Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Proposed SPAR Modeling Method for Quantifying Time Dependent Station Blackout Cut Sets

Abstract: The U.S. Nuclear Regulatory Commission’s (USNRC’s) Standardized Plant Analysis Risk (SPAR) models and industry risk models take similar approaches to analyzing the risk associated with loss of offsite power and station blackout (LOOP/SBO) events at nuclear reactor plants. In both SPAR models and industry models, core damage risk resulting from a LOOP/SBO event is analyzed using a combination of event trees and fault trees that produce cut sets that are, in turn, quantified to obtain a numerical estimate of the resulting core damage risk. A proposed SPAR method for quantifying the time-dependent cut sets is sometimes referred to as a convolution method. The SPAR method reflects assumptions about the timing of emergency diesel failures, the timing of subsequent attempts at emergency diesel repair, and the timing of core damage that may be different than those often used in industry models. This paper describes the proposed SPAR method.

99 GENERAL AND MISCELLANEOUS↗

Yesterday’s extremes, today’s new normal: flood risk in the Kathmandu Valley, Nepal

Unplanned urban growth has left many cities increasingly vulnerable to extreme rainfall events, particularly in regions with inadequate drainage infrastructures and development encroaching on natural floodplains. Here, in this perspective paper, we examine the September 2024 floods that struck Central Nepal, triggered by a persistent low-pressure system and enhanced by converging moisture flows from the Arabian Sea and the Bay of Bengal which led to widespread catastrophic damage. In the Kathmandu Valley, floodwaters expanded to more than 2.5 times the bankfull water extent, causing significant damage to housing, transportation network, and critical infrastructure, displacing thousands of residents, and severely disrupting urban services. This event highlights the urgent need for improved flood management strategies that integrate both structural and non-structural measures into the infrastructure development. While early warning systems provided critical lead time, challenges remain in reducing forecasting uncertainties and improving communication across government agencies and with local communities. A forward-looking approach is essential, including probabilistic flood forecasting systems, sustainable floodplain management, risk-sensitive land use planning, climate- and disaster- resilient infrastructure development, and the integration of nature-based solutions like urban green and blue spaces to mitigate flood impacts. By involving local communities in planning and preparedness efforts, particularly through citizen science initiatives, and engagement with underserved and disadvantaged communities, Nepal can better adapt to the growing risks posed by extreme rainfall and urban flooding and enhance long-term disaster resilience in rapidly urbanizing areas like Kathmandu Valley.

Kathmandu Valley↗

Metal uptake by homegrown vegetables – The relative importance in human health risk assessments at contaminated sites

Risk assessments of contaminated land often involve the use of generic bioconcentration factors (BCFs), which express contaminant concentrations in edible plant parts as a function of the concentration in soil, in order to assess the risks associated with consumption of homegrown vegetables. This study aimed to quantify variability in BCFs and evaluate the implications of this variability for human exposure assessments, focusing on cadmium (Cd) and lead (Pb) in lettuce and potatoes sampled around 22 contaminated glassworks sites. In addition, risks associated with measured Cd and Pb concentrations in soil and vegetable samples were characterized and a probabilistic exposure assessment was conducted to estimate the likelihood of local residents exceeding tolerable daily intakes. The results show that concentrations in vegetables were only moderately elevated despite high concentrations in soil, and most samples complied with applicable foodstuff legislation. Still, the daily intake of Cd (but not Pb) was assessed to exceed toxicological thresholds for about a fifth of the study population. Bioconcentration factors were found to vary more than indicated by previous studies, but decreasing BCFs with increasing metal concentrations in the soil can explain why the calculated exposure is only moderately affected by the choice of BCF value when generic soil guideline values are exceeded and the risk may be unacceptable. - Highlights: • Uptake of Cd and Pb by lettuce and potatoes increased with soil contamination. • Consumption of homegrown vegetables may lead to a daily Cd intake above TDIs. • The variability in the calculated BCFs is high when compared to previous studies. • Exposure assessments are most sensitive to the choice of BCFs at low contamination.

