Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMPLIANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Site Environmental Report–Pantex Plant (CY2020)

The 2020 Annual Site Environmental Report (ASER) summarizes the Pantex Plant’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOEa), and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOEb). These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

Influence of Business Models on PV-Battery Dispatch Decisions and Market Value

PV-battery hybrid projects dominate interconnection queues in some regions in the United States, but few projects have been operational long enough to assess how the hybrid capabilities may be used in practice. We interview plant operators and analyze empirical dispatch data for eleven large-scale PV-battery hybrids in three organized wholesale markets in the United States. We use the dispatch data and wholesale market prices to estimate the market value of our sample hybrids in 2020. The empirical increase in market value of a PV-battery hybrid relative to a standalone PV plant varies by project and ranges from $\$$1 to $\$$48/MWhsolar. The premium is driven by market, location, technical characteristics of the PV and battery asset, and battery dispatch strategies. In contrast to the widespread assumptions in the PV-battery hybrid modeling literature, only three of the eleven project operators optimize battery usage for wholesale market revenue as merchant plants. Instead, the majority of operators in the sample have alternate objectives. For example, load-serving entities target peak load reductions, incentive program participants focus on compliance with program requirements, and large energy consumers prioritize resiliency and utility bill minimization. Understanding prevalent dispatch signals and the degree of alignment with system-wide grid needs can increase the market value of PV-battery hybrids.

14 SOLAR ENERGY↗

Model Year 2021 Fuel Economy Guide

The Fuel Economy Guide is published by the U.S. Department of Energy as an aid to consumers considering the purchase of a new vehicle. The Guide lists estimates of miles per gallon (mpg) for each vehicle available for the new model year. These estimates are provided by the U.S. Environmental Protection Agency in compliance with Federal Law. By using this Guide, consumers can estimate the average yearly fuel cost for any vehicle. The Guide is intended to help consumers compare the fuel economy of similarly sized cars, light duty trucks and special purpose vehicles.

2017 EPA fuel economy↗

Natural Resource Management Plan for Brookhaven National Laboratory

The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory’s mission. The philosophy or guiding principles of the NRMP include stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is reviewed and updated every five years. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered species documented on site (Appendices A, B and C).

54 ENVIRONMENTAL SCIENCES↗

An Examination of the Hydropower Licensing and Federal Authorization Process

Site-permitting and regulation are necessary to ensure hydropower projects (both original and relicensed) comply with statutory requirements and address multiple stakeholder priorities that consider a range of factors, including water quality, species protection, cultural resource impacts, and recreation. However, the time involved in acquiring a license for an individual hydropower project can be highly variable by project, leading to increased project costs, financial risks, and uncertainties. In part, this variability is the result of a regulatory structure that has evolved over time to include multiple approvals and compliance requirements administered by the Federal Energy Regulatory Commission (FERC), U.S. Army Corp of Engineers (USACE), federal land management agencies, federal and state resource agencies, and Indian Tribes. Ultimately, the time, benefits, costs, and risks to developers associated with hydropower regulatory processes and/or the preparation (e.g., studies) required for regulatory agency review are not well documented or synthesized in the public domain, which may increase uncertainty and variability within the process. This report addresses these needs by presenting results of a comprehensive examination of hydropower licensing including quantitative and qualitative analyses of timelines, causal factors, and their combined effect on risk and costs to developers.

13 HYDRO ENERGY↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway

Significant efforts are underway to develop and implement a risk-informed performance-based licensing framework for advanced reactors built on the establishment of an affirmative safety case. Such approaches offer the benefits of increased flexibility regarding key design and licensing decisions based on a detailed assessment and understanding of plant risk. These methods include the comprehensive analysis of scenarios that have historically been addressed through conservative and deterministic licensing analysis approaches, such as the evaluation of event sequences at frequencies of occurrence beyond the design basis. While the detailed analysis of low frequency events provides insights that can help justify alternative treatments to past conservatism, the findings are dependent on the quality and confidence associated with the analyses. The assessment of external hazards presents a unique challenge, as their potential frequency of occurrence, especially of large magnitude events, is inherently uncertain given the long return periods in question. The current project seeks to further explore the regulatory treatment of low frequency external events as part of a risk-informed performance-based framework. The goals are to identify the benefits and challenges of such approaches for advanced reactor vendors and to aid in the development of consistent and appropriate methodologies. As part of this effort, the current report summarizes initial project findings, with a focus on the evaluation of the seismic hazard. This includes an exploration of the implementation of a risk-informed performance-based approach through an example analysis. Based on the identified challenges associated with the probabilistic treatment of low frequency event sequences, additional performance-based methods were explored as complementary tools for demonstrating regulatory compliance. The report highlights key challenges and opportunities associated with the methods and outlines recommendations and future activities to assist with their implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; 40 CFR Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247 and 173-480 were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL-Richland Campus) and in Sequim, Washington, (PNNL-Sequim Campus, which formerly was known as the Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2021 for calendar year ending 2020.

