[Component and System Level of the FASTRAC Engine]

The primary activities of Lee & Associates during the period 7/20/99 to 12/31/99 as specified in the referenced Purchase Order has been in direct support of the Advanced Space Technology Program OfFice's Core Propulsion Project. An independent review to assess the program readiness to conduct component and system level testing of the FASTRAC Engine and to proceed into Fabrication has been provided. This was accomplished through the identification of program weaknesses and potential failure areas and where applicable recommended solutions were suggested to the Program Office that would mitigate technical and program risk. The approach taken to satisfy the objectives has been for the contractor to provide a team of experts with relevant experience from past programs and a strong background of experience in the fields critical to the success of the program. The team participated in Test Planning, Test Readiness Reviews for system testing at Stennis Space Center, Anomaly Resolution Reviews, an Operations Audit, and data analysis. This approach worked well in satisfying the objectives and providing the Project Office with valuable information in real time and through monthly reports. During the month of December 1999 the primary effort involved the participation in anomaly resolution and the detailed review of the data from the final H3 and H4 test series performed on the FASTRAC engine in the b-2 Horizontal Test Facility at Stennis. The more significant findings and recommendations from this review are presented in this report.

Source record↗

Spinoff 1998

In 1958, a Congressional Mandate directed the National Aeronautics and Space Agency to ensure for the widest possible dissemination of its research and development results. Thus, the Scientific and Technical Information (STI) Program was born. While this program addressed mostly the timely dissemination of information to NASA, NASA contractors, other government agencies, and the public, technologies were identified that were clearly transferable and applicable to industry for additional use in the development of commercial products and services. Such considerations spun off the Technology Utilization Program. The very successful program went through several name changes and is today called the NASA Commercial Technology Program. The changes that have occurred over time are not only name changes, but program changes that have dramatically altered the philosophy, mission, and goal of the program. It has been identified that a more intense and proactive outreach effort within the program is necessary in order to make the newest and latest technologies available to industry now-at the time the technology is actually developed. The NASA Commercial Technology Network (NCTN), its interaction with industry at all levels through a large network of organizations and offices, is contributing to the success of small, medium, and large U.S. businesses to remain globally competitive. At the same time, new products and services derived from the transfer and application of NASA technology benefit everyone. This publication includes the following: Aerospace research and development - NASA headquarters and centers. Technology transfer and commercialization. Commercial benefits - spinoffs.NASA success and education. NASA commercial technology network.

Source record↗

The NPG 7120.5A Electronic Review Process

The use of electronics to review a document is well within the technical realm of today's state-of-the-art workplace. File servers and web site interaction are common tools for many NASA employees. The electronic comment processing described here was developed for the NPG 7120.5A review to augment the existing NASA Online Directives Information System (NODIS). The NODIS system is NASA's official system for formal review, approval and storage of NASA Directives. The electronic review process worked so well that NASA and other agencies may want to consider it as one of our "best practices." It was participatory decision making at its very best, a process that attracted dozens of very good ideas to improve the document as well as the way we can be managing projects far more effectively. The revision of NPG 7120.5A has significant implications for the way all elements of the Agency accomplish program and project management. Therefore, the review of NPG 7120.5A was an Agencywide effort with high visibility, heavy participation and a short schedule. The level of involvement created interest in supplementing the formal NODIS system with a system to collect comments efficiently and to allow the Centers and Codes to review and consolidate their comments into the official system in a short period of time. In addition, the Program Management Council Working Group (PMCWG), responsible for the revision of the document and the disposition of official comments, needed an electronic system to manage the disposition of comments, obtain PMCWG consensus on each disposition, and coordinate the disposition with the appropriate Headquarters Code that had submitted the official comment. The combined NASA and contractor talents and resources provided a system that supplemented the NODIS system and its operating personnel to produce a thorough review and approval of NPG 7120.5A on April 3, 1998, 7.5 months from the start of the process. The original six-month schedule is indicated. All milestones occurred on time, except for completion of comment disposition, which required an additional 30 days. Approval of the document occurred sixteen days after completion of the "Purple Package."

McBrayer, Robert↗

NASA Langley Scientific and Technical Information Output: 1999

This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1999. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, Tech Briefs, and Patents.

