Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Applications of Analytic Models to Spent Fuel Cask Analysis

The advent of high performance computing has changed the way scientists and engineers solve problems. Scientists previously would make a tremendous effort to simplify a complex problem to it’s essence by reducing geometry, neglecting changes and only preserving first-order effects. Now, scientist are able to leave the details in the problem and computationally arrive at a result. To develop the computational physics programs used by scientists, developers make assumptions and use approximation to reduce complex, continuous calculus to algebraic expressions which computers are able to solve.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development for Aluminum-clad Spent Nuclear Fuel for Extended Dry Storage (Status Report)

A task group under the Spent Nuclear Fuel Working Group of the U.S. Department of Energy (DOE), Offices of Environmental Management (EM) and Nuclear Energy (NE) identified technical challenges (“information gaps"’) to the ability to provide for safe extended (>50 years) dry storage of Aluminum-Clad Spent Nuclear Fuel (ASNF) in a report issued in 2017, An Action Plan was developed, and a task- based program was launched under the sponsorship of DOE-EM, Office of Technology Development (EMTD) in October 2018 to close the gaps and complete the technical information set needed to implement extended dry storage with confidence. This interim status report summarizes the work to date of this EMTD program to complete the technical bases and demonstrate that extended dry storage is safe and viable.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Resin Liner Recovery and Over-Packing at Ontario Power Generation's Western Waste Management Facility

Spent resins generated from Ontario Power Generation (OPG)'s and Bruce Power's Candu reactor operations are stored at OPG's Western Waste Management Facility in Kincardine, Ontario, Canada. The older resins are contained in 3 m{sup 3} epoxy-coated cylindrical carbon steel containers known as resin liners. The liners are stored in a stacked configuration within cylindrical in-ground containers. Previous studies indicated evidence of unacceptable liner wall corrosion and the potential for eventual leakage of resin from the liners. Based on this, OPG elected to re-package the majority of the resin liners into stainless steel over-packs. A contract for this work was awarded to a project team consisting of Duratek of Canada, Kinectrics, Inc. and E.S. Fox. This paper provides an overall summary of project activities focusing on the effectiveness of the equipment utilized and the soundness of the developed programs, plans and procedures. Specific information is provided on key aspects of the project and the overall achievement of project goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Footprint Reduction at the Hanford Site - 12406

The Department of Energy (DOE) Office of Environmental Management (EM) continues to reduce the footprint of legacy sites throughout the EM complex. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess contaminated facilities, soil and groundwater remediation, and solid waste disposition. All of these initiatives are being accomplished with established technologies in proven regulatory frameworks. Ultimately, completion of these environmental cleanup activities will reduce the monitoring and maintenance costs associated with managing large federal facilities, allowing EM to place more focus on other high priority cleanup efforts and facilitate a successful transition to land-term stewardship of these sites. Through the American Recovery and Reinvestment Act (ARRA) investment, the Department's cleanup footprint has been reduced by 45 percent to date, from 2411 km{sup 2} (931 mi{sup 2}) to 1336 km{sup 2} (516 mi{sup 2}s). With this significant progress on footprint reduction, the Department is on track towards their goal to reduce its overall footprint by approximately 90 percent by 2015. In addition, some areas cleaned up may become available for alternate uses (i.e. recreation, conservation, preservation, industrialization or development). Much of the work to reduce the complex's footprint occurred at the Savannah River Site in South Carolina and the Hanford Site in Washington, but cleanup continues across the complex. Footprint reduction is progressing well at the Hanford Site, supported predominantly through ARRA investment. To date, 994 km{sup 2} (384 mi{sup 2}) (65%) of footprint reduction have been achieved at Hanford, with a goal to achieve a 90% reduction by Fiscal Year 2015. The DOE EM and DOE Richland Operations Office, continue to make great progress to reduce the legacy footprint of the Hanford Site. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess facilities, both contaminated and uncontaminated, waste site cleanup activities, and debris pile removal. All of these activities can be accomplished with proven technologies and within established regulatory frameworks. Footprint reduction goals for Fiscal Year 2011 were exceeded, largely with the help of ARRA funding. As cleanup projects are completed and the total area requiring cleanup shrinks, overall costs for surveillance and maintenance operations and infrastructure services decrease. This work completion and decrease in funding requirements to maintain waste sites and antiquated facilities allows more focus on high priority site missions (i.e. groundwater remediation, tank waste disposition, etc.) and moves Site areas closer to transition from EM to the Legacy Management program. The progress in the Hanford footprint reduction effort will help achieve success in these other important mission areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Minority Serving Institutions Partnership Program (MSIPP) - 18108