54 ENVIRONMENTAL SCIENCES↗

An approach to assessing stochastic radiogenic risk in medical imaging

Purpose: This letter suggests a formalism, the medical effective dose (MED), that is suitable for assessing stochastic radiogenic risks in diagnostic medical procedures. Methods: The MED is derived from radiobiological and probabilistic first principals, including: (1) The independence of radiation-induced biological effects in neighboring voxels at low doses; (2) the linear no-threshold assumption for stochastic radiation injury (although other dose-response relationships could be incorporated, instead); (3) the best human radiation dose-response data currently available; and (4) the built-in possibility that the carcinogenic risk to an irradiated organ may depend on its volume. The MED involves a dose-risk summation over irradiated voxels at high spatial resolution; it reduces to the traditional effective dose when every organ is irradiated uniformly and when the dependence of risk on organ volumes is ignored. Standard relative-risk tissue weighting factors can be used with the MED approach until more refined data become available. Results: The MED is intended for clinical and phantom dosimetry, and it provides an estimate of overall relative radiogenic stochastic risk for any given dose distribution. A result of the MED derivation is that the stochastic risk may increase with the volume of tissue (i.e., the number of cells) irradiated, a feature that can be activated when forthcoming radiobiological research warrants it. In this regard, the MED resembles neither the standard effective dose (E) nor the CT dose index (CTDI), but it is somewhat like the CT dose-length product (DLP). Conclusions: The MED is a novel, probabilistically and biologically based means of estimating stochastic-risk-weighted doses associated with medical imaging. Built in, ab initio, is the ability to link radiogenic risk to organ volume and other clinical factors. It is straightforward to implement when medical dose distributions are available, provided that one is content, for the time being, to accept the relative tissue weighting factors published by the International Commission of Radiological Protection (ICRP). It requires no new radiobiological data and avoids major problems encountered by the E, CTDI, and CT-E formalisms. It makes possible relative inter-patient dosimetry, and also realistic intercomparisons of stochastic risks from different protocols that yield images of comparable quality.

61 RADIATION PROTECTION AND DOSIMETRY↗

Subsidence Risk Mitigation in LLW Final Covers: A Case History - 18286

Typical waste packaging and disposal practices at low-level radioactive waste (LLW) disposal facilities, while adequate for safe transportation and facility operations, introduce significant subsidence risk for the facilities' final cover systems. Subsidence is often caused by the collapse of voids in the waste packaging and surrounding cover soils that eventually propagate to the ground surface. This subsidence could result in the loss of final cover system integrity, stormwater ponding, concentrated flow of surface water and/or gas, increased leachate generation, transport of contaminants from the landfill, and potential adverse chemical reactions within the waste mass. For new LLW facilities, steps can be taken to minimize the subsidence potential of newly placed waste. However, there is a significant inventory of existing disposal facilities (trenches, pits, shafts, vaults, etc.), tank farms, and historic, subsurface burial grounds that require final covers - all of which present real subsidence risks. Final covers for these existing LLW disposal sites can be engineered to mitigate these risks. A case history of a 60-acre LLW final cover system design and construction project illustrates an innovative approach to this problem that offers superior risk mitigation compared to typical final cover design practice. This approach combines engineering simulations of the projected final cover mechanical performance, specific probabilistic performance targets, and targeted cover system improvements to manage the subsidence risk in the final design. The result is a successful final cover project that meets the needs of the community, state and federal regulators, and facility owner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probabilistic Resource Adequacy Suite (PRAS)

Powered By PRAS features the Probabilistic Resource Adequacy Suite (PRAS), an open-source, research-oriented collection of tools for analyzing the resource adequacy of bulk power systems. PRAS performs low-fidelity, high-speed simulations of multi-region power system operations, considering hundreds of thousands of years of unplanned resource outages to quantify the risk and potential nature of energy supply shortfalls in probabilistic terms.