Stewart, Susan H.↗

Goddard Space Flight Center Solar Array Missions, Requirements and Directions

The Goddard Space Flight Center (GSFC) develops and operates a wide variety of spacecraft for conducting NASA's communications, space science, and earth science missions. Some are "in house" spacecraft for which the GSFC builds the spacecraft and performs all solar array design, analysis, integration, and test. Others are "out of house" spacecraft for which an aerospace contractor builds the spacecraft and develops the solar array under direction from GSFC. The experience of developing flight solar arrays for numerous GSFC "in house" and "out of house" spacecraft has resulted in an understanding of solar array requirements for many different applications. This presentation will review those solar array requirements that are common to most GSFC spacecraft. Solar array technologies will be discussed that are currently under development and that could be useful to future GSFC spacecraft.

Gaddy, Edward↗

Scientific and Technical Reports, Articles, Papers, and Presentations

This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY99. It also includes papers of MSFC contractors. All of the NASA series reports may be obtained from the NASA Center for AeroSpace Information (CASI), 7121 Standard Drive, Hanover, MD 21076-1320 The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

Turner, J. E.↗

ACIS Door Failure Investigation and Mitigation Procedures

NASA's Chandra X-ray Observatory (formerly AXAF) was launched on July 23, 1999 and is currently in orbit performing scientific studies. Chandra is the third of NASA's Great Observatories to be launched, following the Hubble Space Telescope and the Compton Gamma Ray Observatory. One of four primary science instruments on Chandra, and one of only two focal plane instruments, is the Advanced CCD Imaging Spectrometer, or ACIS. The ACIS focal plane and Optical Blocking Filter (OBF) must be launched under vacuum, so a tightly sealed, functioning door and venting subsystem were implemented. The door was opened two and one-half weeks after launch (after most out-gassing of composite materials) and allowed X-rays to be imaged by the ACIS CCD's in the focal plane. A failure of this door to open on-orbit would have eliminated all ACIS capabilities, severely degrading mission science. During the final pre-flight thermal-vacuum test of the fully integrated Chandra Observatory at TRW, the ACIS door failed to open when commanded to do so. This paper describes the efforts, under considerable time pressure, by NASA, its contractors and outside review teams to investigate the failure and to develop modified hardware and procedures which would correct the problem. Of interest is the fact that the root cause of the test failure was never clearly identified despite massive effort. We ultimately focussed on hardware and procedures designed to mitigate the effects of potential, but unproven, failure modes. We describe a frequent real-world engineering situation in which one must proceed on the best basis possible in the absence of the complete set of facts.

Podgorski, William A.↗

NASA Parts Selection List (NPSL) WWW Site http://nepp.nasa.gov/npsl

The NASA Parts Selection List (NPSL) is an on-line resource for electronic parts selection tailored for use by spaceflight projects. The NPSL provides a list of commonly used electronic parts that have a history of satisfactory use in spaceflight applications. The objective of this www site is to provide NASA projects, contractors, university experimenters, et al with an easy to use resource that provides a baseline of electronic parts from which designers are encouraged to select. The NPSL is an ongoing resource produced by Code 562 in support of the NASA HQ funded NASA Electronic Parts and Packaging (NEPP) Program. The NPSL is produced as an electronic format deliverable made available via the referenced www site administered by Code 562. The NPSL does not provide information pertaining to patented or proprietary information. All of the information contained in the NPSL is available through various other public domain resources such as US Military procurement specifications for electronic parts, NASA GSFC's Preferred Parts List (PPL-21), and NASA's Standard Parts List (MIL-STD975).

Brusse, Jay↗

Progress in Design and Construction of the Optical Communications Laser Laboratory

The deployment of advanced hyperspectral imaging and other Earth sensing instruments on board Earth observing satellites is driving the demand for high-data-rate communications. Optical communications meet the required data rates with small, low mass, and low-power communications packages. JPL, as NASA's lead center in optical communications, plans to construct a 1-m Optical Communications Telescope Laboratory (OCTL) at its Table Mountain Facility (TMF) complex in the San Gabriel Mountains of Southern California. The design of the building has been completed, and the construction contractor has been selected. Ground breaking is expected to start at the beginning of the 1999 TMF construction season. A request for proposal (RFP) has been issued for the procurement of the telescope system. Prior to letting the RFP we conducted a request for information with industry for the telescope system. Several vendors responded favorably and provided information on key elements of the proposed design. These inputs were considered in developing the final requirements in the RFP. Keywords: Free space optical communications, lasercom, telescopes, ground stations, adaptive optics, astrometry, Table Mountain Facility

