250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Update on Design of 10 MWe Iron-Based Coal Direct Chemical Looping Demonstration Plant

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

EERC Final Topical Report – Findings on Subtask 3.2 – Produced Water Management Through Geologic Homogenization, Conditions, and Reuse

The Energy & Environmental Research Center (EERC) was awarded a contract by the North Dakota Industrial Commission (NDIC) Oil and Gas Research Program (NDIC No. G-051-101) to conduct a study on the recycling of water used in oil and gas operations, also known as produced water, from oil- and gas-producing regions of North Dakota as directed by Section 19 of North Dakota House Bill 1014. This final report provides a compilation of results of the study, which include regulatory, scientific, technological, and feasibility methods and considerations associated with North Dakota produced water management. The report provides a synopsis of this project’s previously submitted produced water assessment report entitled “Produced Water Management and Recycling Options in North Dakota” (Energy & Environmental Research Center, 2020), with updated values provided as appropriate. The report provides the results from the investigation of a novel produced water management strategy, referred to as geologic homogenization, conditioning, and reuse (GHCR), which aims to use a subsurface geologic formation as a natural medium for managing produced water recycling and reuse. Water management is a significant technical and economic challenge for sustainable oil and gas production, and water volumes are intrinsically linked to oil production volumes. North Dakota oil production rose to over 1.5 million barrels (MMbbl)/day in 2019, and despite a downturn in oil price in early 2020, North Dakota oil production has recovered to 1.1 MMbbl/day as of August 2021. Bakken petroleum system development between 2008 and 2020 has resulted in a nearly fourfold increase in produced water volumes to 642 MMbbl/yr in 2020 after peaking at 740 MMbbl/yr in 2019 and a fivefold increase in saltwater disposal (SWD) volumes to 565 MMbbl/yr in 2020 after a peak of 682 MMbbl/yr in 2019. Produced water and SWD volumes are forecasted to double by 2030. SWD is the primary method of produced water management used in North Dakota, with approximately 95% of the SWD volume occurring through subsurface injection into sandstones of the Dakota Group (Dakota). Localized pressurization of the Dakota resulting from SWD and projected increases in produced water volumes could impact the economics of North Dakota oil production. As a result, there is an emerging need to pursue alternative produced water management approaches, including recycling and reuse. While produced water recycling is not yet widespread, commercial operators are making strides in overcoming the technical challenges of using high salinity produced water in completion operations (Marathon Oil, 2020). As water management continues to be a key focal point in companies’ environmental, social, and governance (ESG) initiatives, focus on water management, including recycling, will likely continue to increase. Laboratory column testing, field sample collection, geologic modeling and numerical simulation, and techno-economic analysis all indicate that GHCR could feasibly be implemented as a potential water management option. Laboratory column testing and field sample collection indicate that the Inyan Kara sandstone and native formation fluid are capable of homogenizing with the Bakken produced water to a point where the fluid composition appears to stabilize. Extracting that stabilized fluid could be considered homogeneous and capable of providing individual batches of hydraulic fracturing fluid. Numerical simulation results indicate that extraction of fluids from the Inyan Kara in a GHCR implementation scenario is capable of reducing formation pressure, which would help ease localized pressurization of the Inyan Kara and extend the available capacity for nearby existing SWD wells. Economic analysis indicates that there are scenarios where GHCR implementation can be a competitive or even lower-cost option than a conventional water management approach. Site-specific conditions will dictate the economic potential of GHCR, but potentially attractive sites for GHCR implementation will be those that are located above a pressurized zone of the Inyan Kara, need six or more Bakken infill wells, and face high costs for conventional SWD and/or freshwater. Based on the regulatory review, drilling into the Inyan Kara for SWD and to harness as a source water for industrial use have precedent in North Dakota, and a workable regulatory solution for GHCR seems likely. However, restrictions in the state regarding surface storage and transport of produced fluids may limit some activities, which will affect how GHCR could ultimately be implemented. In summary, this study reveals pursuing GHCR can be a viable approach to water management in North Dakota. The GHCR concept addresses some of the challenges that hinder the more traditional approaches to recycling in the industry. Furthermore, an assessment of the current landscape of water management within the state reveals the ongoing trend of increasing volumes of produced water and SWD. Projections reveal that the volumes of produced water that need to be managed are expected to double over the next decade (Energy & Environmental Research Center, 2020). With the continued development of the Bakken and continuing driving factors related to ESG initiatives, implementing a practice such as GHCR is a feasible approach to adding recycling of produced water to industry within the state. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission Oil and Gas Research Program. References Energy & Environmental Research Center, 2020, Produced water management and recycling options in North Dakota: Final Report for North Dakota Legislative Management Energy Development and Transmission Committee and North Dakota Industrial Commission. Marathon Oil, 2020, Sustainability report: https://cdn.sanity.io/files/ghcnw9z2/website/ 91744eb6ef8fbe59505a911c6b8d2e8dd9a537fa.pdf?dl (accessed November 2021).

