Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NASA Program Flight”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Program Management Tool

The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

Gawadiak, Yuri↗

Planning and Estimation of Operations Support Requirements

Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

Newhouse, Marilyn E.↗

A Case Study of Measuring Process Risk for Early Insights into Software Safety

In this case study, we examine software safety risk in three flight hardware systems in NASA's Constellation spaceflight program. We applied our Technical and Process Risk Measurement (TPRM) methodology to the Constellation hazard analysis process to quantify the technical and process risks involving software safety in the early design phase of these projects. We analyzed 154 hazard reports and collected metrics to measure the prevalence of software in hazards and the specificity of descriptions of software causes of hazardous conditions. We found that 49-70% of 154 hazardous conditions could be caused by software or software was involved in the prevention of the hazardous condition. We also found that 12-17% of the 2013 hazard causes involved software, and that 23-29% of all causes had a software control. The application of the TPRM methodology identified process risks in the application of the hazard analysis process itself that may lead to software safety risk.

Layman, Lucas↗

Low-Latency Telerobotics from Mars Orbit: The Case for Synergy Between Science and Human Exploration

Initial, science-directed human exploration of Mars will benefit from capabilities in which human explorers remain in orbit to control telerobotic systems on the surface (Figure 1). Low-latency, high-bandwidth telerobotics (LLT) from Mars orbit offers opportunities for what the terrestrial robotics community considers to be high-quality telepresence. Such telepresence would provide high quality sensory perception and situation awareness, and even capabilities for dexterous manipulation as required for adaptive, informed selection of scientific samples [1]. Astronauts on orbit in close communication proximity to a surface exploration site (in order to minimize communication latency) represent a capability that would extend human cognition to Mars (and potentially for other bodies such as asteroids, Venus, the Moon, etc.) without the challenges, expense, and risk of putting those humans on hazardous surfaces or within deep gravity wells. Such a strategy may be consistent with goals for a human space flight program that, are currently being developed within NASA.

Valinia, A.↗

The Design of Large-Scale Complex Engineered Systems: Present Challenges and Future Promise

Model-Based Systems Engineering techniques are used in the SE community to address the need for managing the development of complex systems. A key feature of the MBSE approach is the use of a model to capture the requirements, architecture, behavior, operating environment and other key aspects of the system. The focus on the model differentiates MBSE from traditional SE techniques that may have a document centric approach. In an effort to assess the benefit of utilizing MBSE on its flight projects, NASA Langley has implemented a pilot program to apply MBSE techniques during the early phase of the Materials International Space Station Experiment-X (MISSE-X). MISSE-X is a Technology Demonstration Mission being developed by the NASA Office of the Chief Technologist i . Designed to be installed on the exterior of the International Space Station (ISS), MISSE-X will host experiments that advance the technology readiness of materials and devices needed for future space exploration. As a follow-on to the highly successful series of previous MISSE experiments on ISS, MISSE-X benefits from a significant interest by the

Bloebaum, Christina L.↗

Consolidated Development Objectives Document (CDOD) For MB-60

This document defines the objectives related to liquid rocket engine system development to be undertaken by JAXA in support of the Space Launch System (SLS) Program managed out of the NASA Marshall Space Flight Center (MSFC). These objectives include furnishing the necessary management, labor, facilities, tools, equipment, and materials required to execute the specified activities. 1.1 Project Scope: The scope of this effort is to develop a rocket engine and associated products per the objectives and technical requirements established in this document. This engine, minus the engine controller, designated here as MB ]60, is to be developed through to a prequalification point of maturity. It is assumed that should JCNE ]1 development proceed beyond this maturity point towards actual flight qualification, the engine controller will be supplied and integrated by NASA. 1.2 Document Structure: The structure of this Consolidated Development Objectives Document (CDOD) includes a traditional description of objectives in a SOO, plus the associated Data Products Document (DPD) in an attached appendix, and then Engine Requirements Document (ERD) as another attached appendix. It is the intent that this document, in conjunction with the cited applicable documents, should constitute a complete programmatic and technical description of the development effort to be pursued.