Wilson, K. E.↗

Research and Technology 1999

This report selectively summarizes the NASA Glenn Research Center's research and technology accomplishments for the fiscal year 1999. It comprises 130 short articles submitted by the staff scientists and engineers. The report is organized into four major sections: Aeronautics. Research and Technology, Space, and Engineering and Technical Services. A table of contents and an author index have been developed to assist readers in finding articles of special interest. This report is not intended to be a comprehensive summary of all the research and technology work done over the past fiscal year. Most of the work is reported in Glenn-published technical reports, journal articles, and presentations prepared by Glenn staff and contractors. In addition, university grants have enabled faculty members and graduate students to engage in sponsored research that is reported at technical meetings or in journal articles. For each article in this report, a Glenn contact person has been identified, and where possible, reference documents are listed so that additional information can be easily obtained. The diversity of topics attests to the breadth of research and technology being pursued and to the skill mix of the staff that makes it possible. For more information about research at NASA Glenn, visit us on the World Wide Web (http://www.grc.nasa.gov). This document is available on the World Wide Web (http://www.grc.nasa.gov/WWW/RT/). For publicly available reports, visit the Glenn Technical Report Server (GLTRS) on the World Wide Web (http://gltrs.grc.nasa.gov/GLTRS/).

Source record↗

A Three-Dimensional Analysis of the Galactic Gamma-Ray Emission Resulting from Cosmic-Ray Interactions with the Interstellar Gas and Radiation Fields

The primary task objective is to construct a 3-D model for the distribution of high-energy (20 MeV - 30 GeV) gamma-ray emission in the Galactic disk. Under this task the contractor will utilize data from the EGRET instrument on the Compton Gamma-Ray Observatory, H I and CO surveys, radio-continuum surveys at 408 MHz, 1420 MHz, 5 GHz, and 19 GHz, the COBE Diffuse Infrared Background Experiment (DIRBE) all-sky maps from 1 to 240 microns, and ground-based B, V, J, H, and K photometry. The respective contributions to the gamma-ray emission from cosmic ray/matter interactions, inverse Compton scattering, and extragalactic emission will be determined.

Sodroski, Thomas J.↗

Report on the Loss of the Mars Polar Lander and Deep Space 2 Missions

NASA's Mars Surveyor Program (MSP) began in 1994 with plans to send spacecraft to Mars every 26 months. Mars Global Surveyor (MGS), a global mapping mission, was launched in 1996 and is currently orbiting Mars. Mars Surveyor '98 consisted of Mars Climate Orbiter (MCO) and Mars Polar Lander (MPL). Lockheed Martin Astronautics (LMA) was the prime contractor for Mars Surveyor '98. The Jet Propulsion Laboratory (JPL), California Institute of Technology, manages the Mars Surveyor Program for NASA's Office of Space Science. MPL was developed under very tight funding constraints. The combined development cost of MPL and MCO, including the cost of the two launch vehicles, was approximately the same as the development cost of the Mars Pathfinder mission, including the cost of its single launch vehicle. The MPL project accepted the challenge to develop effective implementation methodologies consistent with programmatic requirements.

Albee, Arden↗

AIRES: An Airborne Infra-Red Echelle Spectrometer for SOFIA

SOFIA will enable astronomical observations with unprecedented angular resolution at infrared wavelengths obscured from the ground. To help open this new chapter in the exploration of the infrared universe, we are building AIRES, an Airborne Infra-Red Echelle Spectrometer. AIRES will be operated as a first generation, general purpose facility instrument by USRA, NASA's prime contractor for SOFIA. AIRES is a long slit spectrograph operating from 17 - 210 microns. In high resolution mode the spectral resolving power is approx. 10(exp 6) microns/A or approx. 10(exp 4) at 100 microns. Unfortunately, since the conference, a low resolution mode with resolving power about 100 times lower has been deleted due to budgetary constraints. AIRES includes a slit viewing camera which operates in broad bands at 18 and 25 microns.

Dotson, Jessie J.↗

Application of Rapid Prototyping to the Investment Casting of Test Hardware (MSFC Center Director's Discretionary Fund Final Report, Project No. 98-08)

Investment casting masters of a selected propulsion hardware component, a fuel pump housing, were rapid prototyped on the several processes in-house, along with the new Z-Corp process acquired through this project. Also, tensile samples were prototyped and cast using the same significant parameters. The models were then shelled in-house using a commercial grade zircon-based slurry and stucco technique. Next, the shelled models were fired and cast by our in-house foundry contractor (IITRI), with NASA-23, a commonly used test hardware metal. The cast models are compared by their surface finish and overall appearance (i.e., the occurrence of pitting, warping, etc.), as well as dimensional accuracy.

