Gamma-ray spectrometry as a tool for exploring archaeological nuclear facilities: a case study from the Nevada Test Site Nuclear Rocket Development Station

Since its first demonstration in the early 2000s, the exploration of gamma-ray spectrometry (GRS) applications as a geophysical tool in archaeology remains nascent. While intentional neutron activation, which requires a gamma-ray analysis, has seen increasing use as a geoforensics technique in archaeology, little or no research has been published concerning the possibility of GRS as an industrial archaeological tool for use in exploring nuclear sites or facilities where neutron activation and surface contamination may have already occurred. Consequently, the use of GRS as a geophysical tool for the archaeological investigation of abandoned or decommissioned nuclear facilities is proposed, demonstrated, and discussed using a case study from the Nevada Test Site Nuclear Rocket Development Station.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Active–Source Seismic Tomography at the Brady Geothermal Field, Nevada, with Dense Nodal and Fiber–Optic Seismic Arrays

We deployed a dense seismic array to image the shallow structure in the injection area of the Brady Hot Springs geothermal power plant in western Nevada. The array was composed of 238 three-component, 5 Hz nodal instruments, 8700 m of distributed acoustic sensing (DAS) fiber-optic cable (FOC) installed horizontally in surface trenches, and 400 m of FOC installed vertically in a borehole. The geophone array had about 60 m instrument spacing in the target zone, whereas DAS channel separations were about 1 m with an averaging (gauge) length of 10 m. The acquisition systems provided 15 days of continuous records, including active-source and ambient noise signals. A large vibroseis truck was operated at 196 locations, exciting a swept-frequency signal from 5 to 80 Hz over 20 s using three vibration modes (vertical, longitudinal, and transverse), with three sweeps per mode at each site. Sweeps were repeated up to four times at each site during four different stages of power plant operation: normal operation, shutdown, high and oscillatory injection and production, and normal operation. After removal of the sweep signal from the raw data, the first P-wave arrivals were automatically picked using a combination of methods. Here, the travel times were then used to invert for the 3D P-wave velocity structure. Models with 100 m horizontal and 20–50 m vertical node spacing were obtained, covering an area 2000 m by 1300 m, with acceptable resolution extending to about 250 m below surface. The travel-time data were fit to a root mean square (rms) misfit of 31 ms, close to our estimated picking uncertainty. Lateral boundaries between high and low velocity zones agree relatively well with the location of local faults from previous studies, and low near-surface velocities are associated with faults and fumarole locations. A sharp increase in velocity from < 1500 to > 2000 m/s at approximately 50 m below the ground surface in many parts of the study area may indicate a shallower water table than expected for the region.

15 GEOTHERMAL ENERGY↗

Complex Fault Geometry of the 2020 M ww 6.5 Monte Cristo Range, Nevada, Earthquake Sequence

On 15 May 2020 an M ww 6.5 earthquake occurred beneath the Monte Cristo Range in the Mina Deflection region of western Nevada. Rapid deployment of eight temporary seismic stations enabled detailed analysis of its productive and slowly decaying aftershock sequence (p=0.8), which included ~18,000 autodetected events in 3.5 months. Double-difference, waveform-based relative relocation of 16,714 earthquakes reveals a complex network of faults, many of which cross the inferred 35-km-long east–northeast-striking, left-lateral mainshock rupture. Seismicity aligns with left-lateral, right-lateral, and normal mechanism moment tensors of 128 of the largest earthquakes. The mainshock occurred near the middle of the aftershock zone at the intersection of two distinct zones of seismicity. In the western section, numerous subparallel, shallow, north-northeast-striking faults form a broad flower-structure-like fault mesh that coalesces at depth into a near-vertical, left-lateral fault. We infer the near-vertical fault to be a region of significant slip in the mainshock and an eastward extension of the left-lateral Candelaria fault. Near the mainshock hypocenter, seismicity occurs on a northeast-striking, west-dipping structure that extends north from the eastern Columbus Salt Marsh normal fault. Together, these two intersecting structures bound the Columbus Salt Marsh tectonic basin. East of this intersection and the mainshock hypocenter, seismicity occurs in a narrow, near-vertical, east-northeast-striking fault zone through to its eastern terminus. At the eastern end, the aftershock zone broadens and extends northwest toward the southern extension of the northwest-striking, right-lateral Petrified Springs fault system. The eastern section hosts significantly fewer aftershocks than the western section, but has more moment release. We infer that shallow aftershocks throughout the system highlight fault-fracture meshes that connect mapped fault systems at depth. Here, comparing earthquake data with surface ruptures and a simple geodetic fault model sheds light on the complexity of this recent M 6.5 Walker Lane earthquake.

