Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Informative Path Planning for Mapping Radiation

This project involves making measurements of contaminated areas using portable radiation detectors and small robots. Tasks involve operating detectors and small robots, combining data acquisition for the two systems, and automating the systems. The end result is a radiation map of contamination areas. Localization of radioactive sources and mapping of contamination distribution is essential when responding to emergencies, or when dealing with cleanup efforts. Radiation maps are used for situational awareness and for establishing a safe perimeter. However, it may be hazardous or impossible for humans to safely enter the site and survey the area. Informative Path Planning (IPP) is used to design a path for a robotic sensor platform to gather the most information about the radiation distribution while operating under the set of constraints given by the dynamics of the robot and other requirements such as minimizing the overall mission time. The key challenge for IPP is the tight coupling in multiple layers of decisions: Selection of locations to visit; Allocation of sensors to those locations; Processing of information gathered. Given a robot equipped with a basic gamma detector and Lidar sensor, how can we efficiently explore an unknown environment in such a way that we can satisfy the robot's constraints while simultaneously maximizing the accuracy of the map and minimizing the total runtime? This work presents a systematic procedure for IPP and environmental mapping that: Selects the best locations at which to sample; Finds the best path for robots; Estimates the measurement value at unknown locations using a Gaussian Process regression framework. Given a set of points where radiation measurements were taken, we are utilizing a Gaussian Process Regression with a Matern kernel to reconstruct the shape of the underlying ground truth. Mapping is done via the Robot Operating System's OpenSlam Gmapping package, which creates a 2D occupancy grid map. Simulated trials were run with a radiation source placed at random locations, and allowing the robot to select and move towards 20 samples at separate locations, as well as sampling along the path while moving. The simulated sensor model assumed an efficiency of 0.3, collection time of 1 second. Various weighting schemes were tested and compared. Quantitative evaluations often favored exploitation-heavy weighting schemes where μ was emphasized, with the Root Mean Squared Error (RMSE) quickly tending towards 2, whereas qualitative comparisons would favor exploration-biased schemes with greater weight on σ. The difference comes from operators often favoring knowing the general location of a source, rather than the exact properties of a source. Weighting of the path-length π often reduced the quality of the regression as less exploration occurred, however this may be deemed a worthwhile trade-off under certain circumstances, such as with sensitive robots. Successfully developed a methodology for informative path-planning for a robot to efficiently gather information and create a map of radiation. In the future, we would like to focus on: Hardware trials with integration of the robot platform and the IPP software; More refined sensor and environmental modeling; Multiple robot platforms.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Augmented Reality Rendering of Computed Tomography 3-D Density Data

Overall Objectives: Purchase equipment and Software required to develop the technology; Import CT Data for viewing on an AR device; Develop the tools necessary to manipulate the data in AR. With Augmented and Virtual Reality technology becoming more common and affordable everyday, new visualization techniques need to be developed that can leverage this technology to visualize data in new and useful ways. Computed Tomography (CT) scans, are the result of a powerful X-ray machine taking multiple images of the same object. These images represent slices of the original object and have extremely high resolution. Because of the high resolution, CT scanning is often used in the medical field but is becoming increasingly predominate in diverse industrial fields as well. This is an example of a CT scan that shows an object with multiple items inside. These items are represented by different colors in gray scale to indicate different densities. This is also from the data set used for the duration of the project. The data sets usually contain hundreds of slides that looks like just like this. Visualizing these large data sets can be difficult. The general approach for this seedling was to identify the devices and software that are currently in use for data visualization and evaluate them for use in the project. After that a plan was made to convert the data into a format viewable in AR. Tools were then developed to manipulate that data. The project was a success, but there is plenty of room to advance the technology and create better visualizations.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Automated treatment planning for a dedicated multi-source intracranial radiosurgery treatment unit using projected gradient and grassfire algorithms

