Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Influence of Power System Technology on Electric Propulsion Missions

Electric propulsion (EP) thruster technology, with efficient lightweight power systems can provide substantial reductions in propulsion system wet mass due to the high specific impulse (Isp) of the thrusters. Historically, the space power systems are too massive for many potential orbital missions. The objective of this paper is to show the impact of current power system technology on EP mission performance and determine what technology advancements are needed to make EP beneficial for earth orbital applications. The approach of the paper is to model the electric propulsion system and orbital mission using a partial parametric method. Various missions are analyzed from orbit maintenance to orbit transfer. Results portray the relationship between mission performance and power technology level. Conclusions show which mission applications currently have acceptable power technology, and which mission applications require power technology improvements.

Oleson, Steven R.↗

Micro-Pressure Sensors for Future Mars Missions

The joint research interchange effort was directed at the following principal areas: u further development of NASA-Ames' Mars Micro-meteorology mission concept as a viable NASA space mission especially with regard to the science and instrument specifications u interaction with the flight team from NASA's New Millennium 'Deep-Space 2' (DS-2) mission with regard to selection and design of micro-pressure sensors for Mars u further development of micro-pressure sensors suitable for Mars The research work undertaken in the course of the Joint Research Interchange should be placed in the context of an ongoing planetary exploration objective to characterize the climate system on Mars. In particular, a network of small probes globally-distributed on the surface of the planet has often been cited as the only way to address this particular science goal. A team from NASA Ames has proposed such a mission called the Micrometeorology mission, or 'Micro-met' for short. Surface pressure data are all that are required, in principle, to calculate the Martian atmospheric circulation, provided that simultaneous orbital measurements of the atmosphere are also obtained. Consequently, in the proposed Micro-met mission a large number of landers would measure barometric pressure at various locations around Mars, each equipped with a micro-pressure sensor. Much of the time on the JRI was therefore spent working with the engineers and scientists concerned with Micro-met to develop this particular mission concept into a more realistic proposition.

Catling, David C.↗

Design of a Formation of Earth-Orbiting Satellites: The Auroral Lites Mission

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has proposed a set of spacecraft flying in close formation around the Earth in order to measure the behavior of the auroras. The mission, named Auroral Lites, consists of four spacecraft configured to start at the vertices of a tetrahedron, flying over three mission phases. During the first phase, the distance between any two spacecraft in the formation is targeted at 10 kilometers (km). The second mission phase is much tighter, requiring satellite interrange spacing targeted at 500 meters. During the final phase of the mission, the formation opens to a nominal 100-km interrange spacing. In this paper, we present the strategy employed to initialize and model such a close formation during each of these phases. The analysis performed to date provides the design and characteristics of the reference orbit, the evolution of the formation during Phases I and II, and an estimate of the total mission delta-V budget. AI Solutions' mission design tool, FreeFlyer, was used to generate each of these analysis elements. The tool contains full force models, including both impulsive and finite duration maneuvers. Orbital maintenance can be fully modeled in the system using a flexible, natural scripting language built into the system. In addition, AI Solutions is in the process of adding formation extensions to the system facilitating mission analysis for formations like Auroral Lites. We will discuss how FreeFlyer is used for these analyses.

Hametz, Mark E.↗

Design of a Formation of Earth Orbiting Satellites: The Auroral Lites Mission

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has proposed a set of spacecraft flying in close formation around the Earth in order to measure the behavior of the auroras. The mission, named Auroral Lites, consists of four spacecraft configured to start at the vertices of a tetrahedron, flying over three mission phases. During the first phase, the distance between any two spacecraft in the formation is targeted at 10 kilometers (km). The second mission phase is much tighter, requiring satellite interrange spacing targeted at 500 meters. During the final phase of the mission, the formation opens to a nominal 100-km interrange spacing. In this paper, we present the strategy employed to initialize and model such a close formation during each of these phases. The analysis performed to date provides the design and characteristics of the reference orbit, the evolution of the formation during Phases I and II, and an estimate of the total mission delta-V budget. AI Solutions' mission design tool, FreeFlyer(R), was used to generate each of these analysis elements. The tool contains full force models, including both impulsive and finite duration maneuvers. Orbital maintenance can be fully modeled in the system using a flexible, natural scripting language built into the system. In addition, AI Solutions is in the process of adding formation extensions to the system facilitating mission analysis for formations like Auroral Lites. We will discuss how FreeFlyer(R) is used for these analyses.

