Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contamination Control Process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614

By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM's primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE 'full administrative jurisdiction' and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites' radiological safety and long-term public and environmental protection. This 'shared-jurisdiction approach' will meet LM's strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to 'manage and conserve the lands under the mandate of multiple-use and sustained yield'. In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets. The portions of the sites where LM will ask for full jurisdiction are those that contain the disposal cell and any adjacent lands and minerals required to maintain and protect it. It is anticipated that the shared jurisdiction portion of the withdrawal would largely coincide with land where known or projected contaminated groundwater from the past ore processing exists or will migrate over time. Examples of BLM-authorized activities on the shared jurisdiction portions of the withdrawals may include livestock grazing, wildlife habitat improvement projects, recreation, and rights of ways for roads, pipelines, utilities, and communication sites. In addition, BLM could authorize subsurface uses such as oil and gas, coal, or geothermal development or groundwater pumping from deeper aquifers if the proposal would not disturb groundwater contamination. For areas of the withdrawal where the agencies will share jurisdictional authority, DOE LM and BLM will develop an interagency agreement (IA) to define acceptable uses and associated roles and responsibilities. To ensure maximum protection of human health and the environment, each site's IA will include a provision allowing DOE LM the right of first refusal against any action it believes might affect radiological safety at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Molecular characterization of organic matter mobilized from Bangladeshi aquifer sediment: tracking carbon compositional change during microbial utilization

Bioavailable organic carbon in aquifer recharge waters and sediments can fuel microbial reactions with implications for groundwater quality. A previous incubation experiment showed that sedimentary organic carbon (SOC) mobilized off sandy sediment collected from an arsenic-contaminated and methanogenic aquifer in Bangladesh was bioavailable; it was transformed into methane. We used high-resolution mass spectrometry to molecularly characterize this mobilized SOC, reference its composition against dissolved organic carbon (DOC) in surface recharge water, track compositional changes during incubation, and advance understanding of microbial processing of organic carbon in anaerobic environments. Organic carbon mobilized off aquifer sediment was more diverse, proportionately larger, more aromatic, and more oxidized than DOC in surface recharge. Mobilized SOC was predominately composed of terrestrially derived organic matter and had characteristics signifying that it evaded microbial processing within the aquifer. Approximately 50?% of identified compounds in mobilized SOC and in DOC from surface recharge water contained sulfur. During incubation, after mobilized SOC was converted into methane, new organosulfur compounds with high S-to-C ratios and a high nominal oxidation state of carbon (NOSC) were detected. We reason that these detected compounds formed abiotically following microbial reduction of sulfate to sulfide, which could have occurred during incubation but was not directly measured or that they were microbially synthesized. Most notably, microbes transformed all carbon types during incubation, including those currently considered thermodynamically unviable for microbes to degrade in anaerobic conditions (i.e., those with a low NOSC). In anaerobic environments, energy yields from redox reactions are small and the amount of energy required to remove electrons from highly reduced carbon substrates during oxidation decreases the thermodynamic favorability of degrading compounds with a low NOSC. While all compound types were eventually degraded during incubation, NOSC and compound size controlled the rates of carbon transformation. Large, more thermodynamically favorable compounds (e.g., aromatics with a high NOSC) were targeted first, while small, less thermodynamically favorable compounds (e.g., alkanes and olefinics with a low NOSC) were used last. These results indicate that in anaerobic conditions, microbial communities are capable of degrading and mineralizing all forms of organic matter, converting larger energy-rich compounds into smaller energy-poor compounds. However, in an open system, where fresh carbon is continually supplied, the slower degradation rate of reduced carbon compounds would enable this portion of the organic carbon pool to build up, explaining the apparent persistence of compounds with a low NOSC in anaerobic environments.

Pracht, Lara↗

Design and Construction of the Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, Ohio - 16165

The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km{sup 2} (16 mi{sup 2}), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the 'Pit 3 Swale', an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014. Construction activities resumed in April 2015, with completion in November 2015. To date, this stabilization project has been successful. The regraded bank and streambed have remained stable, and no compromise to installed cross-vanes, the rock toe, or the soil encapsulated lifts has been observed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maneuver Design and Calibration for the Genesis Spacecraft