demand↗

NMME Monthly / Seasonal Forecasts for NASA SERVIR Applications Science

This work details use of the North American Multi-Model Ensemble (NMME) experimental forecasts as drivers for Decision Support Systems (DSSs) in the NASA / USAID initiative, SERVIR (a Spanish acronym meaning "to serve"). SERVIR integrates satellite observations, ground-based data and forecast models to monitor and forecast environmental changes and to improve response to natural disasters. Through the use of DSSs whose "front ends" are physically based models, the SERVIR activity provides a natural testbed to determine the extent to which NMME monthly to seasonal projections enable scientists, educators, project managers and policy implementers in developing countries to better use probabilistic outlooks of seasonal hydrologic anomalies in assessing agricultural / food security impacts, water availability, and risk to societal infrastructure. The multi-model NMME framework provides a "best practices" approach to probabilistic forecasting. The NMME forecasts are generated at resolution more coarse than that required to support DSS models; downscaling in both space and time is necessary. The methodology adopted here applied model output statistics where we use NMME ensemble monthly projections of sea-surface temperature (SST) and precipitation from 30 years of hindcasts with observations of precipitation and temperature for target regions. Since raw model forecasts are well-known to have structural biases, a cross-validated multivariate regression methodology (CCA) is used to link the model projected states as predictors to the predictands of the target region. The target regions include a number of basins in East and South Africa as well as the Ganges / Baramaputra / Meghna basin complex. The MOS approach used address spatial downscaling. Temporal disaggregation of monthly seasonal forecasts is achieved through use of a tercile bootstrapping approach. We interpret the results of these studies, the levels of skill by several metrics, and key uncertainties.

Robertson, Franklin R.↗

Probabalistic Risk Analysis and Thermal Margin Process for an Inflatable Aeroshell

Uncertainties always exist in atmospheric entry aeroheating environments and the thermal response of thermal protection system (TPS) material. These uncertainties are mitigated in the design by ap-plying margin and factors of safety to the TPS. Entry vehicle TPS is often conservatively over-sized for the heat loads that are experienced along the entry trajectory by stacking worst-case scenarios together. Additionally, the current TPS design and margin process used by NASA offers very little insight into the risk of over-temperature during flight and the reliability of the heat shield performance [1,3]. A probabilistic margin process can be used to calculate the amount of TPS margin necessary to survive a given entry heat load at a specified level of risk [2,3,4]. The vehicle’s initial entry state (entry velocity, flight path angle, and entry mass) determines the expected atmospheric entry environmental conditions and resulting heat load that the entry vehicle will experience. If there is flexibility in the entry state, then this process can be used to select an appropriate combination of entry state parameters and TPS size to target a desired reentry reliability. This probabilistic margin process allows engineers to make informed aeroshell design, entry-trajectory design, and TPS performance risk trades while preventing excessive TPS margin from being applied. The probabilistic TPS margin process has been performed to determine TPS thickness and entry heating constraints given an acceptable risk level for the Low Earth Orbit Flight Experiment of an Inflatable Decelerator (LOFTID) flight project. The process is used in a manner to size the entry heat load for a given flexible TPS (FTPS) thickness so that it meets project reliability standards while allowing the FTPS and the underlying inflatable structure (IS) to be pushed to adequately high temperatures. Since the LOFTID project is an experimental flight demonstration, it is de-sired to drive the FTPS and IS to temperatures that cover a large range of their thermal response models’ applicability. This will allow the thermal response models to be better improved and validated post-flight using LOFTID’s extensive instrumentation embedded within the aeroshell. The presentation demonstrates how uncertainty analysis is carried out using an end-to-end Monte Carlo process where three separate Monte Carlo simulations are run in sequence. The first Monte Carlo simulation operates on the entry trajectory model to generate trajectory parameter dispersions that are fed into the second Monte Carlo simulation. The second Monte Carlo simulation operates on the aerothermodynamics model to generate aeroheating parameter dispersions that are fed into the third Monte Carlo simulation. The third Monte Carlo simulation operates on the FTPS material thermal response model to generate the final FTPS/IS thermal response dispersions. The end-to-end Monte Carlo simulation propagates the uncertainties of each model into the next to quantify the resulting uncertainty of the FTPS/IS thermal response. The fractional contributions of the uncertain parameters in the trajectory, aerothermal, and thermal response models to the variance in the FTPS/IS thermal response is determined as a byproduct of the Monte Carlo analysis. The structural uncertainty of the FTPS thermal response model is evaluated by flight relevant ground testing and model error analysis using test measurements. This probabilistic TPS margin process had never been applied to an entry vehicle and it is one of the LOFTID project’s goals to demonstrate its merits.