Purpose: The purpose of this work is to develop a framework to the inverse problem for radiosurgery treatment planning on the Gamma Knife{sup Registered-Sign} Perfexion Trade-Mark-Sign (PFX) for intracranial targets. Methods: The approach taken in the present study consists of two parts. First, a hybrid grassfire and sphere-packing algorithm is used to obtain shot positions (isocenters) based on the geometry of the target to be treated. For the selected isocenters, a sector duration optimization (SDO) model is used to optimize the duration of radiation delivery from each collimator size from each individual source bank. The SDO model is solved using a projected gradient algorithm. This approach has been retrospectively tested on seven manually planned clinical cases (comprising 11 lesions) including acoustic neuromas and brain metastases. Results: In terms of conformity and organ-at-risk (OAR) sparing, the quality of plans achieved with the inverse planning approach were, on average, improved compared to the manually generated plans. The mean difference in conformity index between inverse and forward plans was -0.12 (range: -0.27 to +0.03) and +0.08 (range: 0.00-0.17) for classic and Paddick definitions, respectively, favoring the inverse plans. The mean difference in volume receiving the prescribed dose (V{sub 100}) between forward and inverse plans was 0.2% (range: -2.4% to +2.0%). After plan renormalization for equivalent coverage (i.e., V{sub 100}), the mean difference in dose to 1 mm{sup 3} of brainstem between forward and inverse plans was -0.24 Gy (range: -2.40 to +2.02 Gy) favoring the inverse plans. Beam-on time varied with the number of isocenters but for the most optimal plans was on average 33 min longer than manual plans (range: -17 to +91 min) when normalized to a calibration dose rate of 3.5 Gy/min. In terms of algorithm performance, the isocenter selection for all the presented plans was performed in less than 3 s, while the SDO was performed in an average of 215 min. Conclusions: PFX inverse planning can be performed using geometric isocenter selection and mathematical modeling and optimization techniques. The obtained treatment plans all meet or exceed clinical guidelines while displaying high conformity.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Solar Energy Extension Project

The town of Stratford plans to develop and own a 6 kilowatt (kW) solar array on the roof of a municipal-owned public pavilion on the town green. A SolarEdge level 2 EV charging station will be installed at the pavilion to be used by the public. The charging station will have one charging port. The town will install 3 air source heat pumps in the library located adjacent to the pavilion to reduce the use of propane to heat the library. The town will install 4 air source heat pumps in the Town Hall to reduce the use of #2 heating oil to heat the facility. The 6 kW solar array will provide electricity to the library to offset electricity usage, and when an EV plugs into the charging station the solar will provide electricity to the charging station. There is no ground disturbance or ground trenching associated with this project. The 6 kW solar array on the roof of the pavilion will include 20 (390) watt all black panels. A SolarEdge level 2 EV charger will be installed at the pavilion with the 240 V inverter. The solar array will provide electricity to the library and when a vehicle plugs into the EV charger the solar array will switch to power the charger. Any excess electricity that is generated by the array and not used by the library or the EV charger will be fed onto the grid and the town will receive a net metering credit applied towards future consumption. There is no ground disturbance associated with the EV charger or solar array, and the town will install signage to direct the public to the charger. The library will install 2 (18,000) BTU ductless air source heat pumps and 1 (24,000) BTU unit. This will significantly reduce the amount of propane required to heat the library. The Town Hall will install 2 (36,000) BTU ductless air source heat pumps and 2 (9,000) BTU units to reduce the amount of #2 heating oil required to heat the building.

14 SOLAR ENERGY↗

Positioning People for Effective Communication and Coordination - 18033

If the aim of people working together is to solve complex problems and develop creative solutions, would it make sense to position people to actually do this kind of work? A growing number of project teams span organizational boundaries: government agencies coordinate with other government agencies, private companies conduct major projects for government agencies, and public utilities coordinate decision-making with citizen groups. In such instances, these project teams are especially vulnerable to experiencing a gap in expectations in terms of how people should communicate and coordinate with one another. If these gaps are not addressed, communication bogs down, those involved in the project become frustrated and impatient, and solving complex problems and developing creative solutions becomes challenging if not impossible. However, it is possible to position people to effectively communicate and coordinate. One approach is to give attention to the discussion and development of a P3 Plan that describes how the project team agrees to coordinate its efforts and toward what ends. A P3 Plan is developed by the project team typically through one or more facilitated conversations. Multiple US government-to-government, government/contractor, and government/public citizen groups and teams have used this approach and have been successful moving beyond their own self-interests to deal with controversial issues. The project benefits because the work product combines the best thinking from everyone, eliminating potential political and turf battles from the start. (authors)