02 PETROLEUM↗

A decision support system prototype including human factors based on the TOGA meta-theory approach

The human contribution to the risk of operation of complex technological systems is often not negligible and sometimes tends to become significant, as shown by many reports on incidents and accidents occurred in the past inside Nuclear Power Plants (NPPs). An error of a human operator of a NPP can derive by both omission and commission. For instance, complex commission errors can also lead to significant catastrophic technological accidents, as for the case of the Three Mile Island accident. Typically, the problem is analyzed by focusing on the single event chain that has provoked the incident or accident. What is needed is a general framework able to include as many parameters as possible, i.e. both technological and human factors. Such a general model could allow to envisage an omission or commission error before it can happen or, alternatively, suggest preferred actions to do in order to take countermeasures to neutralize the effect of the error before it becomes critical. In this paper, a preliminary Decision Support System (DSS) based on the so-called (-) TOGA meta-theory approach is presented. The application of such a theory to the management of nuclear power plants has been presented in the previous ICAPP 2011. Here, a human factor simulator prototype is proposed in order to include the effect of human errors in the decision path. The DSS has been developed using a TRIGA research reactor as reference plant, and implemented using the LabVIEW programming environment and the Finite State Machine (FSM) model The proposed DSS shows how to apply the Universal Reasoning Paradigm (URP) and the Universal Management Paradigm (UMP) to a real plant context. The DSS receives inputs from instrumentation data and gives as output a suggested decision. It is obtained as the result of an internal elaborating process based on a performance function. The latter, describes the degree of satisfaction and efficiency, which are dependent on the level of responsibility related to each professional role. As an application, we present the simulation of the discussed error, e.g. the unchecked extraction of the control rods during a power variation maneuver and we show how the effect of human errors can affect the performance function, giving rise to different countermeasures which could call different operator figures into play, potentially not envisaged in the standard procedure. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhancement of NRC station blackout requirements for nuclear power plants