Steven A. Tobin↗

Operator Action Time Evaluation of Emergency Water Injection Strategy for Extreme SGTR Accidents

In terms of severe accidents caused by earthquakes or tsunamis that are beyond expectation, a special safety inspection for operating plants, following the Fukushima accident, has been conducted by the government of Korea to verify that nation's nuclear power plants have been adequately designed to respond to extreme accidents. The inspection results show that Korean nuclear power plants in operation have no imminent risk for an expected maximum potential earthquake or coastal flooding based on the up-to-date investigation. However, there is a need to implement long- and short-term safety improvements in order to secure the level of safety for natural beyond-design-basis events. One of the measures to increase the mitigation capability during extreme accidents is installing the injection flow paths to provide emergency cooling water of extemal sources using fire engines to the steam generators (SGs) or reactor cooling system (RCS). An emergency cooling water system consists of a fixed pipe connected from the RCS or SGs to the outside of the containment. A standby valve is installed on the pipe. Following the occurrence of an extreme accident, movable equipment (for example, a fire truck hose) can be connected to the pipe hole at the opening of the isolation valve. The emergency cooling water injection strategy was not taken into account for the steam generator tube rupture (SGTR) accident management strategy of the OPR-1000. Therefore, it is necessary to develop some guidelines or strategies to cope with an extreme SGTR scenarios using the newly installed injection flow paths and fire engines. As long as the fission products released from the core during severe accidents are kept inside the containment, there may be several ways to reduce the radionuclide release into the environment, for example, by using plant safety features. The containment bypass sequences, however, allow the fission products to be released into the environment or directly to the auxiliary building. The SGTR accidents, which are one of the containment bypass sequences, have shown during various probabilistic safety assessments (PSAs) to be contributors to plant risk, mainly because of their potential for causing a release outside containment. This paper is intended to be an investigation of the characteristics of accident progressions and assessments for the mitigative effectiveness of the external cooling water injection strategies during extreme SGTR accidents in a typical OPR-1000 plant. Analyses were performed using a MAAP computer code version 5.03. The MAAP code is a system-level computer code capable of conducting integral analyses of potential severe accident progressions in nuclear power plants, whose main purpose is to support a level 2 PSA or severe accident management strategy developments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Limiting Future Proliferation and Security Risks

A major new technical tool for evaluation of proliferation and security risks has emerged over the past decade as part the activities of the Generation IV International Forum. The tool has been developed by a consensus group from participating countries and organizations and is termed the Proliferation Resistance and Physical Protection (PR&PP) Evaluation Methodology. The methodology defines a set of challenges, analyzes system response to these challenges, and assesses outcomes. The challenges are the threats posed by potential actors (proliferant states or sub-national adversaries). It is of paramount importance in an evaluation to establish the objectives, capabilities, resources, and strategies of the adversary as well as the design and protection contexts. Technical and institutional characteristics are both used to evaluate the response of the system and to determine its resistance against proliferation threats and robustness against sabotage and terrorism threats. The outcomes of the system response are expressed in terms of a set of measures, which thereby define the PR&PP characteristics of the system. This paper summarizes results of applications of the methodology to nuclear energy systems including reprocessing facilities and large and small modular reactors. The use of the methodology in the design phase a facility will be discussed as it applies to future safeguards concepts.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y Zhu↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y. Zhu↗

A Comparison of GoldSim, RESRAD-Onsite, and NORMALYSA Modeling Tools at Radioactive Waste Sites - 19480