99 GENERAL AND MISCELLANEOUS↗

Search for a mixed quark-hadron phase of QCD matter at the JINR nuclotron

Physics aspects of a JINR project to reach the planned 5 A GeV energy for the Au and U beams and to increase the bombarding energy up to 10 AGeV are discussed. The project aims to search for a possible formation of a strongly interacting mixed quark-hadron phase. The relevant problems are exemplified. The need for scanning heavy-ion interactions in bombarding energy, collision centrality, and isospin asymmetry is emphasized.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Climate Model Output Rewriter

The Climate Model Output Rewriter (CMOR) software was first developed by LLNL’s PCMDI program in early 2000s and was formally released with v1.0 (July 2006), v2.0 (January 2011), and v3.1(June 2016). CMOR is used to produce Climate and Forecast Convention (http://cfconventions.org/) CF-compliant netCDF files, in the standard format required to satisfy the World Climate Research Program (WCRP) Coupled Model Intercomparison Project (CMIP). The software has been used across multiple phases of the Earth System Modeling (ESM) project CMIP (CMIP3, CMIP5, CMIP6, and planned use in CMIP7) along with numerous parallel projects focused on preparation observations for use in model evaluation (obs4MIPs) and forcing datasets (input4MIPs) to guide ESM simulations to meet strict experimental protocols. More information can be obtained from the CMOR website and code repositories: https://cmor.llnl.gov/; https://github.com/pcmdi/cmor; https://github.com/PCMDI/cmor3_documentation The ESM variable definitions used as input for CMOR can also be viewed in code repositories: https://github.com/PCMDI/cmip3-cmor-tables/; https://github.com/PCMDI/cmip5-cmor-tables/; https://github.com/PCMDI/cmip6-cmor-tables/

Mauzey, ChristopherF↗

The D and D of Nuclear Facilities: a Systemic Approach for Project Organization and Monitoring - 18099

The Decontamination and Decommissioning (D and D) of Licensed Nuclear facilities takes place under circumstances which make it a very complex field. On the one hand, more and more facilities of widely varying types are concerned, and many D and D projects are currently running or planned. A nuclear facility's life cycle is often very long and the building may be modified or impacted by incidents during its operation. These changes need to be known and taken into account for the D and D plans, in order to ensure safety at all times. In addition, the numerous stakeholders involved in a project express needs which impose many requirements. These encompass various points of view, and data from different detail levels must be managed to satisfactorily meet them. On the other hand, legacy data (including records, plans etc.) is a recurring issue for D and D projects. The quality and availability of relevant data regarding the different phases of the nuclear facility lifetime may be insufficient, for instance due to the lack of traceability practices in the past. The uncertainty level is not always specified and explained, old documents can be damaged and are not necessarily digitized, etc. It is therefore particularly important to define the relevant type of raw data to be collected and traced for D and D projects as early as possible. In this context, CEA (Commissariat a l'energie Atomique et aux energies Alternatives) has been analyzing past D and D projects for many years. The goal is to facilitate reproducibility by generalizing best practices and promoting efficient organizational rules and technical solutions. A method is currently being studied to help project managers to prepare specifications for future D and D operations and improve both the efficiency and the relevance of the decommissioning strategy throughout each project, depending on the expected quality of its end-state. This method first consists in formalizing and specifying the entire set of requirements to be taken into consideration, e.g. technical, operational, logistical, regulatory, financial, organizational, safety and security, human, ethical, or, naturally, environmental aspects. Second, based on these requirements, it will enable the project team to structure, check, and then to demonstrate the coherence and feasibility of the project from both the technological and organizational points of view. Lastly, the method will enable the evaluation of the various possible solutions for the management of dismantling products, for instance, regarding the waste outlets: direct disposal or interim storage. To conclude, the method should permit a constant re-evaluation of the D and D strategy depending on the possible evolution of the stakeholders' requirements, and thus it should optimize the monitoring of D and D projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of PGSFR Project

