Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FEET”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Custodial Services End of Year Report for 2016

Sandia’s Custodial Services Department is a full-service, in-house custodial department. The department consists of one manager, four team supervisors, three administrative support personnel, 11 lead custodians, 71 day-shift custodians, four swing shift custodians, and eight heavy floor care personnel. The department services approximately 3.5 million square feet of office, lobby, laboratory, break room, classroom, and conference room space and assists with the collection of recycling products, including aluminum, plastic, card board box, and mixed paper products. Detailed in this report are audits, awards, and certifications; department highlights; departmental promotions; custodial metrics.

99 GENERAL AND MISCELLANEOUS↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter). All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

Green, Clean, & Mean: Pushing the Energy Envelope in Tech Industry Buildings

When it comes to innovation in energy and building performance, one can expect leading-edge activity from the technology sector. As front-line innovators in design, materials science, and information management, developing and operating high-performance buildings is a natural extension of their core business. The energy choices made by technology companies have broad importance given their influence on society at large as well as the extent of their own energy footprint. Microsoft, for example, has approximately 250 facilities around the world (30 million square feet of floor area), with significant aggregate energy use of approximately 4 million kilowatt-hours per day (Figure 1).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

HTS Transmission Cable System for installation in the Long Island Power Grid

Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2 and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Early Career: The search for weakly interacting dark matter with liquid xenon

We report results from a search for weakly interacting dark matter particles obtained with the LUX experiment. LUX was located at a depth of 4850 feet at the Sanford Underground Research Facility in Lead, South Dakota from 2013 through 2016. It found no evidence for dark matter particle interactions and set new constraints on the properties of such particles for masses between 6 GeV and 100 TeV. The work reported here also characterized the performance of such experiments by developing a new calibration technique based upon a tritium beta decay source.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

America Saves! Energizing Main Street's Small Businesses

The America Saves! Energizing Main Street Small Businesses project engaged the 1,200-member National Main Street Center (NMSC) network of downtown organizations and other local, regional, and national partners to test a methodology for sharing customized energy efficiency information with owners of commercial buildings smaller than 50,000 square feet. Led by the National Trust for Historic Preservation’s Preservation Green Lab, the project marshalled local staff and volunteers to gather voluntarily-disclosed energy use information from participating businesses. This information was analyzed using a remote auditing tool (validated by the National Renewable Energy Lab) to assess energy savings opportunities and design retrofit strategies targeting seven building types (food service and sales, attached mixed-use, strip mall, retail, office, lodging, and schools). The original project design contemplated extensive leveraging of the Green Button protocol for sharing annualized utility data at a district scale. Due the lack of adoption of Green Button, the project partners developed customized approaches to data collection in each of twelve pilot communities. The project team encountered considerable challenges in gathering standardized annual utility data from local partners. After overcoming these issues, the data was uploaded to a data storehouse. Over 450 properties were benchmarked and the remote auditing tool was tested using full building profiles and utility records for more than 100 commercial properties in three of the pilot communities. The audit tool demonstrated potential for quickly capturing, analyzing, and communicating energy efficiency opportunities in small commercial buildings. However, the project team found that the unique physical characteristics and use patterns (partial vacancy, periodic intensive uses) of small commercial buildings required more trouble-shooting and data correction than was anticipated. In addition, the project revealed that remote technology alone (such as audits) is not sufficient to convince most owners of commercial buildings or businesses to invest in energy efficiency. Additional, one-on-one personal communication is critical. A combination of technology and well-planned direct contact is likely to produce the highest rate of energy efficiency implementation in the small commercial building market sector. Note that only two of the three planned phases of this project were completed. As a result, research and testing were not fully implemented and thus all results and conclusions from the America Saves! Energizing Main Street Small Businesses project should be considered preliminary. In addition to the National Main Street Center, local organizations, and regional utilities, the America Saves! project partners included the National Renewable Energy Laboratory, Energy Center of Wisconsin (Seventh Wave), Lend Lease, Building Energy, and Energy RM.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2016 Groundwater Monitoring and Inspection Report Gnome-Coach, New Mexico, Site January 2017

