D and D of the Callisto PWR Loop as part of the Refurbishment of the BR2 Research Reactor - 16168
Research reactor BR2 is undergoing a thorough maintenance and modernisation operation until mid-2016. In order to be able to use the reactor safely and efficiently in the coming period of 10 years, a preventive replacement of the beryllium matrix was required as a major step in the refurbishment. At the same time, a number of preventive maintenance and modernisation activities have been defined, including the dismantling of the CALLISTO (Capability for Light Water Irradiation in Steady State and Transient Operation) PWR experimental facility for in-pile studies installed into BR2 for more than 20 years. The CALLISTO end of life decommissioning strategy aims for waste, cost and dose uptake minimisation and includes: - the unloading and removal of the in-pile sections; - a closed-loop full system decontamination for dose reduction; - the complete dismantling of the loop; - the further sorting and segmentation in a dedicated workshop; - a hard chemical batch-wise decontamination for unconditional clearance. The operation is planned in the period of mid-2015 until mid-2016. The paper will describe in detail these subsequent steps, with a focus on decontamination and dismantling. Lessons learned and potential benefits towards the D and D of commercial PWR will be highlighted. (authors)