The long-term plan for advanced SFR development was authorized by Korean Atomic Energy Commission (KAEC) in 2008 and updated in 2011, which will be carried out toward the construction of a SFR prototype plant called PGSFR (Prototype Gen-IV Sodium-cooled Fast Reactor) by 2028. The primary purpose of PGSFR is to demonstrate the technology reducing radioactive waste of spent nuclear fuel from nuclear power plants (NPP) in Korea. There are 24 NPPs in operation nationwide covering 30% of domestic electricity demand. The spent nuclear fuel is currently stored in the on-site storage pool of NPPs. Then, it has become a critical issue to ensure technical options to handle spent nuclear fuel in the long term basis to secure the sustainable operation of NPPs. PGSFR is a pool type sodium-cooled fast reactor with the power of 150 MWe or 400 MWth. PGSFR uses metallic fuel to make use of inherent safety characteristics of metallic fuel. The spent nuclear fuel will be processed using pyro-process to produce U-TRU-Zr fuel for PGSFR. But the initial core shall be loaded by low enriched U-Zr fuels. PGSFR has two intermediate loops with two intermediate heat exchangers (IHX) for each loop to deliver the generated heat from the core to power conversion system. There a steam generators producing super-heated steam in each loop. There are four decay heat removal circuits; two passive and two active ones. The reactor building is built on a seismic isolation base mat which can significantly mitigate seismic vibration of major components in the reactor building. The reactor building has a containment structure to isolate the reactor building under specific accident conditions and also provide structural integrity at the time of aircraft impact accident. PGSFR project is the national development program of Korea to construct the first SFR in Korea by 2028. The primary goal of PGSFR is the demonstration of reduction of radioactive waste from spent nuclear fuel by incineration in PGSFR. SFRA will flexibly cope with the licensing environment to minimize the uncertainty in licensing and safety concerns. The successful construction of PGSFR will bring Korean nuclear industry a step closer to guarantee the sustainable operation of NPPs nationwide and finally most importantly will solve the spent nuclear fuel issue of Korea. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CERF – A Geospatial Model for Assessing Future Energy Production Technology Expansion Feasibility

Electricity system expansion planning faces significant challenges not only because of commonly modeled uncertainties such as future demand growth, fuel prices, and technology cost and performance, but also because of challenges such as climate change and carbon policies that can affect supply and demand. Changes in energy technology, natural resource availability, and population migration and growth will affect the feasibility of power plant siting, potentially hindering the achievement of policy goals. New modeling approaches are needed that couple future projections of energy system expansion with “on the ground” feasibility modeling—where both are informed by a consistent set of assumptions about future climate trends, resource availability, climate policy, socioeconomics, and environmental regulations. This research describes the development and evaluation of the Capacity Expansion Regional Feasibility (CERF) model, a geospatial tool for scenario analysis of electricity system expansions.

grid expansion, water-energy nexus, power plant si↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Developing a roadmap for carbon capture, and storage in Oklahoma by assessing the viability of stacked storage

Abstract The Intergovernmental Panel on Climate Change concludes that CO 2 capture and storage (CCS) is critical for climate‐stabilizing energy transitions. In CCS, captured CO 2 is sequestered in saline aquifers within sedimentary basins. The CO 2 storage capacity and the rate of injection are functions of the geology of the saline aquifer, which is uncertain. To minimize impacts of this uncertainty, CCS projects could include backup plans, such as co‐locating geologic CO 2 storage (GCS) sites with or near existing CO 2 ‐enhanced oil recovery (CO 2 ‐EOR) operations. These “stacked storage” projects could hedge against uncertainty in the saline formation performance because captured CO 2 could be injected into either location in the event of unexpected events (e.g., the injectivity decreases). Here, we investigate the possibility and ramifications of developing CCS networks in Oklahoma that are amendable to stacked storage. We find that stacked storage is possible in Oklahoma but the counties with the lowest‐cost saline storage resources do not have existing CO 2 ‐EOR operations. At the systems level, we find it is slightly more expensive (e.g., $1/tCO 2 to $5/tCO 2 ) to site GCS in counties with CO 2 ‐EOR projects. This increased expense is largely due to increased CO 2 transportation costs because hundreds of km of additional pipeline is required to capture CO 2 from the lowest‐cost sources. Overall, our results suggest that it is optimal to build more pipelines and avoid injecting CO 2 in some of the lowest‐cost saline storage resources, to enable capturing CO 2 from the least‐cost sources. © 2023 Society of Chemical Industry and John Wiley & Sons, Ltd.