58 GEOSCIENCES↗

Sublacustrine geomorphology and modern sedimentation in a glacial scour basin, June Lake, eastern Sierra Nevada, U.S.A.

Small sub-alpine glacial lakes are often targeted as Holocene paleoclimate archives, but their evolution as landforms and depositional basins is understudied. At June Lake in the eastern Sierra Nevada of California (USA), bathymetry, surface sediment composition, and seismic stratigraphy are studied to assess the modern sedimentary system and gain insight into the basin's origins. A basin-wide seismic survey reveals sublacustrine morphological features that attest to the role of ice in scouring the June Lake basin, including a prominent abraded bedrock shoal and an adjacent overdeepened depression. The seismic survey reveals four acoustically distinct stratigraphic units that reflect the history of sedimentation following glacial scouring. The youngest of these is represented in the recovered lacustrine core records as hemipelagically deposited, organic-rich, laminated diatomaceous oozes alternating with coarse tephra beds. The organic-rich oozes are characterized by low carbon and nitrogen stable-isotope values and occur in profundal areas of the modern lake floor. These sediments suggest an algae-dominated productivity regime and preservation of organic matter at depth. With no perennial streams entering June Lake, surface-sediment grain-size distribution and geochemistry are controlled by water depth and basin morphology. Additional modern facies types include poorly sorted coarse detrital landslide deposits below steep basin walls and volcaniclastic sandy gravel in windward littoral areas. Here, these data provide a modern facies model for sedimentation in ice-scoured, hydrologically closed sub-alpine lakes and a baseline for future paleoclimate studies using June Lake sediment cores.

58 GEOSCIENCES↗

Oxygen isotope ratios in zircon and garnet: A record of assimilation and fractional crystallization in the Dinkey Dome peraluminous granite, Sierra Nevada, California

Abstract The 119 Ma Dinkey Dome pluton in the central Sierra Nevada Batholith is a peraluminous granite and contains magmatic garnet and zircon that are complexly zoned with respect to oxygen isotope ratios. Intracrystalline SIMS analysis tests the relative importance of magmatic differentiation processes vs. partial melting of metasedimentary rocks. Whereas δ18O values of bulk zircon concentrates are uniform across the entire pluton (7.7‰ VSMOW), zircon crystals are zoned in δ18O by up to 1.8‰, and when compared to late garnet, show evidence of changing magma chemistry during multiple interactions of the magma with wall rock during crustal transit. The evolution from an early high-δ18O magma [δ18O(WR) = 9.8‰] toward lower values is shown by high-δ18O zircon cores (7.8‰) and lower δ 18O rims (6.8‰). Garnets from the northwest side of the pluton show a final increase in δ18O with rims reaching 8.1‰. In situ REE measurements show zircon is magmatic and grew before garnets. Additionally, δ18O in garnets from the western side of the pluton are consistently higher (avg = 7.3‰) relative to the west (avg = 5.9‰). These δ18O variations in zircon and garnet record different stages of assimilation and fractional crystallization whereby an initially high-δ18O magma partially melted low-δ18O wallrock and was subsequently contaminated near the current level of emplacement by higher δ18O melts. Collectively, the comparison of δ18O zoning in garnet and zircon shows how a peraluminous pluton can be constructed from multiple batches of variably contaminated melts, especially in early stages of arc magmatism where magmas encounter significant heterogeneity of wall-rock assemblages. Collectively, peraluminous magmas in the Sierran arc are limited to small <100 km2 plutons that are intimately associated with metasedimentary wall rocks and often surrounded by later and larger metaluminous tonalite and granodiorite plutons. The general associations suggest that early-stage arc magmas sample crustal heterogeneities in small melt batches, but that with progressive invigoration of the arc, such compositions are more effectively blended with mantle melts in source regions. Thus, peraluminous magmas provide important details of the nascent Sierran arc and pre-batholithic crustal structure.