The DOE-EM recognizes that successfully completing its legacy environmental cleanup mission will require maintaining a well-trained, technically skilled, and diverse workforce. Minority representation in critical science and engineering fields is an important part of EM's vision for the future workforce. The Minority Serving Institutions Partnership Program (MSIPP) has been created and designed to increase the numbers of minorities with science and engineering experience in areas important to the success of the DOE-EM mission. MSIPP will provide financial assistance for science, technology, engineering, and mathematics (STEM) activities at Minority Serving Institutions (MSI) engaged in research and related STEM efforts supporting EM's needs. The program offers research internship opportunities at DOE National Laboratories across the DOE complex. MSIPP also encourages research collaborations between MSI Universities and DOE National Laboratories by funding research in areas relevant to DOE-EM needs. Based on current DOE-EM missions, there are two research focus areas: Tank Waste and Site Restoration. Tank Waste includes priority areas of current DOE tank waste and waste processing approaches, alternative DOE tank waste processing options, and tank management and closure. Site Restoration research concentrates in the areas of Soil and Groundwater with priority areas of attenuation-based remedies for the subsurface, deep vadose zone, remediation of mercury and industrial contaminants, and advanced simulation capability for environmental management; and, in the areas of Deactivation and Decommissioning, with priority areas of unique sensor networks for remote monitoring of entombed facilities and tanks, interactions between radiological and chemical contaminants of concern to DOE and facility materials, incombustible fixatives and decontamination agents, acceptability of DeconGel and various contaminant mixtures and robotics, remote systems with plug-and-play interchangeable components, and models for facility decommissioning. This paper gives an overview of the opportunities available to MSI students and universities and outlines the progress this program has made since its inception, and the path forward to further enhance efforts to create a pipeline into the DOE-EM workforce. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 62: Progress on Deep Repository Programs Around the World

This panel session focused on the progress of deep repository programs, worldwide. While efforts on a deep geological repository for SNF/UNF and HLW in the USA were terminated in 2010, several other repository programs continue to make considerable progress and deserve to be recognized. Panelists were invited from national, multi-national, and international repository programs and organizations to report upon the status and future as well as the perceived reasons underlying the success and the failure of components of their respective repository program. This panel provided a forum for interested parties to present, exchange, and take advantage of, as appropriate, repository progress, challenges, concepts/designs and other lessons learned around the world, including site characterization, site selection, research and development, licensing, construction, operation, and public acceptance and participation. Presentations proposed include: 1 - Cigeo (French Deep Geological Repository Project) update 2018 (Daniel Delort, Andra (France)); 2 - Progress on Deep Geological Repository Programs Around the World (Bruce McKirdy, Radioactive Waste Management (United Kingdom)); 3 - Geological disposal facility in Belgium (Didier Leonard, ONDRAF/NIRAS (Belgium))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transuranic Waste Processing Center (TWPC) Legacy Tank RH-TRU Sludge Processing and Compliance Strategy - 13255