Hametz, Mark E.↗

Hubble Space Telescope Servicing Mission 3A

The Hubble Space Telescope's purpose is to spend 20 years probing the farthest and faintest reaches of the cosmos. Crucial to fulfilling this objective is a series of on-orbit servicing missions. Hubble was placed in orbit on April 25, 1990, by the shuttle Discovery and subsequent servicing followed in December 1993 and February 1997. The third in the series of planned servicing missions for the Hubble Space Telescope was scheduled for June 2000. This third Servicing Mission has been separated into two flights. The first of these flights, Servicing Mission 3A, is scheduled for December 1999, and the second, Servicing Mission 3B, is scheduled for 2001. The fourth Servicing Mission is scheduled for 2003 with a "close-out" Mission in 2010. Three instruments are currently in active scientific use on Hubble - the Wide Field and Planetary Camera 2, the Space Telescope Imaging Spectrograph, and Fine Guidance Sensor I R, which has been designated as the prime FGS for astrometric science. Other instrument bays are occupied by the Near Infrared Camera and Multi-Object Spectrometer (NICMOS), which is now dormant due to the depletion of its solid nitrogen cryogen, the Faint Object Camera, which has been decommissioned, and the corrective optical device called COSTAR, which is no longer needed.

Source record↗

STS-99 / Endeavour Mission Overview

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM). This radar system will produce unrivaled 3-D images of the Earth's Surface. This videotape presents a mission overview press briefing. The panel members are Dr. Ghassem Asrar, NASA Associate Administrator Earth Sciences; General James C. King, Director National Imagery and Mapping Agency (NIMA); Professor Achim Bachem, Member of the Executive Board, Deutschen Zentrum fur Luft- und Raumfahrt (DLR), the German National Aerospace Research Center; and Professor Sergio Deiulio, President of the Italian Space Agency. Dr. Asrar opened with a summary of the history of Earth Observations from space, relating the SRTM to this history. This mission, due to cost and complexity, required partnership with other agencies and nations, and the active participation of the astronauts. General King spoke to the expectations of NIMA, and the use of the Synthetic Aperture Radar to produce the high resolution topographic images. Dr. Achim Bachem spoke about the international cooperation that this mission required, and some of the commercial applications and companies that will use this data. Dr Deiulio spoke of future plans to improve knowledge of the Earth using satellites. Questions from the press concerned use of the information for military actions, the reason for the restriction on access to the higher resolution data, the mechanism to acquire that data for scientific research, and the cost sharing from the mission's partners. There was also discussion about the mission's length.

Source record↗

On-Line Analysis of Physiologic and Neurobehavioral Variables During Long-Duration Space Missions