Radioactive waste disposal and associated decision making is a challenging problem around the world. A strong performance assessment model plays a crucial role in making good management and remediation decisions and in optimizing the performance of a site. The International Atomic Energy Agency (IAEA) MODARIA II Working Group 1 (WG1) is comparing the performance of various modeling platforms used at Naturally Occurring Radioactive Material (NORM) and legacy waste sites to support risk-informed decision making. Neptune and Company, Inc. (Neptune) has developed probabilistic performance assessment models using the GoldSim system modeling software at a variety of radioactive waste sites. This paper presents a comparison between GoldSim and two other tools used to evaluate radiation exposure and their associated risks: the NORM And Legacy Site Assessment (NORMALYSA) tool used to assess risk at the Zapadnoe mill tailings site, and the residual radioactivity (RESRAD-Onsite) computer program used to calculate Authorized Limits at the Los Alamos National Laboratory (LANL). The International Atomic Energy Agency (IAEA) supported development of NORMALYSA based off of Ecolego 6.0, in which the user connects several universal modules, representing various environmental transport and exposure pathways, and enters in site-specific data. Further work with NORMALYSA has continued under the MODARIA II WG 1. A radionuclide transport and dose calculation model of the Zapadnoe uranium mill tailings site at the Pridneprovsky Chemical Plant in the Ukraine has been configured by MODARIA II WG1 to test the capabilities of NORMALYSA. Under this test case, contaminant transport and effective dose calculations were performed for two exposure scenarios. The onsite worker is exposed via external ground irradiation and radon and radioactive dust inhalation. The offsite resident defines a residence established 300 years after institutional control has ended, 800 meters downstream from the site with exposure pathways including: ingestion of garden vegetables irrigated by contaminated ground water, ingestion of fish from the Konoplyanka River and agricultural activities in the contaminated garden. GoldSim modeling software is a dynamic probabilistic modeling platform that evaluates uncertainty in a robust and transparent manner. Although GoldSim provides contaminant and radionuclide transport modules to facilitate integrated modeling of radionuclide migration in the environment, these features are not embedded in an existing modeling framework, except as created by the user. Neptune developed a GoldSim model for the two exposure scenarios of the Zapadnoe test case. Neptune's Generic PA Model was used as a starting point for the Zapadnoe site. Input parameters for the GoldSim model include site-specific parameters from the MODARIA Working Group as well as parameters from the Generic PA Model and other PA models created by Neptune. For the other comparison, Version 7.0 of RESRAD-Onsite, developed by Argonne National Laboratory for the U.S. Department of Energy (DOE), was used to calculate Authorized Limits for LANL. Authorized Limits are concentrations of radionuclides in soil that support the evaluation process to clear land for release under different uses. The RESRAD-Onsite computer code was used to calculate Authorized Limits because this program was specifically designed to derive radionuclide soil guidelines corresponding to a specific dose criterion. The scope of the RESRAD dose or risk evaluation is constrained to the transport and exposure pathways that have been included in the computer code. To assist in illustrating the capability of GoldSim modeling software, a GoldSim model was created to replicate the calculation of LANL's Authorized Limits for soil. The main exposure pathways in this model are inhalation of dust and gas, plant ingestion, soil ingestion, and external ground irradiation. All of the processes and outputs of RESRAD-Onsite and NORMALYSA can be created in a GoldSim model, but the value of GoldSim lies in its flexibility for application to any of a wide variety of environmental modeling problems. GoldSim allows development of site-specific inventory, transport mechanisms and risk assessment scenarios. If all potentially complete release, transport, and exposure pathways are addressed in an existing dose and risk assessment computer code, and if the code's capabilities fulfill the project modeling objectives, then expending resources to create a GoldSim model may not be necessary. Site optimization and good decision making about site management are often best when supported with the flexibility of GoldSim as a modeling tool. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probabilistic Resilience-Oriented Assessment Approach for Transmission Networks Under Wildfires

The rising threat of wildfires poses significant challenges to power transmission networks, particularly in areas prone to such disasters. Traditional approaches for wildfire risk assessment neglect some potential wildfire scenarios. Here, this paper introduces a probabilistic resilience-oriented assessment approach for power transmission networks to address this gap. Initially, a probabilistic wildfire model is developed to capture uncertainties in ignition, intensity, and fire spread. Next, a spatiotemporal fragility model is constructed to assess the impact of wildfires on transmission corridors, incorporating Thermal Aging (TA) and Dynamic Thermal Rate (DTR) change. Finally, a comprehensive resilience metric is defined to evaluate system performance, leveraging the fragility model to determine component and system-level resilience. The approach employs a combinatorial enumeration method to generate potential wildfire scenarios, enhanced by an impact-increment-based state enumeration (IISE) method for computational efficiency. The proposed method provides critical insights for identifying system vulnerabilities and developing robust strategies to protect transmission networks from wildfires. The efficacy of this approach is validated through extensive scenarios of the RTS-GMLC system across Southern California, Nevada and Arizona.

