Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

US DOE Office of Technology Innovation and Development - Integration of the EM R and D Program in 2012 and Beyond - 12537

Applied research and technology development has the potential to accelerate environmental cleanup and reduce the cost for cleanup and closure of U.S. Department of Energy (DOE) legacy waste sites throughout the United States. Providing the scientific understanding, knowledge, and technologies to enable successful completion of the DOE Office of Environmental Management (EM) mission, the Technology Innovation and Development program is transforming science and innovation into practical solutions for environmental cleanup. Through integration, collaboration, and communication with DOE partner organization, DOE site managers and contractors, these technologies will reduce human health and environmental risk, cost, and time associated with cleanup and closure. The Office of Technology Innovation and Development (OTID) focused efforts in fiscal year 2011 (FY 2011) to a proactive, visionary program balance with integrated, cross-disciplinary applied research and technology development activities. This transition provides the necessary scientific and technical advancements to address near-term needs. In addition, it fills the critical role in providing scientific approaches and advanced technologies that look beyond today's known needs and requirements to provide innovative technologies to make the necessary long-term changes required to facilitate cleanup and bring sites to closure. The outcomes and impacts of this strategy are summarized in the Impact Plan, which describes potential reduction in life-cycle costs through the development and deployment of advanced technologies supporting EM needs associated with waste processing, groundwater and soil remediation, deactivation and decommissioning, and spent nuclear fuel and materials disposition. Additionally, the OTID International Program Strategic Plan 2010-2015 outlines cooperation and collaboration with the international community that has similar nuclear legacy management experience and expertise to foster transfer of best science practices being used in the field. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure End States for Facilities, Waste Sites, and Subsurface Contamination - 12543

The United States (U.S.) Department of Energy (DOE) manages the largest groundwater and soil cleanup effort in the world. DOE's Office of Environmental Management (EM) has made significant progress in its restoration efforts at sites such as Fernald and Rocky Flats. However, remaining sites, such as Savannah River Site, Oak Ridge Site, Hanford Site, Los Alamos, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant, and West Valley Demonstration Project possess the most complex challenges ever encountered by the technical community and represent a challenge that will face DOE for the next decade. Closure of the remaining 18 sites in the DOE EM Program requires remediation of 75 million cubic yards of contaminated soil and 1.7 trillion gallons of contaminated groundwater, deactivation and decommissioning (D and D) of over 3000 contaminated facilities and thousands of miles of contaminated piping, removal and disposition of millions of cubic yards of legacy materials, treatment of millions of gallons of high level tank waste and disposition of hundreds of contaminated tanks. The financial obligation required to remediate this volume of contaminated environment is estimated to cost more than 7% of the to-go life-cycle cost. Critical in meeting this goal within the current life-cycle cost projections is defining technically achievable end states that formally acknowledge that remedial goals will not be achieved for a long time and that residual contamination will be managed in the interim in ways that are protective of human health and environment. Formally acknowledging the long timeframe needed for remediation can be a basis for establishing common expectations for remedy performance, thereby minimizing the risk of re-evaluating the selected remedy at a later time. Once the expectations for long-term management are in place, remedial efforts can be directed towards near-term objectives (e.g., reducing the risk of exposure to residual contamination) instead of focusing on long-term cleanup requirements. An acknowledgement of the long timeframe for complete restoration and the need for long-term management can also help a site transition from the process of pilot testing different remedial strategies to selecting a final remedy and establishing a long-term management and monitoring approach. This approach has led to cost savings and the more efficient use of resources across the Department of Defense complex and at numerous industrial sites across the U.S. Defensible end states provide numerous benefits for the DOE environmental remediation programs including cost-effective, sustainable long-term monitoring strategies, remediation and site transition decision support, and long-term management of closure sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chernobyl NPP: Completion of LRW Treatment Plant and LRW Management on Site - 12568

Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m3 of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010 SIA RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWS tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. Currently, the LRTP is getting ready to perform the following activities: 1. retrieval of waste from tanks stored at ChNPP LWS using waste retrieval system with existing equipment involved; 2. transfer of retrieved waste into LRTP reception tanks with partial use of existing transfer pipelines; 3. laboratory chemical and radiochemical analysis of reception tanks contest to define the full spectrum of characteristics before processing, to acknowledge the necessity of preliminary processing and to select end product recipe; 4. preliminary processing of the waste to meet the requirements for further stages of the process; 5. shrinkage (concentrating) of preliminary processed waste; 6. solidification of preliminary processed waste with concrete to make a solid-state (end product) and load of concrete compound into 200-l drums; 7. curing of end product drums in LRTP curing hall; 8. radiologic monitoring of end product drums and their loading into special overpacks; 9. overpack radiological monitoring; 10. send for disposal (ICSRM Lot 3); The current technical decisions allow to control and return to ChNPP of process media and supporting systems outputs until they satisfy the following quality norms: salt content: < 100 g/l; pH: 1 - 11; anionic surface-active agent: < 25 mg/l; oil dissipated in the liquid: < 2 mg/l; overall gamma-activity: < 3,7 x10{sup 5} Bq/l. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bi-Modal Model for Neutron Emissions from PuO{sub 2} and MOX Holdup

The measurement of uranium and plutonium holdup in plants during process activity and for decommissioning is important for nuclear safeguards and material control. The amount of plutonium and uranium holdup in glove-boxes, pipes, ducts, and other containers has been measured for several decades using both neutron and gamma-ray techniques. For the larger containers such as hot cells and glove-boxes that contain processing equipment, the gamma-ray techniques are limited by self-shielding in the sample as well as gamma absorption in the equipment and associated shielding. The neutron emission is more penetrating and has been used extensively to measure the holdup for the large facilities such as the MOX processing and fabrication facilities in Japan and Europe. In some case the totals neutron emission rates are used to determine the holdup mass and in other cases the coincidence rates are used such as at the PFPF MOX fabrication plant in Japan. The neutron emission from plutonium and MOX has 3 primary source terms: 1) Spontaneous fission (SF) from the plutonium isotopes, 2) The (α,n) reactions from the plutonium alpha particle emission reacting with the oxygen and other impurities, and 3) Neutron multiplication (M) in the plutonium and uranium as a result of neutrons created by the first two sources. The spontaneous fission yield per gram is independent of thickness, whereas, the above sources 2) and 3) are very dependent on the thickness of the deposit. As the effective thickness of the deposit becomes thin relative to the alpha particle range, the (α,n) reactions and neutrons from multiplication (M) approach zero. In any glove-box, there will always be two primary modes of holdup accumulation, namely direct powder contact and non-contact by air dispersal. These regimes correspond to surfaces in the glove-box that have come into direct contact with the process MOX powder versus surface areas that have not had direct contact with the powder. The air dispersal of PuO{sub 2} particles has been studied for several decades by health physicists, because the primary health hazard of plutonium is breathing the airborne particles. The air dispersal mechanism results from the smaller particles in the top layer of powder that are lifted into the air by the electrostatic charge buildup from the alpha decay process, and the air convection carries the particles to new more distant locations. If there is open plutonium powder in a glove-box, the surfaces at more distant locations will become contaminated over time. The range of an alpha particle in a solid or powder is a function of the particle energy, the material density, and the atomic number A of the material. The average energy of a plutonium alpha particle is ∼5.2 MeV and the range in air is ∼37 mm. The range in other materials can be estimated via the Bragg-Kleenman equation. For plutonium, A is 94, and the typical density for a single particle is ∼11.5 g/cm{sup 3}, but for a powder, the density would be less because of the air packing fraction. The significance of the small diameter is that the range of the alpha particle is ∼50 μm for powder density 2.5 and significantly less for a single particle with density 11.5, so the thin deposit of separate small particles will have a greatly reduced (α,n) yield. The average alpha transit length to the surface in the isolated MOX particle would be < 2.5 μm; whereas, the range of the alpha particle is much longer. Thus, most of the alpha particles would escape from the MOX particle and be absorbed by the walls and air. The air dispersal particles will have access to a large surface area that includes the walls, whereas, the powder contact surface area will be orders of magnitude smaller. Thus, the vast majority of the glove-box surface area does not produce the full (α,n) reaction neutron yield, even from the O{sub 2} in the PuO{sub 2} as well as any impurity contamination such as H{sub 2}O. To obtain a more quantitative estimate of the neutron (α,n) yields as a function of holdup deposit thickness, we have used MCNPX calculations to estimate the absorption of alpha particles in PuO{sub 2} holdup deposits. The powder thickness was varied from 0.1 μm to 5000 μm and the alpha particle escape probability was calculated. As would be expected, as the thickness approaches zero, the escape probability approaches 1.0, and as the thickness gets much greater than the alpha particle range (∼50 μm), the escape probability becomes small. Typically, the neutron holdup calibration measurement are performed using sealed containers of thick MOX that has all 3 sources of neutrons [SF, (α,n), and M], and no significant impurities. Thus, the calibration counting rates need to include corrections for M and (α,n) yields that are different for the holdup compared with the calibration samples. If totals neutron counting is used for the holdup measurements, the variability of the (α,n) term needs to be considered.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Novel HPGe Probe solution for Harsh Environments