The U.S. Nuclear Regulatory Commission (NRC) established a Near-Term Task Force (NTTF) in response to Commission direction to conduct a systematic and methodical review of NRC processes and regulations to determine whether the agency should make additional improvements to its regulatory system and to make recommendations to the Commission for its policy direction, in light of the accident at the Fukushima Dai-ichi Nuclear Power Plant. The NTTF's review resulted in a set of recommendations that took a balanced approach to defense-in-depth as applied to low-likelihood, high-consequence events such as prolonged station blackout (SBO) resulting from severe natural phenomena. Part 50, Section 63, of Title 10 of the Code of Federal Regulations (CFR), 'Loss of All Alternating Current Power,' currently requires that each nuclear power plant must be able to cool the reactor core and maintain containment integrity for a specified duration of an SBO. The SBO duration and mitigation strategy for each nuclear power plant is site specific and is based on the robustness of the local transmission system and the transmission system operator's capability to restore offsite power to the nuclear power plant. With regard to SBO, the NTTF recommended that the NRC strengthen SBO mitigation capability at all operating and new reactors for design-basis and beyond-design-basis external events. The NTTF also recommended strengthening emergency preparedness for prolonged SBO and multi-unit events. These recommendations, taken together, are intended to clarify and strengthen US nuclear reactor safety regarding protection against and mitigation of the consequences of natural disasters and emergency preparedness during SBO. The focus of this paper is on the existing SBO requirements and NRC initiatives to strengthen SBO capability at all operating and new reactors to address prolonged SBO stemming from design-basis and beyond-design-basis external events. The NRC initiatives are intended to enhance core and spent fuel pool cooling, reactor coolant system integrity, and containment integrity. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Siting and Transportation for Consolidated Used Nuclear Fuel Management Facilities: A Proposed Approach for a Regional Initiative to Begin the Dialogue - 13562

The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed in January 2010 to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, and to develop a new national strategy. Over two years, the BRC held dozens of meetings and heard from hundreds of Federal, State, Tribal, and local officials, as well as representatives of trade and labor organizations, technical groups, non-governmental organizations, and other stakeholders. The Commission's final report (issued January 26, 2012) offers a strategy to resolve longstanding challenges to responsible management of the United States' nuclear waste legacy. The Commission recommended Congressional action to rewrite parts of the Nuclear Waste Policy Act (NWPA); however, a comprehensive legislative overhaul will likely take years to fully implement. The nature and characteristics of nuclear waste, the activities that generated it, and the past history of federal efforts to manage the waste make it virtually certain that finding workable solutions will be controversial and difficult. As the BRC report suggests, this difficulty can be made insurmountable if top-down, federally-mandated efforts are forced upon unwilling States, Tribes, and local communities. Decades of effort and billions of ratepayer and taxpayer dollars have been spent attempting to site and operate spent fuel storage and disposal facilities in this manner. The experience thus far indicates that voluntary consent and active partnership of States, Tribes, and local governments in siting, designing, and operating such facilities are critical. Some States, Tribes, and local communities have indicated that, given adequate scientific and technical information, along with appropriate incentives, assurances, and authority, they might be willing to consider hosting facilities for consolidated storage and disposal of spent nuclear fuel. The authors propose a new regional approach to identifying and resolving issues related to the selection of a consolidated storage site. The approach would be characterized by informed discussion and deliberation, bringing together stakeholders from government, the non-governmental (NGO) community, industry, and other sectors. Because site selection would result in regional transportation impacts, the development of the transportation system (e.g., route identification, infrastructure improvements) would be integrated into the issue-resolution process. In addition to laying out the necessary steps and associated timeline, the authors address the challenges of building public trust and confidence in the new waste management program, as well as the difficulty of reaching and sustaining broad-based consensus on a decision to host a consolidated storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nye County Nevada Perspectives on the State of the Yucca Mountain Project - 12388

Responding to the Department of Energy decision to try to withdraw the Yucca Mountain license application and the Administration actions to close down the Yucca Mountain project, Nye County undertook a number of activities to articulate its support for continuing the Yucca Mountain project. The activities included responding to inquiries from federal agencies, including investigations undertaken by the Government Accountability Office addressing other potential uses for the Yucca Mountain site, responding to a Draft Environmental Impact Statement on the possible use of Yucca Mountain for disposal of Greater than Class C wastes, testifying in hearings, and interacting with the President's Blue Ribbon Commission on America's Nuclear Future. The paper summarizes Nye County's position on the Yucca Mountain repository, Nye County's perspectives on the various activities that were developed and considered by the Government Accountability Office, Nye County's concerns with the use of the Nevada National Security Site for Disposal of Greater than Class C Low-Level Radioactive Wastes, testimony of Nye County officials expressing local community support for the Yucca Mountain project, and Nye County's perspectives on recommendations provided by the Blue Ribbon Commission to move the nation's high-level radioactive waste disposal programs forward without consideration of the role Yucca Mountain could have served in those recommendations. Nye County believes that every effort should be made to, at a minimum, fund the Nuclear Regulatory Commission to complete the license application review. Then, if Congress does decide to change the Nuclear Waste Policy Act, there will be valuable information available to support new policy development. This administration contends that Congressional language associated with the FY2010 and FY2011 appropriations and authorization process is sufficient evidence of its intent to terminate the Yucca Mountain repository program. The appropriation process needs to be explicit that, absent explicit language to the contrary, the Nuclear Waste Policy Act stands. It also should include language that requires the Department of Energy to preserve all necessary records until the Nuclear Waste Policy Act is amended or rescinded by specific Congressional action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Revision of the Branch Technical Position on Concentration Averaging and Encapsulation - 12510