Vahedi, Soroush [Univ. of Connecticut, Storrs, CT ↗

A review for identification of initiating events in event tree development process on nuclear power plants

Initiating event is defined as any event either internal or external to the nuclear power plants (NPPs) that perturbs the steady state operation of the plant, if operating, thereby initiating an abnormal event such as transient or loss of coolant accident (LOCA) within the NPPs. These initiating events trigger sequences of events that challenge plant control and safety systems whose failure could potentially lead to core damage or large early release. Selection for initiating events consists of two steps i.e. first step, definition of possible events, such as by evaluating a comprehensive engineering, and by constructing a top level logic model. Then the second step, grouping of identified initiating event's by the safety function to be performed or combinations of systems responses. Therefore, the purpose of this paper is to discuss initiating events identification in event tree development process and to reviews other probabilistic safety assessments (PSA). The identification of initiating events also involves the past operating experience, review of other PSA, failure mode and effect analysis (FMEA), feedback from system modeling, and master logic diagram (special type of fault tree). By using the method of study for the condition of the traditional US PSA categorization in detail, could be obtained the important initiating events that are categorized into LOCA, transients and external events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrogen Plus Other Alternative Fuels Risk Assessment Models (HyRAM+) (Technical Reference Manual V.4)

The HyRAM+ software toolkit provides a basis for conducting quantitative risk assessment and consequence modeling for hydrogen, methane, and propane infrastructure and transportation systems. HyRAM+ is designed to facilitate the use of state-of-the-art science and engineering models to conduct robust, repeatable assessments of safety, hazards, and risk. HyRAM+ includes generic probabilities for equipment failures, probabilistic models for the impact of heat flux on humans and structures, and experimentally validated first-order models of release and flame physics. HyRAM+ integrates deterministic and probabilistic models for quantifying accident scenarios, predicting physical effects, and characterizing hazards (thermal effects from jet fires, overpressure effects from delayed ignition), and assessing impact on people and structures. HyRAM+ is developed at Sandia National Laboratories to support the development and revision of national and international codes and standards. HyRAM+ is a research software in active development and thus the models and data may change. This report will be updated at appropriate developmental intervals. This document provides a description of the methodology and models contained in HyRAM+ version 4.0. The most significant change for HyRAM+ version 4.0 from HyRAM version 3.1 is the incorporation of other alternative fuels, namely methane (as a proxy for natural gas) and propane into the toolkit. This change necessitated significant changes to the installable graphical user interface as well as changes to the back-end Python models. A second major change is the inclusion of physics models for the overpressure associated with the delayed ignition of an unconfined jet/plume of flammable gas.

02 PETROLEUM↗

Structural reliability assessment capability in NESSUS

The principal capabilities of NESSUS (Numerical Evaluation of Stochastic Structures Under Stress), an advanced computer code developed for probabilistic structural response analysis, are reviewed, and its structural reliability assessed. The code combines flexible structural modeling tools with advanced probabilistic algorithms in order to compute probabilistic structural response and resistance, component reliability and risk, and system reliability and risk. An illustrative numerical example is presented.

Millwater, H.↗

Calculation of Fire Severity Factors and Fire Non-Suppression Probabilities For A DOE Facility Fire PRA

Over a 12 month period, a fire PRA was developed for a DOE facility using the NUREG/CR-6850 EPRI/NRC fire PRA methodology. The fire PRA modeling included calculation of fire severity factors (SFs) and fire non-suppression probabilities (PNS) for each safe shutdown (SSD) component considered in the fire PRA model. The SFs were developed by performing detailed fire modeling through a combination of CFAST fire zone model calculations and Latin Hypercube Sampling (LHS). Component damage times and automatic fire suppression system actuation times calculated in the CFAST LHS analyses were then input to a time-dependent model of fire non-suppression probability. The fire non-suppression probability model is based on the modeling approach outlined in NUREG/CR-6850 and is supplemented with plant specific data. This paper presents the methodology used in the DOE facility fire PRA for modeling fire-induced SSD component failures and includes discussions of modeling techniques for: • Development of time-dependent fire heat release rate profiles (required as input to CFAST), • Calculation of fire severity factors based on CFAST detailed fire modeling, and • Calculation of fire non-suppression probabilities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