The U.S. Department of Energy (DOE) needs to safely and efficiently treat its 'legacy' transuranic (TRU) waste and mixed low-level waste (LLW) from past research and defense activities at the Oak Ridge National Laboratory (ORNL) so that the waste is prepared for safe and secure disposal. The TWPC operates an Environmental Management (EM) waste processing facility on the Oak Ridge Reservation (ORR). The TWPC is classified as a Hazard Category 2, non-reactor nuclear facility. This facility receives, treats, and packages low-level waste and TRU waste stored at various facilities on the ORR for eventual off-site disposal at various DOE sites and commercial facilities. The Remote Handled TRU Waste Sludge held in the Melton Valley Storage Tanks (MVSTs) was produced as a result of the collection, treatment, and storage of liquid radioactive waste originating from the ORNL radiochemical processing and radioisotope production programs. The MVSTs contain most of the associated waste from the Gunite and Associated Tanks (GAAT) in the ORNL's Tank Farms in Bethel Valley and the sludge (SL) and associated waste from the Old Hydro-fracture Facility tanks and other Federal Facility Agreement (FFA) tanks. The SL Processing Facility Build-outs (SL-PFB) Project is integral to the EM cleanup mission at ORNL and is being accelerated by DOE to meet updated regulatory commitments in the Site Treatment Plan. To meet these commitments a Baseline (BL) Change Proposal (BCP) is being submitted to provide continued spending authority as the project re-initiation extends across fiscal year 2012 (FY2012) into fiscal year 2013. Future waste from the ORNL Building 3019 U-233 Disposition project, in the form of U-233 dissolved in nitric acid and water, down-blended with depleted uranyl nitrate solution is also expected to be transferred to the 7856 MVST Annex Facility (formally the Capacity Increase Project (CIP) Tanks) for co-processing with the SL. The SL-PFB project will construct and install the necessary integrated systems to process the accumulated MVST Facilities SL inventory at the TWPC thus enabling safe and effective disposal of the waste. This BCP does not include work to support current MVST Facility Surveillance and Maintenance programs or the ORNL Building 3019 U-233 Disposition project, since they are not currently part of the TWPC prime contract. The purpose of the environmental compliance strategy is to identify the environmental permits and other required regulatory documents necessary for the construction and operation of the SL- PFB at the TWPC, Oak Ridge, TN. The permits and other regulatory documents identified are necessary to comply with the environmental laws and regulations of DOE Orders, and other requirements documented in the SL-PFB, Safety Design Strategy (SDS), SL-A-AD-002, R0 draft, and the Systems, Function and Requirements Document (SFRD), SL-X-AD-002, R1 draft. This compliance strategy is considered a 'living strategy' and it is anticipated that it will be revised as design progresses and more detail is known. The design basis on which this environmental permitting and compliance strategy is based is the Wastren Advantage, Inc., (WAI), TWPC, SL-PFB (WAI-BL-B.01.06) baseline. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Quality Management for Transport Packages Not Requiring Authority Design Approval - 18194

The majority of transports of radioactive materials are carried out in packages which don't need a package design approval of a competent authority. Low active radioactive materials are transported in such kind of packages e.g. in the medical and pharmaceutical industry and in the nuclear industry as well. In Germany the decision to phase out nuclear energy leads to a strong demand for packages to transport low and middle active radioactive waste due to the dismantling and decommissioning of nuclear power plants. According to IAEA regulations the 'non-competent authority approved package types' are the excepted packages and the industrial packages of Type IP-1, IP-2 and IP-3 and of Type A. For the packages of Type IP-2, IP-3 and Type A an assessment by the German competent authority is required for the quality management for the design, manufacture, testing, documentation, use, maintenance and inspection. In general a compliance audit of the manufacturer of the packaging is required during this assessment procedure. Their regulatory level in the IAEA regulations is not comparable with the regulatory density for packages requiring competent authority design approval. The countries apply different approaches within the assessment of the quality assurance measures in the management system as well as in the quality assurance program of a special package design. To use the package or packaging in a safe manner and in compliance with the regulations a management system for each phase of the life of the package or packaging is necessary. In order to help manufactures, which measurements and documents are needed for the assessment procedure, BAM developed a guideline. The guideline BAM-GGR 016 [5] describes the needed quality management for the design, manufacture, testing, documentation, use, maintenance and inspection of a packaging and the package. The poster to be presented will explain the different requirements of the quality assurance measures and give examples. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016a). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx.