Greene, William D.↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

Initial Pre-Launch Imaging and Spectral Characterization of Landsat 9 Thermal Infrared Sensor-2

The Thermal Infrared Sensor-2 (TIRS-2) scheduled to launch in December 2020 aboard Landsat 9 will continue Landsat's four decade-long legacy of providing moderate resolution thermal imagery from low earth orbit (at 705 km) for environmental applications. Like the Thermal Infrared Sensor aboard Landsat 8, it is a pushbroom sensor with a cross-track field of view of 15 and provides two spectral channels at 10.8 and 12 micrometers To ensure radiometric, spatial, and spectral performance, a comprehensive pre-launch testing program is being conducted at NASA Goddard Space Flight Center at the component, subsystem, and instrument level. This effort will focus on the results from the subsystem level testing to assess TIRS-2 imaging performance including focus, spatial performance, and stray light rejection. It is also used to provide a preliminary assessment of spectral performance. The TIRS-2 subsystem is placed in a thermal vacuum chamber with the calibration ground support equipment, which provides a flexible blackbody illumination source and optics to assess imaging performance. Spectral performance is tested using a spectral response test setup with its own illumination source outside the chamber that propagates through the calibration ground support equipment in an optical configuration designed for this purpose. The results show that TIRS-2 performance is expected to meet all of its performance requirements with few waivers and deviations.

Landsat 9↗

Landsat 9 Thermal Infrared Sensor 2 Pre-Launch Characterization: Initial Imaging and Spectral Performance Results

The Thermal Infrared Sensor-2 (TIRS-2) scheduled to launch in December 2020 aboard Landsat 9 will continue Landsat's four decade-long legacy of providing moderate resolution thermal imagery from low earth orbit (at 705 km) for environmental applications. Like the Thermal Infrared Sensor aboard Landsat 8, it is a pushbroom sensor with a cross-track field of view of 15 and provides two spectral channels at 10.8 and 12 micrometers. To ensure radiometric, spatial, and spectral performance, a comprehensive pre-launch testing program is being conducted at NASA Goddard Space Flight Center at the component, subsystem, and instrument level. This effort will focus on the results from the subsystem level testing to assess TIRS-2 imaging performance including focus, spatial performance, and stray light rejection. It is also used to provide a preliminary assessment of spectral performance. The TIRS-2 subsystem is placed in a thermal vacuum chamber with the calibration ground support equipment, which provides a flexible blackbody illumination source and optics to assess imaging performance. Spectral performance is tested using a spectral response test setup with its own illumination source outside the chamber that propagates through the calibration ground support equipment in an optical configuration designed for this purpose. The results show that TIRS-2 performance is expected to meet all of its performance requirements with few waivers and deviations.

Landsat 9↗

Landsat 9 Thermal Infrared Sensor 2 Pre-Launch Characterization: Initial Imaging & Spectral Performance Results

The Thermal Infrared Sensor-2 (TIRS-2) scheduled to launch in December 2020 aboard Landsat 9 will continue Landsat's four decade-long legacy of providing moderate resolution thermal imagery from low earth orbit (at 705 km) for environmental applications. Like the Thermal Infrared Sensor aboard Landsat 8, it is a pushbroom sensor with a cross-track field of view of 15 and provides two spectral channels at 10.8 and 12 um. To ensure radiometric, spatial, and spectral performance, a comprehensive pre-launch testing program is being conducted at NASA Goddard Space Flight Center at the component, subsystem, and instrument level. This effort will focus on the results from the subsystem level testing to assess TIRS-2 imaging performance including focus, spatial performance, and stray light rejection. It is also used to provide a preliminary assessment of spectral performance. The TIRS-2 subsystem is placed in a thermal vacuum chamber with the calibration ground support equipment, which provides a flexible blackbody illumination source and optics to assess imaging performance. Spectral performance is tested using a spectral response test setup with its own illumination source outside the chamber that propagates through the calibration ground support equipment in an optical configuration designed for this purpose. The results show that TIRS-2 performance is expected to meet all of its performance requirements with few waivers and deviations.

