Space Station Freedom. Suggestions provided by a survey of Wyle consultants and outside fire safety experts were combined into 30 research and engineering projects. The projects were then prioritized with respect to urgency to meet Freedom design goals, status of enabling technology, cost, and so on, to yield 14 highest priority projects, described in terms of background, work breakdown structure, and schedule. These highest priority projects can be grouped into the thematic areas of fire detection, fire extinguishment, risk assessment, toxicology and human effects, and ground based testing. Recommendations for overall program management stress the need for NASA Headquarters and field center coordination, with information exchange through spacecraft fire safety oversight committees.

Youngblood, Wallace W.↗

Elementary and middle school science improvement project

The Alabama A and M University Elementary and Middle School Science Improvement Project (Project SIP) was instituted to improve the science knowledge of elementary and middle school teachers using the experimental or hands-on approach. Summer workshops were conducted during the summers of 1986, 1987, and 1988 in the areas of biology, chemistry, physics, and electricity, and magnetism. Additionally, a manual containing 43 lessons which included background information, experiments and activities for classroom and home use was provided to each teacher. During the course of the project activities, the teachers interacted with various university faculty members, scientists, and NASA staff. The administrative aspects of the program, the delivery of the services to participating teachers, and the project outcome are addressed.

Mcguire, Saundra Y.↗

Review of geography internship of convective wave project

The internship of the author is examined in detail. The acquisition of the internship, the personnel of the project, the project itself, and the goals associated with it are described. The authors orientation to the internship, the project's operations, and the conclusion of the findings are also described. The overall goal of the project was to determine the effect of convective waves on wind speeds in the middle and upper troposphere, and how these waves affect the general circulation on a global scale. A more specific goal of the author was the satellite analysis of cloud street formations. This was done to determine frequency and areas in which cloud streets occur off the East Asian and North American coastlines.

Rademacher, Kurt R.↗

Historical overview of the Biosphere 2 project

An extensive historical overview is given of the Biosphere 2 project. The overview begins in late 1969, as the moon landings commenced, when work began on ecological projects which laid the conceptual foundation for the current Biosphere 2 project. Continuing through to taking a complete functional suite of microbes together with their associated aquatic elements and an air volume and putting them inside a closed lab flask in which to measure the oxygen and CO2 levels, study energy flows and visually observe the changes therein. The laws of biospherics formulated by the author which can be tested in the Biosphere 2 project are listed.

Allen, John P.↗

The ISIS project: Fault-tolerance in large distributed systems

The semi-annual status report covers activities of the ISIS project during the second half of 1989. The project had several independent objectives: (1) At the level of the ISIS Toolkit, ISIS release V2.0 was completed, containing bypass communication protocols. Performance of the system is greatly enhanced by this change, but the initial software release is limited in some respects. (2) The Meta project focused on the definition of the Lomita programming language for specifying rules that monitor sensors for conditions of interest and triggering appropriate reactions. This design was completed, and implementation of Lomita is underway on the Meta 2.0 platform. (3) The Deceit file system effort completed a prototype. It is planned to make Deceit available for use in two hospital information systems. (4) A long-haul communication subsystem project was completed and can be used as part of ISIS. This effort resulted in tools for linking ISIS systems on different LANs together over long-haul communications lines. (5) Magic Lantern, a graphical tool for building application monitoring and control interfaces, is included as part of the general ISIS releases.

Birman, Kenneth P.↗

An evaluation of the total quality management implementation strategy for the advanced solid rocket motor project at NASA's Marshall Space Flight Center

An evaluation of the NASA's Marshall Space Flight Center (MSFC) strategy to implement Total Quality Management (TQM) in the Advanced Solid Rocket Motor (ASRM) Project is presented. The evaluation of the implementation strategy reflected the Civil Service personnel perspective at the project level. The external and internal environments at MSFC were analyzed for their effects on the ASRM TQM strategy. Organizational forms, cultures, management systems, problem solving techniques, and training were assessed for their influence on the implementation strategy. The influence of ASRM's effort was assessed relative to its impact on mature projects as well as future projects at MSFC.

Schramm, Harry F.↗

Controlled ecological life support system breadboard project, 1988

The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

Knott, W. M.↗

Demonstrating artificial intelligence for space systems - Integration and project management issues

As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.

Hack, Edmund C.↗

Global Change Encyclopedia - A project for the international space year

'Global Change Encyclopedia' is a project for the International Space Year in 1992. The project will produce a comprehensive set of satellite and other global data with relevance to studies of global change and of the earth as a system. These data will be packaged on CD-ROMs, accompanied by appropriate software for access, display and manipulation. On behalf of the Canadian Space Agency, the project is being carried out by the Canada Centre for Remote Sensing, with the U.S. National Oceanic and Atmospheric Administration and the U.S. National Aeronautics and Space Administration as major contributors. This paper highlights the background leading to the project, the concept and principal characteristics of the Encyclopedia itself, and the current status and plans.

Cihlar, J.↗

ART/Ada design project, phase 1

An Ada-Based Expert System Building Tool Design Research Project was conducted. The goal was to investigate various issues in the context of the design of an Ada-based expert system building tool. An attempt was made to achieve a comprehensive understanding of the potential for embedding expert systems in Ada systems for eventual application in future projects. The current status of the project is described by introducing an operational prototype, ART/Ada. How the project was conducted is explained. The performance of the prototype is analyzed and compared with other related works. Future research directions are suggested.

Source record↗

Manpower and project planning

The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

Johnson, David W.↗

Sudbury project (University of Muenster-Ontario Geological Survey): Summary of results - an updated impact model

In 1984 the Ontario Geological Survey initiated a research project on the Sudbury structure (SS) in cooperation with the University of Muenster. The project included field mapping (1984-1989) and petrographic, chemical, and isotope analyses of the major stratigraphic units of the SS. Four diploma theses and four doctoral theses were performed during the project (1984-1992). Specific results of the various investigations are reported. Selected areas of the SS were mapped and sampled: Footwall rocks; Footwall breccia and parts of the sublayer and lower section of the Sudbury Igneous Complex (SIC); Onaping Formation and the upper section of the SIC; and Sudbury breccia and adjacent Footwall rocks along extended profiles up to 55 km from the SIC. All these stratigraphic units of the SS were studied in substantial detail by previous workers. The most important characteristic of the previous research is that it was based either on a volcanic model or on a mixed volcanic-impact model for the origin of the SS. The present project was clearly directed toward a test of the impact origin of the SS without invoking an endogenic component. In general, our results confirm the most widely accepted stratigraphic division of the SS. However, our interpretation of some of the major stratigraphic units is different from most views expressed. The stratigraphy of the SS and its new interpretation is given as a basis for discussion.

Avermann, M.↗

The NASA CSTI high capacity power project

The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.

Winter, J.↗

Desktop Computing Integration Project

The Desktop Computing Integration Project for the Human Resources Management Division (HRMD) of LaRC was designed to help division personnel use personal computing resources to perform job tasks. The three goals of the project were to involve HRMD personnel in desktop computing, link mainframe data to desktop capabilities, and to estimate training needs for the division. The project resulted in increased usage of personal computers by Awards specialists, an increased awareness of LaRC resources to help perform tasks, and personal computer output that was used in presentation of information to center personnel. In addition, the necessary skills for HRMD personal computer users were identified. The Awards Office was chosen for the project because of the consistency of their data requests and the desire of employees in that area to use the personal computer.

Tureman, Robert L., Jr.↗