Genesis is the fifth mission selected as part of NASA's Discovery Program. The objective of Genesis is to collect solar wind samples for a period of approximately two years while in a halo orbit about the Earth-Sun L I point. At the end of this period, the samples are to be returned to a specific recovery point on the Earth for subsequent analysis. This goal has never been attempted before and presents a formidable challenge in terms of mission design and operations, particularly planning and execution of propulsive maneuvers. To achieve a level of cost-effectiveness consistent with a Discovery-class mission, the Genesis spacecraft design was adapted to the maximum extent possible from designs used on earlier missions, such as Mars Global Surveyor (MGS) and Stardust, another sample collection mission. The spacecraft design for Genesis is shown. Spin stabilization was chosen for attitude control, in lieu of three-axis stabilization, with neither reaction wheels nor accelerometers included. This precludes closed-loop control of propulsive maneuvers and implies that any attitude changes, including spin changes and precessions, will behave like translational propulsive maneuvers and affect the spacecraft trajectory. Moreover, to minimize contamination risk to the samples collected, all thrusters were placed on the side opposite the sample collection canister. The orientation and characteristics of thrusters are indicated. For large maneuvers (>2.5 m/s), two 5 lbf thrusters will be used for delta v, with precession to the burn attitude, followed by spin-up from 1.6 to 10 rpm before the burn and spin down to 1.6 rpm afterwards, then precession back to the original spin attitude. For small maneuvers (<2.5 m/s), no spin change is needed and four 0.2 lbf thrusters are used for Av. Single or double 360 deg. precession changes are required whenever the desired delta v falls inside the two-way turn circle (about 0.4 m/s) based on the mass properties, spin rate and lever arm lengths based on thruster locations. In such instances, delta v resulting from spacecraft precession cannot be used effectively as a component of the desired delta v, and must therefore be removed by precessing at least one complete revolution around the turn circle. To eliminate cross-track execution errors, a second revolution in the opposite direction would also be performed. This paper will address the design of propulsive maneuvers in light of the aforementioned challenges and other constraints. Maneuver design will be performed jointly by the Navigation Team at JPL and the Spacecraft Team at LMA, based on the process indicated . Typical maneuver timelines will be presented which address considerations introduced by attitude changes. These include nutation, which is introduced by precessing or spinning down and must be given sufficient time to damp out prior to execution of subsequent events, as well as sun and earth pointing constraints, which must be considered to ensure sufficient spacecraft power and to minimize telecommunications interruptions, respectively. The paper will include a description of how individual propulsive maneuvers are resolved into components to account for delta v from translational burns and spacecraft attitude changes required to carry out such maneuvers. Contributions to maneuver delta v arising from attitude changes, based on mass properties for the period just after launch, are indicated. Similar curves will be presented spanning all mission phases from launch through return. A set of closed-form equations for resolving maneuver components, base on a specific delta v required for correction or deterministic changes to the spacecraft trajectory will be presented, as well. In addition to nominal maneuvers, special calibration maneuvers are planned to improve open-loop modeling of maneuvers and to reduce execution errors. Uncalibrated execution errors are indicated. Such errors could be reduced by 50% or more over the course of the mission. Special calibrations are of particular importance for the return leg of the mission, since the sample canister must be returned to a specific location within the Utah Test and Training Range (UTTR) for mid-air retrieval. An entry angle tolerance of no less than +/- 0.08 deg. is required to achieve this objective. Biasing of the final return maneuvers coupled with a specific maneuver mode to use a series of well-characterized spin changes to effect these maneuvers is part of the current Genesis baseline mission plan. Another important objective of calibrations is to better characterize precession maneuvers. Such maneuvers are part of most propulsive maneuvers, but are also required periodically to maintain sun-pointing for power or daily during solar-wind pointing during collection periods. Although relatively small, such maneuvers will have a significant cumulative impact on orbit determination, particularly in the halo portion of the mission. The current mission design also calls for three stationkeeping maneuvers during each halo orbit of approximately six months duration. These stationkeeping maneuvers may be sufficiently small that single or double 360 deg. precession changes may be required. Because there are no accelerometers on board the spacecraft, calibration can only be performed with the aid of ground-based radiometric tracking. To establish a high degree of accuracy in characterizing the magnitude of burns, the spacecraft spin axis should be along the line of sight to the Earth, providing Doppler measurements with <1 mm/sec accuracy in S-Band. Emission constraints allow such alignment only during certain portions of the mission when the Earth-spacecraft-sun geometry is favorable. The impact of precessions, or burns at times when geometry is not favorable, can be assessed by reconstruction of the spacecraft trajectory using tracking arcs of several days before and after the event.