54 ENVIRONMENTAL SCIENCES↗

Risk Assessment in Event Evaluation P-302

Incidents at locations such as nuclear power plants, waste repositories, and medical treatment facilities occur at many different times and under a variety of situations. Even the most modern, well run organizations may experience events that are precursors to more serious situations. Currently, the U.S. Nuclear Regulatory Commission evaluates a variety of such events at commercial nuclear plants via the Significance Determination Process (SDP), Management Directive 8.3, and the Accident Sequence Precursor (ASP) program. In these programs, the analyst calculates a conditional risk measure (e.g., conditional core damage probability) for an initiating event situation or an unplanned equipment outage. This calculation is called an “event evaluation.” An “event evaluation” uses a probabilistic risk assessment model to obtain a risk measure that is conditional on the situation which existed during an incident. The Risk Assessment in Event Evaluation material is intended to address how this evaluation is performed using modern risk analysis tools.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Design of Hypothetical Processes for the Production of 131 I and 99 Mo from Activation Targets

For over six decades, medical isotope production has been a high-priority focus of many research reactors across the globe. The majority of these isotopes were produced using highly-enriched uranium (HEU) or low enriched uranium (LEU) – delivering millions of doses of diagnostic and therapeutic isotopes. As a consequence of this production, however, six decades of isotope production has resulted in massive quantities of spent uranium material worldwide with no known disposition pathway creating growing proliferation concerns. Supported by the National Nuclear Security Administration’s (NNSA) Material Management and Minimization (M3) program, there has been increased focus in the production of high-priority isotopes without special nuclear materials or without uranium altogether. Isotope production via activation can potentially fulfill regional isotope demands – particularly in under-developed regions without access to isotope supply chains. The benefits of this approach would be a reduction in uranium proliferation risks, less special nuclear material wastes, and reduced risk of supply disruption in the likely event that major isotope producers will again go off-line as has happened in recent years due to a number of factors.

07 ISOTOPE AND RADIATION SOURCES↗

Activities of the OECD/NEA Expert Group on Assay Data for Spent Nuclear Fuel

Management of spent nuclear fuel is a key issue for many NEA member countries. In nuclear criticality safety, the decision of many countries to advance burnup credit as part of their licensing strategy has heightened recent interest in experimental data needed to validate computer codes used in burnup credit calculations. This paper discusses recent activities of an Expert Group on assay data, formed under the OECD/NEA/NSC/WPNCS (Working Party on Nuclear Criticality Safety) to help coordinate isotopic assay data activities and facilitate international collaboration between NEA member countries developing or implementing burnup credit methodologies. Recent activities of the Expert Group are described, focusing on the planned expansion of the Spent Fuel Isotopic Composition Database (SFCOMPO), and preparation of a state-of-the-art report on assay data that includes sections on recommended radiochemical analysis methods, techniques, and lessons learned from previous experiments.