In situ measurement is a privileged way of monitoring radioactive contamination compared to analyzing samples in a distant, specialized laboratory. Scintillators based spectrometers offer small footprints and are easy to easy to use, however they do not provide an accurate nuclide identification capability and activities measurement because notably of their limited energy resolution, for instance when low minimum detectable activity (MDA) are required, or in complex mixture of sources. On the other hand, High Purity Germanium (HPGe) detectors provide unmatched nuclide identification capability with the lowest MDA but they are not always of practical use on the field because the crystal needs to be cooled down to liquid nitrogen temperature, increasing the overall weight, bulkiness and complexity of the measurement. This paper presents the configuration and performance of a novel turnkey and compact HPGe solution developed by Canberra for radionuclide identification under harsh environments. Radio-contaminations surveys now can be undertaken outdoor under various weather conditions, in contaminated areas, underground or underwater locations (including under sea water), with fast on site deployment. The spectrometer is also designed in a small diameter tubular shape to offer minimal footprint for an operation in narrow and confined spaces. Besides, this innovative design does not mitigate the performances nor the reliability experienced with standard laboratory-grade HPGe spectrometers. This achievement relies on advanced technologies such as the encapsulation of the crystal in ultra-high vacuum (UHV) which provides higher robustness and does not requires thermal cycles faced with regular HPGe equipment. It also relies on a low vibration, low consumption electrical cooler so that no liquid nitrogen is being used. The detector is connected to a state-of-the-art digital spectroscopy suite embedded in an autonomous acquisition station monitoring the cryo-cooler and including the spectroscopy software. This system presented is therefore a new solution to perform high resolution spectroscopy where no current products are compact or robust enough to be installed, for instance for soil and water decontamination measurement when anthropogenic radioactive sources must be identified from natural ones or when low contamination levels are expected, the MDA being 3 to 5 times higher than scintillator-based detectors of similar sizes. Environmental inspection such as well logging for geophysics and mining, water contamination monitoring, or decommissioning works can thus benefits from both ruggedness, mobility without compromise on the nuclide identification or activity measurement capability. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Characterizations of the radioactive waste by the remotely-controlled collimated spectrometric system

Decontamination and decommissioning of the research reactors MR (Testing Reactor) and RFT (Reactor of Physics and Technology) has recently been initiated in the National Research Center (NRC) 'Kurchatov institute', Moscow. In the building, neighboring to the reactor, the storage of HLRW is located. The storage is made of monolithic concrete in which steel cells depth 4 m are located. In cells of storage the HLRW packed into cases are placed. These the radioactive waste are also subject to export on long storage in the specialized organization. For characterization of the radioactive waste in cases the remote-controlled collimated spectrometer system was used. The system consists of a spectrometric collimated gamma-ray detector, a color video camera and a control unit, mounted on a rotator, which are mounted on a tripod with the host computer. For determination of specific activity of radionuclides in cases, it is developed programs of calculation of coefficients of proportionality of specific activity to the corresponding speeds of the account in peaks of full absorption at single specific activity of radionuclides in cases. For determination of these coefficients the mathematical model of spectrometer system based on the Monte-Carlo method was used. Dependences of calibration coefficients for various radionuclides from distance between the detector and a case at various values of the radioactive waste density in cases are given. Measurements of specific activity in cases are taken and are discussed. By results of measurements decisions on the appeal of the radioactive waste being in cases are made. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Going for complete defueling - A comprehensive solution for damaged spent fuel

The complete defueling of a NPP is a prerequisite for decommissioning and dismantling. In particular the defueling of damaged spent fuel and the following dry storage remains a challenge. It is the aim of the Quiver project to develop a one-fits-it-all solution for all different kinds of damaged spent fuel and to develop in addition comprehensive handling equipment to ensure a thoroughly dispatch of the damaged spent fuel inside the Quiver. As a comprehensive solution, GNS developed a Quiver System which complies with the requirements of the transport and storage cask CASTOR V. This paper details, first, the loading of damaged fuel rods into the Quivers including the necessary equipment, secondly, the dispatch of the Quivers including an illustration of the required equipment and facilities, and thirdly, the loading and dispatch of Quivers in the CASTOR V casks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NitroJet's Basic Characteristics and Decontamination Performance for Concrete Scabbling - 17025