Williams, Kenneth E.↗

Comparison of Laboratory Analytical Methods for Uranium Analysis Superior Steel FUSRAP Site - 16606

The Superior Steel Site processed uranium metal in support of the Atomic Energy Commission's fuel-element development program in the 1950's, and was subsequently classified as a Formerly Utilized Sites Remedial Action Program (FUSRAP) Site. Previous investigations at the site identified uranium contamination both inside and outside the buildings associated with historic uranium metalworking activities. The U.S. Army Corps of Engineers (USACE) is currently engaged in the Remedial Investigation (RI) phase in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. As part of the RI, gamma spectroscopy analysis of environmental samples was performed on-site using a laboratory-grade, high-purity germanium (HPGe) spectrometer. The gamma spectroscopy analysis included isotopes of uranium and their progeny. As a quality assurance measure, a subset of samples already analyzed on-site were sent to a certified, commercial, off-site laboratory for analysis using a suite of analytical methods including gamma spectroscopy, alpha spectroscopy, and mass spectroscopy. As an element of the quality assurance program implemented for the RI, an assessment of the correlations between the various analytical methods employed by both the on-site and off-site laboratory was performed. This assessment revealed inconsistencies between on-site and off-site gamma spectroscopy analytical results, which raised concerns about the appropriateness and suitability of the analytical data. To resolve the data quality concerns and better understand the source(s) of analytical results variability, the Superior Steel RI team (USACE together with its contractor, Amec Foster Wheeler) developed a quality control test whose design objective was to control or practically eliminate sampling and sample preparation variability in order to focus more clearly on analytical variability. This paper discusses the results of this supplemental quality control test, showing the differences in the various analytical methods (both on-site and off-site). It demonstrates in a practical and real world setting how sample preparation and analytical variability, if not controlled and understood can impact data quality and data defensibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technetium Stabilization in Low-Solubility Sulfide Phases: A Review

We report that technetium contamination remains a major environmental problem at nuclear reprocessing sites, e.g., the Hanford Site, Washington, USA. At these sites, Tc is present in liquid waste destined for immobilization in a waste form or has been released into the subsurface environment. The high environmental risk associated with Tc is due to its long half-life (214 000 years) and the mobility of the oxidized anionic species Tc(VII)O 4 - . Under reducing conditions, TcO 4 - is readily reduced to Tc(IV), which commonly exists as a relatively insoluble and therefore immobile, hydrous Tc-oxide (TcO 2 · n H 2 O). The stability of Tc(IV) sequestered as solid phases depends on the solubility of the solid and susceptibility to reoxidation to TcO 4 - , which in turn depend on the (biogeo)chemical conditions of the environment and/or nuclear waste streams. Unfortunately, the solubility of crystalline TcO 2 or amorphous TcO 2 ·H 2 O is still above the maximum contaminant level (MCL) established by the U.S. EPA (900 pCi/L), and the kinetics of TcO 2 oxidative dissolution can be on the order of days to years. In addition to oxygen, sulfur can form complexes that significantly affect the adsorption, solubility, and reoxidation potential of Tc, especially Tc(IV). The principal technetium sulfides are TcS 2 and Tc 2 S 7 , but much less is known about the mechanisms of formation, stabilization, and reoxidation of Tc-sulfides. A common assumption is that sulfides are less soluble than their oxyhydrous counterparts. Determination of the molecular structure of Tc 2 S 7 in particular has been hampered by the propensity of this phase to precipitate as an amorphous substance. Recent work indicates that the oxidation state of Tc in Tc 2 S 7 is Tc(IV), in apparent contradiction to its nominal stoichiometry. Technetium is relatively immobile in reduced sediments and soils, but in many cases the exact sink for Tc has not been identified. Experiments and modeling have demonstrated that both abiotic and biologic mechanisms can exert strong controls on Tc mobility and that Tc binding or uptake into sulfide phases can occur. These and similar investigations also show that extended exposure to oxidizing conditions results in transformation of sulfide-stabilized Tc(IV) to a Tc(IV)O 2 -like phase without formation of measurable dissolved TcO 4 - , suggesting a solid-state transformation in which Tc(IV)-associated sulfide is preferentially oxidized before the Tc(IV) cation. This transformation of Tc(IV)-sulfides to Tc(IV)-oxides may be the main process that limits remobilization of Tc as Tc(VII)O 4 - . The efficacy of the final waste form to retain Tc also strongly depends on the ability of oxidizing species to enter the waste and convert Tc(IV) to Tc(VII). Finally, many waste form designs are reducing (e.g., cementitious waste forms such as salt stone) and, therefore, attempt to restrict access of oxidizing species such that diffusion is the rate-limiting step in remobilization of Tc.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The use of non-destructive passive neutron measurement methods in dismantling and radioactive waste characterization