07 ISOTOPE AND RADIATION SOURCES↗

Decommissioning of obsolete Nuclear Facilities in the UJV Rez, a. s. - 19027

UJV Rez, a. s. (further also UJV) is a leading institution in all areas of nuclear R and D in the Czech Republic and has had a dominant position in the nuclear program since it was established in 1955 as the Nuclear Research Institute Rez. The activities of UJV encompass nuclear physics, chemistry, nuclear power and many other topics. The main issues addressed at UJV in past decades have included research, development and services for NPPs, the fuel cycle and irradiation services for research and development in the industrial sector and medicine. UJV also manages most institutional radioactive wastes (RAW) produced in the Czech Republic (approx. 90 %). After more than 60 years of activities of the UJV in the nuclear field, there were obsolete nuclear facilities to be decommissioned. Decommissioning of nuclear facilities UJV is the only ongoing decommissioning project in the Czech Republic. Preparations for decommissioning began in 1996. Safety analysis report (SAR) was performed comprising the identification and characterization of potential sources of risk, potentially exposed receptors and exposure pathways, potential chemical compounds, radionuclides and media of concern. The results of the SAR enabled to determine the priorities of the decommissioning, the decommissioning the expenses and as well as project implementation. The decommissioning project was revised on the base of information obtained during decommissioning. The decommissioning was divided into two phases according to the level of risk and the financing limitations. The Ministry of Finance significantly financially contributed the decommissioning, although the UJV also contributed a considerable amount. Overall cost is close to the amount of Eur 27 million. Decommissioning started in 2003 and will be finished in 2018. Almost all facilities have already been successfully decommissioned. In the following table, the status of decommissioning of facilities is described. 1) Reloading site for RAW storage (Building 211/6): last item in progress 2003 - 2018; 2) Special Sewage System: decommissioned 2004 - 2005, reused; 3) Liquid RAW storage tanks (Building 211/3): decontaminated 2004 - 2013, reused; 4) Technology for RAW treatment (Building 241): decommissioned 2003 - 2011; 5) Contaminated equipment (Building 250): decommissioned 2003 - 2016; 6) Systems for storage of sealed sources (Building 261); decommissioned 2003 - 2005; 7) Decay tanks (Building 211/5); decommissioned 2003 - 2014, reused; 8) Old bituminating unit (Building 211/3); decommissioned 2004 - 2008; 9) Surface RAW storage site; decommissioned 2009 - 2014. Later, other unused decommissioning facilities, which were not included in the decommissioning project financed by the state, were included. These facilities are continuously decommissioned and financed from own resources of UJV. These facilities are like facilities already decommissioned: radiochemical laboratories, (including glove boxes), liquid RW storage tanks (including sewage systems), liquid RW treatment technology, hot cells, accumulated RW, etc. Realization started 2016 and expected duration is till 2026. Estimated budget is approximately Eur 17 million. The decommissioning of nuclear facilities in UJV is being carried out on the high level of radiation protection and up to now there was no extraordinary event or accident, although some challenges we were forced to address. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Taking Closure to the Next Level - 13030

The River Corridor Closure Project (RCCP) is the Hanford Site's first closure project and when it is complete, in 2015, it will have cleaned up 220 mi{sup 2} of contaminated land adjacent to the Columbia River. Washington Closure Hanford (WCH) was selected by the DOE to manage the removal and cleanup of Hanford's nuclear legacy along the River Corridor. Work began in 2005 and is now more than 85% complete with more than 2 years left in the contract. A Closure Team was commissioned in December 2009 and has since issued a closure strategy and a disciplined three-phase approach to transition land parcels to DOE, Richland Operations Office (DOE-RL) as cleanup is completed. This process supports DOE-RL objectives for progressive footprint reduction based on the division of the River Corridor into geographical land parcels. It also allows for incremental area-by-area transition and turnover to the Long-Term Stewardship program. Several important milestones stand between now and the successful end of the RCCP. They include overall funding impacts, working with DOE-RL on new scope additions, meeting regulatory milestones, and maintaining a strong safety performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Role of Congress in the High Level Radioactive Waste Odyssey: The Wisdom and Will of the Congress - 13096

Congress has had a dual role with regard to high level radioactive waste, being involved in both its creation and its disposal. A significant amount of time has passed between the creation of the nation's first high level radioactive waste and the present day. The pace of addressing its remediation has been highly irregular. Congress has had to consider the technical, regulatory, and political issues and all have had specific difficulties. It is a true odyssey framed by an imperative and accountability, by a sense of urgency, by an ability or inability to finish the job and by consequences. Congress had set a politically acceptable course by 1982. However, President Obama intervened in the process after he took office in January 2009. Through the efforts of his Administration, by the end of 2012, the US government has no program to dispose of high level radioactive waste and no reasonable prospect of a repository for high level radioactive waste. It is not obvious how the US government program will be reestablished or who will assume responsibility for leadership. The ultimate criteria for judging the consequences are 1) the outcome of the ongoing NRC's Nuclear Waste Confidence Rulemaking and 2) the concomitant permissibility of nuclear energy supplying electricity from operating reactors in the US. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford site asbestos management lessons learned - 15183