The goal of this project is to develop reliable statistical algorithms for on-line analysis of physiologic and neurobehavioral variables monitored during long-duration space missions. Maintenance of physiologic and neurobehavioral homeostasis during long-duration space missions is crucial for ensuring optimal crew performance. If countermeasures are not applied, alterations in homeostasis will occur in nearly all-physiologic systems. During such missions data from most of these systems will be either continually and/or continuously monitored. Therefore, if these data can be analyzed as they are acquired and the status of these systems can be continually assessed, then once alterations are detected, appropriate countermeasures can be applied to correct them. One of the most important physiologic systems in which to maintain homeostasis during long-duration missions is the circadian system. To detect and treat alterations in circadian physiology during long duration space missions requires development of: 1) a ground-based protocol to assess the status of the circadian system under the light-dark environment in which crews in space will typically work; and 2) appropriate statistical methods to make this assessment. The protocol in Project 1, Circadian Entrainment, Sleep-Wake Regulation and Neurobehavioral will study human volunteers under the simulated light-dark environment of long-duration space missions. Therefore, we propose to develop statistical models to characterize in near real time circadian and neurobehavioral physiology under these conditions. The specific aims of this project are to test the hypotheses that: 1) Dynamic statistical methods based on the Kronauer model of the human circadian system can be developed to estimate circadian phase, period, amplitude from core-temperature data collected under simulated light- dark conditions of long-duration space missions. 2) Analytic formulae and numerical algorithms can be developed to compute the error in the estimates of circadian phase, period and amplitude determined from the data in Specific Aim 1. 3) Statistical models can detect reliably in near real- time (daily) significant alternations in the circadian physiology of individual subjects by analyzing the circadian and neurobehavioral data collected in Project 1. 4) Criteria can be developed using the Kronauer model and the recently developed Jewett model of cognitive -performance and subjective alertness to define altered circadian and neurobehavioral physiology and to set conditions for immediate administration of countermeasures.

Brown, Emery N.↗

A Comprehensive Orbit Reconstruction for the Galileo Prime Mission in the J2000 System

The Galileo spacecraft arrived at Jupiter in December of 1995 to begin an orbital tour of the Jovian system. The objective of the tour was up close study of the planet, its satellites, and its magnetosphere. The spacecraft completed its 11 orbit prime mission in November of 1997 having had 16 successful close encounters with the Galilean satellites (including two prior to Jupiter orbit insertion). Galileo continues to operate and will have made an additional 10 orbits of Jupiter by the date of this Conference. Earlier papers discuss the determination of the spacecraft orbit in support of mission operations from arrival at Jupiter through the first 9 orbits. In this paper we re-examine those earlier orbits and extend the analysis through orbit 12, the first orbit of the Galileo Europa Mission (GEM). The objective of our work is the reconstruction of the spacecraft trajectory together with the development of a consistent set of ephemerides for the Galilean satellites. As a necessary byproduct of the reconstruction we determine improved values for the Jovian system gravitational parameters and for the Jupiter pole orientation angles. Our preliminary analyses have already led to many of the results reported in the scientific literature. Unlike the Galileo Navigation Team which operates in the EME-1950 coordinate system, we elected to work in the (J2000) International Celestial Reference Frame (ICRF), the reference frame of the current JPL planetary and satellite ephemerides as well as the standard frame of the international astronomical and planetary science community. Use of this frame permits more precise modelling of the spacecraft and satellite observations. Moreover, it is the frame of choice for all other operational JPL missions and will probably be the frame for future missions for some time. Consequently, our adoption of the ICRF will facilitate the combination of our results with any obtained from future missions (e.g. the proposed Europa Orbiter mission). In addition, our results may be used by the science community, without need of a reference frame conversion.

Jacobson, Robert A.↗

Post Galileo-Europa-Mission Satellite Tour Design

The Galileo orbiter mission as originally envisioned would orbit Jupiter eleven times, closely encountering either Europa, Ganymede, or Callisto on ten of those orbits. This nominal or prime mission began with Jupiter orbit insertion on December 7, 1995 and ended as designed ten encounters later on December 1, 1997. An extension to this nominal mission was proposed, developed and accepted in 1997 and was designed to continue orbital operations through an additional two years until December 31, 1999. This follow- on mission, labelled the Galileo Europa Mission, visits Europa eight times, Callisto four times, and ends with two visits to Io. It augments the prime mission by offering many attractive additional opportunities for science, especially remote sensing. The opportunities include increased scrutiny of Europa, a world with a possible global ocean hidden beneath the surface ice-cap, and the first high resolution images of Io (the only major satellite not encountered during the nominal tour). In 1998 a new effort was begun to investigate a possible extension to GEM. Remote sensing observations will continue to be important but moreover, valuable unique in situ fields and particles measurements will be a high priority motivation in the design and selection of any post-GEM tour. A significant design feature of a possible post-GEM tour would be the extension of the mission through the December 2000 timeframe. This would permit the possibility of simultaneous fields and particles experiments coordinated with the Cassini spacecraft as it swings by the Jupiter system for the final gravity assist enroute to Saturn.