The Gnome-Coach, New Mexico, Site was the location of an underground nuclear test in 1961 and a groundwater tracer test in 1963. Residual contamination remaining in the subsurface from these events requires long-term oversight. The Long-Term Surveillance and Maintenance Plan for the site describes the U.S. Department of Energy Office of Legacy Management’s (LM’s) plan for monitoring groundwater (radiochemical sampling and hydraulic head measurements), inspecting the site, maintaining the site’s institutional controls, evaluating and reporting data, and documenting the site’s records and data management processes. Groundwater monitoring and site inspection activities are conducted annually. This report summarizes the results of these activities conducted during the October 2015 through September 2016 reporting period. The site inspection and annual sampling were conducted on January 27, 2016. At the time of the site inspection, the signs installed near the emplacement shaft, near well USGS-1, and around the perimeter of the site were observed as being in good condition, as were the roads, wellheads, and Project Gnome monument. No new groundwater extraction wells or oil and gas wells were installed during this reporting period on the site or in the sections that surround the site. One new application was received by the New Mexico Oil Conservation Division to install a salt water disposal well approximately 0.8 miles northeast of the Project Gnome monument. The proposed well has a planned completion depth of 15,500 feet below ground surface, but as of November 2016 a drill date has not been established.

54 ENVIRONMENTAL SCIENCES↗

2015 Advanced Site Investigation and Monitoring Report Riverton, Wyoming, Processing Site September 2016

The U.S. Department of Energy conducted initial groundwater characterization of the Riverton, Wyoming, Processing Site in the 1990s. The characterization culminated in a Site Observational Work Plan in 1998 that recommended a natural flushing compliance strategy. Results of verification monitoring indicated that natural flushing was generally progressing as expected until June 2010, when significant increases in contaminant concentrations were measured in several monitoring wells downgradient of the site after the area flooded. In response to the unexpected results following the flood, an enhanced characterization of the surficial aquifer was conducted in 2012, which included installation of 103 boreholes along nine transects with a Geoprobe, collection of 103 water samples and 65 soil samples, laboratory tests on the soil samples, and additional groundwater modeling. This advanced site investigation report summarizes additional investigation in 2015 through the use of backhoe trenching, sonic drilling, multilevel monitoring wells, direct-push drilling, and temporary well points to collect soil and groundwater samples. Additional surface water measurements were made included the installation of a stilling well and the measurement of stream elevation along the Wind River to approximate upgradient groundwater heads. Groundwater sampling included the addition of geochemical constituents and isotopes that have not been sampled in the past to better understand post-flood conditions and the possibility of additional or ongoing contaminant sources. This sampling was performed to (1) better define the contaminant plumes, (2) verify the occurrence of persistent secondary contaminant sources, (3) better understand the reason for the contaminant spikes after a 2010 flood, and (4) assess contaminant plume stagnation near the Little Wind River. This report provides data analyses and interpretations for the 2015 site investigation that addresses these issues and provides recommendations for future efforts. Observations from trenches and sonic drilling indicate the general lithology of the shallow, unconsolidated sediments consists of a silt zone at the surface that ranges from 2.5 to 4.8 feet below ground surface, underlain by sand and gravel, underlain by the top of the weathered bedrock (Wind River Formation). Soil data from trenches and sonic drilling indicate (1) elevated concentrations of several constituents in the silt zone, likely due to the formation of evaporites, (2) uranium is the only measured element that appears to be concentrated in the silt over the groundwater contaminant plume, (3) in the former tailings impoundment area, there may be a thin unsaturated zone with elevated uranium in the native material just below the fill, (4) in the former tailings impoundment area, slightly higher uranium concentrations occur in the underlying saturated sand and gravel, and (5) several bedrock samples have a unique geochemical signature, generally related to a higher silt content. Assessment of groundwater flow included measuring river elevations along the Wind River and installing the temporary well points adjacent to the Little Wind River that provided additional data points to refine contours for water table elevations. These data confirm past interpretations of groundwater flow to the southeast across the site toward the Little Wind River. Hydraulic head elevations between paired surficial and semiconfined aquifer wells indicate variable vertical gradients across the site with the potential for upward and downward flow. Additional direct-push drilling and groundwater sampling confirmed the contaminant plume configuration, but it also revealed a low-sulfate-concentration zone at the edge of the former tailings impoundment. Temporary well points provided better definition of plume concentrations at the bank of the Little Wind River, and data from these wells indicate plume discharge to the river. Additional sampling in an area southwest of the plume that had elevated uranium groundwater concentrations in the past did not have any uranium concentrations