Geochemistry & Geophysics↗

Southern Nevada Alternative Fuels Demonstration Project

The Southern Nevada Alternative Fuels Program is designed to demonstrate, in a day-to-day bus operation, the reliability and efficiency of a hydrogen bus operation under extreme conditions. By using ICE technology and utilizing a virtually emission free fuel, benefits to be derived include air quality enhancement and vehicle performance improvements from domestically produced, renewable energy sources. The project objective is to help both Ford and the City demonstrate and evaluate the performance characteristics of the E-450 H2ICE shuttle buses developed by Ford, which use a 6.8-liter supercharged Triton V-10 engine with a hydrogen storage system equivalent to 29 gallons of gasoline. The technology used during the demonstration project in the Ford buses is a modified internal combustion engine that allows the vehicles to run on 100% hydrogen fuel. Hydrogen gives a more thorough fuel burn which results in more power and responsiveness and less pollution. The resultant emissions from the tailpipe are 2010 Phase II compliant with NO after treatment. The City will lease two of these E-450 H2ICE buses from Ford for two years. The buses are outfitted with additional equipment used to gather information needed for the evaluation. Performance, reliability, safety, efficiency, and rider comments data will be collected. The method of data collection will be both electronically and manually. Emissions readings were not obtained during the project. The City planned to measure the vehicle exhaust with an emissions analyzer machine but discovered the bus emission levels were below the capability of their machine. Passenger comments were solicited on the survey cards. The majority of comments were favorable. The controllable issues encountered during this demonstration project were mainly due to the size of the hydrogen fuel tanks at the site and the amount of fuel that could be dispensed during a specified period of time. The uncontrollable issues encountered during this project were related to the economy and the budget cutbacks required during the project duration, which resulted in fewer bus drivers than expected the ultimate shut down of the City’s downtown bus operations.

08 HYDROGEN↗

Nevada National Security Site 2010 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2010 results. During 2010, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Samples were collected at UE5PW-1 on March 10 and August 10, 2010; at UE5PW-2 on March 10, August 10, and August 25, 2010; and at UE5PW-3 on March 31, August 10, and August 25, 2010. Static water levels were measured at each of the three pilot wells on March 1, April 26, August 9, and November 9, 2010. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Results from all samples collected in 2010 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pre-shot simulations of far-field ground motion for the Source Physics Experiment (SPE) Explosions at the Climax Stock, Nevada National Security Site: SPE2

The Source Physics Experiment (SPE) is planning a 1000 kg (TNT equivalent) shot (SPE2) at the Nevada National Security Site (NNSS) in a granite borehole at a depth (canister centroid) of 45 meters. This shot follows an earlier shot of 100 kg in the same borehole at a depth 60 m. Surrounding the shotpoint is an extensive array of seismic sensors arrayed in 5 radial lines extending out 2 km to the north and east and approximately 10-15 to the south and west. Prior to SPE1, simulations using a finite difference code and a 3D numerical model based on the geologic setting were conducted, which predicted higher amplitudes to the south and east in the alluvium of Yucca Flat along with significant energy on the transverse components caused by scattering within the 3D volume along with some contribution by topographic scattering. Observations from the SPE1 shot largely confirmed these predictions although the ratio of transverse energy relative to the vertical and radial components was in general larger than predicted. A new set of simulations has been conducted for the upcoming SPE2 shot. These include improvements to the velocity model based on SPE1 observations as well as new capabilities added to the simulation code. The most significant is the addition of a new source model within the finite difference code by using the predicted ground velocities from a hydrodynamic code (GEODYN) as driving condition on the boundaries of a cube embedded within WPP which provides a more sophisticated source modeling capability linked directly to source site materials (e.g. granite) and type and size of source. Two sets of SPE2 simulations are conducted, one with a GEODYN source and 3D complex media (no topography node spacing of 5 m) and one with a standard isotropic pre-defined time function (3D complex media with topography, node spacing of 5 m). Results were provided as time series at specific points corresponding to sensor locations for both translational (x,y,z) and rotational components. Estimates of spectral scaling for SPE2 are provided using a modified version of the Mueller-Murphy model. An estimate of expected aftershock probabilities were also provided, based on the methodology of Ford and Walter , [2010].

58 GEOSCIENCES↗

Nevada National Security Site 2010 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2010 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2010a; 2010b; 2011). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. All gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below the minimum detectable concentrations, and concentrations of americium and plutonium are only slightly above detection limits. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 246.9 millimeters (mm) (9.72 inches [in.]) of precipitation at the Area 3 RWMS during 2010 is 56 percent above the average of 158.7 mm (6.25 in.), and the 190.4 mm (7.50 in.) of precipitation at the Area 5 RWMS during 2010 is 50 percent above the average of 126.7 mm (4.99 in.). Soil-gas tritium monitoring at borehole GCD-05 continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Data from the automated vadose zone monitoring system for the operational waste pit covers show that moisture from precipitation did not percolate below 90 centimeters (cm) (3 feet [ft]) before being removed by evaporation. Moisture from precipitation did not percolate below 61 cm (2 ft) in the vegetated final mono-layer cover on the U-3ax/bl disposal unit at the Area 3 RWMS before being removed by evapotranspiration. During 2010, there was no drainage through 2.4 meters (8 ft) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Water drained from both the bare-soil drainage lysimeter and the invader species drainage lysimeter that received 3 times natural precipitation. All 2010 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pre-Shot Simulations of Near-Field and Far-Field Ground Motion for the Source Physics Experiment (SPE) Explosions at the Climax Stock, Nevada National Security Site: SPE3