40 CFR 61 Subpart H↗

Radiation Detection Technologies

When governing bodies seek to reduce the spread and development of nuclear material and weapons, arms control and safeguards technologies play an important role in preventing proliferation within a state that has already developed a nuclear weapon. Arms control treaties work to control the development, production, stockpiling, proliferation, distribution, or the usage of a certain weapon type or delivery system. Treaty guidelines are met using combinations of monitoring, detection, and verification technologies. 1 To verify compliance, a country must determine if the activities of another country are within the limits and obligations established by the treaty. A verifiable treaty contains an interlocking web of constraints and provisions designed to deter cheating, to make cheating more complicated and more expensive, or to make its detection timelier. In the past, the U.S. has deemed treaties to be effectively verifiable if there is confidence that significant violations can be detected in time to respond and offset any threat that the violation may create for the U.S.

61 RADIATION PROTECTION AND DOSIMETRY↗

Diesel-like Fuels, Combustion, and Emissions

The need to reduce the carbon footprint from medium- and heavy-duty diesel engines is clear; low-carbon biofuels are a powerful means to achieve this. Liquid fuels are rapidly deployed because existing infrastructure can be utilized for their production, transport, and distribution. Their impact is unique as they can decrease the greenhouse gas (GHG) emissions of existing vehicles and in applications resistant to electrification. However, introducing new diesel-like bio-blends into the market is very challenging. At a minimum, it requires a comprehensive understanding of the life-cycle GHG emissions of the fuels, the implications for refinery optimization and economics, the fuel’s impact on the infrastructure, the effect on the combustion performance of current and future vehicle fleets, and finally the implications for exhaust aftertreatment systems and compliance with emissions regulations. Such understanding is sought within the Co-Optima project.

02 PETROLEUM↗

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗

MARSAME Radiological Release Report TA-50, TRU Liquid Waste Construction Soil

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that the soil associated with Technical Area 50 (TA-50), Transuranic (TRU) Liquid Waste construction project (TLW) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE 2020, NNSA 2021). This conclusion is based on the known history of the area combined with soil sample data collected in 2021; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC ES-FSD-004, Environmental Radiation Protection (LANL 2020a). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (MARSAME 2000) and LANL procedures (LANL 2020b). Final approvals for waste disposition will come from LANL’s Waste Management Program. The scope of this final release report includes the TLW construction site soil located south of TA-50, Building 001.

54 ENVIRONMENTAL SCIENCES↗

ASMT-783246, Assessment Report for Department 635 Analysis of Fiscal Year 2021 ES&H Events

This assessment analyzes Environment, Safety, and Health (ES&H) occurrences and Non-Occurrence Trackable Events (NOTEs) from fiscal year (FY) 2021. For this report, assessors used three primary methods for categorizing occurrence and NOTE data: issue categorization, DOE reporting criteria groups, and DOE cause codes. The FY 2021 Q1 occurrence and NOTE total was the lowest since this type of analysis began in FY 2018 Q4, following a downward trend from the FY 2019 Q3 high point. The FY 2021 Q2 occurrence and NOTE total was nearly double the FY 2021 Q1 total; occurrence totals declined slightly in Q3 and Q4, while NOTE totals remained the same. NOTEs in each of the final three quarters were more than double the amount from Q1. This assessment resulted in one observation. As COVID-19 vaccination rates increase and COVID 19 impacts on operations decrease, the number of workers on-site and the amount of activity-level work will increase. With these changes, focused attention on the following areas related to work planning and controls may reduce the probability of future events, hazard identification and analysis, compliance with standards, formality of operations, and job scoping.

99 GENERAL AND MISCELLANEOUS↗

Safety Analysis Report For Packaging, Y-12 National Security Complex, Model ES-3100 Package with Bulk HEU Contents

This safety analysis report for packaging (SARP) presents the results of the safety analysis prepared in support of the Consolidated Nuclear Security, LLC (CNS) request for licensing of the Model ES-3100 package with bulk highly enriched uranium (HEU) contents and issuance of a Type B(U) Fissile Material Certificate of Compliance. This SARP, published in the format specified in the U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide 7.9 and using information provided in UCID-21218 and NRC Regulatory Guide 7.10, demonstrates that the Y-12 National Security Complex (Y-12) ES-3100 package with bulk HEU contents meets the established NRC regulations for packaging, preparation for shipment, and transportation of radioactive materials given in Title 10, Part 71, of the Code of Federal Regulations (CFR) [10 CFR 71] as well as U.S. Department of Transportation (DOT) regulations for packaging and shipment of hazardous materials given in Title 49 CFR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical analysis of filter testing at the U.S. Department of Energy Filter Test Facility