42 ENGINEERING↗

Regularization approach for tomosynthesis X-ray inspection

X-ray inspection is intended to be used as an escalation technique for inspection of carbon fiber reinforced plastics (CFRP) in aerospace applications, especially in case of unclear indications from ultrasonic or other NDT modalities. Due to their large dimensions, most aerospace components cannot be scanned by conventional computed tomography. In such cases, X-ray Laminography may be applied, allowing a pseudo 3D slice-by-slice reconstruction of the sample with Tomosynthesis. However, due to the limited angle acquisition geometry, reconstruction artifacts arise, especially at surfaces parallel to the imaging plane. To regularize the Tomosynthesis approach, we propose an additional prescan of the object to detect outer sample surfaces. We recommend the use of contrasted markers which are temporarily attached to the sample surfaces. The depth position of the markers is then derived from that prescan. As long as the sample surface remains simple, few markers are required to fit the respective object surfaces. The knowledge about this surface may then be used to regularize the final Tomosynthesis reconstruction, performed with markerless projections. Eventually, it can also serve as prior information for an ART reconstruction or to register a CAD model of the sample. The presented work is carried out within the European FP7 project QUICOM. We demonstrate the proposed approach within a simulation study applying an acquisition geometry suited for CFRP part inspection. A practical verification of the approach is planned later in the project.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Technical Report on Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

The Nature Conservancy participated in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project was 'Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration'. The objectives of the project were to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects, providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Final Technical Report discusses the results of the six tasks that The Nature Conservancy undertook to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between July 1st 2001 and July 10th 2008. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool. The project occurred in two phases. The first was a focused exploration of specific carbon measurement and monitoring methodologies and pre-selected carbon sequestration opportunities. The second was a more systematic and comprehensive approach to compare various competing measurement and monitoring methodologies, and assessment of a variety of carbon sequestration opportunities in order to find those that are the lowest cost with the greatest combined carbon and other environmental benefits. In the first phase we worked in the U.S., Brazil, Belize, Bolivia, Peru, and Chile to develop and refine specific carbon inventory methods, pioneering a new remote-sensing method for cost-effectively measuring and monitoring terrestrial carbon sequestration and system for developing carbon baselines for both avoided deforestation and afforestation/reforestation projects. We evaluated the costs and carbon benefits of a number of specific terrestrial carbon sequestration activities throughout the U.S., including reforestation of abandoned mined lands in southwest Virginia, grassland restoration in Arizona and Indiana, and reforestation in the Mississippi Alluvial Delta. The most cost-effective U.S. terrestrial sequestration opportunity we found through these studies was reforestation in the Mississippi Alluvial Delta. In Phase II we conducted a more systematic assessment and comparison of several different measurement and monitoring approaches in the Northern Cascades of California, and a broad 11-state Northeast regional assessment, rather than pre-selected and targeted, analysis of terrestrial sequestration costs and benefits. Work was carried out in Brazil, Belize, Chile, Peru and the USA. Partners include the Winrock International Institute for Agricultural Development, The Sampson Group, Programme for Belize, Society for Wildlife Conservation (SPVS), Universidad Austral de Chile, Michael Lefsky, Colorado State University, UC Berkeley, the Carnegie Institution of Washington, ProNaturaleza, Ohio State University, Stephen F. Austin University, Geographical Modeling Services, Inc., WestWater, Los Alamos National Laboratory, Century Ecosystem Services, Mirant Corporation, General Motors, American Electric Power, Salt River Project, Applied Energy Systems, KeySpan, NiSource, and PSEG. This project, 'Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration', has resulted in over 50 presentations and reports, available publicly through the Department of Energy or by visiting the links listed in Appendix 1. More important than the reports, the project has helped to lead to the development of on-the-ground projects in Southwestern Virginia, Louisiana, and Chile while informing policy development in Virginia, the Regional Greenhouse Gas Initiative, the California Climate Action Registry and U.S. and international programs.

