Overview of environmental test plans for Space Station Freedom work package 4

The generation and distribution of electric power for Space Station Freedom (SSF) is critical to the station's success. Work Package 4 (WP-04) has the responsibility for the design, development, test, and delivery of the Electric Power System (EPS) for the SSF. During launch, assembly, and operation, the EPS will be subjected to various environments. A test and verification approach has been developed to assure that the EPS will function in these environments. An overview of that test program is presented with emphasis on environmental testing of hardware. Two key areas of the test program are highlighted in the overview. One area is the verification of the Solar Power Module (SPM) and associated cargo element hardware. This area includes detailing the plans for development and qualification testing of the SPM hardware. One series of tests, including modal and acoustic, has been completed on a development cargo element. Another area highlighted is the acceptance testing of high-power Orbital Replacement Units (ORU). The environmental test equipment plans are presented and reviewed in light of an aggressive production rate, which delivers ORU's to the WP-04 and other Space Station Work Packages. Through implementing the test program as outlined, the EPS hardware will be certified for flight and operation on the Space Station Freedom.

Peterson, Tom J.↗

Summary of CPAS EDU Testing Analysis Results

The Orion program's Capsule Parachute Assembly System (CPAS) project is currently conducting its third generation of testing, the Engineering Development Unit (EDU) series. This series utilizes two test articles, a dart-shaped Parachute Compartment Drop Test Vehicle (PCDTV) and capsule-shaped Parachute Test Vehicle (PTV), both of which include a full size, flight-like parachute system and require a pallet delivery system for aircraft extraction. To date, 15 tests have been completed, including six with PCDTVs and nine with PTVs. Two of the PTV tests included the Forward Bay Cover (FBC) provided by Lockheed Martin. Advancements in modeling techniques applicable to parachute fly-out, vehicle rate of descent, torque, and load train, also occurred during the EDU testing series. An upgrade from a composite to an independent parachute simulation allowed parachute modeling at a higher level of fidelity than during previous generations. The complexity of separating the test vehicles from their pallet delivery systems necessitated the use the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulator for modeling mated vehicle aircraft extraction and separation. This paper gives an overview of each EDU test and summarizes the development of CPAS analysis tools and techniques during EDU testing.

Romero, Leah M.↗

Liquid Hydrogen Propellant Tank Sub-Surface Pressurization with Gaseous Helium

A series of tests were conducted to evaluate the performance of a propellant tank pressurization system with the pressurant diffuser intentionally submerged beneath the surface of the liquid. Propellant tanks and pressurization systems are typically designed with the diffuser positioned to apply pressurant gas directly into the tank ullage space when the liquid propellant is settled. Space vehicles, and potentially propellant depots, may need to conduct tank pressurization operations in micro‐gravity environments where the exact location of the liquid relative to the diffuser is not well understood. If the diffuser is positioned to supply pressurant gas directly to the tank ullage space when the propellant is settled, then it may become partially or completely submerged when the liquid becomes unsettled in a microgravity environment. In such case, the pressurization system performance will be adversely affected requiring additional pressurant mass and longer pressurization times. This series of tests compares and evaluates pressurization system performance using the conventional method of supplying pressurant gas directly to the propellant tank ullage, and then supplying pressurant gas beneath the liquid surface. The pressurization tests were conducted on the Engineering Development Unit (EDU) located at Test Stand 300 at NASA Marshall Space Flight Center (MSFC). EDU is a ground based Cryogenic Fluid Management (CFM) test article supported by Glenn Research Center (GRC) and MSFC. A 150 ft3 propellant tank was filled with liquid hydrogen (LH2). The pressurization system used regulated ambient helium (GHe) as a pressurant, a variable position valve to maintain flow rate, and two identical independent pressurant diffusers. The ullage diffuser was located in the forward end of the tank and was completely exposed to the tank ullage. The submerged diffuser was located in the aft end of the tank and was completely submerged when the tank liquid level was 10% or greater. The ullage diffuser tests were conducted as a baseline to evaluate the performance of the pressurization system, and the submerged diffuser tests showed how the performance of the pressurization system was compromised when the diffuser was submerged in LH2. The test results are evaluated and compared, and included in this report for various propellant tank fill levels.

Stephens, J. R.↗

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

Thermal↗

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

JWST↗

A Facility Effect Characterization Test of the BHT-6000 Hall Thruster

During the development of the BHT-6000 Hall thruster for flight on NASA’s Power and Propulsion Element, a facility effect test campaign was performed on an engineering unit of the thruster. Testing occurred in Vacuum Facility 5 at NASA Glenn Research Center. The goal of the test campaign was to characterize the behavior of the BHT-6000 Hall thruster as functions of facility effects such that the thruster’s in-flight behavior can be reasonably bounded. In particular, the behavior of the thruster with regard to the background pressure and electrical environment was tested. The background pressure was controlled by injecting supplemental propellant flow into the environment, while the electrical environment was controlled by biasing the facility beam dump. Thrust was found to remain constant over the tested range of pressures while specific impulse was found to increase slightly (1 to 1.5% over a range of up to 20 μTorr, depending on operating point). Plasma plume properties, particularly of ions exiting the side of the thruster, were found to be highly sensitive to pressure and may require pressures of less than a few μTorr for accurate measurements. The thruster was found to operate identically with changing beam dump bias voltage to within measurement uncertainties.