The U.S. Nuclear Regulatory Commission (NRC) regulation governing low-level waste (LLW) disposal, 'Licensing Requirements for Land Disposal of Radioactive Waste', 10 CFR Part 61, establishes a waste classification system based on the concentration of specific radionuclides contained in the waste. The regulation also states, at 10 CFR 61.55(a)(8), that, 'the concentration of a radionuclide (in waste) may be averaged over the volume of the waste, or weight of the waste if the units are expressed as nanocuries per gram'. The NRC's Branch Technical Position on Concentration Averaging and Encapsulation provides guidance on averaging radionuclide concentrations in waste under 10 CFR 61.55(a)(8) when classifying waste for disposal. In 2007, the NRC staff proposed to revise the Branch Technical Position on Concentration Averaging and Encapsulation. The Branch Technical Position on Concentration Averaging and Encapsulation is an NRC guidance document for averaging and classifying wastes under 10 CFR 61. The Branch Technical Position on Concentration Averaging and Encapsulation is used by nuclear power plants (NPPs) licensees and sealed source users, among others. In addition, three of the four U.S. LLW disposal facility operators are required to honor the Branch Technical Position on Concentration Averaging and Encapsulation as a licensing condition. In 2010, the Commission directed the staff to develop guidance regarding large scale blending of similar homogenous waste types, as described in SECY-10-0043 as part of its Branch Technical Position on Concentration Averaging and Encapsulation revision. The Commission is improving the regulatory approach used in the Branch Technical Position on Concentration Averaging and Encapsulation by moving towards a making it more risk-informed and performance-based approach, which is more consistent with the agency's regulatory policies. Among the improvements to the Branch Technical Position on Concentration Averaging and Encapsulation are more risk-informed limits for the sizes of sealed sources for safe disposal. Using more realistic intruder exposure scenarios, the suggested limits for Class B and C waste disposal of sealed sources, particularly Cs-137 and Co-60, have been increased. These suggested changes, and others in the Branch Technical Position on Concentration Averaging and Encapsulation, if adopted by Agreement States, have the potential to eliminate numerous orphan sources (i.e., sources that currently have no disposal pathway) that are now being stored. Permanent disposal of these sources, rather than temporary storage, will help reduce safety and security risks. The revised Branch Technical Position on Concentration Averaging and Encapsulation has an alternative approach section which provides flexibility to generators and processors, while also ensuring that intruder protection will be maintained. Alternative approaches provide flexibility by allowing for consideration of likelihood of intrusion, the possibility of averaging over larger volumes and allowing for disposal of large activity sources. The revision has improved the organization of the Branch Technical Position on Concentration Averaging and Encapsulation, improved its clarity, better documented the bases for positions, and made the positions more risk informed while also maintaining protection for intruder as required by 10 CFR Part 61. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing a Low Activity Waste Direct Feed Capability in the Hanford Waste Treatment Plant - 17277