The Source Physics Experiment (SPE) is designed to improve ground motion prediction capabilities for underground nuclear testing through the development of new physics-based models together with validation via new chemical explosion data. The SPE shots consist of different size and depth chemical explosions in a granite borehole at the Climax Stock on the Nevada National Security Site (NNSS). The third shot in the series (SPE3) will be the same size (1000 kg TNT equivalent) and depth (45 m canister centroid) as the previous shot (SPE2). The main purpose of the SPE3 is to investigate the effects of the damage zone caused by the SPE2 chemical explosion on the SPE3 explosion, keeping all other parameters (e.g. size, depth, explosive type) the same. This SPE3 pre-shot report addresses progress made in simulation of the expected wavefield in the both the near- and the far-field. In this report we consider the far-field to be where seismic wave motion can be characterized by elastic or visco-elastic approximations, in contrast to the near-field where other, often non-linear effects, play a major role. The current simulations build on previous work from the SPE1 and SPE2 shots. The simulations are intended to highlight differences between SPE2 and SPE3 using a variety to approximations intended to mimic the expected effect of the damage zone. The simplest physics of damage zone effects suggest changes in the source region material properties (density, velocity), and in the yield strength (coupling) of the rock, should both impact the far-field signal. We can illustrate this in a simplistic way for P-waves in Figure A using the empirical Mueller-Muphy (1971) far-field explosion model (MM). First if the SPE2 explosion-induced damage reduces velocities and densities without affecting the yield strength or coupling, then by energy conservation the amplitudes for SPE 3 would increase as shown in the top of Figure A. Similarly if the explosion induced damage increased density (say by compacting pore space) the amplitude would decrease. This impedance effect, where the product of the density, wave-velocity, and ground-velocity squared is conserved, is well known. The second and harder effect to quantify, are changes in the energy coupling or yield strength. In the simple MM model this is represented by the coupling factor between cavity radius and yield. If we assume the granite was slightly weakened by SPE2 such that the cavity radius increases slightly then the overall amplitudes of SPE3 decrease relative to SPE2 as shown in the bottom of Figure A. In reality both effects, may exist due to the damage zone, and furthermore we know they are interrelated in complex ways. For S-waves we expect even more complex effects due to motion on joints and faults. For this reason we are developing physics-based near field simulation models coupled to far-field propagation codes to predict the overall effects of changes in the source emplacement region on observed signals. Near-field simulations have been performed using the Eulerian code (GEODYN). An ensemble model, calibrated to match records from past large-scale nuclear events is used. Both 2D axisymmetric (no faults) and fully three-dimensional GEODYN calculations (with /without faults) were conducted in which the damage zones sustained by SPE2 are retained as the initial condition for the SPE3 calculations. The results indicate that the waveform peak amplitudes are slightly decayed since the ensemble model includes no softening mechanism. The pulse widths are reduced, indicating the energy is dissipated more by the damage zone as expected. The dominant motions calculated in all the scenarios are spherically symmetric and non-spherical components are small as seen for the SPE2 calculations. The arrival time of the SPE3 waveform at the boreholes is shorter than SPE2 due to compaction during the previous explosion. As shown in the SPE 1 and 2 observations shear waves are generated, indicating the potential contributions from the induced motion on distributed joints. The effects of joints are evaluated using the Lagrangian hydrocode (GEODYN-L), which was benchmarked against the GEODYN calculations for the ensemble model. A new granite model calibrated for samples from the SPE site is used. The new model includes effects of poroelasticity and water saturation and may be scaled allowing application to both small and large scales. Parametric tests were performed to evaluate the effect of joints within the granite and the results demonstrate that in situ joints introduce anisotropy and significant tangential motions.

58 GEOSCIENCES↗

Soil Composition, Area 6 of the Nevada National Security Site

Three soil samples (two from the surrounding soils and one from the intersecting gravel roadbed) were collected from Frenchman Flat Area 6, across from the DAF at the Nevada National Security Site for analysis of major and trace element compositions.

54 ENVIRONMENTAL SCIENCES↗

Nevada National Security Site 2012 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2012 results. During 2012, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Groundwater samples were collected at UE5PW-1, UE5PW-2, and UE5PW-3 on March 21, August 7, August 21, and September 11, 2012, and static water levels were measured at each of the three pilot wells on March 19, June 6, August 2, and October 15, 2012. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Final results from samples collected in 2012 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 476: Area 12 T-Tunnel Muckpile, Nevada Test Site

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 476, Area 12 T-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 477: Area 12 N-Tunnel Muckpile, Nevada Test Site

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 478: Area 12 T-Tunnel Ponds, Nevada Test Site

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 478.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 504: 16a-Tunnel Muckpile, Nevada Test Site

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 504, 16a-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 504 is comprised of four Corrective Action Sites (CASs).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