above the U.S. Environmental Protection Agency maximum concentration limit for uranium. Results from multilevel monitoring wells indicate some geochemical differences with depth, but overall concentrations are similar to those in nearby conventional monitoring wells in the long-term monitoring program. Geochemistry data from these multilevel monitoring wells confirm the general increase in contaminant concentrations toward the river and toward the plume centerline for chloride, sulfate, and uranium but highlight geochemical controls on calcium. Iron data indicate slightly reducing conditions, especially near water table and bedrock surfaces, with more oxidizing conditions in the middle of the sand and gravel. Uranium activity ratios (234U/238U) confirm the uranium plume in the surficial aquifer as being mill related, and the area to the southwest outside the plume as natural, non-mill related. In the semiconfined aquifer, evidence of aquifer connection and impacts from the mill is inconclusive. Values of δD and δ 18 O suggest water is derived from different sources and tritium data confirm that the semiconfined aquifer water is generally older than the surficial aquifer water. However, these data do indicate some groundwater communication from the surficial aquifer into the semiconfined aquifer, which resulted in δD and δ 18 O and tritium values in the semiconfined aquifer that are more similar to those in the surficial aquifer. Values of δ 34 S sulfate in the semiconfined aquifer combined with sulfate concentrations indicate the potential for some mill- related sulfate in the semiconfined aquifer, albeit limited to an area near and beneath the former tailings impoundment. Uranium and molybdenum concentrations in the semiconfined aquifer are below groundwater standards in all wells. However, the elevated molybdenum concentrations at one semiconfined aquifer well underneath the former tailings impoundment suggests a mill- derived source for the uranium and molybdenum in that well. It is possible that aquifer cross- communication occurred when the tailings impoundment was active and created a higher head. Current cross-communication appears unlikely given the large differences in tritium values and an upward hydraulic head at this location. Nine domestic wells are located within the institutional control boundary (eight in the confined aquifer and one in the semiconfined aquifer). Uranium and molybdenum concentrations in all samples collected from these wells were one or two orders of magnitude below the groundwater standards. Surface water flow in the Little Wind River in September 2015 was low compared to historical averages for that time of year. As a result, the uranium concentration measured in the Little Wind River was at a historical maximum at the sampling location upstream of the site. However, the impact of uranium discharge from the groundwater plume into the Little Wind River was not measureable. Elevated sulfate concentrations were observed in an outfall ditch related to an active sulfuric acid plant. Uranium concentrations in the oxbow lake remain at concentrations above the groundwater standard. Plume contaminant concentrations had returned to levels found prior to the 2010 flood by the end of 2015. However, these concentrations still exceed model predictions for natural flushing, and the current data indicate that natural flushing to achieve remediation goals within the 100-year time period is not likely, especially with the high potential for additional floods in the update to the conceptual site model (CSM), soil data indicate additional contaminant sources, specifically uranium, in evaporites within the silt layer over the uranium plume and in naturally reduced zones (NRZs). Additional zones of slightly elevated uranium concentration are in the native sediments just above the water table but below the fill layer in the former tailings impoundment area. This area also has slightly elevated uranium in the sand and gravel below the water table. Mass balance calculations indicate that small amounts of dissolution in any of these zones with increased uranium in the solid phase can produce groundwater uranium concentrations above the groundwater standard and could account for the post-flood uranium spike. The additional uranium near the former tailings impoundment provides a mechanism for a continuing source for the uranium plume that was not considered in earlier natural flushing models. In addition, uranium released from the silt layer or the NRZs seasonally and during flooding may add uranium to the groundwater plume near the Little Wind River. These mechanisms provide a possible explanation for plume persistence, along with spikes in concentrations during floods, that creates the current plume configuration. Additional updates to the CSM include (1) chloride flushes more rapidly than uranium beneath the former mill site, (2) chloride in the silt layer provides a scenario in which chloride cannot be used as a conservative tracer (especially in areas prone to flooding), (3) uranium concentrations with depth can be variable (especially below NRZs), and (4) calcite and gypsum solubility limits appear to provide important geochemical controls on groundwater geochemistry. The conclusion of this study provides several recommendations for additional work to refine the CSM and continue assessment of the natural flushing compliance strategy. Recommendations for additional work include targeted soil and groundwater sampling to assess geochemical conditions, distribution of contaminants, and groundwater/surface water interaction; additional column tests to provide data for geochemical modeling; and development of an updated groundwater flow model, which will be used in conjunction with a geochemical model to assess the viability of the natural flushing compliance strategy.