The U.S. Department of Energy (DOE) technical standard DOE-STD-3020-2015 requires verification testing at the Filter Test Facility (FTF) of high-efficiency particulate air (HEPA) filters to be installed in nuclear facility (Hazard Category 1, 2, 3, and radiological facilities) confinement ventilation systems, or to be installed in habitability systems (e.g., filters for protection of workers required to act for the control and mitigation of emergency situations). Filters in these applications perform a safety function in accident situations, are designated as important to safety, or are necessary for habitability systems. Different FTFs have operated for decades, and results of tests are available to examine the need for and benefits of continued execution of 100 percent QA verification testing. The objective of this study and resulting report was to assess the need for 100 percent QA testing at the current FTF in Maryland, based on an examination of a database of test results from 2013 to August 2020. Filters that require independent testing per DOE-STD-3020-2015 to be installed in nuclear facilities are sent to the FTF before being shipped to the facilities. The FTF examines the documentation (e.g., certificates of compliance, results of particle penetration and airflow resistance testing by the manufacturers, labels affixed to filters and packages, and other requirements specified in purchase orders by the nuclear facility operators), implements visual inspections of the physical state of the filters, and checks the dimensions of frames. Filters that meet the documentation and visual inspection requirements are subjected to particle penetration and airflow resistance testing. In case of rejections, the filters are shipped back to the manufacturers, at the cost of the manufacturers, for replacement. Filters that pass all tests are shipped to the nuclear facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

TA-60-2 Warehouse Asset Tree and Supporting Information

The purpose of the document is to show an example of a Multi-Sector General Permit environmental compliance program inspection structure to new software provider (new provider is under contract w/ LANL) to begin setting up new database.

54 ENVIRONMENTAL SCIENCES↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Low-Temperature Chlorination of Zirconium

Recovery of Zr from nuclear fuel is of high interest because the Zr cladding material comprises up to 50% of the high-level radioactive waste (HLW) that requires disposition. An ideal Zr-recovery process would not only recover the bulk Zr from the fuel or cladding but would also provide decontamination from the components that give rise to the HLW designation. A simplified decontamination pathway providing recovered Zr in compliance with low-level radioactive waste acceptance criteria could significantly reduce the burden of HLW requiring geologic disposition. A newly developed advanced low-temperature chlorination process presents an opportunity to recover a ZrCl4 product that is effectively decontaminated from the elements of concern. This advanced low-temperature chlorination process uses a mixture of the sulfur-containing chlorination compounds sulfur monochloride (S 2 Cl 2 ) and thionyl chloride (SOCl 2 ).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Report Series: Evaluation, Finding of Effect, and Mitigation Documentation for the Main Gate (23-GS100), Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to replace the existing guard shack at the Main Gate (23-GS100, Nevada State Historic Preservation Office [SHPO] Resource No. S1758) to the Nevada National Security Site (NNSS) in Nye County, Nevada. The purpose of the project is to improve security. The project is considered an undertaking subject to review under Title 54 of United States Code (USC) § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 USC § 300101, et seq., and its implementing regulations, Title 36 of the Code of Federal Regulations (36 CFR) Part 800. In 2018, Desert Research Institute (DRI) completed an architectural survey of the town of Mercury. This effort resulted in the identification, recordation, and evaluation of the Mercury Historic District (MHD, SHPO Resource No. D230), including the identification of its contributing elements (Reno et al. 2018). The MHD was recommended eligible for listing in the National Register of Historic Places (NRHP, National Register) under the Secretary of the Interior’s (SOI) Significance Criteria A and C, as defined in 36 CFR Part 60.4, as a significant concentration of buildings and structures with a direct and important association with Cold War-era nuclear testing from 1951 through 1992. It has not been evaluated under Criteria B and D to date. As part of a larger modernization program for Mercury, the NNSA/NFO and the SHPO executed the 2018 Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (Mercury PA). The Mercury PA includes streamlined Section 106 procedures for undertakings in the MHD based on contributing element categories. The Main Gate is identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of Section 106 compliance and subject to the stipulations of the Mercury PA. Per Stipulation VI of the Mercury PA, when the Area of Potential Effect (APE) for an undertaking includes Category I elements, the NNSA/NFO must evaluate the Category I elements for individual NRHP eligibility under all of the SOI Significance Criteria, prior to initiating any activity that may affect the elements. Thus, the purpose of this report is to evaluate the Main Gate as a potential individually eligible historic property in fulfillment of Stipulation VI of the Mercury PA. The evaluation detailed herein concludes that the Main Gate is individually eligible for listing in the NRHP under SOI Significance Criterion A at the national level of significance for its direct, important association with Cold War-era nuclear testing from 1965 (the date the current Main Gate was constructed) through 1992 (when critical nuclear testing on the NNSS ceased).

23-GS100↗