scatter↗

The O/OREOS Mission - Astrobiology in Low Earth Orbit

The O/OREOS (Organism/Organic Exposure to Orbital Stresses) nanosatellite is the first science demonstration spacecraft and flight mission of the NASA Astrobiology Small- Payloads Program (ASP). O/OREOS was launched successfully on November 19, 2010, to a high-inclination (72°), 650-km Earth orbit aboard a US Air Force Minotaur IV rocket from Kodiak, Alaska. O/OREOS consists of 3 conjoined cubesat (each 1000 cu.cm) modules: (i) a control bus, (ii) the Space Environment Survivability of Living Organisms (SESLO) experiment, and (iii) the Space Environment Viability of Organics (SEVO) experiment. Among the innovative aspects of the O/OREOS mission are a real-time analysis of the photostability of organics and biomarkers and the collection of data on the survival and metabolic activity for micro-organisms at 3 times during the 6-month mission. We will report on the spacecraft characteristics, payload capabilities and first operational phase of the O/OREOS mission. The science and technology rationale of O/OREOS supports NASA’s scientific exploration program by investigating the local space environment as well as space biology relevant to Moon and Mars missions. It also serves as precursor for experiments on small satellites, the International Space Station (ISS), future free-flyers and lunar surface exposure facilities.

Ehrenfreund, P.↗

The O/OREOS Mission - Astrobiology in Low Earth Orbit

The O/OREOS (Organism/Organic Exposure to Orbital Stresses) nanosatellite is the first science demonstration spacecraft and flight mission of the NASA Astrobiology Small- Payloads Program (ASP). O/OREOS was launched successfully on November 19, 2010, to a high-inclination (72°), 650-km Earth orbit aboard a US Air Force Minotaur IV rocket from Kodiak, Alaska. O/OREOS consists of 3 conjoined cubesat (each 1000 cu.cm) modules: (i) a control bus, (ii) the Space Environment Survivability of Living Organisms (SESLO) experiment, and (iii) the Space Environment Viability of Organics (SEVO) experiment. Among the innovative aspects of the O/OREOS mission are a real-time analysis of the photostability of organics and biomarkers and the collection of data on the survival and metabolic activity for micro-organisms at 3 times during the 6-month mission. We will report on the spacecraft characteristics, payload capabilities and first operational phase of the O/OREOS mission. The science and technology rationale of O/OREOS supports NASA’s scientific exploration program by investigating the local space environment as well as space biology relevant to Moon and Mars missions. It also serves as precursor for experiments on small satellites, the International Space Station (ISS), future free-flyers and lunar surface exposure facilities.

Ehrenfreund, P.↗

Helium Balloon Valve Improvement

The NASA Balloon Program Office (BPO), located at Wallops Flight Facility asked the Mechanical Systems Branch (Code 548) to improve the design of their balloon valve. BPO uses two main types of balloons, Zero Pressure Balloon (ZPB) and Super Pressure Balloon (SPB), which both use the valve. It is used for termination of the ZPB, and inflation and termination of the SPB. During launch campaigns the valve showed signs of helium leakage which lead the BPO to ask for an improvement. As part of a Professional Readiness Engineering Program (PREP), research and review of the current valve was conducted and a new design was prepared. The current custom designed valve consists of a "pie" plate that is actuated up and down via a gear rack that is driven by a globe motor. When closed the knife edge of the pie plate bites into a silicone gasket to seal the structure. Unfortunately, the gasket material permanently deforms after being compressed and the plate itself bends under the force induced by the motor, introducing two possible helium leak paths. The new custom designed valve utilizes o-rings instead of one gasket to reduce the possibility of leakage from permanent deformation. One o-ring seals the valve structure to its mating surface and a spring energized o-ring is used in a piston design to seal the valve once it's closed. The design also utilizes different materials to increase stiffness and strength so that it is less likely to bend under the force from the motor. Currently the new valve has finished the design and analysis phases and is proceeding towards manufacturing and testing.