Electric propulsion↗

A Facility Effect Characterization Test of the BHT6000 Hall Thruster

During the development of the BHT-6000 Hall thruster for flight on NASA’s Power and Propulsion Element, a facility effect test campaign was performed on an engineering unit of the thruster. Testing occurred in Vacuum Facility 5 at NASA Glenn Research Center. The goal of the test campaign was to characterize the behavior of the BHT-6000 Hall thruster as functions of facility effects such that the thruster’s in-flight behavior can be reasonably bounded. In particular, the behavior of the thruster with regard to the background pressure and electrical environment was tested. The background pressure was controlled by injecting supplemental propellant flow into the environment, while the electrical environment was controlled by biasing the facility beam dump. Thrust was found to remain constant over the tested range of pressures while specific impulse was found to increase slightly (1 to 1.5% over a range of up to 20 μTorr, depending on operating point). Plasma plume properties, particularly of ions exiting the side of the thruster, were found to be highly sensitive to pressure and may require pressures of less than a few μTorr for accurate measurements. The thruster was found to operate identically with changing beam dump bias voltage to within measurement uncertainties.

Electric propulsion↗

Advanced, Energy-Efficient Hybrid Membrane System for Industrial Water Reuse

In the U.S. manufacturing sector, current industrial water use practices are energy-intensive and utilize and discharge high volumes of waters, rendering them not sustainable especially in light of the growing scarcity of suitable water supplies. To help address this problem, the goal of this project was to develop an advanced, cost-effective, hybrid membrane-based water treatment system that can improve the energy efficiency of industrial wastewater treatment while allowing at least 50% water reuse efficiency. This hybrid process would combine emerging Forward Osmosis (FO) and Membrane Distillation (MD) technology components into an integrated FO-MD system that can beneficially utilize low-grade waste heat (i.e., T < 450 °F) in industrial facilities to produce distilled-quality product water for reuse. In this project, laboratory-, bench-, and pilot-scale experiments on the hybrid FO-MD system were conducted for industrial wastewater treatment. It was demonstrated at laboratory, bench, and pilot scales that FO-MD membrane technology can concentrate brine to very high total dissolved solids (TDS) levels (>200,000 ppm) that are at least 2.5 times higher than the TDS level to which RO can achieve. In laboratory testing, currently available FO and MD membranes were tested to select for high-performing membranes with high salt rejection and high water flux. Multiple FO membrane/draw-salt solution combinations that gave high water flux with higher than 98% salt rejection were also identified. Reverse draw-salt fluxes were observed to be much lower for divalent salts than for monovalent salts. MD membranes were identified that had 99.9+% salt rejection and water flux as high as 50-90 L/(m 2 ·h) for flat-sheet membranes and >20 L/(m 2 ·h) for hollow fibers. In bench-scale testing, a single unit of commercially available FO and MD membrane modules were evaluated for continuous, integrated operation. Using the laboratory- and bench-scale test data, numerical modeling was performed on the FO and MD processes to estimate engineering parameters for a larger-scale pilot unit. Based on the experimental studies and modeling results, a pilot-scale, integrated FO-MD prototype unit was designed and built for trailer-mounted operation. This prototype system was fed real industrial wastewater, which could not be further treated by conventional technologies, from an oil production facility and was successfully operated for over 15 weeks without major stoppage. About 90% water recovery was possible, while concentrating the TDS from 12,000 ppm up to 190,500 ppm. The FO-MD prototype rejected most wastewater contaminants while producing water with <300 ppm TDS, even when the feed TDS was higher than 150,000 ppm. No chemical cleaning was necessary during the pilot testing period. Flushing the system with dechlorinated tap water was sufficient to reset the membranes for the next set of test conditions. Pilot performance and membrane autopsy showed that, even though the feed was concentrated more than 10 times, membrane fouling was unnoticeable and no defects were detected on the FO and MD membrane surfaces. This project demonstrated the technical feasibility of the hybrid FO-MD process by taking water already treated to the limit with the highest level of current technologies and further concentrating it 10-fold by using mostly low-cost materials. Because no membranes suitable for full-scale plant applications are available at present, economical feasibility of the hybrid technology is still uncertain, but it is expected that broader industry participation can further reduce FO-MD process costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Biomass Energy Generation Project

The Municipal Electric Utility of the City of Cedar Falls (dba Cedar Fals Utilities or CFU) received a congressionally directed grant funded through DOE-EERE to run three short (4 hour) duration test burns and one long (10 days) duration test burn to test the viability of renewable fuels in Streeter Station Boiler #6, a stoker coal fired electric generation unit. The long test burn was intended to test supply chain assumptions, optimize boiler combustion and assess the effects of a longer duration burn of biomass on the boiler.