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Using this approach, low-activity waste will be pretreated in a Low-Activity Waste Pretreatment System (LAWPS) for cesium and solids separation to meet LAW Facility safety basis requirements and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed waste burial ground located in the Hanford 200-East Area. The primary driver for the DFLAW approach is to enable commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste (HLW) facilities. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the HLW Facility must be refined and modified to enable DFLAW operations. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. For example, liquid effluents from the LAW Facility, primarily melter offgas condensate, will be processed in a new effluent management facility (EMF) within the WTP footprint rather than sending the effluent back to the PT Facility for processing. During DFLAW operations approximately 3 785 m{sup 3} (1 million gallons) of double-shell tank (DST) waste will be delivered to WTP for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the DSTs will support safe tank farm operation and staging of additional waste for treatment. In December 2016, DOE executed a contract modification and approved an incremental change to the project's performance baseline to complete the WTP facilities needed to allow direct feed of low-activity waste to the LAW Facility. The revised performance baseline supports completion and cold commissioning of the WTP facilities needed for DFLAW operations no later than August 2023. The design of modifications to WTP facilities needed to enable DFLAW operations is more that 60 percent complete. DOE approved the preliminary safety basis for DFLAW modifications to WTP based on the 30 percent design package in early 2016. Early construction work for DFLAW modifications to WTP began in mid-2015. Long-lead procurement actions for some of the more complex equipment needed for LAW Facility effluent treatment were initiated in early 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site selection in Germany - Start of the evaluation of the site selection law - 15561

Since 2011 Germany is pursuing a phase out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high active heat producing waste from scratch. The consequence of this law is a delay of at least two decades to start operation of a final disposal site and additional costs of at least EUR 2.7 billion. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission includes representatives from the parliament, academia, civil society organizations, industry, the environmental organizations and trade unions and should forward its recommendations after a delay in starting the evaluation process now in 2016. The first author of this paper is member of the evaluation commission. The present law has to be reviewed within this time span. The site selection then might start after the next federal election in 2017 probably based on a new site selection law. This new site selection law will take into account or even follow the recommendations of the evaluation group. A new repository site should be according to the present law determined till 2031 and for this site the more detailed site investigation will take place followed by a detailed safety analysis, before the erection of the repository can start. Based on the present procedural steps it seems to be rather unlikely to determine a repository site till 2031. As shown in this publication, there will be a delay of at least 20 years compared to the schedule given in the site selection law until a repository site can be determined. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing a Low-Activity Waste Direct Feed Capability in the Waste Treatment and Immobilization Plant Project - 15594

The current design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility. The U.S. Department of Energy (DOE) has developed a strategic, phased approach to completing the WTP Project, beginning with feeding some liquid waste from the tank farms to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. To accomplish this, the DOE Office of River Protection (ORP) will construct a new capability outside WTP to remove cesium and solids from the liquid portion of the tank waste before transferring that waste to the LAW Facility. This new capability, referred to as the Low-Activity Waste Pretreatment System, is outside WTP and not included in the project's scope. The primary driver for the Direct-Feed LAW (DFLAW) approach is to enable commissioning of the LAW Facility for low-activity waste processing before the PT and High-Level Waste Facilities are complete and operational. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the High-Level Waste Facility must be refined and modified. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. In February 2014, ORP requested the WTP contractor to develop separate contract modification proposals for completing: (1) the LAW Facility, Balance of Facilities, and Analytical Laboratory work scope in the current contract through hot commissioning in a manner to accommodate a phased start of the WTP mission; and (2) initial planning and design for incorporating a permanent capability to accommodate DFLAW in the WTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposal of Greater Than Class C Low-Level Radioactive Waste in Andrews County, Texas - 16408