Seo, Lindsey↗

Celestial Navigation in Cislunar Space with autoNGC

Celestial navigation (CelNav) is a source of navigation observables where images of known solar system bodies are used to locate a spacecraft, beneficial within the solar system for both cislunar and deep space missions. CelNav provides a variety of design benefits to support and enable current and new autonomous space operations- using only a camera and a processor to produce in-situ measurements for navigation. This technology reduces subscription to ground-based tracking during all phases of a mission, freeing up resources for other operational needs. This also supports secure navigation since it eliminates the need for ground contact. CelNav enables missions where the light time delay between Earth and the spacecraft is too long (or the Earth to spacecraft line of sight is obscured) to support critical operations. It also enables smaller mission classes, where Deep Space Network (DSN)time is cost prohibitive, to reduce its cost by focusing primarily on data downlink. Finally, it enables the NASA Artemis program and other cislunar human space flight by providing redundant navigation to traditional radiometric tracking. In this presentation, we discuss the implementation of a CelNav app in autonomous Navigation, Guidance, and Control (autoNGC), a comprehensive flight software suite for onboard autonomy that is built on the core Flight System (cFS). The presentation also summarizes the results of flight software-in-the-loop (SIL) and processor-in-the-loop (PIL) demonstrations. Both are high-fidelity simulations with the use of a camera emulator hosted on a GPU server that simulates images that would be captured by the camera. The CelNav app leverages the use of cGIANT (cFS Goddard Image Analysis and Navigation Tool).Previously developed for the autoNGC software suite, cGIANT is an onboard autonomous image processing and optical navigation (OpNav) tool that performs limb-based OpNav and Terrain Relative Navigation. The added CelNav capability of cGIANT generates bearing measurements to multiple known celestial bodies (planets, moons, asteroids, comets, etc.) in monocular (2D) images. These observables are then fed to the Goddard Enhanced Onboard Navigation System (GEONS)navigation filter app, enabling us to navigate the spacecraft autonomously. In early 2025, the autoNGC CelNav capability is planned to be flight tested as part of the onboard autonomy experiment on the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment(CAPSTONE) spacecraft that is currently in a Lunar Near Rectilinear Halo Orbit(NRHO).

celestial navigation↗

Rapid development of the X-31 simulation to support flight-testing

The X-31 Enhanced Fighter Maneuverability Program has been recognized to form the International Test Organization, with the NASA Dryden Flight Research Facility (NASA-Dryden) as the responsible test organization. The two X-31 research aircraft and engineering support personnel were colocated at NASA-Dryden, with flight test operations beginning in Apr. 1992. Therefore, rapid development of a hardware-in-the-loop simulation was needed to support the flight test operations at NASA-Dryden, and to perform verification and validation of flight control software. The X-31 simulation system requirements, distributed simulation system architecture, simulation components math models to the visual system, and the advanced capabilities the X-31 simulation provides. In addition, unique software tools and the methods used to rapidly develop this simulation system will be highlighted.

Mackall, Dale↗

Rapid development of the X-31 simulation to support flight-testing

The X-31 Enhanced Fighter Maneuverability Program has been recognized to form the International Test Organization, with the NASA Dryden Flight Research Facility (NASA-Dryden) as the responsible test organization. The two X-31 research aircraft and engineering support personnel were colocated at NASA-Dryden, with flight test operations beginning in Apr. 1992. Therefore, rapid development of a hardware-in-the-loop simulation was needed to support the flight test operations at NASA-Dryden, and to perform verification and validation of flight control software. The X-31 simulation system requirements, distributed simulation system architecture, simulation components math models to the visual system, and the advanced capabilities the X-31 simulation provides. In addition, unique software tools and the methods used to rapidly develop this simulation system will be highlighted.

Mackall, Dale↗