Wilson, M. G.↗

Mars Orbit Rendezvous Strategy for the Mars 2003/2005 Sample Return Mission

The primary objective of the Mars 2003/2005 Sample Return Project is to return Martian surface materials to Earth from two different sites by the year 2008. The baseline mission plan relies heavily on the use of a Mars orbit rendezvous strategy similar to the lunar orbit rendezvous scheme used for the Apollo missions. The 2003 mission consists of a single spacecraft comprised of a Lander, Rover, and Mars ascent vehicle (MAV). The 2003 mission will be launched on a Delta-III-class launch vehicle in May/June 2003 and arrive at Mars in December 2003/January 2004. The Lander deploys the Rover to collect surface samples from several sites and return them to the Lander where they are transferred to a sample canister onboard the MAV. The MAV is launched into a low Mars orbit (targeted for 600 km circular, 45 deg inclination) and releases the sample canister to await retrieval by an Orbiter launched in 2005. (The sample canister is a passive vehicle with no maneuvering capability.) The duration of Mars surface operations is at most about 90 days. The 2005 mission consists of two separate spacecraft: a Lander/Rover/MAV spacecraft identical to that used for the 2003 mission and an Orbiter carrying an Earth Entry Vehicle (EEV). Both spacecraft will be launched on a single Ariane-5 in August 2005 and arrive at Mars in July/August 2006. A second sample canister is delivered to Mars orbit using the same scenario as was used for the 2003 mission. The Orbiter uses aerocapture for insertion into Mars orbit (targeted for 250 x 1400 km, 45 deg inclination). During its approximately one-year stay at Mars, the Orbiter will search for and attempt to rendezvous first with the 2003 sample canister and then with the 2005 sample canister. After retrieval, each sample canister is transferred to the EEV. The Orbiter departs Mars in July 2007 and returns to Earth in October 2008 on a trajectory targeted for landing at the Utah Test and Training Range (UTTR). After deploying the EEV, the Orbiter performs a deflection maneuver to avoid reentry into Earth's atmosphere.

DAmario, Louis A.↗

SeaWinds on QuikSCAT Mission and Early Science Results

SeaWinds on QuikSCAT (QSCAT) is a dedicated satellite remote sensing mission for measuring ocean surface wind speed and direction, using a spinning, pencil-beam Ku-band scatterometer. It is a replacement mission for NASA Scatterometer (NSCAT), which was launched on board of the Japan's Advanced Earth Observation System (ADEOS-1) in August 1996 and returned 10 months of high quality data before the mission was terminated in June, 1997 due to the failure of the ADEOS-1 spacecraft. Since the next NASA scatterometer mission, SeaWinds on ADEOS-2 (SeaWinds), will not be launched until November 2000, NASA decided to fill the data gap by launching the QSCAT mission. Furthermore, after year 2000. the potential exists for using both the QSCAT and SeaWinds to provide approximately 6 hours global coverage of the marine winds. QSCAT is currently scheduled for launch in April, 1999 from Vandenberg Air Force Base, using Titan-II launch vehicle. The purpose of this paper is to first present the mission objectives, the spacecraft and instrument design, ground receiving systems, the science data processing system, and the data products. We will then present the post-launch calibration and verification results of the QSCAT end-to-end sensor system. Finally, we present some of the key results obtained from the first two months of the mission, which include ocean surface wind measurements, ice detection and classification, global snow cover detection, and flood detection.