2015 Monitoring Riverton, WY↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 1

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter) for a portion of the Tertiary volcanic section near the water table. Tritium concentrations were at or near the field detection limit in the Lower carbonate aquifer (LCA) while drilling. During drilling, a sample was collected while circulating in the LCA. The sample was submitted for off-site laboratory analysis. The sample results indicated low but measurable tritium concentrations. All Fluid Management Plan requirements were met during drilling activities.

54 ENVIRONMENTAL SCIENCES↗

Site 300 City Water Master Plan

Lawrence Livermore National Laboratory (LLNL), a scientific research facility, operates an experimental test site known as Site 300. The site is located in a remote area of southeastern Alameda County, California, and consists of about 100 facilities spread across 7,000-acres. The Site 300 water system includes groundwater wells and a system of storage tanks, booster pumps, and underground piping to distribute water to buildings and significant areas throughout the site. Site 300, which is classified as a non-transient non-community (NTNC) water system, serves approximately 110 employees through 109 service connections. The distribution system includes approximately 76,500-feet of water mains varying from 4- to 10-inches in diameter, mostly asbestos cement (AC) pipe, and eleven water storage tanks. The water system is divided into four pressure zones fed by three booster pump stations to tanks in each zone.

42 ENGINEERING↗

Mercury Dispersion Modeling And Purge Ventilation Stack Height Determination For Tank 40H

The SRNL Atmospheric Technologies Group performed an analysis for mercury emissions from H-Tank Farm - Tank 40 ventilation system exhaust in order to assess whether the Short Term Exposure Limit (STEL), or Threshold Limit Value (TLV) levels for mercury will be exceeded during bulk sludge slurry mixing and sludge removal operations. The American Meteorological Society/Environmental Protection Agency Regulatory Model (AERMOD) was used as the main dispersion modelling tool for this analysis. The results indicated that a 45-foot stack is sufficient to raise the plume centerline from the Tank 40 release to prevent mercury exposure problems for any of the stack discharge scenarios provided. However, a 42-foot stack at Tank 40 is sufficient to prevent mercury exposure concerns in all emission scenarios except the 50 mg/m 3 release. At a 42-foot stack height, values exceeding the exposure standards are only measured on receptors located above 34 feet.

54 ENVIRONMENTAL SCIENCES↗

Optimizing and Quantifying CO 2 Storage Resource in Saline Formations and Hydrocarbon Reservoirs

