Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

The role of metrics and measurements in a software intensive total quality management environment

Paramax Space Systems began its mission as a member of the Rockwell Space Operations Company (RSOC) team which was the successful bidder on a massive operations consolidation contract for the Mission Operations Directorate (MOD) at JSC. The contract awarded to the team was the Space Transportation System Operations Contract (STSOC). Our initial challenge was to accept responsibility for a very large, highly complex and fragmented collection of software from eleven different contractors and transform it into a coherent, operational baseline. Concurrently, we had to integrate a diverse group of people from eleven different companies into a single, cohesive team. Paramax executives recognized the absolute necessity to develop a business culture based on the concept of employee involvement to execute and improve the complex process of our new environment. Our executives clearly understood that management needed to set the example and lead the way to quality improvement. The total quality management policy and the metrics used in this endeavor are presented.

Daniels, Charles B.↗

Observations of optical counterparts of Gamma-Ray bursts

This is a final report for a contract begun in Dec. 1987 and ended in Mar. 1989 to use the existing Lincoln Laboratory Experimental Test Site in Socorro, NM to search for optical counterparts to gamma-ray bursts. The objective was to develop an autonomous staring system to search for stationary, transient optical flashes. The search was to use an existing 31-inch telescope equipped with a sensitive video detector. The approach for the search was to develop real-time processing software to monitor the video signal from the detector and to record any transient, point-like flashes that occurred in the field of view. The system would have been able to detect fainter flashes (B is approximately 15(sup m) in 1/30 s, delta(m(sub v)) = 0.25(sup m)) than other systems but lacked a large field of view (only 1.2 deg diameter) necessary to give a high probability of detecting a random flash on the sky. As such, the plan was to monitor known gamma-ray burst error boxes and wait for a repetition of an earlier event. The high payoff of good sensitivity with high angular resolution (1 pixel = 10sec) and good time resolution (30 s) to allow post-burst searches warranted funding if the cost was not prohibitive. The contract began in the middle of the three-year cycle for High Energy Astrophysics Gamma-Ray Astronomy Research and Analysis Program. This final report briefly describes the portion of the plan completed under the original contract.

Knight, Frederick K.↗

Development of a naming convention and data ma nagement system

This contract covered work in data management, acquisition, and analysis for the Earth Science and Applications Division (ESAD) of the Space Science Laboratory of MSFC. Under this contract, a naming convention and data management system were developed for ESAD data sets, data visualization, and standard data format issues were investigated, and specific data analysis and management needs were addressed for several ESAD projects and data sets. In the following sections, details of the research performed over the duration of this contract are summarized.

Mcnider, Richard T.↗

NASA procurement report, FY 1993

Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

Source record↗

Summary data on all NASA procurement actions

This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

Source record↗

Analysis and effects of the advanced solid rocket motor on the Space Shuttle elements

This interim final report summarizes the activities and major accomplishments under NASA/MSFC Contract NAS8-39235 for the initial two year contractual effort beginning October 1, 1991, and ending September 30, 1993. It is not intended as an exhaustive treatment or review of any particular technical issue which was addressed during this two-year period, but does provide an overview of the many induced environment studies and test support activities undertaken by REMTECH and its subcontractors during this two-year period. The initial scope of work has been pursued vigorously through this two-year period by separating the effort into five functional areas. The five functional areas are ascent plume radiation, ascent plume convection, ascent aerodynamic heating, launch stand environments, and reentry heating. A work breakdown structure (WBS) for each functional area was devised to permit nearly autonomous activities within each functional responsibility while maintaining commonality in reporting procedures and cost accounting. The contract was modified 11 times to provide incremental funding and to expand the scope of work. Additional work breakdown structure was incorporated to meet the expanded scope. A contract chronology is provided in Section 2. The initial scope of work, expanded scope, and corresponding WBS designation are described in Section 3. A summary review of major accomplishments is also provided in Section 4 to show the breadth of activities and extent of reporting. Reports, meetings, test activities, and other accomplishments within each functional area are also summarized by WBS heading in the appendices.

Source record↗

Eccentric exercise testing and training

Some researchers and practitioners have touted the benefits of including eccentric exercise in strength training programs. However, others have challenged its use because they believe that eccentric actions are dangerous and lead to injuries. Much of the controversy may be based on a lack of understanding of the physiology of eccentric actions. This review will present data concerning eccentric exercise in strength training, the physiological characteristics of eccentric exercise, and the possible stimulus for strength development. Also a discussion of strength needs for extended exposure to microgravity will be presented. Not only is the use of eccentric exercise controversial, but the name itself is fraught with problems. The correct pronunciation is with a hard 'c' so that the word sounds like ekscentric. The confusion in pronunciation may have been prevented if the spelling that Asmussen used in 1953, excentric, had been adopted. Another problem concerns the expressions used to describe eccentric exercise. Commonly used expressions are negatives, eccentric contractions, lengthening contractions, resisted muscle lengthenings, muscle lengthening actions, and eccentric actions. Some of these terms are cumbersome (i.e., resisted muscle lengthenings), one is slang (negatives), and another is an oxymoron (lengthening contractions). Only eccentric action is appropriate and adoption of this term has been recommended by Cavanagh. Despite the controversy that surrounds eccentric exercise, it is important to note that these types of actions play an integral role in normal daily activities. Eccentric actions are used during most forms of movement, for example, in walking when the foot touches the ground and the center of mass is decelerated and in lowering objects, such as placing a bag of groceries in the car.