Tsai, Wu-Yang↗

Planetary Protection, Sample Return Missions and Mars Exploration: History, Status, and Future Needs

As the prospect grows for a Mars sample return mission early in the next millennium, it will be important to ensure that appropriate planetary protection (PP) controls are incorporated into the mission design and implementation from the start. The need for these PP controls is firmly based on scientific considerations and backed by a number of national and international agreements and guidelines aimed at preventing harmful cross contamination of planets and extraterrestrial bodies. The historical precedent for the use of PP measures on both unmanned and manned missions traces from post-Sputnik missions to the present, with periodic modifications as new information was obtained. In consideration of the anticipated attention to PP questions by both the scientific/technical community and the public, this paper presents a comprehensive review of the major issues and problems surrounding PP for a Mars Sample Return (MSR) mission, including an analysis of arguments that have been raised for and against the imposition of PP measures. Also discussed are the history and foundations for PP policies and requirements; important research areas needing attention prior to defining detailed PP requirements for a MSR mission; and legal and public awareness issues that must be considered with mission planning.

DeVincenzi, Donald L.↗

Ground Data System Risk Mitigation Techniques for Faster, Better, Cheaper Missions

With the advent of faster, cheaper, and better missions, NASA Projects acknowledged that a higher level of risk was inherent and accepted with this approach. It was incumbent however upon each component of the Project whether spacecraft, payload, launch vehicle, or ground data system to ensure that the mission would nevertheless be an unqualified success. The Small Explorer (SMEX) program's ground data system (GDS) team developed risk mitigation techniques to achieve these goals starting in 1989. These techniques have evolved through the SMEX series of missions and are practiced today under the Triana program. These techniques are: (1) Mission Team Organization--empowerment of a closeknit ground data system team comprising system engineering, software engineering, testing, and flight operations personnel; (2) Common Spacecraft Test and Operational Control System--utilization of the pre-launch spacecraft integration system as the post-launch ground data system on-orbit command and control system; (3) Utilization of operations personnel in pre-launch testing--making the flight operations team an integrated member of the spacecraft testing activities at the beginning of the spacecraft fabrication phase; (4) Consolidated Test Team--combined system, mission readiness and operations testing to optimize test opportunities with the ground system and spacecraft; and (5). Reuse of Spacecraft, Systems and People--reuse of people, software and on-orbit spacecraft throughout the SMEX mission series. The SMEX ground system development approach for faster, cheaper, better missions has been very successful. This paper will discuss these risk management techniques in the areas of ground data system design, implementation, test, and operational readiness.

Catena, John J.↗

Life Testing of the Hollow Cathode Plasma Contactor for the ProSEDS Mission

The Propulsive Small Expendable Deployer System (ProSEDS) mission is designed to provide an on-orbit demonstration of the electrodynamic propulsion capabilities of tethers in space. The ProSEDS experiment will be a secondary payload on a Delta 11 unmanned expendable booster. A 5-km conductive tether is attached to the Delta 11 second stage and collects current from the low Earth orbit (LEO) plasma. A hollow cathode plasma contactor emits the collected electrons from the Delta II, completing the electrical circuit with the ambient plasma. The current flowing through the tether generates thrust based on the Lorentz Force Law. The thrust will be generated opposite to the velocity vector, slowing down the spacecraft and causing it to de-orbit in approximately 14 days compared to the normal 6 months. A 10-km non-conductive tether is between the conductive tether and an endmass containing several scientific instruments. The ProSEDS mission lifetime was set at I day because most of the primary objectives can be met in that time. The extended ProSEDS mission will be for as many days as possible, until the Delta 11 second stage burns up or the tether is severed by a micrometeoroid or space debris particle. The Hollow Cathode Plasma Contactor (HCPC) unit has been designed for a 12-day mission. Because of the science requirements to measure the background ambient plasma, the HCPC must operate on a duty cycle. Later in the ProSEDS mission, the HCPC is operated in a manner to allow charging of the secondary battery. Due to the unusual operating requirements by the ProSEDS mission, a development unit of the HCPC was built for thorough testing. This developmental unit was tested for a simulated ProSEDS mission, with measurements of the ability to start and stop during the duty cycle. These tests also provided valuable data for the ProSEDS software requirements. Qualification tests of the HCPC flight hardware are also discussed.