The cleaning up and dismantling of nuclear facilities lead to a great volume of technological radioactive wastes which need to be characterized in order to be sent to the adequate final disposal or interim storage. The control and characterization can be performed with non-destructive nuclear measurements such as gamma-ray spectrometry. Passive neutron counting is an alternative when the alpha-gamma emitters cannot be detected due to the presence of a high gamma emission resulting from fission or activation products, or when the waste matrix is too absorbing for the gamma rays of interest (too dense and/or made of high atomic number elements). It can also be a complement to gamma-ray spectrometry when two measurement results must be confronted to improve the confidence in the activity assessment. Passive neutron assays involve the detection of spontaneous fission neutrons emitted by even nuclides ({sup 238}Pu, {sup 240}Pu, {sup 242}Pu, {sup 242}Cm, {sup 244}Cm...) and neutrons resulting from ({alpha}, n) reactions with light nuclides (O, F, Be...). The latter is conditioned by the presence of high {alpha}-activity radionuclides ({sup 234}U, {sup 238}Pu, {sup 240}Pu, {sup 241}Am...) and low-Z elements, which depends on the chemical form (metallic, oxide or fluorine) of the plutonium or uranium contaminant. This paper presents the recent application of passive neutron methods to the cleaning up of a nuclear facility located at CEA Cadarache (France), which concerns the Pu mass assessment of 2714 historic, 100 litre radioactive waste drums produced between 1980 and 1997. Another application is the dismantling and decommissioning of an uranium enrichment facility for military purposes, which involves the {sup 235}U and total uranium quantifications in about a thousand, large compressors employed in the gaseous diffusion enrichment process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benefits of digitalizing and employing simulation to increase plant system performance and ensure compliance with technical specifications - 109

The essential services water system in a BWR nuclear power plant was affected by corrosion, soiling and blockages due to ageing. Those episodes affected safety margins hindering the Technical Specifications compliance during periodic system testing. Tecnatom designed, implemented and tested a design modification for the on-line monitoring of this system by integrating it in the existing Digital Control System (DCS). Key system parameters were acquired in real time to be displayed in the Human System Interface, used in performing calculations and stored their historical evolution. The objective was to optimize monitoring and surveillance of the essential service water system. Furthermore, Tecnatom developed an engineering simulator ('What if' simulator) consisting of a hydraulic model of the system. This simulator takes as inputs each heat exchanger performance parameters from the plant DCS, allows the user to change the essential services water system configuration (valves position, UHS level...) and calculates theoretical process values predicting the system real behavior. In a second stage, more system instruments were wired to the DCS for Technical Specifications compliance automatic surveillance regarding opening and closing times of system valves. Operating experience shows important benefits after the digitalization. It enhances on-line information of system operation and automates calculation of load loss factor of each heat exchanger. It eases the evaluation of blockages and soiling in the system allowing optimization of cleaning proceedings. System Surveillance Requirements and Test Requirements reports have been automated optimizing the operation workload. The simulator use enables to identify optimal system configuration increasing safety margins of the system and ensuring Technical Specifications fulfillment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

History of Ultrasonic Inspection of High-Level Waste Tanks at SRS - 20220

The Liquid Waste Disposition Projects (LWDP) Structural Authority and Inspection Engineering Support Group has teamed with the Materials Science and Technology Non-destructive Evaluation Group of Savannah River National Laboratory (SRNL) to implement a comprehensive In-Service Inspection (ISI) program for the High-Level Waste (HLW) tanks in the sites tank farms. The purpose of this program is to demonstrate the structural and leak integrity of the tanks to maintain the function of waste containment throughout the desired service life. Four types of waste tanks were constructed at Savannah River Site (SRS) from 1951 thru 1981 to store radioactive nuclear waste from the separations process. The Type I, II and III are carbon steel cylindrical tanks with varying degrees of access to the side walls and very limited access to the tank bottom. The tanks contain 750,000 to 1.3 million gallons of waste and are buried or backfilled with soil. The tanks are 75'-85' in diameter and 24'-33' from tank bottom to the tank roof. Inspection of the HLW tanks is made difficult by radiation, contamination, and small access openings. Through the years these challenges have been overcome by progressive improvements to programs and equipment resulting in the sophisticated wall crawler Ultrasonic Testing (UT) technology of today. A formal inspection program was developed and put in service in 1972. UT thickness measurements were first made in 1967 and 1969 of selected waste tanks using an analog-type instrument to measure the thickness of the carbon steel walls. Routine inspections for thinning were performed from 1972-1985 and then discontinued because no thinning had been observed and this technique could not detect pitting or cracking. UT inspections resumed in 1994 using a sophisticated robotic wall crawler with UT technology capable of detecting thinning, cracking and pitting. The current program focuses on the newer Type III tanks that are used primarily for storage. The program was upgraded in 2003 to include selected regions of the tank wall, secondary wall and annulus floor on a 7 to 10-year frequency. The facility is currently in its third cycle of tank inspections. Thus far, there have been no reportable indications of service induced degradation. This result provides assurance that the chemistry control program has been effective at mitigating corrosion and that the tanks remain structurally sound even after more than 40 years of service. This paper will present the UT technology first used at SRS and the evolution to the current systems and their capabilities. Additionally, plans for equipment upgrades that will improve the extent of inspection will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Human Factors and Habitability Challenges for Mars Missions