09 BIOMASS FUELS↗

Organic Rankine power conversion subsystem development for the small community solar thermal power system

The development and preliminary test results for an air-cooled, hermetically sealed 20 kW sub E organic Rankine cycle engine/alternator unit for use with point focussing distributed receiver solar thermal power system. A 750 F toluene is the working fluid and the system features a high speed, single-stage axial flow turbine direct-coupled to a permanent magnet alternator. Good performance was achieved with the unit in preliminary tests.

Barber, R. E.↗

Managing Risks via Small/Pilot Scale Testing for INL's Integrated Waste Treatment Unit (IWTU) - 19268

In 2005, the THOR steam reforming fluidized-bed reactor (FBR) technology was selected by the U.S. Department of Energy (DOE) as the technology of choice for treatment of sodium- bearing waste (SBW) at the INL. The basis of the process was to use fluidized bed technology to convert an acidic radioactive nitrate-rich liquid waste into a solid carbonate product suitable for long-term disposal and storage. During initial commissioning, as well as subsequent start-ups, the plant faced many operational challenges, such as stagnant/de-fluidized bed, and wall-scale formation. Such operational issues prompted the original contractor to seek expertise in pilot-scale testing, thereby reaching out to Hazen Research Inc. (HRI, Golden, Co). Several tests were conducted, but the results did not seem to address the underlying issues observed in the full-scale plant, as evidenced by continued operational issues. A systematic approach was then taken by the Fluor-Idaho team (new contractor as of June 2016) with respect to solving these technical issues. First, two different bench-scale, 2-inch fluidized bed reactors (stainless-steal and quartz), were utilized to test several theories to better understand the underlying chemical reactions that may be taking place under expected normal operating conditions. Then, the team designed and built an 18-inch FBR unit, mimicking the full-scale main vessel at IWTU - Denitration Mineralization Reformer (DMR). This was used to test various aspects of operational challenges observed at IWTU, namely particle size control, wall-scale growth-rate control, long-term operational stability, process optimization, and process off- gas filtration challenges. An example of information obtained from bench-scale testing, which was then tested during pilot-scale testing, was the phenomena that an addition of 5 vol % of CO{sub 2} gas into the fluidizing gas system nearly eliminated the formation of agglomerates that had typically led to bed de-fluidization. This change proved to be correct in both the pilot and full-scale testing and will be implemented as part of a long-term operational strategy of IWTU. Several other findings that have provided answers with respect to IWTU operational issues will be discussed in this report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ROSE MIU Testing

Overview of work done by Rebekah Austin during Pathways Internship work tour. Describes ROSE MIU (Reconfigurable Operational Spacecraft for Science and Exploration Module Interface Unit) features and test plan.

hot-swap↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

I. Motivation and Background Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall Current Thruster in support of the NASA mission to establish a permanent human presence in lunar orbit and to land the next American astronauts on the South Pole of the Moon. The project is led by the NASA Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by L3 Harris Aerojet Rocketdyne (AR).The AEPS project has completed the development testing of a high power, solar electric propulsion Hall Current thruster that will be used on the NASA Power & Propulsion Element (PPE) of the Gateway space station. NASA initially built three Technology Development Units to understand key characteristics of the hall-effect rocket with magnetic shielding. The design led to development testing on two Engineering Test Unit Thrusters and multiple critical components. The project has begun production of the three flight thrusters and entered qualification testing at the component and thruster levels. II. Approach NASA and AR teams completed all development phases of the project, including full development and integration testing of the Engineering Model hardware, Critical Design Review, and ground test equipment validation, as well as fabrication and acceptance testing of the initial qualification thruster. Qualification and verification of the environmental and life requirements of the AEPS design was initiated in the Fall of 2023 and will be accomplished on two thruster units and using a series of component-level tests during 2024 and 2025. Environmental testing will incorporate functional reference firings, shock, vibration, and Thermal Vacuum (TVAC) testing. Life verification will assess the thruster wear and performance over the lifetime of the Gateway spacecraft. Critical component qualification tests include cathode heater, magnet coils, magnet heaters, temperature sensors, and a cathode assembly that will undergo life cycle testing on multiple units. Flight thrusters will complete assembly and acceptance testing and be delivered to the PPE program in early 2025. III. Preliminary and Anticipated Results The program has completed the acceptance testing, including dynamic testing and hot fire characterization, of the first qualification thruster. In the Fall of 2023, the program entered the environmental qualification phase for thruster testing. This paper will present an overview of the AEPS thruster project, thruster capabilities and flight design, preliminary results from the thruster acceptance and qualification testing, component life cycle testing and flight hardware status.