The nuclear decontamination and decommissioning (D and D) market is much growing all over the world. Especially many Japanese NPPs are determined to be shut down. Then, IHI Corporation (hereinafter, IHI) have NitroJet{sup R} technology to scabble concrete, remove paint, and cut metals by spraying liquid nitrogen to be applied to such D and D operations. As spoken at WM2016, NitroJet{sup R}'s decontamination performance for painted metal plate was verified quite high. Then, IHI tried verifying NitroJet{sup R}'s basic characteristics to scabble bare and painted concrete, and its decontamination performance by comparing water jet. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Does the Perfect Waste Package Exist? Development of a Decisional Tool Addressing this Challenge - 17053

The definition of a safe, technically, economically and societally acceptable waste management strategy is highly dependent on the Waste Acceptance Criteria in each country and on the already available disposal routes. It is the reason why there is not a single solution but a combination of optimized solutions depending on the type of waste and on each country's considerations. In fact, when operating a nuclear plant or performing its decommissioning or legacy waste management, one has to consider a large waste diversity in term of natures, types, volumes and radioactivity spectra. All nuclear operators have to take-up the challenge of implementing solutions for conditioning its waste in packages suitable for transport short to long term interim storage and final disposal of it (or prepare for final disposal if the repository is not yet available). Operators have then to answer the following dilemma: either define a complete strategy packaging the waste for final disposal, or 'containerising' it temporarily, pending final disposal. The strategy is highly country dependent; in the first case, one has to take into account the available information and future orientations relative to acceptability of the packages in order to define a robust solution. The approach implemented in France requires a close dialogue between the Operators, the Safety Authority, the Administration and the stakeholders. Moreover it pushes forward whenever possible standardization, contributing to cost minimization. If the second approach has the advantage of leaving the options open, and reducing the initial investments, it inevitably requires future retrieval and re-packaging with potential evolutions/degradation of the initial waste form. It also induces the potential risk to produce additional secondary waste. As an additional drawback, it introduces uncertainties and unknowns related to the future waste management criteria and to the costs. The general idea is that, depending on context, a given route (i.e., treatment, conditioning, and transport), could be considered as efficient or not. Assessing a waste package is certainly highly context dependent. However it should be possible to recognize and to lead an evaluation based on a number of fixed criteria, whatever the context, to be addressed when assessing the development of a final waste package in connection to the overall management route. A waste package is always a combination of a waste container and a waste form and will have to be transported one day from the production site to the final repository or to off-site interim storage facilities. AREVA's approach consists in defining an evaluation grid based on a set of criteria which aim (i) to evaluate whether the different waste treatments, conditionings, transport and packages deserve to be considered within different national contexts, and (ii) to evaluate R and D actions to be performed for improving existing solutions or developing new ones. One of the key lessons to be drawn from AREVA's experience in developing waste packages is that the perfect waste doesn't exist even though the vitrified canister is probably the most efficient one. The performance of a package resulting from a compromise depends on context and is a strength combination between the waste container and the waste form. The approach is to evaluate a waste package development against different set of criteria and to draw optimization diagrams. In such diagram, a given waste package is assessed with respect to selected criteria such as waste form and waste container, stability, level of waste incorporation, integrity lifetime, secondary waste generation, transport, long term behavior, and economical effectiveness, etc. Addressing a waste form is a very key point. This evaluation grid and comparative approach will be presented through examples and comparison providing from AREVA feedback on waste package development related to complex waste management such as problematic waste or legacy waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Minimization of HyBRID Decontamination Process - 17060

The Korea Atomic Energy Research Institute (KAERI) developed a Hydrazine base reductive metal ion decontamination (HyBRID) and related pre-oxidation techniques for use in decommissioning a nuclear facility. Inorganic chemicals were used to increase the integrity of the radioactive waste in a repository. Decomposition and precipitation of residual reagents with inorganic chemicals were introduced to minimize the final waste volume. The waste volume was calculated theoretically and demonstrated in a small-scale waste treatment system and bench-scale candle filtration system. The total waste volume of the HyBRID process was less than 1/10 of that of commercial processes, and spent ion-exchange resins were significantly reduced to 5% of that of commercial processes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in the UK Generic Design Assessment Process - 17062