As NASA is planning to send humans deeper into space than ever before, adequate crew health and performance will be critical for mission success. Within the NASA Human Research Program (HRP), the Space Human Factors and Habitability (SHFH) team is responsible for characterizing the risks associated with human capabilities and limitations with respect to long-duration spaceflight, and for providing mitigations (e.g., guidelines, technologies, and tools) to promote safe, reliable and productive missions. SHFH research includes three domains: Advanced Environmental Health (AEH), Advanced Food Technology (AFT), and Space Human Factors Engineering (SHFE). The AEH portfolio focuses on understanding the risk of microbial contamination of the spacecraft and on the development of standards for exposure to potential toxins such as chemicals, bacteria, fungus, and lunar/Martian dust. The two risks that the environmental health project focuses on are adverse health effects due to changes in host-microbe interactions, and risks associated with exposure to dust in planetary surface habitats. This portfolio also proposes countermeasures to these risks by making recommendations that relate to requirements for environmental quality, foods, and crew health on spacecraft and space missions. The AFT portfolio focuses on reducing the mass, volume, and waste of the entire integrated food system to be used in exploration missions, and investigating processing methods to extend the shelf life of food items up to five years, while assuring that exploration crews will have nutritious and palatable foods. The portfolio also delivers improvements in both the food itself and the technologies for storing and preparing it. SHFE sponsors research to establish human factors and habitability standards and guidelines in five risk areas, and provides improved design concepts for advanced crew interfaces and habitability systems. These risk areas include: Incompatible vehicle/habitat design, inadequate human-computer interaction, inadequate critical task design, inadequate human-automation/robotic interaction, and performance errors due to training deficiencies. To address the identified research gaps within each risk, SHFH's research plan includes studies in the laboratory, in analogs, and on International Space Station (ISS). In addition to establishing and maintaining the risk-based research portfolio, SHFH is also implementing a qualitative approach to determine how we at NASA evaluate human performance. Via interviews with experts, such as trainers, flight controllers, and flight surgeons, we are collecting the metrics by which they assess human performance, evidence of performance issues, and potential or actual consequences. The Human Performance Data Project will determine what human performance data have been collected in the past at NASA, and what data should be collected in the future in order to complete our knowledgebase and reduce risks related to human factors and habitability.

Whitmore, Mihriban↗

Exploring cosmic origins with CORE: Survey requirements and mission design

Future observations of cosmic microwave background (CMB) polarisation have the potential to answer some of the most fundamental questions of modern physics and cosmology, including: what physical process gave birth to the Universe we see today? What are the dark matter and dark energy that seem to constitute 95% of the energy density of the Universe? Do we need extensions to the standard model of particle physics and fundamental interactions? Is the ΛCDM cosmological scenario correct, or are we missing an essential piece of the puzzle? In this paper, we list the requirements for a future CMB polarisation survey addressing these scientific objectives, and discuss the design drivers of the COREmfive space mission proposed to ESA in answer to the "M5" call for a medium-sized mission. The rationale and options, and the methodologies used to assess the mission's performance, are of interest to other future CMB mission design studies. COREmfive has 19 frequency channels, distributed over a broad frequency range, spanning the 60–600 GHz interval, to control astrophysical foreground emission. The angular resolution ranges from 2' to 18', and the aggregate CMB sensitivity is about 2 μK∙arcmin. The observations are made with a single integrated focal-plane instrument, consisting of an array of 2100 cryogenically-cooled, linearly-polarised detectors at the focus of a 1.2-m aperture cross-Dragone telescope. The mission is designed to minimise all sources of systematic effects, which must be controlled so that no more than 10 -4 of the intensity leaks into polarisation maps, and no more than about 1% of E-type polarisation leaks into B-type modes. COREmfive observes the sky from a large Lissajous orbit around the Sun-Earth L2 point on an orbit that offers stable observing conditions and avoids contamination from sidelobe pick-up of stray radiation originating from the Sun, Earth, and Moon. The entire sky is observed repeatedly during four years of continuous scanning, with a combination of three rotations of the spacecraft over different timescales. With about 50% of the sky covered every few days, this scan strategy provides the mitigation of systematic effects and the internal redundancy that are needed to convincingly extract the primordial B-mode signal on large angular scales, and check with adequate sensitivity the consistency of the observations in several independent data subsets. COREmfive is designed as a "near-ultimate" CMB polarisation mission which, for optimal complementarity with ground-based observations, will perform the observations that are known to be essential to CMB polarisation science and cannot be obtained by any other means than a dedicated space mission. It will provide well-characterised, highly-redundant multi-frequency observations of polarisation at all the scales where foreground emission and cosmic variance dominate the final uncertainty for obtaining precision CMB science, as well as 2' angular resolution maps of high-frequency foreground emission in the 300–600 GHz frequency range, essential for complementarity with future ground-based observations with large telescopes that can observe the CMB with the same beamsize.