In an effort to reduce carbon dioxide (CO 2 ) emissions from large stationary sources, carbon capture and storage (CCS) is being investigated as one approach. This work assesses CO 2 storage resource estimation methods for deep saline formations (DSFs) and hydrocarbon reservoirs undergoing CO 2 enhanced oil recovery (EOR). Project activities were conducted using geologic modeling and simulation to investigate CO 2 storage efficiency. CO 2 storage rates and efficiencies in DSFs classified by interpreted depositional environment were evaluated at the regional scale over a 100-year time frame. A focus was placed on developing results applicable to future widespread commercial-scale CO 2 storage operations in which an array of injection wells may be used to optimize storage in saline formations. The results of this work suggest future investigations of prospective storage resource in closed or semiclosed formations need not have a detailed understanding of the depositional environment of the reservoir to generate meaningful estimates. However, the results of this work also illustrate the relative importance of depositional environment, formation depth, structural geometry, and boundary conditions on the rate of CO 2 storage in these types of systems. CO 2 EOR occupies an important place in the realm of geologic storage of CO 2 , as it is likely to be the primary means of geologic CO 2 storage during the early stages of commercial implementation, given the lack of a national policy and the viability of the current business case. This work estimates CO 2 storage efficiency factors using a unique industry database of CO 2 EOR sites and 18 different reservoir simulation models capturing fluvial clastic and shallow shelf carbonate depositional environments for reservoir depths of 1219 and 2438 meters (4000 and 8000 feet) and 7.6-, 20-, and 64-meter (25-, 66,- and 209-foot) pay zones. The results of this work provide practical information that can be used to quantify CO 2 storage resource estimates in oil reservoirs during CO 2 EOR operations (as opposed to storage following depletion) and the uncertainty associated with those estimates.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of the ICET Test Stand to Assess the Performance of a Range of Ceramic Media Filter Elements in Support of ASME AG-1 Subsection FO

High Efficiency Particulate Air (HEPA) filters are defined as extended-medium, dry-type filters with: (1) a minimum particle removal efficiency of no less than 99.97 percent for 0.3 micrometer particles, (2) a maximum, clean resistance of 1.0 inch water column (in. WC) when operated at 1,000 cubic feet per minute (CFM), and (3) a rigid casing that extends the full depth of the medium. Specifically, ceramic media HEPA filters provide better performance at elevated temperatures, are moisture resistant and nonflammable, can perform their function if wetted and exposed to greater pressures, and can be cleaned and reused. This paper describes the modification and design of a large scale test stand which properly evaluates the filtration characteristics of a range of ceramic media filters challenged with a nuclear aerosol agent in order to develop Section FO of ASME AG-1.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Nonlinear Time Domain Seismic Soil-Structure Interaction (SSI) Deep Soil Site Methodology Development

Currently the Department of Energy (DOE) and the nuclear industry perform seismic soil-structure interaction (SSI) analysis using equivalent linear numerical analysis tools. For lower levels of ground motion, these tools should produce reasonable in-structure response values for evaluation of existing and new facilities. For larger levels of ground motion these tools likely overestimate the in-structure response (and therefore structural demand) since they do not consider geometric nonlinearities (such as gaping and sliding between the soil and structure) and are limited in the ability to model nonlinear soil behavior. The current equivalent linear SSI (SASSI) analysis approach either joins the soil and structure together in both tension and compression or releases the soil from the structure for both tension and compression. It also makes linear approximations for material nonlinearities and generalizes energy absorption with viscous damping. This produces the potential for inaccurately establishing where the structural concerns exist and/or inaccurately establishing the amplitude of the in-structure responses. Seismic hazard curves at nuclear facilities have continued to increase over the years as more information has been developed on seismic sources (i.e. faults), additional information gathered on seismic events, and additional research performed to determine local site effects. Seismic hazard curves are used to develop design basis earthquakes (DBE) that are used to evaluate nuclear facility response. As the seismic hazard curves increase, the input ground motions (DBE’s) used to numerically evaluation nuclear facility response increase causing larger in-structure response. As ground motions increase so does the importance of including nonlinear effects in numerical SSI models. To include material nonlinearity in the soil and geometric nonlinearity using contact (gaping and sliding) it is necessary to develop a nonlinear time domain methodology. This methodology will be known as, NonLinear Soil-Structure Interaction (NLSSI). In general NLSSI analysis should provide a more accurate representation of the seismic demands on nuclear facilities their systems and components. INL, in collaboration with a Nuclear Power Plant Vender (NPP-V), will develop a generic Nuclear Power Plant (NPP) structural design to be used in development of the methodology and for comparison with SASSI. This generic NPP design has been evaluated for the INL soil site because of the ease of access and quality of the site specific data. It is now being evaluated for a second site at Vogtle which is located approximately 15 miles East-Northeast of Waynesboro, Georgia and adjacent to Savanna River. The Vogtle site consists of many soil layers spanning down to a depth of 1058 feet. The reason that two soil sites are chosen is to demonstrate the methodology across multiple soil sites. The project will drive the models (soil and structure) using successively increasing acceleration time histories with amplitudes. The models will be run in time domain codes such as ABAQUS, LS-DYNA, and/or ESSI and compared with the same models run in SASSI. The project is focused on developing and documenting a method for performing time domain, non-linear seismic soil structure interaction (SSI) analysis. Development of this method will provide the Department of Energy (DOE) and industry with another tool to perform seismic SSI analysis.