Clarkson, Priscilla M.↗

Cardiac output and cardiac contractility by impedance cardiography during exercise of runners

Most of the solid state electronic engineering of the system now generally known as the Minnesota Impedance Cardiograph was performed with the support of a five-year contract, NAS9-4500, with the NASA Lyndon B. Johnson Space Center, Houston, Texas. This contract ran from 1965 to 1970. In addition to the engineering design and development of the hardware, the contract called for testing on both animals and human subjects. This project also provided funds to construct twenty impedance cardiographs and place them in selected research and clinical facilities for further evaluation. This, then, led to the First Symposium on Impedance Cardiography, held at the NASA Lyndon B. Johnson Space Center, Houston, Texas, 2-4 June 1969. Twenty-four excellent papers were presented.

Kubicek, W. G.↗

The value of electrical stimulation as an exercise training modality

Voluntary exercise is the traditional way of improving performance of the human body in both the healthy and unhealthy states. Physiological responses to voluntary exercise are well documented. It benefits the functions of bone, joints, connective tissue, and muscle. In recent years, research has shown that neuromuscular electrical stimulation (NMES) simulates voluntary exercise in many ways. Generically, NMES can perform three major functions: suppression of pain, improve healing of soft tissues, and produce muscle contractions. Low frequency NMES may gate or disrupt the sensory input to the central nervous system which results in masking or control of pain. At the same time NMES may contribute to the activation of endorphins, serotonin, vasoactive intestinal polypeptides, and ACTH which control pain and may even cause improved athletic performances. Soft tissue conditions such as wounds and inflammations have responded very favorably to NMES. NMES of various amplitudes can induce muscle contractions ranging from weak to intense levels. NMES seems to have made its greatest gains in rehabilitation where directed muscle contractions may improve joint ranges of motion correct joint contractures that result from shortening muscles; control abnormal movements through facilitating recruitment or excitation into the alpha motoneuron in orthopedically, neurologically, or healthy subjects with intense sensory, kinesthetic, and proprioceptive information; provide a conservative approach to management of spasticity in neurological patients; by stimulation of the antagonist muscle to a spastic muscle stimulation of the agonist muscle, and sensory habituation; serve as an orthotic substitute to conventional bracing used with stroke patients in lieu of dorsiflexor muscles in preventing step page gait and for shoulder muscles to maintain glenohumeral alignment to prevent subluxation; and of course NMES is used in maintaining or improving the performance or torque producing capability of muscle. NMES in exercise training is our major concern.

Currier, Dean P.↗

Analysis of EDP performance

The objective of this contract was the investigation of the potential performance gains that would result from an upgrade of the Space Station Freedom (SSF) Data Management System (DMS) Embedded Data Processor (EDP) '386' design with the Intel Pentium (registered trade-mark of Intel Corp.) '586' microprocessor. The Pentium ('586') is the latest member of the industry standard Intel X86 family of CISC (Complex Instruction Set Computer) microprocessors. This contract was scheduled to run in parallel with an internal IBM Federal Systems Company (FSC) Internal Research and Development (IR&D) task that had the goal to generate a baseline flight design for an upgraded EDP using the Pentium. This final report summarizes the activities performed in support of Contract NAS2-13758. Our plan was to baseline performance analyses and measurements on the latest state-of-the-art commercially available Pentium processor, representative of the proposed space station design, and then phase to an IBM capital funded breadboard version of the flight design (if available from IR&D and Space Station work) for additional evaluation of results. Unfortunately, the phase-over to the flight design breadboard did not take place, since the IBM Data Management System (DMS) for the Space Station Freedom was terminated by NASA before the referenced capital funded EDP breadboard could be completed. The baseline performance analyses and measurements, however, were successfully completed, as planned, on the commercial Pentium hardware. The results of those analyses, evaluations, and measurements are presented in this final report.