79 ASTRONOMY AND ASTROPHYSICS↗

Evaluation of Pre- and Post- Redevelopment Groundwater Chemical Analyses from LM Monitoring Wells

This report documents the efforts and analyses conducted for the Applied Studies and Technology (AS&T) Ancillary Work Plan (AWP) project titled Evaluation of Pre- and Post- Redevelopment Groundwater Sample Laboratory Analyses from Selected LM Groundwater Monitoring Wells. This effort entailed compiling an inventory of nearly 500 previous well redevelopment events at 16 U.S. Department of Energy Office of Legacy Management (LM) sites, searching the literature for impacts of well redevelopment on groundwater sample quality, and—the focus of this report—evaluating the impacts of well redevelopment on field measurements and sample analytical results. Study Catalyst Monitoring well redevelopment, the surging or high-volume pumping of a well to loosen and remove accumulated sediment and biological build-up from a well, is considered an element of monitoring well maintenance that is implemented periodically during the lifetime of the well to mitigate its gradual deterioration. Well redevelopment has been conducted fairly routinely at a few LM sites in the western United States (e.g., the Grand Junction office site and the Gunnison processing site in Colorado), but at most other sites in this region it is not a routine practice. Also, until recently (2014–2015), there had been no specific criteria for implementing well redevelopment, and documentation of redevelopment events has been inconsistent. A catalyst for this evaluation was the self-identification of these inconsistencies by the Legacy Management Support contractor. As a result, in early 2015 Environmental Monitoring Operations (EMO) staff began collecting and documenting additional field measurements during well redevelopment events. In late 2015, AS&T staff undertook an independent internal evaluation of EMO's well redevelopment records and corresponding pre- and post-well-redevelopment groundwater analytical results. Study Findings Although literature discussions parallel the prevailing industry-wide assumption that well redevelopment is necessary to increase production or to extend the life of a well, no data in the literature indicate that redevelopment affects chemical signatures in monitoring wells. The comprehensive evaluation undertaken for this study also yielded no evidence that redevelopment has any quantifiable or predictable effect on groundwater sample quality. Both short-term and long-term changes in groundwater chemistry were assessed relative to preceding and subsequent well redevelopment events. Although short-term changes in specific conductance or contaminant concentrations likely attributable to well redevelopment were found at some sites, these cases were limited to a small subset of wells in which chemical stratification had been observed. Redevelopment causes mixing of the well water, resulting in short-term impacts, but not in a consistent direction. Long-term groundwater concentration trends of uranium, the primary contaminant of concern at most LM Uranium Mill Tailings Radiation Control Act (UMTRCA) sites, were evaluated for all 16 sites addressed in this study. Based on the data evaluated, there are no apparent impacts of well redevelopment on uranium trends. In most cases where deviations in trends were found, these could be attributed to water level fluctuations or other factors. A few exceptions were found where spikes or marked decreases in uranium concentrations could potentially be related to the preceding well redevelopment, but apparent impacts were neither predictable nor quantifiable. Summary and Recommendations A catalyst for this project was a concern that there was a need for strict criteria for a program-wide approach to well redevelopment at LM sites. There was also an implicit question as to whether well redevelopment was a necessary practice that was being overlooked at some sites. The primary objective of this study was to determine if there are significant differences in laboratory analytical results between pre- and post-redevelopment groundwater samples. Results of this evaluation indicate that this is not the case—groundwater concentrations of uranium, the primary contaminant of concern at most LM UMTRCA sites, generally remained unchanged pre- and post-well-redevelopment. The literature supports redevelopment of monitoring and municipal wells if signs of reduced productivity, biofouling, sediment buildup, or other conditions potentially affecting long-term well integrity are observed. In these cases, use of a downhole camera to examine the condition of the well screen and casing may be useful. However, based on the data sets examined for this study, there is no evidence that well redevelopment is needed in order to obtain samples that have the same chemical concentrations as those in the groundwater. To conclusively demonstrate that point—that is, to define chemical effects—the underlying mechanisms have to be understood. For example, if biofouling is observed in a well and is considered a potential cause of spurious or invalid chemical data, appropriate hypothesis-testing ethodology should be used to test the validity of this claim. Until late 2014, the onset of this project, there was no standard procedure for documenting well redevelopment events; some (perhaps many) had not been captured in the historical record. EMO has made notable progress in this regard since 2015, having established a format for documenting well redevelopment events and associated field measurements, as well as a data repository for capturing those records. This policy should be continued to ensure that all well redevelopment events and associated field observations are recorded and easily tracked.