The U.S. Department of Energy (DOE) is responsible for the environmental cleanup of the Hanford Site central plateau. As part of this responsibility, DOE contractors conduct deactivation, decommissioning, decontamination, and demolition (D4) of retired/inactive facilities, including very large chemical processing facilities. To date, DOE contractors have demolished hundreds of facilities, reducing baseline site maintenance costs and reducing the environmental threats and hazards that the degrading buildings present. Many of these Hanford facilities include asbestos-containing materials (as well as other hazardous components), which must be managed in compliance with applicable regulations and standards. In most cases, the facilities are demolished as Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) removal or remedial actions. In an effort to streamline cleanup operations and to utilize site cleanup funding more efficiently, while still being protective of personnel and the environment, agreements were reached between the US Environmental Protection Agency (EPA) Hanford Project Office, the Washington Department of Ecology (Ecology), the Benton Clean Air Agency (BCAA) and the US Department of Energy Richland Operations Office (DOE-RL) on approaches to be utilized for demolition. One of these approaches would involve leaving cement asbestos board siding (e.g. transite), an EPA National Emissions Standards for Hazardous Air Pollutants (NESHAP) Category II non-friable asbestos-containing material, in place during demolition using heavy equipment, employing a set of controls that would maintain protection of personnel and the environment. This agreement was documented in a number of formal communications, including Notices of Intent issued as required by the asbestos NESHAP regulation, letters between the various agencies, CERCLA work plans, and the approved contractor baselines. A large number of buildings were demolished with transite siding in place, using the agreed upon controls and approaches. Personnel breathing zone and work area perimeter monitoring verified that the controls employed were protective in that there were no exceedances of permissible exposure limits during or after the demolition operations. EPA later reconsidered their previous concurrence with demolishing transite materials in place and issued a joint letter with Ecology revoking concurrence on any of the aforementioned CERCLA decision documents and associated work plans. DOE and their contractors took action to comply with the approach to demolition preferred by EPA for future demolitions, and initiated a series of actions to modify asbestos management practices in their operations accordingly. This paper will discuss both the actions taken to address EPA concerns with sites where transite materials were left in place for demolition and actions taken to ensure that the central plateau D4 program complies with the 40 CFR 61 Subpart M, National Emission Standard for Asbestos, (Asbestos NESHAP) methods for asbestos management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford double-shell tank extent-of-condition construction review - 15498

During routine visual inspections of Hanford double-shell waste tank 241-AY-102 (AY-102), anomalies were identified on the annulus floor which resulted in further evaluations. Following a formal leak assessment in October 2012, Washington River Protection Solutions, LLC (WRPS) determined that the primary tank of AY-102 was leaking. A formal leak assessment, documented in RPP-ASMT-53793, Tank 241-AY-102 Leak Assessment Report, identified first-of-a-kind construction difficulties and trial-and-error repairs as major contributing factors to tank failure. To determine if improvements in double-shell tank (DST) construction occurred after construction of tank AY-102, a detailed review and evaluation of historical construction records was performed for Hanford's remaining twenty-seven DSTs. Review involved research of 241 boxes of historical project documentation to better understand the condition of the Hanford DST farms, noting similarities in construction difficulties/issues to tank AY-102. Information gathered provides valuable insight regarding construction difficulties, future tank operations decisions, and guidance of the current tank inspection program. Should new waste storage tanks be constructed in the future, these reviews also provide valuable lessons-learned.(authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