In the UK, Generic Design Assessment (GDA) is a voluntary step-wise joint assessment process undertaken by the Office for Nuclear Regulation (ONR) and the Environment Agency (EA) of a generic reactor design. The process focuses purely on the reactor design and does not consider any site specific issues. The key objective of GDA is for the regulators to consider the adequacy of claims, arguments and evidence (CAE) put forward by a requesting party (RP) to demonstrate the safety of its design in the UK context. This includes all CAE relating to management of spent fuel and radioactive waste. The CAE are generally applied to a reference design put forward by the RP that is substantially complete in terms of the overall concepts and functions of the major systems, having already been deployed elsewhere. GDA assessment encompasses a broad range of topic areas which include fuel and core design, management of spent fuel, radioactive waste management and decommissioning. Other technical disciplines also have valid interests in particular aspects of the management of spent fuel. This paper summarises the UK GDA process and the types of issues raised; in particular aspects of the proposed operation of liquid waste management systems and Spent Fuel Interim Storage are presented and the instructive resolution of the RP's original limited design scope to allow the regulators to carry out a meaningful assessment. Some examples are presented and useful lessons learned for future GDAs are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Diamond dose rate detector testing at KURRI- A joint UK-Japan research project - 17126

Measurements of radiation dose rates in highly active environments, such as nuclear plant decommissioning or following a nuclear disaster, is challenging due to the extreme environments encountered and restricted access. Therefore, novel radiation detector technology is required to address these challenges. One such example of a radiation detection material is diamond, as it is able to withstand and measure high radiation intensities, is chemically inert and formable into extremely small, sensitive detectors. These detectors generate small currents when exposed to radiation, and if the radiation levels are high enough this can be measured. Testing of such detectors is not possible in routine laboratories due to the requirement to have high active radiation sources. However, through a new collaboration formed through the University of Bristol- Kyoto University bilateral symposia such facilities are accessible for UK researchers at Kyoto University Research Reactor Institute. This paper presents an overview of the collaborative research project, the accessible facilities for device manufacture and testing and some early results from radiation testing of diamond detectors at KURRI. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Mitigation of Radioactive Waste by Sampling and Analyzing the Affected Area and Efficient Use of Different Detectors - 17139

The paper describes the ways by which the mitigation of the radioactive waste during events like decommissioning of nuclear plants, mines, other nuclear-related facilities and also in event of nuclear disaster is done, so that the rehabilitation process for flora and fauna can begin in a natural manner. There are many parameters that have to be kept in mind during the planning stage of environmental remediation (ER), as there are many hindrances and snags that might occur during environmental remediation and rescue operation. The paper describes the problems faced during ER operations in the developing countries and needs of international committees. The paper emphasizes proper site characterization and suggestions for it, and suggests simultaneous detection of various activity of radionuclides dispersed and the need for proper knowledge and handling in ER operations. It describes how the radioactivity can be an interference in detection and the importance of low-level activity. The paper describes why site characterization should be quick and prior to other important key points during rescue operations. Also, it gives a description of various detectors used widely and their related significance in ER. The paper describes the strategy on how after site surveying the input can be used to map an area, as to provide easy operation and working conditions for personnel, and how it can be helpful in the evaluation of other parameters. The paper also gives suggestions on the use of bio-indicators in above described events and their benefits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TN{sup R} MW- Multi Waste Package 'All In One Solution' For Conditioning - Transport - Storage - Up To Final Disposal - 17196

For the management of radioactive waste, either during nuclear facility operation or decommissioning, one must consider a diverse array of nuclear waste forms of various types, volumes and activities. Examples are: activated metallic waste; legacy waste; sludge; resins; and orphan waste. Customers are frequently faced with the obligation of undertaking multiple, costly waste management operations. These operations activities include handling, reconditioning or material transfers between packages, as in the case when moving material from on-site storage to transportation, and then from transportation to final disposal. To address this issue, a new - highly flexible up to reversible - cask system, the TN{sup R} MW, is being developed as an 'All in One Solution'. TN{sup R} MW has a total weight of 10 metric tons and is compliant with the 2012 International Atomic Energy Agency (IAEA) regulations. It was developed to provide flexibility and designed with the capability to be adaptable to the various needs of the nuclear industry. From IP-2 and Type A containers to Type B(U) and B(U)F casks, this cask offers different options to sufficiently address the requirements of each step of the waste stream from on-site and international transport to long-term interim storage and final disposal. Licensing and manufacturing of a number of packagings in this TN{sup R} MW family are underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The new CASTOR{sup R} geo - A Comprehensive Solution for Transport and Storage of Spent Nuclear Fuel, MOX and Damaged Fuel - 17202