Vaughn, Jason A.↗

Planetary Protection, Sample Return Missions and Mars Exploration: History, Status, and Future Needs

As the prospect grows for a Mars sample return mission early in the next millennium, it will be important to ensure that appropriate planetary protection (PP) controls are incorporated into the mission design and implementation from the start. The need for these PP controls is firmly based on scientific considerations and backed by a number of national and international agreements and guidelines aimed at preventing harmful cross contamination of planets and extraterrestrial bodies. The historical precedent for the use of PP measures on both unmanned and manned missions traces from post-Sputnik missions to the present, with periodic modifications as new information was obtained. In consideration of the anticipated attention to PP questions by both the scientific/technical community and the public, this paper presents a comprehensive review of the major issues and problems surrounding PP for a Mars Sample Return (MSR) mission, including an analysis of arguments that have been raised for and against the imposition of PP measures. Also discussed are the history and foundations for PP policies and requirements; important research areas needing attention prior to defining detailed PP requirements for a MSR mission; and legal and public awareness issues that must be considered with mission planning.

DeVincenzi, Donald L.↗

Revision to Planetary Protection Policy for Mars Missions

Under existing COSPAR policy adopted in 1984, missions to Mars (landers, probes, and some orbiters) are designated as Category IV missions. As such, the procedures for implementing planetary protection requirements could include trajectory biasing, cleanrooms, bioload reduction, sterilization of hardware, and bioshields, i. e. requirements could be similar to Viking. However, in 1992, a U. S. National Academy of Sciences study recommended that controls on forward contamination of Mars be tied to specific mission objectives. The report recommended that Mars landers with life detection instruments be subject to at least Viking-level sterilization procedures for bioload reduction, while spacecraft (including orbiters) without life detection instruments be subject to at least Viking-level pre sterilization procedures for bioload reduction but need not be sterilized. In light of this, it is proposed that the current policy's Category IV missions and their planetary protection requirements be divided into two subcategories as follows: Category IV A, for missions comprising landers and probes without life detection experiments and some orbiters, which will meet a specified bioburden limit for exposed surfaces; Category IV B, for landers and probes with life detection experiments, which will require complete system sterilization. For Category IV A missions, bioburden specifications will be proposed and implementing procedures discussed. A resolution will be proposed to modify the existing COSPAR policy to reflect these changes. Similar specifications, procedures, and resolution for Category IV B missions will be the subject of a later study.

DeVincenzi, D. L.↗

Shuttle Radar Topography Mission (SRTM) Flight System Design and Operations Overview

This paper provides an overview of the Shuttle Radar Topography Mission (SRTM), with emphasis on flight system implementation and mission operations from systems engineering perspective. Successfully flown in February, 2000, the SRTM's primary payload consists of several subsystems to form the first spaceborne dual-frequency (C-band and X-band) fixed baseline interferometric synthetic aperture radar (InSAR) system, with the mission objective to acquire data sets over 80% of Earth's landmass for height reconstruction. The paper provides system architecture, unique design features, engineering budgets, design verification, in-flight checkout and data acquisition of the SRTM payload, in particular for the C-band system. Mission operation and post-mission data processing activities are also presented. The complexity of the SRTM as a system, the ambitious mission objective, the demanding requirements and the high interdependency between multi-disciplined subsystems posed many challenges. The engineering experience and the insight thus gained have important implications for future spaceborne interferometric SAR mission design and implementation.

Shen, Yuhsyen↗

The Development of the TRMM Mission and the Reasons for its Scientific Success

A short history of the development of the TRMM mission will be described focusing on the development of the science requirements, the close collaboration between the U.S. and Japan, and the technological and scientific success of the mission. The initial TRMM science workshop was held in 1986 and with the science requirements derived from that start a set of instruments were developed to measure tropical precipitation for the first mission with that parameter as the principal focus. Implementation of the mission concept was carried out by through close cooperation between U.S. and Japanese scientists, engineers and managers. The Tropical Rainfall Measuring Mission (TRMM) has now completed three years in orbit. A short summary of research highlights will be presented and these successes will be traced back to the scientific and programmatic approaches used to develop and manage the mission. Plans for a Global Precipitation Mission (GPM) based on the successful approach used for TRMM will also be outlined.

Kakar, Ramesh↗