54 ENVIRONMENTAL SCIENCES↗

Of the final end state for decommissioning of reactors at SRS: collaboration between stakeholders, regulators, and the Federal Government - 15279

The Savannah River Site (SRS) is an 802 square-kilometer (310 square-miles) United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina. Nuclear weapons material production began in the early 1950's, utilizing five (5) production reactors. In the early 1990's all SRS production reactor operations were terminated. The first reactor closure end-state declaration was documented in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 29,543 square-meter (318,000 square-feet) 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost-effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized / immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the up-front planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 321 kilometer (200-mile) radius) with stakeholder and SRS Citizens Advisory Board (CAB) participation. These meetings were conducted over an eight- month period as the end-state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four (4) SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons). Closure of the SRS P Reactor Area was precedent setting and sets the stage for closure of other reactors and hardened facilities. The DOE, USEPA, and SCDHEC engaged in active, up-front, and timely involvement with the SRS. The SRS CAB, elected officials, and citizens of South Carolina and Georgia met to discuss the P reactor area closure and associated risks. Early public involvement gave SRS and the regulators assurance that the selected decision was valid and would not be overturned. Public input improved the process and ensured that the important decision on the final end-state of the reactor facilities was not made in isolation. ISD of P Reactor will provide adequate protection of human health and the environment and the lowest cost since short-term risk is minimized to remedial workers from exposure to contaminated equipment and facilities by leaving the reactor vessel in place allowing for radiological decay over time. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test of Point-Source Helicity Injection for Non-Solenoidal Startup in NSTX

This grant supported research activity focused on the development of Local Helicity Injection (LHI) as a technique for initiation and growth of spherical tokamak plasmas without the use of a traditional ohmic solenoid for magnetic induction. The LHI technique consists of injection of high-density current streams into a vacuum magnetic field consisting of toroidal and vertical fields. Under appropriate conditions, these streams become unstable and support magnetic reconnection to allow the system to reconfigure itself into a tokamak-like plasma magnetic configuration. This research program focused on three aspects of this plasma startup technique: 1) development and tests of appropriate electron current sources that provide sufficiently high injection currents into the near-plasma edge without strongly contaminating the resultant tokamak plasma with impurities; 2) development and validation of a 0-D power balance model to describe the evolution of the plasma current I p (t) during this startup process; and 3) initial estimates of I p levels achievable with this technique in NSTX-U scale plasmas. The 0-D model development included extremely low aspect ratio corrections to analytical formulae for the plasma inductances that produce voltages due to rapid changes in plasma size and location. Applications of this model to sample plasmas in the Pegasus ultra-low aspect ratio tokamak confirms the expectation that I p (t) is dominated by these induced voltages when injection occurs from the outer low-field side of the plasma. Conversly, I p (t) is dominated by an effective toroidal loop voltage arising from helicity conservation when injectors are placed in the inner high-field side divertor region. The activities pursued here, combined with more general research on LHI followed by the Pegasus experiment group, provide the tools needed for initial consideration of a MA-level plasma startup capability for the NSTX-U experiment. Simplified modeling for LHI on NSTX-U indicates that no showstoppers exist, and ~ 0.8MA appears accessible using a moderate current injection facility. However, many issues remain to be resolved to address extrapolating this technique to the larger sizes and magnetic field strengths of NSTX-U and larger fusion-grade tokamaks. These include, among others: I p scaling with helicity drive input; extending current injector technology; understanding electron confinement and the resulting helicity dissipation processes that determine the achievable I p ; the role of plasma stability in controlling the current evolution; and controlling plasma-material interactions and impurity content. These open issues will be further explored in a future experiment dedicated to integrated studies of non-solenoidal startup at higher magnetic fields and plasma currents.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Robotic Crane System for the Deconstruction of Chernobyl Unit 4 - 18583