Cooper, K. G.↗

Vibration and Acoustic Testing for Mars Micromission Spacecraft

The objective of the Mars Micromission program being managed by the Jet Propulsion Laboratory (JPL) for NASA is to develop a common spacecraft that can carry telecommunications equipment and a variety of science payloads for exploration of Mars. The spacecraft will be capable of carrying robot landers and rovers, cameras, probes, balloons, gliders or aircraft, and telecommunications equipment to Mars at much lower cost than recent NASA Mars missions. The lightweight spacecraft (about 220 Kg mass) will be launched in a cooperative venture with CNES as a TWIN auxiliary payload on the Ariane 5 launch vehicle. Two or more Mars Micromission launches are planned for each Mars launch opportunity, which occur every 26 months. The Mars launch window for the first mission is November 1, 2002 through April 2003, which is planned to be a Mars airplane technology demonstration mission to coincide with the 100 year anniversary of the Kittyhawk flight. Several subsequent launches will create a telecommunications network orbiting Mars, which will provide for continuous communication with lenders and rovers on the Martian surface. Dedicated science payload flights to Mars are slated to start in 2005. This new cheaper and faster approach to Mars exploration calls for innovative approaches to the qualification of the Mars Micromission spacecraft for the Ariane 5 launch vibration and acoustic environments. JPL has in recent years implemented new approaches to spacecraft testing that may be effectively applied to the Mars Micromission. These include 1) force limited vibration testing, 2) combined loads, vibration and modal testing, and 3) direct acoustic testing. JPL has performed nearly 200 force limited vibration tests in the past 9 years; several of the tests were on spacecraft and large instruments, including the Cassini and Deep Space One spacecraft. Force limiting, which measures and limits the spacecraft base reaction force using triaxial force gages sandwiched between the spacecraft and the test fixture, alleviates the severe overtest at spacecraft resonances inherent in rigid fixture vibration tests. It has the distinct advantage over response limiting that the method is not dependent on the accuracy of a detailed dynamic model of the spacecraft. Combined loads, vibration, and modal testing were recently performed on the QuikSCAT spacecraft. The combined tests were performed in a single test setup per axis on a vibration shaker, reducing test time by a factor of two or three. Force gages were employed to measure the true c.g. acceleration of the spacecraft for structural loads verification using a sine burst test, to automatically notch random vibration test input accelerations at spacecraft resonances based on predetermined force limits, and to directly measure modal masses in a base drive modal test. In addition to these combined tests on the shaker, the QuikSCAT spacecraft was subjected to a direct field acoustic test by surrounding the spacecraft, still on the vibration shaker, with rock concert type acoustic speakers. Since the spacecraft contractor does not have a reverberant field acoustic test facility, performing a direct field acoustic test -saved the program nearly two weeks schedule time that would have been required for packing / unpacking and shipping of the spacecraft. This paper discusses the rationale behind and advantages of the above test approaches and provides examples of their actual implementation and comparisons to flight data. The applicability of the test approaches to Mars Micromission spacecraft qualification is discussed.

Kern, Dennis L.↗

FY 1999 Scientific and Technical Reports, Articles, Papers, and Presentations

This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY99. It also includes papers of MSFC contractors. All of the NASA series reports may be obtained from the NASA Center for AeroSpace Information (CASI), 7121 Standard Drive, Hanover, MD 21076-1320 The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

Waits, J.oyce E.Turner↗

Simulation of a Flywheel Electrical System for Aerospace Applications

A Flywheel Energy Storage Demonstration Project was initiated at the NASA Glenn Research Center as a possible replacement for the battery energy storage system on the International Space Station (ISS). While the hardware fabrication work was being performed at a university and contractor's facility, the related simulation activity was begun at Glenn. At the top level, Glenn researchers simulated the operation of the ISS primary electrical system (as described in another paper) with the Flywheel Energy Storage Unit (FESU) replacing one Battery Charge and Discharge Unit (BCDU). The FESU consists of a Permanent Magnet Synchronous Motor/Generator (PMSM), which is connected to the flywheel; the power electronics that connects the PMSM to the ISS direct-current bus; and the associated controller. The PMSM model is still under development, but this paper describes the rest of the FESU model-the simulation of the converter and the associated control system that regulates energy transfer to and from the flywheel.

Truong, Long V.↗