The U.S. Nuclear Regulatory Commission (NRC) staff has recommended approval of an initiative to permit the Texas Commission on Environmental Quality (TCEQ) to license the disposal of commercial and co-mingled Greater Than Class C Low-Level Radioactive Waste (GTCC LLW) in Andrews County, Texas. Such a framework is clearly articulated in the Section 274 of the Atomic Energy Act of 1954, as amended. The NRC staff also recommended approval to proceed with a rulemaking to align the Waste Classification Tables in Title 10 of the Code of Federal Regulations (CFR), Part 61.55 with the paragraph 61.2 definition of 'waste' to provide a disposal pathway for waste containing certain alpha-emitting transuranic elements with concentrations exceeding 100 nanocuries per gram (nCi/g). A pathway for the disposal of commercial and co-mingled GTCC LLW, including waste with certain alpha emitting transuranic elements exceeding 100 nCi/g (TRU waste), might emerge if the initiative described in the Commissions' July 22, 2015 document, SECY-15-0094, Historical and Current Issues Related to Disposal of GTCC LLW, is approved. The NRC staff recommendations envisioned the NRC and TCEQ working together to review a site-specific performance assessment that would be submitted by Waste Control Specialists LLC (WCS) as part of an amendment to its existing Radioactive Materials License No. R04100. The TCEQ's recommendations were prompted by a petition for rulemaking filed by WCS to allow the disposal of GTCC waste in Texas. On September 10, 2014, the TCEQ Commissioners directed their staff to engage stakeholders and request input from the NRC and the U.S. Department of Energy (DOE) regarding actions needed to proceed with any future rulemaking. On January 30, 2015, the TCEQ requested clarification from the NRC regarding their legal authority and jurisdiction to regulate GTCC, GTCC-like, and TRU waste. The deliberations that have transpired over the past year have raised important legal, policy, and technical matters. This initiative could provide a safe disposal pathway for certain waste streams that have been orphaned over the past 30 years. One important realization that has emerged is the conservative assumptions used to establish the upper limits for Class C LLW when Part 61 was promulgated in 1981 would be much too restrictive when applied to a modern, highly engineered disposal facility located in arid west Texas. Waste that was not suitable for near surface disposal in 1981 could certainly be demonstrated to be safely disposed at the WCS Federal Waste Disposal Facility in Andrews County, Texas. This paper will address the legal, policy, and technical matters supporting this important topic currently under consideration both nationally and within the State of Texas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Perspective of Dry Interim Storage of spent nuclear fuel (SNF) in Germany - 16504

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office of Radiation Protection (BfS). In 1995 a license to store spent nuclear fuel (SNF) and vitrified high level waste (HAW) for the interim storage facility in Gorleben was granted. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since this time each NPP erected its own storage facility and three central storage facilities have been built. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2035. During the last two years in Germany preparatory consultations to restart the process towards finding a repository took place, organised by a commission. This commission consists out of members of the scientific community, religious parties, social communities and environmental organizations as well as members of federal states governments and members of the German parliament (Bundestag). Recently the commission decided to extend its working period until summer 2016. Taking this background into account the BfS plans to intensify its research into extended interim storage with respect to potential material degradation leading to interference with safety functions (e.g. neutron shielding material). This includes topics like ageing of gasket materials which are already studied in ongoing experiments (e.g. at the Federal Institute for Materials Research and Testing) as well as studies of long term relaxation processes. Because of the need for transportation towards a repository another important field is the behaviour of the inventory under mechanical loads. For SNF, first calculations showed that because of the lower decay heat load after 60 years due to hydride reorientation the cladding might become much less ductile. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 19295

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The reprocessing wastes include high-level waste (HLW), so U.S. Department of Energy (DOE) was compelled to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980, including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the contamination at the West Valley Site and its potential implications for human health and the environment. The West Valley PPA Model (the Model), developed using the GoldSim modeling software, is a tool intended to provide support for decision making with uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-organized contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of HLW resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife are exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion in subsurface air and water, and erosion of the Site. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes that contribute most to overall uncertainty. With this information, the Supplemental Environmental Impact Statement (SEIS) can inform defensible decisions regarding remediation of the Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EBIS charge breeder for radioactive ion beams at ATLAS