Clayton Kachele↗

The modern rotor aerodynamic limits survey: A report and data survey

The first phase of the Modern Technology Rotor Program, the Modern Rotor Aerodynamic Limits Survey, was a flight test conducted by the United States Army Aviation Engineering Flight Activity for NASA Ames Research Center. The test was performed using a United States Army UH-60A Black Hawk aircraft and the United States Air Force HH-60A Night Hawk instrumented main-rotor blade. The primary purpose of this test was to gather high-speed, steady-state, and maneuvering data suitable for correlation purposes with analytical prediction tools. All aspects of the data base, flight-test instrumentation, and test procedures are presented and analyzed. Because of the high volume of data, only select data points are presented. However, access to the entire data set is available upon request.

Cross, J.↗

Imaging Electron Spectrometer (IES) Electron Preprocessor (EPP) Design

The Aerospace Corporation developed the Electron PreProcessor (EPP) to support the Imaging Electron Spectrometer (IES) that is part of the RAPID experiment on the ESA/NASA CLUSTER mission. The purpose of the EPP is to collect raw data from the IES and perform processing and data compression on it before transferring it to the RAPID microprocessor system for formatting and transmission to the CLUSTER satellite data system. The report provides a short history of the RAPID and CLUSTER programs and describes the EPP design. Four EPP units were fabricated, tested, and delivered for the original CLUSTER program. These were destroyed during a launch failure. Four more EPP units were delivered for the CLUSTER II program. These were successfully launched and are operating nominally on orbit.

Fennell, J. F.↗

Development of a Wide Range Segmented Gamma Scanner for Measuring Radioactive Wastes Arising in the Chinese Nuclear Industry - 16261

There is a requirement to measure a variety of challenging radioactive waste forms generated by the Chinese nuclear industry. These range from low activity waste to high activity waste with a high content of Cs-137 and waste in high density 200 litre drums. This paper describes the design, development and testing of an updated and automated Wide Range Segmented Gamma Scanner (WR-SGS) specifically configured for Chinese nuclear industry radioactive waste measuring requirements. The instrument retains the capabilities of the original SGS developed by Parker and Martin at the Los Alamos National Laboratory and now widely used for radioactive waste assay. It also incorporates additional features to improve measurement efficiency and reduce cost. These features include continuous helical scanning of the waste drum, and separate lifting pillars to lift the detector and the transmission source. In place of a transmission source shutter mechanism, the source is placed in a shielded safe when not in use. The design also incorporates a variable aperture collimator, and tungsten filters that can be deployed for the measurement of high activity, high dose-rate drums. Updated motion control electronics, based on the use of a programed logic controller have been incorporated to address potential future obsolescence. The WR-SGS employs a 40% high purity Germanium detector with electro-mechanical cooling and state of the art digital spectroscopy counting electronics for gamma ray spectrum data acquisition. Testing of the unit has been performed with both point sources and rod sources, which are traceable to international standards. Typical test drums, each with six distributed re-entrant tubes and with different density matrices, have been employed with the rod sources to validate both the calibration and the measurement performance of the WR-SGS for drums of different density. The measurement results have been compared with the reference decay corrected activity values and very good agreement is achieved, confirming the measurement performance of the instrument. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrate Power Conversion Unit with MAGNET to Enable Integrated Microreactor Heat Transfer System Testing

Idaho National Laboratory obtained a closed, Brayton-cycle, power conversion unit (PCU) from Sandia National Laboratories. This PCU began as a commercially available, 30 kWe, C30, gas turbine from Capstone. The C30 was modified to use heat from an electric heater in a closed-loop system pressurized with nitrogen or dry air. INL has modified the unit further to integrate it with MAGNET and use heat from a microreactor test article.

42 - ENGINEERING↗

Comparing soil boundaries delineated by digital analysis of multispectral scanner data from high and low spatial resolution systems

The author has identified the following significant results. Computer-aided analysis techniques used with aircraft MSS data showed that the spatial resolution was sufficient to recognize each soil mapping unit of the test site. Some difficulties occurred where different soil series were intricately mixed, and this mixture showed as a separate spectral mapping unit, or where the difference between two soils depended on the depth of silty surface material. Analysis of LANDSAT data with computer-aided techniques showed that it was not possible to find spectrally homogeneous soil features of the seven soil series on the 40 ha test site on the digital display or on a picture print map. Cluster techniques could be used on an extended test area to group spectrally similar data points into cluster classes.

Kristof, S. J.↗