54 ENVIRONMENTAL SCIENCES↗

Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC

The planned upgrade of the LHC collimation system includes additional collimators in the LHC lattice. The longitudinal space for the collimators could be obtained by replacing some LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. A joint development program with the goal of building a 5.5 m long two-in-one aperture Nb_3Sn dipole prototype suitable for installation in the LHC is being conducted by FNAL and CERN magnet groups. As part of the first phase of the program, 1 m long and 2 m long single aperture models are being built and tested, and the collared coils from these magnets will be assembled and tested in two-in-one configuration in both laboratories. In parallel with the short model magnet activities, the work has started on the production line in view of the scale-up to 5.5 m long prototype magnet. The development of the final cryo-assembly comprising two 5.5 m long 11 T dipole cold masses and the warm collimator in the middle, fully compatible with the LHC main systems and the existing machine interfaces, has also started at CERN. This paper summarizes the progress made at CERN and FNAL towards the construction of 5.5 m long 11 T Nb_3Sn dipole prototype and the present status of the activities related to the integration of the 11 T dipole and collimator in the LHC.

43 PARTICLE ACCELERATORS↗

SU-E-T-133: Dosimetric Impact of Scan Orientation Relative to Target Motion During Spot Scanning Proton Therapy

Purpose: This study seeks to evaluate the dosimetric effects of intra-fraction motion during spot scanning proton beam therapy as a function of beam-scan orientation and target motion amplitude. Method: Multiple 4DCT scans were collected of a dynamic anthropomorphic phantom mimicking respiration amplitudes of 0 (static), 0.5, 1.0, and 1.5 cm. A spot-scanning treatment plan was developed on the maximum intensity projection image set, using an inverse-planning approach. Dynamic phantom motion was continuous throughout treatment plan delivery.The target nodule was designed to accommodate film and thermoluminescent dosimeters (TLD). Film and TLDs were uniquely labeled by location within the target. The phantom was localized on the treatment table using the clinically available orthogonal kV on-board imaging device. Film inserts provided data for dose uniformity; TLDs provided a 3% precision estimate of absolute dose. An inhouse script was developed to modify the delivery order of the beam spots, to orient the scanning direction parallel or perpendicular to target motion.TLD detector characterization and analysis was performed by the Imaging and Radiation Oncology Core group (IROC)-Houston. Film inserts, exhibiting a spatial resolution of 1mm, were analyzed to determine dose homogeneity within the radiation target. Results: Parallel scanning and target motions exhibited reduced target dose heterogeneity, relative to perpendicular scanning orientation. The average percent deviation in absolute dose for the motion deliveries relative to the static delivery was 4.9±1.1% for parallel scanning, and 11.7±3.5% (p<<0.05) for perpendicularly oriented scanning. Individual delivery dose deviations were not necessarily correlated to amplitude of motion for either scan orientation. Conclusions: Results demonstrate a quantifiable difference in dose heterogeneity as a function of scan orientation, more so than target amplitude. Comparison to the analyzed planar dose of a single field hint that multiple-field delivery alters intra-fraction beam-target motion synchronization and may mitigate heterogeneity, though further study is warranted.