58 GEOSCIENCES↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 413: Clean Slate II Plutonium Dispersion (TTR) Tonopah Test Range, Nevada. Revision 0

This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitate site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and closure in place. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAU 413, and the detailed and comparative analysis of CAAs, clean closure was selected as the preferred CAA for CAU 413 by the U.S. Air Force, Nevada Division of Environmental Protection, and U.S. Department of Energy at the CAA meeting held on August 24, 2016.

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-4-1 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 0

Well ER-4-1 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled and completed from March 23 to April 13, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Yucca Flat/Climax Mine Corrective Action Unit (CAU) 97. The primary purpose of the well was to collect hydrogeologic data to assist in validating concepts of the groundwater flow system within the Yucca Flat/Climax Mine CAU, and to test for potential radionuclides in groundwater from the STRAIT (U4a) underground test. The completed well includes one piezometer (p1), to a depth of 663.16 meters (m) (2,175.71 feet [ft]) below ground surface (bgs) and open from the Alluvial aquifer (AA3) to the Oak Spring Butte confining unit (OSBCU) hydrostratigraphic units; and a main completion (m1), which includes 6.625-inch (in.) casing with slotted interval (m1) installed to 906.80 m (2,975.05 ft) bgs in the Lower carbonate aquifer (LCA). A 13.375-in. diameter surface casing was installed from the surface to a depth of 809.00 m (2,654.21 ft) bgs. Well ER-4-1 experienced a number of technical issues during drilling, including borehole instability and sloughing conditions. An intermediate, 10.75-in./9.625-in. casing string was installed to 856.94 m (2,811.48 ft) bgs to control these issues. Borehole stability and erosion problems appear to be associated with the Tunnel Formation (Tn) and the Older tunnel beds (Ton). Overall efforts to stabilize the borehole were successful. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), a partial suite of geophysical logs to a maximum depth of 766.57 m (2,515 ft) bgs, water-quality measurements (including tritium), water-level measurements, and two depth-discrete bailer samples collected at 538.89 m and 646.18 m (1,768 ft and 2,120 ft) bgs respectively. The well penetrated 187.45 m (615 ft) of Quaternary/Tertiary alluvium (QTa), 671.47 m (2,203 ft) of Tertiary Volcanic rocks (Tv), and 66.20 m (217.19 ft) of Paleozoic rocks (|). The stratigraphy and lithology were generally as expected with some exceptions. The top of Paleozoic rocks (|) was predicted to occur at 822.35 m (2,698 ft) bgs and was intercepted at 858.93 m (2,818 ft), a difference of 36.58 m (120 ft). As expected, the Paleozoic rocks (|) are the principal water producing formation in Well ER-4-1. Depth to water was measured after drilling as follows: In the piezometers: p1 at 320.39 m (1,051.16 ft) bgs, (measured January 4, 2017); and in the main production casing interval: m1 at 539.17 m (1,768.92 ft) bgs, (measured December 12, 2016) Geophysical logs and depth-discrete bailer sample analytical results suggest likely zones of prompt injection (underground-test-related) fission products from 472.44 to 481.48 m (1,550 to 1,580 ft) bgs and at approximately 539.50 m (1,770 ft) bgs. Subsequent work at Well ER-4-1 will be included in future reports. Field measurements for tritium were mostly below the Safe Drinking Water Act limit (20,000 picocuries per liter) with the exception of two zones showing elevated tritium concentrations. The first zone is located at approximately 365.76 to 390.14 m (1,200 to 1,280 ft) bgs and a second zone at approximately 542.54 to 566.93 m (1,780 to 1,860 ft) bgs. All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