Dry interim storage has become a common solution for the disposal of spent fuel in recent years. However, in particular the complete defueling of NPP prior to decommissioning and dismantling will dramatically increase the demand worldwide especially for non-standard fuel. Here we present the new dry storage system by GNS for international markets with its capability to also store MOX and damaged spent fuel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Is the 80 - 20 Principle a Friend or a Foe? Critical Remarks on the Dominant Flat Gradient - 17206

The well-known 80 - 20 principle, also known as the Pareto principle, describes the fact that usually 80 % of the result is achieved by 20 % of the effort, because many probability distributions are caused by a power-law. This principle is valued in the realm of project management and management in general because of the fast progress which generally takes place in the first fifth of the process. If the final result is not exactly specified or resources are spent wisely, 100 % of the planned result will be reached easily. However, in nuclear business safety is a principal parameter. Therefore precision is inevitable. In long-lasting projects the bad end of the Pareto-distribution is dominant: The very shallowly-inclined gradient at the end of the graph means that results at that point come at a very high effort and cost. The graph reaches the 100% only asymptomatically, meaning the initially projected results are never met. Especially if in earlier project phases the Pareto principle is applied very successfully, a lot of work is transferred to the future. For example, in decommissioning projects the waste often is badly characterized causing an enormous effort in the process of characterization and qualification. Especially if funding or time are limited, it is important to be aware of the asymmetric distribution of applied work and result. The 80 - 20 principle is a great advantage, if you start a project and respect the asymmetric distribution of applied resources and results in your project plan. Especially in long-lasting projects with changing perspectives, this asymmetric distribution may cause massive delays and expansion of costs, because small changes near the end cause large/big effort due to consequences on the existing data. If the proper goal of a project is not entirely known in the beginning, it is very probable that the last 5 - 10 % of the result will cause major financial threat and extensions of the estimated time frame. If funding or time are limited, it is almost impossible to readjust a project in the estimated frame of resources. In this case a complete restart of the project may be more reasonable than a long-lasting change management with uncertain results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ecological Resource Value, Remediation Options, and Impacts: Functional Remediation at Hanford Site - 17226

Governmental agencies, Tribes, regulators, resource trustees and other stakeholders are interested in understanding the risk to the environment from remediation and restoration, particularly at large DOE sites with complex remediation tasks lasting decades. While each remediation project has the usual environmental impact assessment that include risk to eco-receptors, a piece-meal approach to examining the effect of remediation does not provide an overview of remaining tasks that would aid in sequencing these tasks. The Consortium for Risk Evaluation with Stakeholder Participation (CRESP) developed a risk methodology for Hanford Site that included ecological resources between 2014 and 2015. The ecological methodology included a comparison of the value of on-site resources with the eco-region, with state and federal threatened and endangered species, and with rare and unique habitats. Potential remediation options for particular evaluation units were used in conjunction with the resource level values to determine the risk of remediation of ecological resources. The methodology developed for Hanford Site also considered functional remediation (e.g. number of trucks, personnel, heavy equipment), initiating events (e.g. earthquakes, volcanos) and future land use. These factors were combined to rate the risk to ecological resources on a scale of not-discernible to very high. In this paper seven evaluation units (waste sites requiring remediation) were evaluated to explore the efficacy of the methodology to provide useful information on the comparative risk for decommissioning and waste management sites. The evaluation of resource levels was based on prior site information, state and federal data bases, and field investigations. The final determination of a risk rating for each evaluation unit depended upon both quantitative data, field experience, and professional judgement. It provides a method that can be applied to many remediation sites within a large DOE facility such as Hanford, as well as across the DOE complex. This will provide information for sound decision-making with stakeholder participation, and will allow DOE to reassure stakeholders that they are protecting human and ecological health on the Hanford Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Robotics Technology to D and D - 17249

The Knowledge Management Information Tool (KM-IT) is a web-based system developed to maintain and preserve the deactivation and decommissioning (D and D) knowledge base across the Department of Energy (DOE) complex. The system was developed by the Applied Research Center (ARC) at Florida International University (FIU) with the support of the D and D community, including the DOE Office of Environmental Management (DOE EM), and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. As part of the D and D KM-IT, FIU has developed a robotics database in collaboration with DOE EM and Nuvision/Cogentus which currently contains over 500 robotics technologies along with information about the robotics technology vendors. This information is aggregated in real time and presented as a robotics technology fact sheet to the end user based on the selected technology. FIU is researching these technologies and studying their capabilities and application to D and D. As part of the research, FIU is categorizing each technology into specific application areas: characterization, decontamination, inspection, and demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