The construction of the Californium Rare Isotope Breeder Upgrade (CARIBU) for the Argonne National Laboratory ATLAS facility is completed and its commissioning is being performed. In its full capacity, the CARIBU facility will use fission fragments from a 1 Curie (Ci) {sup 252}Cf source. The ions will be thermalized and collected into a low-energy ion beam by a helium gas catcher, mass analyzed by an isobar separator, and charge bred to higher charge states for acceleration in ATLAS. To reach energies E/A 10 MeV/u, one should inject ions with charge-to-mass ratio (q/A) {ge} 1/7 into the ATLAS linac. In the first stage, the existing Electron Cyclotron Resonance (ECR) ion source will be used as a charge breeder. The maximum intensity of radioactive ion beams at the output of the gas catcher will not exceed 10{sup 7} ions per second. A charge breeder based on an Electron Beam Ion Source (EBIS) has significant advantages over the ECR option for ion beam intensities up to about 10{sup 9} ions per second, providing 3-4 times higher efficiency and significantly better purity of highly charged radioactive ion beams for further acceleration. The proposed EBIS project for CARIBU will heavily utilize state-of-the-art EBIS technology recently developed at Brookhaven National Laboratory. This will allow us to reduce both the project cost and timescale, simultaneously insuring reliable technical realization of the cutting-edge technology. Several parameters of the CARIBU EBIS charge breeder (EBIS-CB) will be relaxed with respect to the BNL EBIS in favor of higher reliability and lower cost. Technical performance of the CARIBU charge breeder will not suffer from such a relaxation and will provide high efficiency for a whole range of radioactive ion beams. The goal of this paper is to present the initial design of the EBIS charge breeder for radioactive ion beams at ATLAS.

43 PARTICLE ACCELERATORS↗

Small field in-air output factors: The role of miniphantom design and dosimeter type

Purpose: The commissioning of treatment planning systems and beam modeling requires measured input parameters. The measurement of relative output in-air, S{sub c} is particularly difficult for small fields. The purpose of this study was to investigate the influence of miniphantom design and detector selection on measured S{sub c} values for small fields and to validate the measurements against Monte Carlo simulations. Methods: Measurements were performed using brass caps (with sidewalls) or tops (no sidewalls) of varying heights and widths. The performance of two unshielded diodes (60012 and SFD), EBT2 radiochromic film, and a fiber optic dosimeter (FOD) were compared for fields defined by MLCs (5–100 mm) and SRS cones (4–30 mm) on a Varian Novalis linear accelerator. Monte Carlo simulations were performed to theoretically predict S{sub c} as measured by the FOD. Results: For all detectors, S{sub c} agreed to within 1% for fields larger than 10 mm and to within 2.3% for smaller fields. Monte Carlo simulation matched the FOD measurements for all size of cone defined fields to within 0.5%. Conclusions: Miniphantom design is the most important variable for reproducible and accurate measurements of the in-air output ratio, S{sub c}, in small photon fields (less than 30 mm). Sidewalls are not required for fields ≤ 30 mm and tops are therefore preferred over the larger caps. Unlike output measurements in water, S{sub cp,} the selection of detector type for S{sub c} is not critical, provided the active dosimeter volume is small relative to the field size.

61 RADIATION PROTECTION AND DOSIMETRY↗

BEAM SIMULATIONS USING VIRTUAL DIAGNOSTICS FOR THE DRIVER LINAC

End-to-end beam simulations for the driver linac have shown that the design meets the necessary performance requirements including having adequate transverse and longitudinal acceptances. However, to achieve reliable operational performance, the development of appropriate beam diagnostic systems and control room procedures are crucial. With limited R&D funding, beam simulations provide a cost effective tool to evaluate candidate beam diagnostic systems and to provide a critical basis for developing early commissioning and later operational activities. We propose to perform beam dynamic studies and engineering analyses to define the requisite diagnostic systems of the driver linac and through simulation to develop and test commissioning and operational procedures.