The SURE House (Solar Decathlon 2015)

Coastal towns and cities across the Northeastern US, with their high population density, aged utility infrastructure, and unique geography, are increasingly vulnerable to climate change related storm events. In October 2012 superstorm Sandy highlighted the fragility of our current coastal building types and made clear the need for a new model of design and construction which works to understand and mitigate these weaknesses. Dramatic changes in public policy, championed by both The Federal Emergency Management Agency (FEMA) and the National Flood Insurance Program (NFIP) are driving the rebuilding of these shore communities, often resulting in costly renovations, un-sustainable neighborhood configurations and in direct conflict with concurrent government policies such as The American with Disabilities Act (ADA). The SURE HOUSE demonstrates a series of new design solutions to these conflicting public policies and environmental imperatives. At Stevens Institute of Technology, the 2015 Solar Decathlon started with the challenge: Can we design a home for coastal New Jersey that dramatically reduces its energy use while protecting itself from the realities of a changing, more extreme climate? The SURE HOUSE merges the iconic 20th century shore home with 21st century building science. Utilizing innovative renewable energy technologies, a ‘Passive House’ level building envelope, and rugged glass-fiber-composite materials to flood-proof the home, the SURE HOUSE is a high-performance, net-zero-energy home, armored against extreme weather, designed for the contemporary lifestyle of the Jersey Shore and other vulnerable coastal communities. SUSTAINABLE At Stevens, we recognize that energy use in the home and workplace is directly connected to the growing problem of climate change. Reducing our energy consumption by designing higher performing, compact homes that are both functional, comfortable and desirable is the first critical step towards a modern, sustainable architecture for New Jersey and beyond. This is what informed the architectural design of the house. Configured about a compact form, thickly insulated and air-sealed walls eliminate thermal bridging and minimize energy losses while advanced glazing brings in free solar heat during the winter months. As a result of these passive design strategies, the SURE HOUSE has a greatly reduced carbon footprint requiring 91% less energy than a typical New Jersey home. Photovoltaic (PV) arrays on both the rooftop and operable shutters easily provide energy in excess of the home’s modest demands. The Stevens team considers a truly sustainable home in the era of climate change, one that prioritizes low energy use, and integrates right-sized renewable generation to supply the home’s needs. Low consumption, low production. RESILIENT In October of 2012, Hurricane Sandy wreaked havoc along the east coast of the US. In New Jersey alone there was an estimated 29.4 billion dollars in damages, 346,000 homes affected, and almost two and a half million people left without power, in some cases for over 10 days. Recovery from this storm and associated flooding is ongoing to this day, as many New Jersey homeowners grapple with the large costs of rebuilding and struggle to adapt to complicated new home building regulations. Damage from this storm to Hoboken, the home of the Stevens Institute of Technology’s campus, and to the New Jersey shore was extensive and many students on the SURE HOUSE team were directly affected by this historic event. The Stevens design team recognizes that in a world of more frequent and stronger storms, the ability to absorb and adapt to change is more important than ever. Successfully weathering the next storm and its aftermath is one of the primary goals in the design of the SURE HOUSE prototype. The SURE HOUSE introduces unique ‘dry flood-proofing’ methods to residential construction. Innovative wall and floor flood-proofing, utilizing durable composite sheathing materials adapted from the boating industry, were developed by the student team to render the SURE House’s building envelope flood proof up to the FEMA AE 6/7 Zone (+ 6/7 feet of water above sea-level). Designed and fabricated utilizing glass-fiber composite materials, the custom storm shutter system serves to protect the large glazed openings of the home from both air-borne debris impact and water infiltration during a storm event while also providing deterrence from the vandalism that often occurs in the aftermath of a calamitous event. During extended power outages, a ‘resilient’ solar array is capable of supplying critical amounts of energy and hot water to the home, without the use of battery storage or grid infrastructure. PV Description AC GRID-TIED PV SYSTEM The SURE HOUSE solar