The Chernobyl Nuclear Power Plant (ChNPP) Unit 4 accident occurred on April 26, 1986 leaving a severely damaged reactor building and a highly radioactive area. To minimize the long-term radiological impact to personnel and the environment, Unit 4 was immediately enclosed by a structure named the Object Shelter (OS). To transform the OS into an ecologically safe system, the Shelter Implementation Plan (SIP) was developed in 1997. The most significant SIP tasks was the design and construction of the New Safe Confinement (NSC). The NSC is a 36,000 tonne arch enclosure that includes a suite of process equipment to address the ruins of Unit 4 while assuring the safety of workers, public, and the environment. The NSC has a span of 257 meters, length of 164 meters, and height of 110 meters and is designed for a 100 years life. The New Safe Confinement was slid from its erection area to directly over Unit 4 (a distance of 327 meters) in November 2016. One of the major mechanical handling systems installed in the NSC is the Main Cranes System (MCS), designed and fabricated by PaR Systems (USA). The planned deconstruction activities require the handling of shielded waste disposal casks containing fuel as well as transporting extremely large structural elements -remotely controlled using video surveillance equipment. The lifting activities required the cranes to be tele-robotically controlled to prevent inadvertent collisions, expedite repetitive and high accuracy functions, protect the equipment and structures within the NSC as well as increase the overall effectiveness of the MCS. In addition, due to the elevated radiation levels, remote deconstruction activities will need to be performed. The MCS has design provisions included for a tele-robotically controlled manipulator and a suite of tooling to be used for multiple activities including concrete coring, cutting, debris collection and other heavy demolition activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Release Timing and Duration Control the Fate of Photolytic Compounds in Stream-Hyporheic Systems

Predicting environmental fate requires an understanding of the underlying, spatiotemporally variable interaction of transport and transformation processes. Photolytic compounds, for example, interact with both time-variable photolysis and the perennially dark hyporheic zone, generating potentially unexpected dynamics that arise from time-variable reactivity. This interaction has been found to significantly impact environmental fate but is commonly oversimplified in predictive models. Our primary objective was to explore how time-variable photolysis and hyporheic storage interact across a range of photolysis rates to control the fate and transport of photolytic solutes in stream-hyporheic systems. In this study, we released a photolytic compound in a natural system at different times of day and simulated variable release timing and durations of photolytic compounds spanning half-lives ranging from about 2 min to 900 hr. To contextualize these results, we simulated five photolytic compounds with varied half-lives to systematically study the interaction between release timing, duration, and reactivity. We found that the environmental fate and transport of photolytic compounds are highly variable as a function of release timing, which controls when, where, and for how long solute is stored in the hyporheic zone or exposed to in-channel photolysis. Finally, this knowledge can be used to improve predictions for photolytic compounds or assess potential impacts for an anticipated discharge or treatment.

54 ENVIRONMENTAL SCIENCES↗

Molten Salt Reactor Experiment (MSRE) Lay-Up - 19187

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. 2019 is the 50. anniversary of the shutdown of the Molten Salt Reactor Experiment (MSRE). MSRE ran a brief four years in the 1960's but earned an enduring legacy as an innovative reactor technology concept which has enjoyed a renewal of global interest in the past several years. In 2018, it was given elevated status among advanced reactor programs within DoE's Nuclear Energy office. The MSRE was a graphite-moderated, liquid fueled reactor that operated from June 1965 through December 1969. Although it was shut down nearly 50 years ago, certain systems within the reactor have continued to operate to maintain the facility in a safe and stable condition until it can be demolished as part of the comprehensive cleanup of the Oak Ridge Reservation. These systems are composed of a complex network of pipes, valves, gauges and associated equipment that control air filtration and pressure buildup resulting from fluorine gas generated through radiolysis of the fluoride salt which once fueled the reactor. In 2016, an MSRE Engineering Evaluation Team was chartered to assess current facility conditions and develop recommendations to maintain the facility in a safe state until deactivation and demolition commences. Plans are now underway to 'lay up' the MSRE facility until deactivation and demolition can occur. The proposed MSRE Facility Layup will minimize maintenance costs, reduce personnel risk of injury and exposure, provide reliable electric service to the facility and require zero personnel occupancy at MSRE. In the proposed layup approach a new source of electrical power to required loads will be routed through the facility, and new gas processing and ventilation systems will be installed that will be optimized for safe processing of the constituent hazardous gasses that exist in the legacy vessels at MSRE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