60 APPLIED LIFE SCIENCES↗

Electric Power Generation from Low to Intermediate Temperature Resources

This project was designed to test the concept on the Eland-Lodgepole Field near Dickinson, North Dakota in the Williston Basin. The field is in secondary-recovery water-flood and consists of 12 producing oil wells, 5 water injection wells and one disposal well. Water production at the site averages approximately 320 gallons per minute (20.2 l s-1) and the temperature is 100 ⁰C. Engineers at Ormat estimated power production potential with the existing resource to be approximately 350 kWh. Unfortunately, ownership of the field was transferred from Encore, Inc., to Denbury, Inc., within the first week of the project. After two years of discussion and planning, Denbury decided not to pursue this project due to complications with the site location and its proximity to Patterson Lake. Attempts to find other partners operating in the Williston Basin were unsuccessful. Consequently, we were unable to pursue the primary objective of the project. However, during negations with Denbury and subsequent time spent contacting other potential partners, we focused on objectives 2 and 3 and developed a clear understanding of the potential for co-produced production in the Williston Basin and the best practices for developing similar projects. At least nine water bearing formations with temperatures greater than 90 ⁰C extend over areas of several 10s of km2. The total energy contained in the rock volume of those geothermal aquifers is 283.6 EJ (1 EJ = 1018 J). The total energy contained in the water volume, determined from porosities which range from 2 percent to 8 percent, is 6.8 EJ. The aquifers grouped by 10 ⁰C temperature bins (Table 1) include one or more formations due to the bowl-shape structure of the basin. Table 1. Summary of energy available in geothermal aquifers in the Williston Basin Analysis of overall fluid production from active wells, units, fields and formations in North Dakota showed that few sites co-produce sufficient fluid for significant power production with ORC technology. Average co-produced water for 10,480 wells is 3.2 gallons per minute (gpm). Even excluding the tight formations, Bakken and Three Forks, average co-produced water for the remaining 3,337 is only 5 gpm. The output of the highest producing well is 184 gpm and the average of the top 100 wells is 52 gpm. Due to the depth of the oil producing formations in the Williston Basin, typically 3 km or greater, pumps are operated slowly to prevent watering out thus total fluid production is purposefully maintained at low volumes. There remain potential possibilities for development of geothermal fluids in the Williston Basin. Unitized fields in which water production from several tens of wells is collected at a single site are good possibilities for development. Water production in the unitized fields is greater than 1000 gpm is several areas. A similar possibility occurs where infill-drilling between Bakken and Three Forks horizontal wells has created areas where large volumes of geothermal fluids are available on multi-well pads and in unitized fields. Although the Bakken produces small amounts of water, the water/oil ration is typically less than 1, the oil and water mix produced at the well head can be sent through the heat exchanger on an ORC. It is estimated that several tens of MWh of power could be generated by a distributed system of ORC engines in the areas of high-density drilling in the Bakken Formation. Finally, horizontal drilling in water bearing formations is the other possibility. Several secondary recovery water-flood projects in the basin are producing water above 100 ⁰C at rates of 300 gpm to 850 gpm. Those systems also could produce several tens of MWh of power with ORC technology. Objective 3 of the project was highly successful. The program has produced 5 PhDs, 7 MS, and 3 BS students with theses in geothermal energy. The team has involved 7 faculty in 4 different engineering and science disciplines, ChE, EE, GE, and Geol. The team has produced 26 peer-reviewed papers and 62 presentations at professional meetings. Faculty involved in the program developed five graduate level courses covering different elements in heat flow and geothermal energy that are now offered in the Harold Hamm School of Geology and Geological Engineering. Lessons learned – Keys to developing a successful project;1. Determine target formations; a. Data from oil and gas operators, state oil and gas regulatory agencies, and state geological surveys help to identify producing formations and their properties; 2. Determine the quantity of energy available in the target formations; a. A complete thermal analysis of the basin or region yields the most useful information; b. Critical data include: BHT, heat flow, stratigraphy, lithology, lithological properties, and thermal conductivity, subsurface structure; 3. Determine fluid production potential; a. State oil and gas regulatory agencies, and state geological surveys have data on oil, gas and water production. State Water Commission/Agencies have data on water quality, aquifers, and regulations; b. Consider single horizontal wells, multiple conventional wells, and unitized fields; 4. Calculate energy production capacity of each formation based on different well combination and power plant scenarios. This is a broad overview rather than a site specific analysis; 5. Research and understand the local electrical power industry. Obtain the PPA before committing to the project; 6. Work with the high-level personnel in the oil company partner. Obtain an MOU that addresses all issues in the project including what to expect if the company goes out of business, is bought out, changes management, etc; and 7. Be prepared for project delays.

15 GEOTHERMAL ENERGY↗

Radiological Consequences of Beam Loss at Front End by FLUKA during Top-off Injection into the Storage Ring for PROJECT Beamlines

NSLS-II plans to run the top-off mode operation in the near future. Particle tracking simulations proved that an errant injected electron beam can be confined to the beam-line frontend inside the storage ring tunnel by use of appropriate apertures and interlocks. Photon shutter collimator 2 (C2) was selected as the safe point (i.e. electron beam can’t travel beyond the safe point). FLUKA simulations have been carried out with the current beamline front ends and ratchet wall configurations to independently verify the previous calculations performed [1].

36 MATERIALS SCIENCE↗