system consists of two distinct arrays, the grid-tied rooftop array which produces AC Powerand the shutter-mounted array which converts DC power generated by the modules directly into usable heat for the domestic hot water (DHW). The roof-mounted AC grid-tied array is comprised of three strings, two 11 module strings connected to an SMA SB 5000TL-US-223 inverter and a single 10 module string equipped and an SMA SB 3000TL-US-22 central inverter. All modules for the rooftop AC array are LG MonoX 2804 watt solar panels, chosen for their durability and efficiency. Inverter sizing and string size are optimized to the electrical characteristics of the chosen PV modules and the desired energy production, see Appendix 5B. The SURE HOUSE is projected to produce 12,353 kWh per year to meet 6,157 kWh per year of estimated consumption. Solar modules for the two AC grid-tied sub arrays are mounted on the main roof surface of the SURE HOUSE with a 10 degree tilt angle using a partially-ballasted polyethylene roof mounting system made by Renusol, which is particularly suited to the corrosive salt air of a coastal environment. This method was chosen for its installation simplicity and to limit detrimental roof penetrations. The 10 degree tilt optimizes the energy generated per roof area at a lower price, see Appendix 5A, and ensures that there is minimal wind uplift. DC SOLAR ELECTRIC DOMESTIC HOT WATER The SURE HOUSE’s approach to sustainable and resilient domestic hot water (DHW) consists of a unique, custom engineered DC solar electric hot water system. Employing the use of Advanced Energy’s DC electric PV heater (DCPVH)5 to heat domestic water well beyond the draw temperature, the SURE HOUSE is able to obtain a remarkably high solar fraction of 75% or more. The custom modified 80 gallon Vaughn DHW tank acts as a large solar ‘battery’ that stores heat energy in the form of hot water at almost 150 degrees, harvesting energy when the sun is out for use later in the day or overnight. The system, which uses electricity rather than heated fluid, is distinct from traditional ‘solar thermal’ systems by eliminating the dangers and associated maintenance issues of fluid based systems. By forgoing the use of external fluid loops, overheated solar collectors and pipes are not an issue for the SURE HOUSE system which never needs any yearly or seasonal flushing. In weather conditions where the integrated DCPVH unit cannot produce enough hot water via solar energy alone, the Vaughn hot water tank comes factory made with an AC powered 2.6 COP heat pump and a AC heating coil that serve as back-up heating elements. The DCPVH is powered by a DC array consisting of 10 custom-made Solbian by PVilion 180 watt, monocrystalline, flexible solar modules6. The Solbian modules are directly mounted to the top half of the operable storm shutters on the south façade of the SURE HOUSE. The SURE HOUSE team worked closely with PVillion, a PV system designer specializing in flexible architectural photovoltaics, to design an adhesive system that works with the glass-fiber storm shutter surface in a reliable manner over an extended period. Because this system operates in DC-only mode and never connects to the municipal power grid, the system can continue to create hot water safely and effectively even during grid disruption events. This hot water, and the energy stored within it, could be used for a range of activities including washing and cooking to more elaborate hydronic heating systems as desired. See Appendix 6 for system engineering, sizing and modeling.

14 SOLAR ENERGY↗

2016 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data include direct radiation exposure, as well as radiation from the air, groundwater, meteorology, and vadose zone. This report summarizes the 2016 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports, developed by National Security Technologies, LLC Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. During 2016, precipitation at the Area 3 RWMS was 8% below average, and precipitation at the Area 5 RWMS was 8% above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. Vadose zone monitoring on Area 5 and Area 3 RWMS cell covers shows no evidence of precipitation percolating through the covers to the waste. Moisture from precipitation did not percolate below 150 centimeters (cm) (5 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS. During 2016, there was no drainage through 2.4 meters (8 ft) of soil as indicated from the Area 3 drainage lysimeters that received only natural precipitation. Forty-four percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter, which received 3 times the natural precipitation. All 2016 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facilities’ PAs

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