Source record↗

Definition of ground test for verification of large space structure control

Under this contract, the Large Space Structure Ground Test Verification (LSSGTV) Facility at the George C. Marshall Space Flight Center (MSFC) was developed. Planning in coordination with NASA was finalized and implemented. The contract was modified and extended with several increments of funding to procure additional hardware and to continue support for the LSSGTV facility. Additional tasks were defined for the performance of studies in the dynamics, control and simulation of tethered satellites. When the LSSGTV facility development task was completed, support and enhancement activities were funded through a new competitive contract won by LCD. All work related to LSSGTV performed under NAS8-35835 has been completed and documented. No further discussion of these activities will appear in this report. This report summarizes the tether dynamics and control studies performed.

Glaese, John R.↗

SPARTAN high resolution solar studies

This report summarizes the work performed on Contract NAS5-29739, a sub-orbital research program directed toward the study of the geometry of and physical conditions in matter found in the upper layers of the solar atmosphere. The report describes a new sounding rocket payload developed under the contract, presents a guide to the contents of semiannual reports submitted during the contract, discusses the results of the first flight of the payload and the progress on scientific analysis. A bibliography of papers and publications is included.

Bruner, Marilyn E.↗

Origins of energetic ions in the Earth's magnetosheath

This final report describes activities under NASA contract NAS5-31213 to Lockheed Missiles and Space Company. The report covers the entire contract period from 8 May 1991 to 7 Jun. 1994. This is a contract under the NASA Guest Investigator Program for the analysis and interpretation of the combined scientific data from the Hot Plasma Composition Experiment (HPCE) and the Charge Energy Mass (CHEM) spectrometer on the AMPTE/Charge Composition Explorer (CCE) spacecraft. These combined data sets have been used to survey the energetic ion environment in the earth's magnetosheath to determine the origins and relative strengths of the energetic ion populations found there.

Source record↗

Active weld control

Through the two phases of this contract, sensors for welding applications and parameter extraction algorithms have been developed. These sensors form the foundation of a weld control system which can provide action weld control through the monitoring of the weld pool and keyhole in a VPPA welding process. Systems of this type offer the potential of quality enhancement and cost reduction (minimization of rework on faulty welds) for high-integrity welding applications. Sensors for preweld and postweld inspection, weld pool monitoring, keyhole/weld wire entry monitoring, and seam tracking were developed. Algorithms for signal extraction were also developed and analyzed to determine their application to an adaptive weld control system. The following sections discuss findings for each of the three sensors developed under this contract: (1) weld profiling sensor; (2) weld pool sensor; and (3) stereo seam tracker/keyhole imaging sensor. Hardened versions of these sensors were designed and built under this contract. A control system, described later, was developed on a multiprocessing/multitasking operating system for maximum power and flexibility. Documentation for sensor mechanical and electrical design is also included as appendices in this report.

Powell, Bradley W.↗

Acquisition forecast: Fiscal year 1995

This volume includes projections of all anticipated FY95, and beyond, NASA contract actions above $25,000 that small and small disadvantaged businesses may be able to perform under direct contract with the government or as subcontractors. The forecast consolidates anticipated procurements at each NASA center into an agencywide report, with the aim of increasing industries' advance knowledge of NASA requirements and enhancing competition in contracting. Each center forecast report is divided into three principal categories of procurement: research and development, services, and supplies and equipment.

Source record↗

Special environmental control and life support equipment test analyses and hardware

This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.

Callahan, David M.↗

Mechanisms test bed math model modification and simulation support

This report summarizes the work performed under contract NAS8-38771 in support of the Marshall Space Flight Center Six Degree of Freedom Motion Facility and Flight Robotics Laboratory. The contract activities included the development of the two flexible body and Remote Manipulator System simulations, Dynamic Overhead Target Simulator control system and operating software, Global Positioning System simulation, and Manipulator Coupled Spacecraft Controls Testbed. Technical support was also provided for the Lightning Imaging Sensor and Solar X-Ray Imaging programs. The cover sheets and introductory sections for the documentation written under this contract are provided as an appendix.

Gilchrist, Andrea C.↗

Structural Damage Prediction and Analysis for Hypervelocity Impact

It is necessary to integrate a wide variety of technical disciplines to provide an analysis of structural damage to a spacecraft due to hypervelocity impact. There are many uncertainties, and more detailed investigation is warranted, in each technical discipline. However, a total picture of the debris and meteoroid hazard is required to support manned spaceflight in general, and the international Space Station in particular. In the performance of this contract, besides producing a handbook, research and development was conducted in several different areas. The contract was broken into six separate tasks. Each task objectives and accomplishments will be reviewed in the following sections. The Handbook and separate task reports are contained as attachments to the final report. The final section summarizes all of the recommendations coming out of this study. The analyses and comments are general design guidelines and not necessarily applicable to final Space Station designs since several configuration and detailed design changes were being made during the course of this contract. Rather, the analyses and comments may indicate either a point-in-time concept analysis, available test data, or desirable protection goals, not hindered by the design and operation constraints faced by Space Station designers.

Elfer, Norman↗